TARIFFS FOR OBLIGATION OF PUBLIC SERVICES AND THE APPLICATION OF TAXES AND LEVIES The tariffs for obligation of public services and the application of taxes and levies mentioned hereafter are the amounts in application on January 1st 2012. Tariffs for Obligation of public services 1° Tariff for obligation of public service for financing of connection of offshore wind turbine parks Table 1: Tariff for obligation of public service for financing of connection of offshore wind turbine parks
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
Tariff (€/kWh offtaken1) 0,0001395 0,0001395 0,0001395 0,0001395
2° Tariff for obligation of public service for the financing of green certificates (federal) Tariff for obligation of public service according to the Royal Decree dated October 31st 2008 modifying the Royal Decree dated July 16th 2008 concerning the instauration of mechanisms for the promotion of the electricity generated out of renewable energy sources. Table 2: Tariff for obligation of public service for the financing of green certificates (federal)
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
1 2
Tariff (€/kWh gross limited offtaken2) 0,0010808 0,0010808 0,0010808 0,0010808
For the definition, see further in this document under Definitions relative to power and energy. For the definition, see further in this document under Definitions relative to power and energy.
1
27/09/2012
3° Tariff for obligation of public service for financing the support measures for renewable energy and cogeneration in Flanders This tariff for obligation of public service is only applicable on the offtakes in the Flemish Region. Table 3: Tariff for obligation of public service for financing the support measures for renewable energy and cogeneration in Flanders
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
Tariff (€/kWh offtaken3) --0,0005171 0,0005171 0,0005171
4° Tariff for obligation of public service for financing measures for promotion of rational energy use in Flanders This tariff for obligation of public service is only applicable on the offtakes in the Flemish Region. Table 5: Tariff for obligation of public service for financing measures for promotion of rational energy use in Flanders
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
3 4
Tariff (€/kWh offtaken4) --0,0000245 0,0000245 0,0000245
For the definition, see further in this document under Definitions relative to power and energy. For the definition, see further in this document under Definitions relative to power and energy.
2
27/09/2012
5° Tariff for obligation of public service for financing the support measures for renewable energy in Wallonia This tariff for obligation of public service is only applicable on the offtakes in the Walloon Region. Table 5: Tariff for obligation of public service for financing the support measures for renewable energy in Wallonia
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
Tariff from 01/01/2012 till 30/09/2012
Tariff from 01/10/2012 till 31/12/2012
(€/kWh offtaken5) --0,0011889 0,0011889 0,0011889
(€/kWh offtaken6) --0,0059445 0,0059445 0,0059445
Tariffs for the application of taxes and levies
1° Federal contribution According to the dispositions of the Royal Decree dated March 27th 2009 modifying the Royal Decree dated March 24th 2003, the federal contribution is received by Elia. Table 1: Federal contribution Tariff Tariff Tariff from 01/01/2012 from 21/01/2012 from 01/04/2012 till 20/01/2012 till 31/03/2012 till 31/12/2012 (€/kWh offtaken7) 0,0050854 0,0050854 0,0050854 0,0050854
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
(€/kWh offtaken8) 0,0049761 0,0049761 0,0049761 0,0049761
(€/kWh offtaken9) 0,0038597 0,0038597 0,0038597 0,0038597
The contribution received from a non final customer: - Federal contribution +0,1% (=0,0050905 €/kWh until 20/01, 0,0049811 €/kWh from 21/01 till 31/03, 0,0038636 €/kWh as from 01/04) - No exemption - No degressivity 5
For the definition, see further in this document Definitions relative to power and energy. For the definition, see further in this document Definitions relative to power and energy. 7 For the definition, see further in this document Definitions relative to power and energy. 8 For the definition, see further in this document Definitions relative to power and energy. 9 For the definition, see further in this document Definitions relative to power and energy. 6
3
27/09/2012
-
Ceiling (250.000 € +0,1%) if by offtake point and by year 250.000 MWh or more is offtaken (not valid for DGOs)
The contribution received from a final customer: -
-
-
Federal contribution +1,1% (=0,0051413 €/kWh until 20/01, 0,0050308 €/kWh from 21/01 till 31/03, 0,0039022 €/kWh as from 01/04) Exemption of 0,0032114 €/kWh +1,1% (=0,0032467 €/kWh) on that part of the fuel mix, that is supplied and produced out of renewable energy sources or qualitative cogeneration units Degressivity – only if sector agreement or covenant (Kyoto) 0-20 MWh/year: 0% 20-50 MWh/year: -15% 50-1.000 MWh/year: -20% 1.000-25.000 MWh/year: -25% 25.000-250.000 MWh/year: -45% Ceiling (250.000 € +1,1%) if by consumption site and by year 250.000 MWh or more is offtaken
2° Levy for occupying public domain in Wallonia This levy is only applicable in the Walloon Region. Table 2: Levy for occupying public domain in Wallonia
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
Tariff (€/kWh offtaken10) --0,0002275 0,0002275 0,0002275
3° Levy for occupying road network in Brussels This levy is only applicable in the Brussels Metropolitan Region. Table 3: Levy for occupying road network in Brussels
On the 380/220/150 kV network At transformer output to the 70/36/30 kV network On the 70/36/30 kV network At transformer output to medium voltage
10 11
Tariff (€/kWh offtaken11) 0,0031146 0,0031146 0,0031146 ---
For the definition, see further in this document under Definitions relative to power and energy. For the definition, see further in this document under Definitions relative to power and energy.
4
27/09/2012
DEFINITIONS RELATIVE TO POWER AND ENERGY The gross limited offtaken power on an access point for a given quarter of an hour, is the difference, if positive, between the offtaken power by the load(s) associated to this access point and the injected power by the local generation(s) associated to this access point, and this for the part of the injected power by these local generations that is smaller or equal to 25 MW. In case the before mentioned difference gives a negative value, the gross limited offtaken power is equal to 0. The gross limited offtaken energy on a given access point for a given period, is the integral of the gross limited offtaken power in this access point for the given period. In other words, if • Pload(qh) is the average offtaken power by the loads on an access point for a given quarter of an hour qh, and • Pgeneration(qh) is the injected (produced) power by the local generation(s) associated to this access point on the given quarter of an hour qh, the gross limited energy, for the period per, equals E gross _ lim ited _ offtaken (per )
max(0; P
load
(qh) min(Pgeneration (qh);25MW )).
qh per
The offtaken power, on an access point for a given quarter of an hour, is the difference, if positive, between the offtaken power by the load(s) associated to this access point and the injected power by the local generation(s) associated to this access point. In case the before mentioned difference gives a negative value, the offtaken power is equal to 0. The offtaken energy, on a given access point for a given period, is the integral of the offtaken power in this access point for the given period. In other words, if • Pload(qh) is the average offtaken power by the loads on an access point for a given quarter of an hour qh, and • Pgeneration(qh) is the injected (produced) power by the local generation(s) associated to this access point on the given quarter of an hour qh, the offtaken energy, for the period per, equals E offtaken (per )
max(0; P
load
(qh) Pgeneration (qh)).
qh per
5
27/09/2012
Remarks If the injected power by the local generation(s) equals 0, the gross limited offtaken energy coincides with the offtaken energy. The production units are measured from 1 MW on.
Example For a load of 100 MW (for a given quarter of an hour), and an injection of 40 MW by a local generation associated to this load:
Offtake by the charge = 100 MW
Injection by the local generation = 40 MW
For the given quarter of an hour: • Offtaken energy = max (0, 100 MW – 40 MW) * 15 minutes = 15 MWh • Gross limited offtaken energy = max (0, 100 MW – min(40 MW, 25 MW)) * 15 minutes =18,75 MWh.
6
27/09/2012