LEVIES The levies mentioned hereafter are the amounts in application on January 1st 2011. 1° Federal contribution According to the dispositions of the Royal Decree dated March 27th 2009 modifying the Royal Decree dated March 24th 2003, the federal contribution is received by Elia. Table 1 :
Federal contribution
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
Levy (€/kWh net offtaken1) 0,0052648 0,0052648 0,0052648 0,0052648
The contribution received from a non final customer: -
Federal contribution +0,1% (=0,0052701 €/kWh) No exemption No degressivity Ceiling (250.000 € +0,1%) if by consumption site and by year 250.000 MWh or more is offtaken (not valid for DGOs)
The contribution received from a final customer: -
-
1
Federal contribution +1,1% (=0,0053227 €/kWh) Exemption of 0,0036155 €/kWh +1,1% (=0,0036553 €/kWh) on that part of the fuel mix, that is supplied and produced out of renewable energy sources or qualitative cogeneration units Degressivity – only if sector agreement or covenant (Kyoto) 0-20 MWh/year: 0% 20-50 MWh/year: -15% 50-1.000 MWh/year: -20% 1.000-25.000 MWh/year: -25% 25.000-250.000 MWh/year: -45% Ceiling (250.000 € +1,1%) if by consumption site and by year 250.000 MWh or more is offtaken
For the definition, see further in this document Definitions relative to energy.
1
21/12/2010
2° Levy for financing of connection of offshore wind turbine parks Table 2 :
Levy for financing of connection of offshore wind turbine parks (federal)
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
Levy (€/kWh net offtaken2) 0,0001413 0,0001413 0,0001413 0,0001413
3° Levy green certificate Levy according to the Royal Decree dated October 31st 2008 modifying the Royal Decree dated July 16th 2008 concerning the instauration of mechanisms for the promotion of the electricity generated out of renewable energy sources. Table 3 :
Levy green certificate (federal)
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
2
Levy (€/kWh gross limited2) 0,0007820 0,0007820 0,0007820 0,0007820
For the definition, see further in this document Definitions relative to energy.
2
21/12/2010
4° Levy for financing the support measures for renewable energy in Flanders This levy is only in application in the Flemish Region. Table 4 : Levy for financing the support measures for renewable energy in Flanders
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
Levy (€/kWh net offtaken3) --0,0001399 0,0001399 0,0001399
5° Levy for financing measures for promotion of rational energy use This levy is only in application in the Flemish Region. Table 5 : Levy for financing measures for promotion of rational energy use (in Flemish Region)
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
Levy (€/kWh net offtaken3) --0,0000245 0,0000245 0,0000245
6° Levy for occupying public domain This levy is only in application in the Flemish Region. Table 6 :
Levy for occupying public domain (in Flemish Region)
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
3
Levy (€/kWh net offtaken3) --0,0000000 0,0000000 0,0000000
For the definition, see further in this document Definitions relative to energy.
3
21/12/2010
7° Levy for occupying public domain This levy is only in application in the Walloon Region. Table 7 :
Levy for occupying public domain (in Walloon Region)
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
Levy (€/kWh net offtaken4) --0,0002433 0,0002433 0,0002433
8° Levy for occupying road network This levy is only in application in the Brussels Metropolitan Region. Table 8 :
Levy for occupying road network (in the Brussels Metropolitan Region)
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
4
Levy (€/kWh net offtaken4) 0,0030108 0,0030108 0,0030108 ---
For the definition, see further in this document Definitions relative to energy.
4
21/12/2010
DEFINITIONS RELATIVE TO ENERGY The gross limited power, on an access point for a given quarter of an hour, is the difference, if positive, between the offtaken power by the load(s) connected in this access point and the injected power by the local generation(s) associated to this access point, and this for the part of the injected power by these local generations that is smaller or equal to 25 MW. In case the before mentioned difference gives a negative value, the gross limited power is equal to 0. The gross limited energy, on a given access point for a given period, is the integral of the gross limited power in this access point for the given period. In other words, if • Pload(qh) is the average offtaken power by the loads on an access point for a given quarter of an hour qh, and • Pgeneration(qh) is the injected (produced) power by the local generation(s) associated to this access point on the given quarter of an hour qh, the gross limited energy, for the period per, equals E gross _ lim ited ( per ) =
∑ max(0; P
ch arg e
qh∈ per
(qh) − min( Pproduction (qh);25MW )).
The net offtaken power, on an access point for a given quarter of an hour, is the difference, if positive, between the offtaken power by the load(s) connected in this access point and the injected power by the local generation(s) associated to this access point. In case the before mentioned difference gives a negative value, the net offtaken power is equal to 0. The net offtaken energy, on a given access point for a given period, is the integral of the offtaken power in this access point for the given period. In other words, if • Pload(qh) is the average offtaken power by the loads on an access point for a given quarter of an hour qh, and • Pgeneration(qh) is the injected (produced) power by the local generation(s) associated to this access point on the given quarter of an hour qh, the net offtaken energy, for the period per, equals E offtaken ( per ) =
∑ max(0; P
qh∈ per
ch arg e
(qh) − Pproduction (qh)).
5
21/12/2010
Remark If the injected power by the local generation(s) equals 0, the net offtaken energy coincides the gross limited energy. Example For a load of 100 MW (for a given quarter of an hour), and an injection of 40 MW by a local generation associated to this load:
Off-take by the charge = 100 MW
Injection by the local production = 40 MW
For the given quarter of an hour: • Net offtaken energy = max( 0, 100 MW – 40 MW) * 15 minutes = 15 MWh • Gross limited energy = max( 0, 100 MW – min(40 MW, 25 MW)) * 15 minutes =18,75 MWh.
6