Eleonora Manca eleonmanca@yahoo.it +393402502627 11.07.1986
Italy-Sardinia
educationandtraining
2013 April / in progress International 2nd Level Post-Master Environmental Design SardiniaUrbanResearchLab Facoltà di Architettura di Alghero Università degli Studi di Sassari
Master Studio with EcosistemaUrbano
2013 May
Subscription to the Architects Institute Ordine degli Architetti, Pianificatori, Paesaggisti, Conservatori delle Province di Oristano
2012 October
Professional Practice Exam
Facoltà di Architettura di Alghero Università degli Studi di Sassari
2005 September / 2011December MasterDegree in U.E. Architecture Facoltà di Architettura ad Alghero Università degli Studi di Sassari | Sardinia | Italy
Architecture | Design and Urban Environmental Planning Museographic Interiors Structural Design
Final vote: 110/110 cum laude
2
Eleonora Manca
Alghero
2008 April / 2008 August
BIPOLAIRE + PARTNER | Valencia | Spain | Internship Business or sector Preliminary and Definitive Design Planning,Sustainability, Housing, Drawing, Cad Drawing, Graphics.
València
2010 December
2012 October / 2013 March International 2nd Level Post-Master Environmental Design SardiniaUrbanResearchLab
Certificate in Portuguese Language Utl Universidade TĂŠcnica de Lisboa | Faculdade de Arquitectura | Lisboa | Portugal Portuguese Language Certificate (Pass with merit)
DIA Dessau Institute of Architecture
Anhalt University of Applied Sciences
2009 September / 2010 August
Erasmus L.L.P Utl Universidade TĂŠcnica de Lisboa | Portugal Faculdade de Arquitectura Architectural Design, Interior Design, Urban Management, History of Portuguese Architecture
Master Studio in Bauhaus
Lisboa
Dessau, Berlin
Curriculum vitae 3
workesperience
March2012 / In progress Architectural / Historical Researcher BIBLIOTECA DI SARDEGNA Regione Autonoma della Sardegna
Architect / Historical Researcher
Business or sector Protection, enhancement and promotion of the heritage of vintage images. Recovering historical / photographic memory.
March2012 Ideas Competion | Genova | Italy Requalification Via XX Settembre,Genova;
Architectural design, Urban design;measures to reduce air pollution arising from the use of fossil fuels, as well as sound and light.
January2010 / September2012 Architect T.MANCA Ingegnere | Sedilo | Sardinia Definitive and Executive Design / Planning.
October2009 -December2011 Volunteer Collaborator ARKIMASTRIA Architecture and Urban Planning Student Association | Alghero | Sardinia cultural activities, publishing and education. January2010 Ideas Competion Logo | Neoneli | Sardinia
Architect / Graphic Designer Design the logo of the City of Neoneli; Iconic brand and visual identity for the municipality.
4
Eleonora Manca
mother tongue : Italian other languages: english(A1) | french(B1) spanish (B1) | portuguese (B1) driving license: B
skillsandcompetences
thecnicalskills
October2012 /Luigi Snozzi: un’autobiografia architettonica;
seminarsandworkshops
Febraury2012/ Maciocco Giovanni: potenziale urbano dei territori esterni;
March2012/ Stefano Riva: Casi di Case; April2012/ MGM: Espacio y Habitar; May2012/RVR arquitectos: Arquitectura, Paisaje, Esp. Publico; May2012/C+S architetti: Translation Architecture Tm; November2010/Bridgescape: Ponti e Viadotti, Enzo Siviero; May2010/ Valerio Olgiati/Lx Factory/Lisboa; CHItaly 2011/Donald A. Norman: Facing Complexity
seminars
July2012 / Photography Workshop
Cultural Association “Su Palatu” | Sedilo | Sardinia Techniques and photographic languages|Selected Project Exhibition attendance August2012 / XXII International Seminar and Award for Architecture and Urban Culture | Camerino 2012 | Italy OF COURSE ... ARCHITECTURE. The project sustainable Scuola di Architettura e Design | UNICAM | Università di Camerino
workshops Curriculum vitae 5
6
Eleonora Manca
TADASUNIBRIDGE machineandpermanenceintheterritory
subject: final LAB teacher: G.Maciocco, G.Filindeu site: Lago Omodeo, Sardinia project: stretching the height of the bridge in such a way that the structure is not swallowed up by the waters, and that it can re-invent in new territorial configuration. type: singol work year: 2011
Project
7
8
Eleonora Manca
Project
9
10 Eleonora Manca
Project
11
12 Eleonora Manca
Project
13
+128 +117.0
A
A 2.80
4.00 1.60
4.00 1.60 4.00
0.00
0.00 0.00
0.00
2.40
1.20
1.20
Pianta livello +124
+120.0
Prospetto lato A scala 1/200
Sezione A-A' scala 1/200
14 Eleonora Manca
4.00
Pianta livello +120 scala 1/200
A
A' 4.00 1.60
1.20
4.00
4.00
+128
2.40
0.00
+124
+120
0.00
+124
2.40
0.00
+120
2.40
2.40
2.40
4.00
1.20
1.20
4.00
1.20
4.00
Pianta livello +128
15 Project
16 Eleonora Manca
Project
17
18 Eleonora Manca
POPARCHITECTURE musicstripesinthebetweenspace
subject: post master COURSE teacher: M.Kraviez, L.Rossi site: Haupbahnof viaduct,Berlin,Germany project: The aim is to create a new form of music space trought different flow layers. Down level of viaduct, by reject space became using space, a place which you can take a brain break from the caotic berliner life. Each stripe includes a event and play in the “between space”. type: team work year: 2013
Project
19
0.70mt
1 1
1
2
1.20mt
1 1 1 1 1
20 Eleonora Manca
0.65mt
1.00mt
0.75mt
1.70mt
1.65mt
1.50mt
1.70mt
1.70mt
2.20mt
1.70mt 0.80mt
0.75mt
connection weave
pillars system
carpet new topography
Project
21
22 Eleonora Manca
Project
23
24 Eleonora Manca
PRODUCTIVELANDSCAPE hotelboatandlaundryintheelbe
subject: post master COURSE teacher: G.Hartmann, J.Fach site: Elbe river, Dessau,Germany project: The energy storage is a compact formand;the three spaces: laundry, storage and hotels are compartments integrated between structure and function with a structure that forms the interior spaces of the boat. type: team work year: 2013
Project
25
26 Eleonora Manca
Project
27
SCENARIO day
balancing energy consumption and production over 24h
natural resources from above
some numbers: storage volumetrically is about double th laundry OFF
boat movement ON
energy production ON
III
kINETIC ENERGY
natural resources from below
28 Eleonora Manca
60째
40째
10째
IV
V
VI
LAUNDRY STORAGE LAYER LAYER
II
IMMEDIATLY USE SYSTEM
I
WATERstorage
LONG -TERM SYSTEM
landscape
AIRstorage
HOTEL LAYER
energy storage OFF
SCENARIO night
balancing energy consumption and production over 24h
natural resources from above
hat of other function
laundry ON
boat movement OFF
energy production ON
III
60째
40째 10째
IV
V
VI
LAUNDRY STORAGE LAYER LAYER
II
WATERstorage
I
IMMEDIATLY USE SYSTEM
LONG -TERM SYSTEM
landscape
AIRstorage
HOTEL LAYER
energy storage ON
kINETIC ENERGY
natural resources from below
Project
29
STEP 1... FRAMEWORK
STEP 1... FRAMEWORK
STEP 2... WATER WHEEL
STEP 1... FRAMEWORK STEP 2... WATER WHEEL
STEP 3... KELL
STEP 1... FRAMEWORK STEP 2... WATER WHEEL STEP 3... KEEL
STEP 4... SHELL1
STEP 1... FRAMEWORK STEP 2... WATER WHEEL STEP 3... KEEL STEP 4... SHELL 1
STEP 5... SHELL2
STEP 1... FRAMEWORK STEP 2... WATER WHEEL STEP 3... KEEL STEP 4... SHELL 1 STEP 5... SHELL 2
STEP 6... GLASS
greenhouse+patio hotel
STEP 1... FRAMEWORK STEP 2... WATER WHEEL STEP 3... KEEL STEP 4... SHELL 1 STEP 5... SHELL 2 STEP 6... GLASS
STEP 7... DOCK
30 Eleonora Manca
energy
DIRTY AREA
resources
MACRO AREAS HOTEL
different working chambers in batch disposition
WORKING PROCESSES working
steps
DELIVERY LINEN
WASH CYCLE
DRYING CYCLE
SCREENING
DISTRIBUTION
SAOKING
PRE-WASH
WASH
RINSE
35°C
50°C
80°C
35°C
3’
10’
10’
IRONING
4’
HYDROMINING
3’
FOLDING
CLEAN AREA
DAY
WORKING AREAS
laundry PRODUCTIVE ITER
The structure defines spatially suites, which are located on the side of the boat in visual relation with the Elbe WRAP CYCLE shores, the windows are quantifiedPACKING numerically constant size relative to the size of the rooms. The connection to land occurs through the side, in a way similar to the storage but to the upper level,
VOLUME calculation
STORAGE
LAUNDRY study of the various stages of work necessary for a laundry room hotel and relative spatial organization
100% m3
50%
8880
4440
50%
4440 Project
31
laundry DATA WORK
hotel
linen
ROOM
linen
LOAD
water
WEIGHT / BED
CONSUMPTION pro/ LINEN weight
Hamburg
256
2 loads
4096kg
14000lt 14m
Dessau
3,5lt
178
1 load
1424kg
5000lt
5m
Dresden
8kg
150
2 loads
2400kg
8400lt
8m
3
3
3
LOAD The study of a weekly calendar allows us to calculate the quantity of load "at worst" and therefore the maximum amount of water needed DRESDEN
DESSAU
HAMBURG
WORKING ITINERARY
FRIDAY
FRIDAY
MONDAY FRIDAY
TUESDAY THURSDAY SATURDAY
WEDNESDAY
THURSDAY
WEDNESDAY
SATURDAY
SUNDAY
32 Eleonora Manca The study of a weekly calendar allows us to calculate the quantity of load "at worst" and thereCALENDAR:
fore the maximum amount of water needed
STORAGE
by programs we obtain different types of storage, storage of different types of water, storage of compressed air and storage of linen The side allows the connection to land for the exchange of materials of the laundry and the daily supply of food and daily goods
VOLUME calculation
LAUNDRY study of the various stages of work necessary for a laundry room hotel and relative spatial organization
HOTEL
Project
33
The structure defines spatially suites, which are located on the side of the boat in visual relation with the Elbe
2
CLEAN water BEFORE laundry work
landscape
150 m 150 m
2 2
RIVER gray water LAUNDRY gray water *
GRAYwater AFTER laundry work
FIELD HOTEL
*
1m
RIVER CLEAN water OUTPUT
HOUSE GUEST+WORKERS
RIVER GRAY water INPUT
2
1m
BIOdegradable TENSIOACTIVES
Detergent BIOdegradability in AEROBIC enviroment
tot. 300 150m2
Phytodepuration Gravel Bed Hydroponics
AEROBIC enviroment decomposition WHIT OXYGEN presence
AnaEROBIC enviroment decomposition WHITOUT OXYGEN presence
GREEN HOUSE Due to the amount of water needed we can calculate the size of the two green house
34 Eleonora Manca
equivalent resident
GreenHouse SIZE 300 m interior view
WHAREHOUSE
ISOLATED TANK
ENERGY storage
CAUSE TOOL EFFECT boat MOVEMENT
laundry WASH 10째
saoking rinse
laundry PACKING
laundry DRYING laundry IRONING
laundry WRAP
hotel WATER
60째
laundry WASH
pre-wash wash
laundry FOLDING hotel ELECTRICITY
40째
hotel heating
STORAGE
by programs we obtain different types of storage, storage of different types of water, storage of compressed air and storage of linen some numbers: storage volumetrically is about double that of other function The side allows the connection to land for the exchange of materials of the laundry and the daily supply of food and daily goods
Project
35
36 Eleonora Manca
PALACIOVALFLORES centrocìvicooldandnew
subject: project V Lab teacher:
F.A.U.T.L A.de Gil e Pires
site:Palácio Valflores,Lisboa,Portugal project: The concept of the wall line is the basis of the subdivision of the space for functions, which in this case is diversified in a housing area, a lazer-education, one dedicated to food and entertainment, and an underground zone that hosts the auditorium. type: single work year: 2010
Project
37
38 Eleonora Manca
atéliers
danc a b c
SALA DE DANçA SALA DE MUSICA
c
OFFICE _SALA REUNIOES
b +3.5 escala 1_10
alรงado 1_100
corte trasversal escala 1_50 Project
39
40 Eleonora Manca
Project
41
42 Eleonora Manca
FUNCTIONALSTRIPES culturalcenterandbusstop
subject: project IV Lab teacher:
A.A.A, Jorge Lobos site:Ex-saica area Alghero,Sardinia,Italy
project: The area, currently used as a parking lot, is cut into strips and then the strips are bent and create space. the fold theme has been a leitmotif of the project. type: team work year: 2009
Project
43
44 Eleonora Manca
Project
45
46 Eleonora Manca
Project
47
48 Eleonora Manca
DESIGNINGINHISTORICALCONTEXT civiccenter
subject: project IV Lab teacher:
A.A.A, GonรงaloByrnesite:F ertlia,Sardinia,Italy
project: the project is a great platform that through the engravings of ict following the differences of soil and create the courts of hosting the buildings. connections ta the various courts have never direct but are designed at perceptive type: team work year: 2008
Project
49
50 Eleonora Manca
Project
51
52 Eleonora Manca
Project
53
54 Eleonora Manca
Project
55
56 Eleonora Manca
RIQUALIFICATIONOFXXSEPTEMPERSTREET
theperspectiveconcept: generatordesign
subject: ides competition site: Genova,Italy project: The aim of the project is to concentrate all the needs within the system trilithic; lighting, green, sessions, the bus stops, the bike sharing stations are incorporated in the structure. The reasoning design starts from a base matrix, which is that of the portal, which is added and incremented by creating multiple sets depending on the case. type: team work year: 2011
Project
57
BICI
BUS
BICI
BUS
sostalux = fermata bus 째+ bike sharing++ ombrario vegetale ( )
modulux = spazio multifunzionale di incontro e aggre
C:\Users\casa\Desktop\2012_Genova\H-and-m-600x398.png
C:\Users\casa\Desktop\2012_Genova\maxmara.jpg
C:\Users\casa\Desktop\2012_Genova\logo-mango.jpeg
AMT_
58 Eleonora Manca
EcO
C:\Users\casa\Desktop\2012_Genova\images.jpg
xx SETTEMBRE 3 D.E FERRARI
C:\Users\casa\Desktop\2012_Genova\logo-coin.jpg
%
%
modulux = spazio multifunzionale di incontro e aggregazione sociale ( )
%
5
10
12 12.5
e( )
3 C:\Users\casa\Desktop\2012_Genova\logo-carre-pimkie.png
C:\Users\casa\Desktop\2012_Genova\mcdonalds-logo.jpg
1
INFO NOVA
BOOK-SHARING
NOVA
MUSIC-SHARING
TICKET
0
EcO
bike-bike-sharing sharing
EcONOVA
EcONOVA
C:\Users\casa\Desktop\2012_Genova\images (1).jpg
Project
59
15 10 5
TICKET
0
1
2
NOVA
cube wi-fi
sistema di inserimento modulux nella configurazione di limitazionedel traffico pubblico ( )
Moduli fotovoltaici permettono l'alimentazione elettrica dei leds che costituiscono il sistema d'illuminazione del sistema portali'.
Pannelli fono-isolanti forati rivestono lo scheletro del portale e lavorano per diffrazione; per cui le onde sonore, quando incontrano la barriera, si propagano oltre ed anche dietro la stessa, ma con •• •• • • ••• •• ••• • • • •• •••• ••• • •• •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Huygens - Fresnel).
zero city
traffico pubblico'
80%
%
% 60 Eleonora Manca
gg/anno
•••• •• • • •• • •• ••• ••• • •• •• •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • foto-catalizzatore per la decomposizione di composti organici. a seguito di esposizione alla luce/acqua, il biossido produce Specie Reattive all'Ossigeno ( ROS), che reagiscono con le sostanze organiche e le trasformano.
perspective city
flexible city
expo'
20%
%
%
gg/anno
%
TiO2
1 struttura metallica del portale 2 rivestimento in materiale plastico fonoassorbente e trattato con Tio2 per la catalizzazione degli elementi organici presenti ed indotti dall'inquinamento 3 sorgente luminosa lineare a led 4 moduli fotovoltaici per l'alimentazione elettrica del portale
4
5 fondazione portale 6 nuova pavimentazione in pietra 7 pavimentazione esistente
2 3 1
3
3
2
1
6
7
7
5
Project
61
62 Eleonora Manca
[...] It is easy to get lost in Eudoxia: but when you concentrate and stare at the carpet, you recognize the street you were seeking in a crimson or indigo or magenta thread which, on a wide loop, brings you to the purple enclosure that is your real destination. Italo Calvino, Invisible Cities, City and Sky I.
PHOTOWORKSHOPwithsalvatoreligios thenewperspective
Project
63
64 Eleonora Manca
WORKSHOPwithcarloscampos
takesomethingdosomethingtoitdosomethingelsetoit
Project
65
Thank you
Eleonora Manca
eleonmanca@yahoo.it +393402502627 11.07.1986 Italy-Sardinia