Elmira Kamyab - Project Sheet - 2018Fall

Page 1

THE BEACON

RECREATION CENTER

Plan Light reflection of walls Continuous framed view

Section Continuous framed view

Light reflection on the folded wall

This project is located on Tucson in adjacency with the Tucson warehouse transfer building. It is essentially a recreation hub including programs for both the outdoor and indoor spaces. The architecture is about merging these spaces and drawing visitors to the site, then illuminating paths that guide them through. To begin, a couple of frames were placed on the site and arranged to link a continuous view from one side to the other side of the site. The frames, through observation and study, evolved into 3 separate buildings, not only framing the continuous view but linking a series of with outdoor spaces in between. Together, they serve as a beacon; attracting, illuminating and guiding visitors to and through the site.

3'' EXTERIOR CONCRETE LAYER 3'' EXTERIOR CONCRETE LAYER RIGID FOAM BLOCK CONTINUSE RIGID FOAM BLOCK CONTINUSE BETWEEN WALL AND ROOF BETWEEN WALL AND ROOF FILLED CONCRETE HOLLOW FILLED CONCRETE HOLLOW 3'' EXTERIOR CONCRETE LAYER RIGID FOAM BLOCK CONTINUSE 3'' EXTERIOR CONCRETE LAYER REBARS REBARS BETWEEN WALL AND ROOF RIGID FOAM BLOCK CONTINUSE 2'' INTERIOR CONCRETE LAYER 2'' INTERIOR CONCRETE LAYER FILLED CONCRETE HOLLOW BETWEEN WALL AND ROOF

A A

2

A

A

3'' EXTERIOR CONCRETE LAYER RIGID FOAM BLOCK CONTINUSE 3'' EXTERIOR CONCRETE LAYER BETWEEN WALL AND ROOF RIGID FOAM BLOCK CONTINUSE FILLED CONCRETE HOLLOW BETWEEN WALL AND ROOF

REBARS FILLED CONCRETE HOLLOW

FILLED CONCRETE HOLLOW REBARS

REBARS 2'' INTERIOR CONCRETE LAYER

REBARS 2'' INTERIOR CONCRETE LAYER

2'' INTERIOR CONCRETE LAYER

2'' INTERIOR CONCRETE LAYER

1 Confer.

Meeting

Confer.

Equipment

Waiting/ Garden h. Mec

t/ en en em rd rtis n Ga ve Ad itatio Inv

t/ en en em rd rtis n Ga ve Ad itatio Inv

t/ en en em rd rtis n Ga ve Ad itatio Inv

Waiting/ i Garden a

Waiting/ Garden

Show/ Concert

Level 4

45'-0''

45'-0''

B B

Fitness

Fitness

Fitness

Level 4 B

B

B

B

B

Show/ Concert

Eating / Resturant

B

Show/ Concert

Tucs c on Warehouse transformer Building tra

y rar Lib

Level 4 Market M

Mech.

Mech.

am Ste na Su

4

/

am Ste na Su

Fitness

Security room

3

Mech.

Assem y

2'' INTERIOR CONCRETE LAYER 2'' INTERIOR CONCRETE LAYER

Fitness

Training / First Aid

Training / First Aid

Training / First Aid

STEEL PLATE 3'' EXTERIOR CONCRETE LAYERSTEEL PLATE 1' STEEL COLUMN 1' STEEL COLUMN 3'' EXTERIOR CONCRETE LAYER 2'' INTERIOR CONCRETE LAYER BATT INSULATION BATT INSULATION 2'' INTERIOR CONCRETE LAYER STEEL PLATE

Lobby

Assembly for 100

SC 1/16’’=1’-0’’

er rm nsfo Tra

er rm nsfo Tra

er rm sfo

GROUND PLAN A

A

SECOND FLOOR PLAN SC 1/16’’=1’-0’’

A

THIRD FLOOR PLAN N SC 1/16’’=1’-0’’

A

45'-0''

3'' EXTERIOR CONCRETE LAYER 3'' EXTERIOR CONCRETE LAYER

/

ers ck Lo

ers ck Lo

Fitness

45'-0'' Level 4

Lobby

Market

Lobby

FOURTH FLOOR PLAN SC 1/16’’=1’-0’’

-1 FLOOR PLAN

3'' EXTERIOR CONCRETE LAYER 3'' EXTERIOR CONCRETE LAYER 2'' INTERIOR CONCRETE LAYER 2'' INTERIOR CONCRETE LAYER STEEL PLATE

1' STEEL COLUMN STEEL PLATE

1' STEEL COLUMN STEEL PLATE

1' STEEL COLUMN BATT INSULATION

1' STEEL COLUMN BATT INSULATION

BATT INSULATION

BATT INSULATION

Floor +2

RETURN AIR DUCT RETURN AIR DUCT SUPPLY AIR DUCT SUPPLY AIR DUCT RETURN AIR DUCT

RETURN AIR DUCT

RETURN AIR DUCT SUPPLY AIR DUCT

RETURN AIR DUCT SUPPLY AIR DUCT

SUPPLY AIR DUCT

SUPPLY AIR DUCT

Floor +2 16'-0''

16'-0''

SC 1/16’’=1’-0’’

Floor +2 16'-0''Floor +2 16'-0''

2'' CONCRETE SLAB 2'' CONCRETE SLAB METAL DECK METAL DECK 2'' CONCRETE SLAB16'' GRIDER 16'' GRIDER 2'' CONCRETE SLAB METAL DECK 7'' STEEL BEAM 7'' STEEL BEAM METAL DECK 16'' GRIDER

2'' CONCRETE SLAB 2'' CONCRETE SLAB METAL DECK

Ground Floor Ground Floor

METAL DECK 16'' GRIDER

16'' GRIDER 7'' STEEL BEAM

16'' GRIDER 7'' STEEL BEAM

7'' STEEL BEAM

7'' STEEL BEAM

0'-0''

0'-0''

Ground Floor 0'-0'' Ground Floor 0'-0''

SUSPENDED CILLING SUSPENDED CILLING GYPSUM BOARD CILLING GYPSUM BOARD CILLING SUSPENDED CILLING GYPSUM BOARD CILLING SUSPENDED CILLING GYPSUM BOARD CILLING

SUSPENDED CILLING GYPSUM BOARD CILLING SUSPENDED CILLING GYPSUM BOARD CILLING

Level -2

Level -2

-28' - 0"

-28' - 0"

Level -2 -28' - 0" Level -2 -28' - 0"

STEEL BASE PLATE STEEL BASE PLATE RETAINING WALL RETAINING WALL STEEL BASE PLATE

FOOTING FOOTING STEEL BASE PLATE GROUND SLAB GROUND SLAB RETAINING WALL

STEEL BASE PLATE STEEL BASE PLATE RETAINING WALL

RETAINING WALL FOOTING GROUND SLAB FOOTING

RETAINING WALL FOOTING GROUND SLAB FOOTING

GROUND SLAB

GROUND SLAB

CONCRETE WALL SECTION SC 1”=1’-0”


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.