WG Belgian Grid Feedback to Users’ Group Frank Wellens 08/12/2011
13.02.2012 Auteur changer dans le masque de titre
1. Traject Analysis Federal Grid Code Meeting 31/01: • Proposals “Title III Technische voorschriften voor aansluiting” (Art. 41 – art 78) • Drivers for proposals: Bottom-up (dateert van 2002; update; nieuwe concepten); Top-down (Code ENTSO-e; harmonisation concepts) • First proposals to WG Belgian Grid but subjected to modifications (nieuw release of NC RfG) => final proposals : september 2012 Meeting 21/02: • White paper “Réservation de capacité des unités de production” • Adaptations “processus de raccordement” (based on work done by WGBG 2011) • NC Entso-e & impacts FTR Next meetings (March – June) Issues already identified for proposals for adaptations = closed distribution system (v. meeting 15/12/2011); local production; safety; capacity reservation for production units (depending conclusions White Paper); reactive energy; principles for ARP (to be shared with WG SO) ; metering ; grid development 13.02.2012 Aueur changer dans le masque des diapositives
2
2. Closed distribution systems 1. Position Paper Users’ Group « relatif à la mise en œuvre opérationnelle du concept de Closed Distribution systems au niveau du réseau d’Elia » On hold 2. Model Closed distribution systems Discussions on operational aspects : 15/12 & 31/1 - Applicability of UMIX rules on data exchanges to Elia (allocation sets of data) and to suppliers : - presentation of UMIX rules on data exchanges applicable to ARM meters (timing + set of data) - presentation of UMIX communication lay-out
- Identification of ARP actif on CDS - Generation of EAN codes for CDS users - Aggregation of individual CDS points/ users as a global ARP perimeter - Relations between Elia, CDS network operator and suppliers Next steps : integration of the comments within the new contractual document between Elia & CDS network operator (up to now new annex to access contract) => new draft document : March 2012 13.02.2012 Aueur changer dans le masque des diapositives
3
3. European Network Codes “connexion” meeting 21/02 Two Network Codes in the pipe for WG Belgian Grid: - final ENTSO-e Draft « Requirements for grid connection applicable to all Generators » - ENTSO-e Draft « Demand Connection Code » Presentation of the NC: topics & issues Formal consultation process: Preparation of the UG’s members to formal consultation process
13.02.2012 Aueur changer dans le masque des diapositives
4