S T UDI O PERANCANGANARS I T EKT UR6
DPRDKABUPAT ENPEMAL ANG EKO F ERI RUDI N 5112417026
T EGUHPRI HANT O,S .T . ,M.T . Di har t o,S .T . ,M.S i . DI MASWI CAKS ONO,S .T . ,M.Eng. T EKNI KARS I T EKT UR
Description
Date
ARSITEKTUR UNNES
KONSEP INVETORY Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
K301
22 Mei 2020 EKO FERIRUDIN Checker
Scale
23/06/2020 17:38:58
No.
Description
Date
ARSITEKTUR UNNES
KONSEP BENTUK Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
K302
22 Mei 2020 EKO FERIRUDIN Checker
Scale
23/06/2020 17:38:59
No.
Description
Date
ARSITEKTUR UNNES
KONSEP SIRKULASI Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
K303
22 Mei 2020 EKO FERIRUDIN Checker
Scale
23/06/2020 17:38:59
No.
Description
Date
ARSITEKTUR UNNES
KONSEP Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
K304
22 Mei 2020 Author Checker
Scale
23/06/2020 17:39:00
No.
Description
Date
ARSITEKTUR UNNES
KONSEP STRUKTUR Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
K305
22 Mei 2020 Author Checker
Scale
23/06/2020 17:39:00
No.
NO 1 5 6 7 8 9
10 11
12 18 19 23 28 31 32 36 37 47 50 51 52 53 57 58 63 65 66
Name BUILDING MAINENANCE UTILITY ROOM RUANG STAF BAG KEUANGAN KABAG KEUANGAN KABAG RISALAH PERSIDANGAN STAFF BAG RISALAH PERSIDANGAN R TUNGGU SEKRETARIS SEKRETARIS R RAPAT SEKRETARIS PHOTOCOPY DIFABLE WC WC WC SELASAR R TUNGGU SUPIR WC WC wc R FRAKSI R FRAKSI R FRAKSI R PERS R FRAKSI R FRAKSI R FRAKSI GENSET WATER SUPLAY
Room Schedule
Area
Level
33.17 m²
Level 1
12.72 m² 140.53 m²
Level 1 Level 1
19.86 m²
Level 1
20.04 m²
Level 1
101.88 m²
Level 1
27.32 m²
Level 1
52.87 m²
Level 1
62.50 m² 7.06 m² 11.74 m² 15.80 m² 8.91 m² 93.58 m² 50.47 m²
Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 1
18.15 m² 11.88 m² 9.36 m² 26.52 m² 25.46 m² 31.04 m² 196.59 m² 24.90 m² 24.90 m² 25.47 m² 98.70 m² 58.42 m²
Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 1 Level 1
NO 67 68 69 70 71 72 73 75 13 14 15 35 46 76 77 78
79
80 81 82 83 84 85 86 87
Name
Area
STP PANTRY R PENERIMA LOBBY R TRANSISI SAMPING LOBBY LIFT RUANG TRANSISI TOILET INNER COURT R WAKIL KETUA TATA USAHA KETUA R PANEL R AC R ARSIP TAHAN API R STAFF BAG UMUM KABAG UMUM KABAG PERUNDANG UNDANGAN R STAFF PERUNDANG UNDANGAN R RAPAT SEKRETARIAT WC WC WC PANTRY R ISTIRAHAT KARYAWAN R SHOLAT UTAMA WUDHU WANITA No.
Room Schedule Level
58.42 m² 15.34 m² 129.00 m² 118.24 m² 11.30 m²
Level 1 Level 1 Level 1 Level 1 Level 1
59.22 m² 28.00 m²
Level 1 Level 1
130.28 m² 60.71 m² 36.67 m²
Level 1 Level 2 Level 2
NO 88 89 90 91 92 93 95 96 97
33.73 m² 33.12 m² 43.44 m²
Level 2 Level 2 Level 2
108.93 m²
Level 2
23.10 m² 24.03 m²
Level 2 Level 2
110.84 m²
Level 2
179.26 m²
Level 2
11.87 m² 18.75 m² 9.66 m² 15.27 m² 51.12 m²
Level 2 Level 2 Level 2 Level 2 Level 2
255.29 m²
Level 1
32.08 m²
Level 1
Description
Date
98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116
Name WUDHU PRIA TAMAN SERAMBI SELASAR R KETUA R TATA USAHA KETUA GUDANG COMERCIAL SPACE COMERCIAL SPACE BALKON RUANG SIDANG PERIPURNA KOMISI 1 KOMISI 2 KOMISI 3 TATA USAHA RUANG RAPAT ANGGOTA R RAPAT KOMISI R SOUND RUANG REHAT RUANG ANGGOTA RUANG REHAT LOBBY WC WC WC R ISTIRAHAT KARYAWAN LOBBY LIFT SELASAR DAN R TRANSISI Room Room
Room Schedule
Area
Level
17.97 m² 71.33 m² 76.65 m²
Level 1 Level 1 Level 1
51.95 m² 29.85 m²
Level 2 Level 2
16.13 m² 68.53 m²
Level 1 Level 2
88.75 m²
Level 2
735.83 m²
Level 3
40.08 m² 41.08 m² 44.70 m² 52.64 m² 136.93 m²
Level 3 Level 3 Level 3 Level 3 Level 3
320.42 m² 33.85 m² 57.27 m² 171.09 m²
Level 3 Level 3 Level 3 Level 3
120.59 m² 52.04 m² 18.75 m² 11.88 m² 9.66 m² 66.32 m²
Level 3 Level 3 Level 3 Level 3 Level 3 Level 3
79.56 m² 446.87 m²
Level 3 Level 3
15.92 m² 11.99 m²
Level 2 Level 2
ARSITEKTUR UNNES
NO 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134
135
Date
PERENCANAAN DPRD PEMALANG
Area
GALERI KEBANGSAAN LOBBY MULTI FUNCTION ROOM RUANG SELASAR DARURAT TERAS EXIT LOBBY SELASAR WC WC JANITOR RUANG UKM TERBUKA DHARMA WANITA KOPERASI KLINIK RUANG LAKTASI RUANG RELAKSASI DAN SANTAI SELASAR
Level 2
39.14 m² 134.74 m²
Level 2 Level 2
60.41 m² 60.89 m²
Level 2 Level 2
51.60 m² 19.43 m² 50.47 m² 468.77 m² 23.58 m² 33.22 m² 7.16 m² 471.02 m²
Level 2 Level 2 Level 2 Level 2 Level 3 Level 3 Level 3 Level 1
58.33 m²
Level 2
28.23 m² 34.96 m² 25.76 m² 271.82 m²
Level 2 Level 2 Level 2 Level 2
447.30 m²
Level 1
Drawn by Checked by
06
A325
22 Mei 2020 Author Checker
Scale
Level
182.38 m²
ROOM SCHEDULE Project number
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
Name
23/06/2020 17:57:56
Room Schedule
103.71
5.07 5.01
5.00 5.00 5.00 5.00 5.00 5.00
masjid
UNIVERSITAS NEGERI SEMARANG 0.35
0.00
FIRMITAS Eko F SEMARANG 081574252133
DN
ekoferirudin1202 @gmail.com
parkir mobil jajaran 0.46
LAPAGAN UPACARA
58.67
0.25
0.45 UP DN 0.51
DN2
0.50
DET03 0.03
0.51 UP
DN
DN
6.00
8.34 DROP OFF
9.99
36.89
No.
Description
Date
0.50
UP
0.00
DN
ARSITEKTUR UNNES 0.05
joglo literasi
PERENCANAAN DPRD PEMALANG
K a rp u s
0.03 0.05
RARKIR TAMU BISA 0.00
0.00
0.03
1
SITEPLAN 1 : 400
SITEPLAN
0.03 0.00
PARKIR TAMU
06
Project number
0.03
EXIT
ENTRANCE KENDARAAN
0.00
ENTRANCE PEJALAN KAKI
0.00
5.00
Date Drawn by
16.13
22 Mei 2020 EKO FERIRUDIN --
Checked by
106.20
AR101 Scale
1 : 400
23/06/2020 17:32:17
188.54
0.03
162.21
0.46
12.77 5.00 3.80 3.98 6.10 5.00 5.00 7.00
5.00 5.00 3.50 5.00
0.00
Room Legend
0.00
A
B
C
D
5.00 5.00 6.00 DN
BUILDING MAINENANCE
DN
R FRAKSI
RUANG TRANSISI TOILET
R PENERIMA
DIFABLE R PERS
22
7.01
WATER SUPLAY
GUDANG INNER COURT
21 KABAG KEUANGAN
6.98
0.45 0.45
KABAG RISALAH PERSIDANGAN
0.46
20
7.01
BUILDING MAINENANCE
R TRANSISI SAMPING
SEKRETARIS R RAPAT SEKRETARIS
R TUNGGU SEKRETARIS
LOBBY LIFT
0.50
1 PANTRY AR106
1
0.50
AR106
19
R TUNGGU SUPIR
STAFF BAG RISALAH PERSIDANGAN
Room
STP
RUANG STAF BAG KEUANGAN
UTILITY ROOM
WC
7.00
0.00
RUANG STAF BAG KEUANGAN
AA
0.15
BB 0.00
0.30 0.50
7.00
KABAG KEUANGAN
0.46
12
0.46
SELASAR
KABAG RISALAH PERSIDANGAN
WC
WC
R FRAKSI
0.50
11
17
No.
0.50
wc
6.99
STAFF BAG RISALAH PERSIDANGAN
16
R FRAKSI
SEKRETARIS R RAPAT SEKRETARIS
Description
Date
PANTRY
10
R FRAKSI
7.00
ekoferirudin1202 @gmail.com
WATER SUPLAY
PHOTOCOPY
18
FIRMITAS Eko F SEMARANG 081574252133
LOBBY LOBBY LIFT
UNIVERSITAS NEGERI SEMARANG
RUANG UKM TERBUKA
GENSET GENSET
wc
R TUNGGU SUPIR
9
0.50 0.46 0.50
AR114
0.50
15
7.00
INNER COURT R FRAKSI
PHOTOCOPY GUDANG
2
8 1
1
AR105
AR105
7
0.50
R FRAKSI
7.00
14
6 UP
0.45
LOBBY LIFT
UP
R FRAKSI
0.50
ARSITEKTUR UNNES
13
0.46
5
DN
RUANG TRANSISI TOILET
DN
PERENCANAAN DPRD PEMALANG
R PENERIMA
4
0.45
MM
AR114 4
R PERS
DENAH LT 1
0.45
0.25
3
0.51
UP
0.50
UP DN
0.40
DN
2
DN
Date
DN
0.00
LL
1
DD
II
JJ
22 Mei 2020 Author
Drawn by
KK
0.00
06
Project number
UP
EE
FF
GG
Checker
Checked by
AR102
SS
1
Level 1 1 : 200
2
SKEMA RUANG lv 1 1 : 200
Scale
1 : 200
23/06/2020 17:32:21
NN
LOBBY
A
B
C
Room Legend
D
5.00 5.00 6.00 22
7.01
R PANEL
R AC
MULTI FUNCTION ROOM SELASAR DARURAT
21
6.98
RUANG
7.01
20 R ARSIP TAHAN API
LOBBY
7.00
19 R STAFF BAG UMUM
COMERCIAL SPACE
R ISTIRAHAT KARYAWAN
TATA USAHA KETUA
COMERCIAL SPACE BALKON
R KETUA
TERAS
DHARMA WANITA
R PANEL
WC
EXIT
R RAPAT SEKRETARIAT
GALERI KEBANGSAAN
R STAFF BAG UMUM
KABAG PERUNDANG UNDANGAN
R STAFF PERUNDANG UNDANGAN
KABAG UMUM
R TATA USAHA KETUA
LOBBY
R WAKIL KETUA
MULTI FUNCTION ROOM
Room
R AC UNIVERSITAS NEGERI SEMARANG
MULTI FUNCTION ROOM
SELASAR DARURAT
RUANG
FIRMITAS Eko F SEMARANG 081574252133 ekoferirudin1202 @gmail.com
R ARSIP TAHAN API LOBBY
PANTRY
RUANG
R AC
RUANG RELAKSASI DAN SANTAI
R ARSIP TAHAN API 1 AA BB
R PANEL
R STAFF BAG UMUM 1
SELASAR DARURAT
AR106
AR106
5.00
18
KABAG UMUM
KABAG UMUM
5.00
SELASAR
KABAG PERUNDANG UNDANGAN
WC
WC
5.00
5.00
17
R KETUA
6.99
PANTRY
R STAFF PERUNDANG UNDANGAN
WC
R TATA USAHA KETUA
5.00
16
R ISTIRAHAT KARYAWAN
5.00
7.00
5.00
R RAPAT SEKRETARIAT
UP
5.00
5.00
12
5.00 5.00 5.00 3.50
7.00
5.00
SELASAR
KABAG PERUNDANG UNDANGAN
11
R STAFF PERUNDANG UNDANGAN
WC
WC
R KETUA PANTRY WC
10
R TATA USAHA KETUA
R ISTIRAHAT KARYAWAN
No.
Description
Date
9 R RAPAT SEKRETARIAT
AR114 2
15
UP
AR114 2
8
1
R WAKIL KETUA
AR105
3.80 7.00 3.98 6.10 5.00
14
7.00
5.00
DN
EXIT
LOBBY
TATA USAHA KETUA
5.00
13
5.00
5.00 5.00
5.00
GALERI KEBANGSAAN
5.00
5.00 5.00
5.00
MM
AR114 4
COMERCIAL SPACE
TERAS
NN DN UP
5.00
COMERCIAL SPACE BALKON
5.00
LL
1
R WAKIL KETUA
AR105
7
6
DN
EXIT
5
LOBBY
TATA USAHA KETUA
GALERI KEBANGSAAN
ARSITEKTUR UNNES
4 TERAS
COMERCIAL SPACE
AR114 4
PERENCANAAN DPRD PEMALANG
DN
3
UP
COMERCIAL SPACE BALKON
DENAH LT 2
2
06
Project number
KK
1
1
Date AR114
22 Mei 2020 Author
Drawn by
DD
1
II
JJ
EE
FF
GG
SS
Checker
Checked by
Level 2 1 : 200
2
AR103
SKEMA RUANG LV 2 1 : 200
Scale
1 : 200
23/06/2020 17:32:24
7.00
5.00
A
B
C
D
5.00 5.00 6.00 Room Legend
7.01
22 R RAPAT KOMISI
21
R RAPAT KOMISI
RUANG ANGGOTA
KOMISI 1
RUANG RAPAT ANGGOTA
KOMISI 2
6.98
KOMISI 3 RUANG SIDANG PERIPURNA
LOBBY 8.70
R SOUND
8.70
LOBBY LIFT
R SOUND
8.70
LOBBY LIFT
UNIVERSITAS NEGERI SEMARANG
RUANG REHAT
8.70
20
7.01
JANITOR
SELASAR DAN R TRANSISI
LOBBY LIFT R ISTIRAHAT KARYAWAN
FIRMITAS Eko F SEMARANG 081574252133 ekoferirudin1202 @gmail.com
TATA USAHA R RAPAT KOMISI
19
WC
7.00
8.70
R SOUND
RUANG REHAT
RUANG REHAT
SELASAR DAN R TRANSISI
1
AA
BB
SELASAR DAN R TRANSISI
AR106
1 AR106
18
8.70
KOMISI 1
17
WC
6.99
8.70
WC
8.70
8.70
KOMISI 2
16
7.00
RUANG SIDANG PERIPURNA
WC
R ISTIRAHAT KARYAWAN
8.70 8.70
DN
5.00 5.00 5.00 3.50
7.00
8.70
12 WC
11
KOMISI 1 WC
10 KOMISI 2
R ISTIRAHAT KARYAWAN
No.
Description
Date
RUANG SIDANG PERIPURNA
9
DN
8
15
WC
1
1
AR105
AR105
7.00
14 8.70 8.70
8.70
LOBBY
TATA USAHA
8.70
13 8.70
RUANG REHAT
8.70
8.70
RUANG RAPAT ANGGOTA
8.70
MM
8.70
NN RUANG ANGGOTA 8.70
LL
KK
7.29 DD
6 LOBBY
TATA USAHA
5 WC RUANG REHAT
4
ARSITEKTUR UNNES RUANG RAPAT ANGGOTA
WC JANITOR
3
RUANG ANGGOTA
AR114 4
PERENCANAAN DPRD PEMALANG
DENAH LT 3
2
Date
JJ
EE
FF
GG
06
Project number
1
5.25 II
KOMISI 3
7
SS
22 Mei 2020 Author
Drawn by
Checker
Checked by
2
Level 3 1 : 200
1
SKEMA RUANG LV 3
AR104
1 : 200 Scale
1 : 200
23/06/2020 17:32:30
KOMISI 3
5.00 3.80 7.00 3.98 6.10 5.00
7.00
8.70
GG BB
FF
AA
EE
KK
JJ
D
II
CLL
DD
B
A
36.76 8.00
1.87
10.88
6.00
5.00
UNIVERSITAS NEGERI SEMARANG
5.00 TOP OF BUILDING 32.00
FIRMITAS Eko F SEMARANG 081574252133 ekoferirudin1202 @gmail.com
1 AR107 1 AR106
LIFT 18.00
ROOFTOP
ROOFTOP
15.00
No.
Description
Date
15.00
RUANG SIDANG PERIPURNA
KOMISI 3
SELASAR DAN R TRANSISI
Level 3
Level 3
8.70
8.70
R WAKIL KETUA
R RAPAT SEKRETARIAT
SELASAR
Level 2
Level 2
5.00
5.00
R FRAKSI
INNER COURT
PHOTOCOPY
ARSITEKTUR UNNES Level 1 0.50
Level 1 0.50 SITEPLAN 0.00
PERENCANAAN DPRD PEMALANG
TOP OF PILE CAP -2.00
POTONGAN 1 06
Project number
22 Mei 2020 Author
Drawn by
1
BANGUNAN UTAMA 1
Checker
Checked by
AR105
1 : 100
Scale
1 : 100
23/06/2020 17:32:36
Date
UNIVERSITAS NEGERI SEMARANG
12
11
10
9
8
1 AR105
7
6
5
4
NN
3
2
1 FIRMITAS Eko F SEMARANG 081574252133 ekoferirudin1202 @gmail.com
ROOFTOP
ROOFTOP
15.00
15.00
1
SELASAR DAN R TRANSISI
RUANG SIDANG PERIPURNA
SELASAR AR113DAN R TRANSISI
RUANG RAPAT ANGGOTA
Level 3
Level 3
8.70
8.70 SELASAR
SELASAR
No.
COMERCIAL SPACE BALKON
COMERCIAL SPACE
Level 2
Description
Date
Level 2
5.00
2
5.00
DET01
R PERS
Level 1 SITEPLAN 0.50 0.00 TOP OF PILE CAP -2.00
Level 1 SITEPLAN 0.50 0.00 TOP OF PILE CAP -2.00
ARSITEKTUR UNNES PERENCANAAN DPRD PEMALANG
POTONGAN 2 1 : 100
06
Project number Date
22 Mei 2020 Author
Drawn by
Checker
Checked by
AR106 Scale
1 : 100
23/06/2020 17:32:38
1
BANGUNAN UTAMA 2
UNIVERSITAS NEGERI SEMARANG
22
21
20
19
18
12
11 17
10
16
9
15 8
1 AR105
7
14
6
13
5
4
MM
NN
3
2
1 FIRMITAS Eko F SEMARANG
7.01
6.98
7.01
7.00
7.00
6.99
6.84
7.16
7.00
16.73
081574252133 ekoferirudin1202 @gmail.com
TOP OF BUILDING 32.00
LIFT
LIFT
18.00
18.00
ROOFTOP
ROOFTOP
15.00
15.00
Level 3
No.
Description
Date
Level 3
8.70
8.70
Level 2
Level 2
5.00
1
5.00
DET01
Level 1 SITEPLAN 0.50 0.00
Level 1 SITEPLAN 0.50 0.00
TOP OF PILE CAP
TOP OF PILE CAP
-2.00
-2.00
ARSITEKTUR UNNES
79.73
1
PERENCANAAN DPRD PEMALANG
DET02
POTONGAN 3 06
Project number Date
22 Mei 2020 Author
Drawn by
Checker
Checked by
AR107 Scale
1 : 150
23/06/2020 17:32:47
BANGUNAN UTAMA 3 1 POTONAGN 1 : 150
UNIVERSITAS NEGERI SEMARANG
TOP OF BUILDING FIRMITAS Eko F SEMARANG
32.00
081574252133 ekoferirudin1202 @gmail.com
LIFT 18.00 ROOFTOP ROOFTOP
15.00
15.00
Level 3
Level 3
8.70
8.70
Level 2
Level 2
5.00
5.00
Level 1
Level 1 SITEPLAN 0.50 0.00
0.50 SITEPLAN
No.
Description
Date
0.00
1
TAMPAK DEPAN 1 : 200
TOP OF BUILDING 32.00
ARSITEKTUR UNNES LIFT
18.00
18.00
ROOFTOP
ROOFTOP
15.00
15.00
Level 3
PERENCANAAN DPRD PEMALANG
TAMPAK
Level 3
8.70
8.70
Level 2
Level 2
5.00
5.00
Date Level 1 SITEPLAN 0.50 0.00
Level 1 SITEPLAN 0.50 0.00
06
Project number
22 Mei 2020 Author
Drawn by
Checker
Checked by
2
TAMPAK KANAN
AR108
1 : 200 Scale
1 : 200
23/06/2020 17:33:03
LIFT
TOP OF BUILDING 32.00
UNIVERSITAS NEGERI SEMARANG
FIRMITAS Eko F SEMARANG 081574252133
LIFT
ekoferirudin1202 @gmail.com
18.00 ROOFTOP
ROOFTOP
15.00
15.00
Level 3
Level 3
8.70
8.70
Level 2
Level 2
5.00
5.00
Level 1 SITEPLAN 0.50 0.00
TAMPAK BELAKANG No.
1 : 200
Description
Date
TOP OF BUILDING 32.00
LIFT
LIFT
18.00
18.00
ROOFTOP 15.00
Level 3 8.70 Level 2 5.00
Level 1 SITEPLAN 0.50 0.00
ROOFTOP 15.00
Level 3
ARSITEKTUR UNNES PERENCANAAN DPRD PEMALANG
8.70 Level 2
TAMPAK
5.00
Level 1 SITEPLAN 0.50 0.00
06
Project number Date
22 Mei 2020 Author
Drawn by
Checker
Checked by
2
TAMPAK KIRI
AR109
1 : 200 Scale
1 : 200
23/06/2020 17:33:22
1
Level 1 SITEPLAN 0.50 0.00
UNIVERSITAS NEGERI SEMARANG
2 AR113
BB 2 1
FIRMITAS Eko F SEMARANG
AR113
AR105
7
081574252133
1 AR105
5.00
ekoferirudin1202 @gmail.com
7 DHARMA WANITA
0.03
KOPERASI
KLINIK
6 5.00
5.00
6.10
0.20
RUANG UKM TERBUKA
6
5.00
5.00
0.50
3.98
5 1 AR113
28.97
5.00
RUANG LAKTASI
5
3 AR114
No.
Description
Date
1
4
AR113
5.00
7.00
4 RUANG RELAKSASI DAN SANTAI AR114 4
5.00
3
3.80
UP
3 2 DN
ARSITEKTUR UNNES 2
SS
5.00 TT
5.00 UU
21.04
VV
DENAH GD EKST GG
SS
TT
UU
VV
06
Project number
1
Level 1 ekstensi 1 : 100
2
Level 2 EKSTENSI 1 : 100
Date
22 Mei 2020 Author
Drawn by
Checker
Checked by
AR112 Scale
1 : 100
23/06/2020 17:33:23
5.00
PERENCANAAN DPRD PEMALANG
RR
VV
UU
TT
SS
2 AR113
Level 3
Level 3
8.70
8.70 UNIVERSITAS NEGERI SEMARANG
Level 2
Level 2
5.00
FIRMITAS Eko F SEMARANG
5.00
081574252133 ekoferirudin1202 @gmail.com Level 1 SITEPLAN 0.50
Level 1 SITEPLAN 0.50 0.00
0.00
TOP OF PILE TOP CAP OF PILE CAP -2.00
1
-2.00
No.
POTONGAN EKST 1
Description
Date
1 : 100
8
Level 3 8.70
Level 2 5.00
7
6
5
1 AR113
4
3
2
Level 3 8.70
Level 2 5.00
ARSITEKTUR UNNES Level 1 SITEPLAN 0.50 0.00
Level 1 SITEPLAN 0.50 0.00
PERENCANAAN DPRD PEMALANG
POTONGAN EKS 06
Project number
22 Mei 2020 Author
Drawn by
Checker
Checked by
2
AR113
POTONGAN EKST 2 1 : 100 Scale
1 : 100
23/06/2020 17:33:25
Date
VV
UU
TT
SS
2
3
4
1 AR113
5
6
UNIVERSITAS NEGERI SEMARANG
7
2
FIRMITAS Eko F SEMARANG
AR113
Level 3
Level 3
8.70
Level 3
8.70
Level 3
8.70
081574252133
8.70 ekoferirudin1202 @gmail.com
Level 2
Level 2
5.00
Level 2
5.00
Level 1 SITEPLAN 0.50
5.00
Level 1 SITEPLAN 0.50 0.00
0.00
SS
TT
UU
Level 1 SITEPLAN 0.50 0.00
0.00
3
1 : 100
5.00
Level 1 SITEPLAN 0.50
EKST BELAKANG
2
Level 2
No.
EKST KANAN
Description
Date
1 : 100
VV
7
6
5
1 AR113
4
3
2
2 AR113
Level 3
Level 3
8.70
Level 3
8.70
Level 2
8.70
Level 2
5.00
Level 2
5.00
5.00
Level 3 8.70
Level 2 5.00
ARSITEKTUR UNNES PERENCANAAN DPRD PEMALANG
0.00
Level 1 SITEPLAN 0.50
Level 1 SITEPLAN 0.50
0.00
0.00
Level 1 SITEPLAN 0.50 0.00
TAMPAK EKST 06
Project number Date
1
EKST DEPAN 1 : 100
4
EKST KIRI 1 : 100
22 Mei 2020 Author
Drawn by
Checker
Checked by
AR114 Scale
1 : 100
23/06/2020 17:33:30
Level 1 SITEPLAN 0.50
1 AR115
Level 2
Level 2
5.00
3
5.00
4
DET03
DET03
UNIVERSITAS NEGERI SEMARANG Level 1
Level 1
0.50 SITEPLAN
0.50
0.00
3
MASJID DEPAN
FIRMITAS Eko F SEMARANG
2 AR115
1 : 100
081574252133
Level 2
Level 2
5.00
Level 2
5.00
SERAMBI SELASAR
R SHOLAT UTAMA
Level 2
5.00
ekoferirudin1202 @gmail.com
5.00
TAMAN
Level 1 SITEPLAN 0.50
Level 1 SITEPLAN 0.50 0.00
0.00
1
2 AR115
MASJID POTONGAN1
Level 1
Level 1
0.50
0.50 SITEPLAN
4
1 AR115
0.00
MASJID SAMPING KIRI 1 : 100
1 : 100
Level 2
Level 2
5.00
5.00
No.
Level 1
Description
Date
Level 1
0.50
0.50 SITEPLAN 0.00
2
MASJID POTONGAN 2 1
1 : 100
AR115
5.00
0.76 3.84
TAMAN
5.00
5.00
5.00
Level 3
Level 3
8.70
2
8.70
AR115
ARSITEKTUR UNNES
0.30 WUDHU WANITA
Level 2
Level 2
5.00
0.50
5.00
PERENCANAAN DPRD PEMALANG
R SHOLAT UTAMA
WUDHU PRIA Level 1 0.50 SITEPLAN
0.30
MASJID
Level 1 0.50
0.00
06
1.00 1.002.33
Project number
SERAMBI SELASAR 0.35 0.30 0.15
6
5
MASJID SAMPING KANAN 1 : 100
Date
Author
Drawn by
Checker
Checked by
AR115
Level 1 MASJID 1 : 100
22 Mei 2020
Scale
1 : 100
23/06/2020 17:33:31
14.77 10.00
2 AR115
Description
Date
ARSITEKTUR UNNES
PERSPEKTIF 1 Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
P301
22 Mei 2020 Author Checker
Scale
23/06/2020 17:36:22
No.
Description
Date
ARSITEKTUR UNNES
PERSPEKTIF 2 Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
P302
22 Mei 2020 Author Checker
Scale
23/06/2020 17:36:22
No.
Description
Date
ARSITEKTUR UNNES
PERSPEKTIF 3 Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
P303
22 Mei 2020 Author Checker
Scale
23/06/2020 17:36:22
No.
Description
Date
ARSITEKTUR UNNES
PERSPEKTIF 4 Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
P304
22 Mei 2020 Author Checker
Scale
23/06/2020 17:36:22
No.
Description
Date
ARSITEKTUR UNNES
PERSPEKTIF Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
P305
22 Mei 2020 Author Checker
Scale
23/06/2020 17:36:23
No.
Description
Date
ARSITEKTUR UNNES
PERSPEKTIF Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
P306
22 Mei 2020 Author Checker
Scale
23/06/2020 17:36:23
No.
Description
Date
ARSITEKTUR UNNES
INTERIOR Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
P307
22 Mei 2020 Author Checker
Scale
23/06/2020 17:36:23
No.
Description
Date
ARSITEKTUR UNNES
INTERIOR Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
P308
22 Mei 2020 Author Checker
Scale
23/06/2020 17:36:23
No.
0.00
0.03 0.00 0.03
-0.12 0.00 0.00 0.35
0.03 0.15 0.00
0.25
DN
1 : 200 No.
Description
Date
ARSITEKTUR UNNES
Landscape Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
LAND301
22 Mei 2020 Author Checker
Scale
1 : 200
23/06/2020 17:42:13
1
Landscape Belakang
Date
Project number
06
22 Mei 2020
Checker
Author
Drawn by
Date
DN
0.25
2
0.03 DET03
Landscape 2
0.00
Checked by
Description
ARSITEKTUR UNNES
0.25
PERENCANAAN DPRD PEMALANG
LAND302
1 : 200
23/06/2020 17:42:45
Landscape Lapangan 1 Upacara 1 : 200
Scale
No.
0.03
0.45
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
K ra su p
0.03 0.05 0.03
0.00
0.00 -0.25
0.03 0.00
0.00 0.00
0.03
0.00
0.03
1 : 200 No.
Description
Date
ARSITEKTUR UNNES
Landscape Pendopo Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
LAND303
22 Mei 2020 Author Checker
Scale
1 : 200
23/06/2020 17:43:29
1
Landscape Pendopo
Project number
Date
Drawn by
Date
Author
Checked by
0.15
0.00
Description
Landscape Ekst
06
22 Mei 2020
Checker
LAND304
1 : 200
1 : 200
Scale
0.00
No.
ARSITEKTUR UNNES
BANGUNAN EKSTENSI
PERENCANAAN DPRD PEMALANG
23/06/2020 17:44:02
Landscape Ekst
1
0.00
0.00
0.03
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PARKIR JAJARAN
0.00
0.00
0.03
0.20
0.03
DN
0.02
0.03
0.00 0.00
K a r p u s
0.25
0.03 0.03 0.05 0.03
-0.25
0.03 0.00
1 : 200 No.
Description
Date
ARSITEKTUR UNNES
Pendopo Literasi Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
LAND305
22 Mei 2020 Author Checker
Scale
1 : 200
23/06/2020 17:44:32
1
Pendopo Literasi
0.25 0.06
0.55
0.06
0.53 0.04
SITEPLAN
0.04
0.04
0.00
0.54 2 1
JENDELA - Callout 2 1 : 10
PILAR DEPAN - Callout 1 1 : 15 No.
Description
Date
ARSITEKTUR UNNES
DETAIL Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
DET01
22 Mei 2020 Author Checker
Scale
As indicated
23/06/2020 17:40:55
0.50
0.03
Level 1
0.81
0.89
0.26 0.26 0.260.20
0.04 0.35
0.04
0.04 0.53
Level 3
Level 3
8.70
8.70
0.86 Level 2
Level 2
5.00
5.00
Level 1
Level 1
0.50 Level 1
Level 1
0.50
2
TAMPAK SCULPTURE 1
1 : 100
DD
MASJID - Callout 1
3
0.50
0.50
1 : 75
LL
AR107 1 AR115
Level 2
Level 2
5.00
5.00
Level 1
Level 1
0.50 SITEPLAN
0.50
0.00
4
1 : 75 No.
Description
Date
ARSITEKTUR UNNES
NAMA MASJID - Callout 1 1 : 50
ARSITEKTURAL Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
DET03
22 Mei 2020 Author Checker
Scale
As indicated
23/06/2020 17:40:55
1
Elevation tangga depan
A
DD
LL
II
JJ
1 AR107
0.20
ROOFTOP
ROOFTOP 15.00
7.25
8.01
15.00
Level 3
Level 3
8.70
8.70
Level 2
Level 2
5.00
5.00
11.57
1 : 100 No.
Description
Date
ARSITEKTUR UNNES
ARSITEKTURAL Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
DET04
22 Mei 2020 Author Checker
Scale
1 : 100
23/06/2020 17:40:57
1
DETAIL SECOND SKIN
Project number
Date
Date
Author
Drawn by
Description
PONDASI
06
22 Mei 2020
Checker
Checked by
No.
ARSITEKTUR UNNES
PERENCANAAN DPRD PEMALANG
23/06/2020 17:45:15
1 : 25
1
PONDASI - Callout 1
DET02
1 : 25
Scale
-2.00 -2.00
0.40
TOP OF PILE CAP TOP OF PILE CAP ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
1.50 0.40
0.90
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
A
B
C
D
22 21 20 19 No.
1 AA AR106
BB
18 Description
12 11
17
10 16
9 8
Date
15 1 AR105
7
ARSITEKTUR UNNES
PERENCANAAN DPRD PEMALANG
14
6 13
5 3 AR114
4
MM 2 NN DET03 UP
1
LL
KK
1
DET03
Project number
Date
Drawn by
06
Author
22 Mei 2020
Checker
Checked by
FONDASI
DD
STR003 Scale
1 : 400
23/06/2020 17:46:07
1
II
JJ
struktural fondation 1 : 400
EE FF GG
3 2
SS TT UU VV
1 No.
Description
Date
STRUKTUR 3D UTAMA
ARSITEKTUR UNNES
3D STRUKTUR Project number Date
ARSITEKTUR UNIVERSITAS NEGERI SEMARANG
PERENCANAAN DPRD PEMALANG
Drawn by Checked by
06
STR001
22 Mei 2020 Author Checker
Scale
23/06/2020 17:47:57
2
STRUKTUR 3D MASJID