saheb architecture P
O
R
T
F
O
L
I
O
We are involved from the start to finish in apartment/ townhouse gut renovations. We also conduct zoning studies to determine the best use of a property for vacant lots as well as existing building. We also do egress plans, local law 11, iCip/iCap and 421a projects.
Our clients are apartment/townhouse owners, real estate developers, and commercial chain store owners. Certified MWBE business with CUNY.
Pa ge 4 | SA HEB ARC HI TEC TU RE PLLC
RESIDENTIAL INTERIOR DESIGN LOWER EAST SIDE, NY (TOP)
NEW CONSTRUCTION BROOKLYN, NY (LEFT)
•• :
•
S AH E B AR CH I TE CTU R E P LL C | P a g e 5
Pa ge 6 | SA HEB ARC HI TEC TU RE PLLC
RESIDENTIAL INTERIOR DESIGN LOWER EAST SIDE, NY (LEFT)
INTERIOR ARCHITECTURE UPPER EAST SIDE, NY (BOTTOM)
S AH E B AR CH I TE CTU R E P LL C | P a g e 7
Pa ge 8 | SA HEB ARC HI TEC TU RE PLLC
DOUBLE TOWNHOUSE UPPER EAST SIDE, NY
S AH E B AR CH I TE CTU R E P LL C | P a g e 9
PENTHOUSE ADDITION WEST VILLAGE, NY
Pa ge 10 | SA HE B ARC HI TEC TU RE PLLC • •• :
S AH E B AR CH I TE CTU R E P LL C | P a g e 1 1
• •• :
• •• :
421-A
BROOKLYN, NY
Pa ge 12 | SA HE B ARC HI TEC TU RE PLLC
COMMERCIAL VARIOUS
S AH E B AR CH I TE CTU R E P LL C | P a g e 1 3
• •• :
Pa ge 14 | SA HE B ARC HI TEC TU RE PLLC
FACADE REHABILITATION BROOKLYN, NY
S AH E B AR CH I TE CTU R E P LL C | P a g e 1 5
PRESCHOOL TODDLER ROOM 2-4 YEARS - 20 CHILDREN R3 DN D5
CHILDREN'S TOILET
KITCHENETTE K1
T2
YOUNG TODDLER ROOM 1-2 YEARS - 12 CHILDREN
R2 GROUND FLOOR ±11'-0"
D6
UTILITY CLOSET
C1
TOILET
T1 INFANT ROOM 6 MONTHS - 1 YEAR - 8 INFANTS
D4
D3
R1 LOBBY
L1 D1
D2
W1
W2
BEDFORD AVE
1 A-005
PROPOSED GROUND FLR PLAN (SCHEME 3) 1/4"=1'-0"
Pa ge 16 | SA HE B ARC HI TEC TU RE PLLC
N
CITITOTS DAYCARE CENTER BROOKLYN, NY
S AH E B AR CH I TE CTU R E P LL C | P a g e 1 7
C O N T A C T 1 2 1 6 B R O A D W A Y, 2 N D F L O O R NEW YORK, NY 10001 rsaheb@sahebarchitecture.com 917 562 6011