Portfolio of Work

Page 1

E LOISE T I M M S FOLIO OF WORK B. Env Des

M. Arch

portfolio of work


+ curriculum vitae

E LOISE TIMMS

CONTENTS

SU M M A R Y

CURRICULUM VITAE

01

REFERENCES

04

01 | Yarra Valley Winery 02 | Western Australian Ecology Centre 03 | Forest Link 04 | Honors Dissertation

07

UNIVERSITY WORK

12 16 22

PROFESSIONAL WORK

01 | Curtin university 02 | Aurecon workplace 03 | Freshwater Parade

46/19 Flynn St Churchlands | Perth, 6018 | 0437 0511 53 | ellie13@iinet.net.au

25

28 32

After almost four years’ experience at HASSELL architects as an Architecture Student I am now looking for something more permanent as I prepare to graduate. My responsibilities at HASSELL delved into both the Architecture and Interior Design disciplines, equipping me with a broad range of skills and project experience. Projects ranged from commercial workplace to healthcare, education and residential. My skill set includes strong graphic skills used to prepare submissions, briefing reports and concept designs, undertaking project benchmarking and formulating space budgets, liaising with suppliers and coordinating finishes and furniture. I am proficient in undertaking building and floor plate analysis in terms of environment and space use efficiency. I have a strong work ethic, defined by confident and considered decision making, ability to multi-task and work effectively under pressure as well as a willingness to learn and be challenged. I am proficient in a number of applications including the adobe design suite, autocad, sketchup, revit and 3ds studio max. I have begun my architectural registration log book and am looking to undertake registration within the next 2 years.

O B JE C T I V E S 1. To work in an environment where I am challenged and where I can gain

valuable experience and build upon my education 2. To be part of a workplace that fosters design and innovation 3. To undertake architectural registration within the next 2 years

+ 01


+ curriculum vitae

+ 02

ED U CAT I O N

WALGA 68-170 Railway Parade, West Leederville Responsibilities: 1. archicad modeling 2. materiality and construction reference and research

University of Western Australia Bachelor Of Environmental Design 2009 – 2011 Master Of Architecture (Due to graduate in September 2013) 2012 – 2013 Completed my Honors Dissertation, “High Rise Resistance: Overcoming High Rise resistance through the development of performance based guidelines.” in 2012 with a Distinction. Awarded the Hassell Dissertation Prize.

AWAR D S Hassell Dissertation Prize (2012) for best dissertation in the Master of Architecture or Bachelor of Landscape Architecture degree course.

EM P LOY M E NT H I STO R Y HASSELL Architects Perth CBD Reference: Caroline Diesner, Principle & Registered Architect P: 08 6477 6000 E: cdiesner@hassellstudio.com Projects: Fiona Stanley Hospital 102-118 Murdoch Drive, Murdoch Responsibilities: 1. 3d modeling 2. AutoCAD drawing and details 3. finishes and sample boards Confidential Oil & Gas Company Responsibilities 1. void and stair studies 2. conceptual development 3. presentations and concept imagery 4. graphic design and diagrams 5. 3d visualizations 6. indesign packages and presentations 7. test fits and space planning

+ curriculum vitae

8/1/2009—Still Employed

Curtin University Refurbishment and Data Visualization Facility Kent St, Bentley Responsibilities: 1. autocad planning and detailing 2. supplier research and coordination 3. product research 4. finishes and fittings 5. coordination of drawings Aurecon Workplace Hay St, Perth Responsibilities: 1. Stair and Void study 2. Concept Design & Briefing Presentations 3. Floor plate zoning plans 4. Floor plate detailing including stair and void 5. Project benchmarking and space budget analysis Woodside Intelligent Operations Centre St Georges Tce, Perth Responsibilities 1. test fits and space planning 2. building analysis 3. preparation of briefing documents 4. participating in workplace workshops 5. space use efficiency and project benchmarking Freshwater Parade Claremont, Perth Responsibilities 1. Revit drafting of construction drawings

T E C H N I C A L PR O F I C I E N C Y: Applications: AutoCAD (excellent), Sketchup (excellent), 3ds Studio Max (good), Adobe Design Suite (excellent), Archicad (basics), Revit (basics)

AVA I LA B I LI T Y July 2013

+ 03


+ 04

+ 05


+ university work

+ 07

Site Plan

PROJECT 01

3RD YEAR TECHNOLOGY UNIT YARRA VALLEY WINERY

This third year unit focused on the structural side of design. We were given a site in the Yarra Valley on which we had to design a tank room for a Winery. We had to take into consideration the wine making process and what kind of facilities and adjacencies this would require. The aim was to create a building formed of a simple structure and detail the systems involved. To this end we performed a number of analyses on the structure including wind and weight loads to ensure that it was structurally sound We gained an awareness of the relationship between structural and non-structural components. Drawings ranged from suspended walkways, to cladding systems and gutter details.

UNIVERSITY WORK

ELOISE TIMMS | FOLIO OF WORK


+ university work

+ 08

+ university work

Drawings (clockwise beginning top left): 1. Ground floor Site plan 2. First Floor Site Plan 3. Cross Section

ELOISE TIMMS | FOLIO OF WORK

+ 09

Drawings (clockwise beginning top left): 1. Footing Detail 2. Steel Concrete Connection 3. Internal Elevation 4. North Elevation

ELOISE TIMMS | FOLIO OF WORK


+ university work

+ 10

+ university work

Drawings (clockwise beginning top left): 1. Drainage System 2. Plan Detail of Wall System 3. Section Detail of Suspended Walkway 4. Roof Sectin 5. Steel Connection

ELOISE TIMMS | FOLIO OF WORK

+ 11

Drawings (top to bottom: 1. Wall Section 2. Cladding System

ELOISE TIMMS | FOLIO OF WORK


+ 12

+ university work

+ university work

Page 1: The site was located in Bold Park, City Beach, a coastal suburb in Perth’s north west. The site was close to a number of amenities including outdoor recreational facilities, the beach, numerous shops, cafes and retail districts.

Deer Valley Rock Art Centre

PROJECT 02

4TH YEAR DESIGN STUDY WESTERN AUSTRALIAN ECOLOGY CENTRE

+ 13

Our brief was to create a Western Australian Ecology Centre in Bold Park Reserve. There were a number of challenges including the protection of the reserve which required a building that had minimal effect on the surrounding context My scheme was holistic in approach, based on the idea of the circle. I took the Deer Valley Rock Art Centre as a precedent which created a building that used materiality and form to blend into its surround. I achieved this by creating a low, slender building which took advantage of the sloping site and sunk into the ground. One of the key features of this scheme was the circular shape and the external walls. By offsetting the circle I created thicker exterior walls which acted as thermal buffers and removed the need for large roof overhangs for shading. This also created interesting ‘pocket’ spaces which could be used as spaces of contemplation or research or relaxation. “All drawings have been scaled to a4 format

ELOISE TIMMS | FOLIO OF WORK

ELOISE TIMMS | FOLIO OF WORK

Page 2: This page expresses precedent influence and how the building interacts with the site, in particular existing trees and slope.


+ university work

+ 14

+ university work

Page 5: This page focused on the technical detail of the building, in particular how the green roof and exterior walls would be constructed. Consideration for the spaces created by the thick external wall were also explored.

Page 3: This page expresses the general look and feel, arrangement and adjacencies of internal spaces and a sectional perspective expressing the relationship with the sun.

ELOISE TIMMS | FOLIO OF WORK

Page 4: A number of elevations express how the building sits on the site and its relationship to the slope. Internal views and 3D axo’s demonstrate the sun penetration and shading at different times of the day.

+ 15

ELOISE TIMMS | FOLIO OF WORK

Page 6: This page was focused on information gained through building analysis in the program Ecotect. This program analyzes the heat gain and loss of the building throughout the year.


+ university work

+ 16

Site Plan

PROJECT 03

5TH YEAR DESIGN STUDIO PROJECT: SUBIACO MIXED USE DEVELOPMENT

This unit was focused on developing an existing car park within the residential suburb of Subiaco. The suburb has been earmarked for increased density and development as part of Perth’s latest planning scheme. The area is characterized by a low rise character and small scale urban fabric. The challenge with this studio was creating a scheme that achieved increased density while being responsive to its specific context and considering local planning restrictions. My final scheme was based on in-depth contextual analysis. The driver behind the scheme was diversity; diversity of housing, of form and of scale. This was a response to the rhythm and scale of the Subiaco streetscape, which incorporates a large level of diversity both in terms of size and architectural style. The scheme included active uses along the ground level such as retail and hospitality. Office took up levels two and three with housing from levels four to seven. Two typologies of housing were explored: high density housing with communal facilities and apartment style housing similar to what already exists in Subiaco. “All drawings have been scaled to a4 format

ELOISE TIMMS | FOLIO OF WORK

+ 17


+ 18

+ 19


+ 20


+ university work

+ 22

+ university work

+ 23

“High Rise Resistance: Overcoming High Rise resistance through the development of performance based guidelines.”

PROJECT 04

HONORS DISSERTATION

In 2012 I completed my Honors Dissertation: “High Rise Resistance: Overcoming High Rise resistance through the development of performance based guidelines.” My dissertation was awarded the HASSELL Dissertation Prize in 2013 and featured in ‘The Post’, a local Perth publication.

A B ST R ACT

Perth’s burgeoning urban footprint and growing population are the main focus of Directions 2031. Directions 2031 is the latest Metropolitan Planning Strategy for Perth and was adopted by the State Government in 2011. The policy aims to create a more connected city through the implementation of three key principles: growth management, intensification of existing activity centers and improvement of public transport. The planning scenario consists of both infill and green field development of which infill will constitute 47%. High rise is a logical component of infill development and a key factor in managing Perth’s outward growth. High rise brings density and amenity; it strengthens local business and mass transit, all key issues raised in Directions 2031. However, resistance to high rise has had a major influence on the progression of such developments. Negative attitudes toward high rise are driven by a number of issues. Whether it is negative associations linked to poorly designed high rise of the past or a NIMBY mentality, high rise for many local residents is synonymous with the destruction of culture and character. Resistance to high rise is intensifying, with local communities becoming increasingly organized in opposing developments. Council members and residents may not have the final say in approving high rise developments but they do have the ability to delay such developments, in some cases to the extent where they are no longer viable. If Directions 2031 is to be successfully implemented then provisions need to be made for the integration of high rise into activity centres. The aim of this research is to increase the understanding of high rise resistance and explore methods of overcoming it. The final outcome will be a set of performance based guidelines specifically concentrated on the relationship between high rise developments and activity centres. The intention is to bridge the gap between State and Development industries and local councils and residents by providing easily accessible and understandable information.

Post Article 4th May, 2013

ELOISE TIMMS | FOLIO OF WORK

The abstract from my Dissertation.

ELOISE TIMMS | FOLIO OF WORK


+ professional work

+ 25

Curtin Bentley Campus Map

PROJECT 01 CURTIN UNIVERSITY KENT ST, BENTLEY

The Curtin University project involved the refurbishment of 11 different rooms within their existing campus in Bentley. I was involved in the project from shematic design through to design development. This involved the development of SCHEMATIC DESIGN a conceptual strategy, selection of finishes and DESIGN DEVELOPMENT furniture, and documenting the final design in autoCAD. Schematic design began by exploring key principles that were important to the client. We then needed to translate this into a legible concept throughout the campus. The concept was about creating a network through the campus. This network was intended to foster connection and a sense of being, manifesting itself physically within the materiality of the flooring, walls and ceilings. The idea was that each room would be connected and represent part of a larger whole.

PROFESSIONAL WORK

ELOISE TIMMS | FOLIO OF WORK


+ professional work

+ 26

+ professional work

+ the process

+ the design

1. Synthesize design principles 2. Develop conceptual scheme a. One room within a building b. Spread across the campus and build a connection c. Insertion of new into existing building fabric, aligning with strong north south axis of campus d. Defining a new network of collaborative learning across the campus, subtly represented in each new space 3. Create a look and feel palette 4. Create a materials palette and select furniture and finishes

The final design was full of colour and texture. The linear structure of the materiality creates structure within the space and the opportunity for smaller collaborative areas within these rooms. All materials chosen were designed to foster collaborate learning. For instance cork boar and echo panel were used on the walls, along with white boards to allow for pinups and increased communication and interaction.

Concept images illustrating the network of connections at a campus scale and at an individual rooms cale.

ELOISE TIMMS | FOLIO OF WORK

Image illustrating the key design principles, look and feel images and the materials and finishes palette.

These images illustrate two of the refurbished rooms. Both floor plans and elevations were animated with colour, people and material for a presentation to Curtin University, ELOISE TIMMS | FOLIO OF WORK

+ 27


+ professional work

+ 28

+ professional work

+ 29

+ the process 1. Site Analysis 2. Development of Conceptual Scheme 3. Development of void + stair strategy 4. Schematic zoning diagrams both in plan and in section 5. Test fits analyzing space use efficiency, adjacencies and population numbers 6. Schematic 3D visualizations

PROJECT 03

This project is currently on going. I was involved AURECON WORKPLACE in the schematic design phase. Roles ranged from concept design to schematic plans involving test HAY ST, PERTH CBD fits and void / stair detailing to space budgets and benchmarking. In addition I helped produce SCHEMATIC DESIGN schematic 3d imagery, InDesign documents and concept imagery. The fit out is located within four levels of a new build along Hay St in Perth CBD. It will take up levels 2 through 5. Given its close proximity to street level there was a heavy focus on its relationship to the street and pedestrian interface. To this end we pursued a stair and void concept that was close to the facade and was expressed as one piece.

Render of Aurecon stair / void concept (HASSELL image).

ELOISE TIMMS | FOLIO OF WORK

Images taken from the schematic design stage. At this point I undertook site and building analysis. ELOISE TIMMS | FOLIO OF WORK


+ professional work

+ 30

+ the design Due to its location on the 2nd floor and its proximity to the street, the void and stair became a strong object which would be used to relate to the street and pedestrian interface. As such significant development went into this strategy.

A group of images illustrating the progression of the project from schematic hand drawn zoning plans to 3D visualizations. ELOISE TIMMS | FOLIO OF WORK


+ professional work

+ 32

+ professional work

+ 33 REFERENCE MAP

NORTH

A

0

800

20

900

400

800

1600mm

REFERENCE 1:20MAP

3910 COS 50

B

600

900

20

600

20

NORTH

General Notes: 1. Do Not Scale Drawings. Written Dimensions Govern. 2. All Dimensions Are In Millimetres and Levels are In Metres Unless Noted Otherwise. 3. All Dimensions and Levels Shall Be Verified On Site Before Proceeding With Construction. Hassell Shall Be Notified in Writing Of Any Discrepancies. 4. The Designer Reserves the Right To Alter Dimensions On Site To Suit Construction, Engineering Or Site Conditions As Required. 5. This Drawing Must Be Read in Conjunction With All Relevant Contracts, Specifications, Reports And Drawings. 6. These Drawings Are The Sole Property Of Hassell And May Not Be Reproduced Or Modified In Whole Or Part Without Written Permission.

A

B

© COPYRIGHT OF THIS DRAWING IS VESTED IN HASSELL. THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

0 3910 COS 50

800

20

900

6

600

5

4

3

400

800

1600mm

1:20 900

20

600

20

General Notes: 1. Do Not Scale Drawings. Written Dimensions Govern. 2. All Dimensions Are In Millimetres and Levels are In Metres Unless Noted Otherwise. 3. All Dimensions and Levels Shall Be Verified On Site Before Proceeding With Construction. Hassell Shall Be Notified in Writing Of Any Discrepancies. 4. The Designer Reserves the Right To Alter Dimensions On Site To Suit Construction, Engineering Or Site Conditions As Required. 5. This Drawing Must Be Read in Conjunction With All Relevant Contracts, Specifications, Reports And Drawings. 6. These Drawings Are The Sole Property Of Hassell And May Not Be Reproduced Or Modified In Whole Or Part Without Written Permission.

© COPYRIGHT OF THIS DRAWING IS VESTED IN HASSELL. THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

6

2

1

2

4

3

Type D - Kitchen Plan 1 : 20

Type D - Kitchen Plan 1 : 20

Type D - Kitchen 3D

1 O REV

24.560

FL 03

24.560

FL 03

24.560

FL 03

870

24.560

FL 03

ADJ

ADJ

ADJ

ADJ

ADJ

ADJ

LA1

1 O REV

ADJ

RENDER TO BACK WALL PRIOR TO INSTALLATION OF CABINET

2400

FL 03

GL01

24.560

24.560

FL 03

50

1430

ADJ

1 : 20

DRAWER

LA1 LA1

ADJ

LA1

POT DRAWER

OPEN CARCASS FOR FUTURE DISHWASHER

POT DRAWER

DRAWER DRAWER DRAWER

POT DRAWER

DRAWER DRAWER

LA1

ADJ

HASSELL LA1

ADJ

ADJ

ADJ

CLIENT

LA1

21.560

FL 02

FL 02

RENDER TO BACK WALL PRIOR TO INSTALLATION OF CABINET GL01

GL01

Type D - Kitchen Elevation 2

4

5

1 : 20

---

LA1 LA1

---

21.560

ADJ

50

21.560

1430

Type D - Kitchen Elevation 1

MW

LA1

ADJ

21.560

FL 02

Type D - Kitchen Elevation 3 LA1

Type D - Kitchen Elevation 4

6

ADJ

1 : 20

1 : 20

--LA1

LA1

ADJ

LA1

Aria Land

FL 02

INFILL PANEL TO SUIT STOVE HEIGHT

PROJECT

LA1

Freshwater 1 Freshwater Parade, Claremont, WA

ADJ

ADJ

LA1

LA1

CLIENT REFERENCE MAP

LA1

21.560

21.560

FL 02

FL 02

21.560

50

3

---

This project is still ongoing. As such the following drawings are a work in progress.

LA1

ADJ

LA1

DRAWER

POT DRAWER

870

LA1

DRAWER

LA1

ADJ

21.560

FL 02

Type D - Kitchen Elevation 1

3

4

1 : 20

---

Type D - Kitchen Elevation 2

5

1 : 20

---

DRAWING TITLE

Room Layouts - Apartment Type D

Type D - Kitchen Elevation 3

6

1 : 20

---

Lots - 33, 41, 52 REFERENCE MAP - 6,B 14 ALots (Handed)

Type D - Kitchen Elevation 4 1 : 20

5 3

NORTH

PROJECT STATUS

Freshwater For Building Permit DRAWN CO-ORD REVIEWED APPROVED SCALE @ A0 Parade, 1 400 Freshwater WA A Claremont, B 800 1600mm Author CheckerApprover 1 : 20

0

4

NORTH

Aria Land

FL 02

INFILL PANEL TO SUIT STOVE HEIGHT

---

01.05.13 15.04.13 DATE

HASSELL Limited ABN 007 711 435 PODIUM LEVEL, CENTRAL PARK 152-158 ST GEORGE TERRACE PERTH WA 6000 AUSTRALIA PERTH@HASSELLSTUDIO.COM T +61 8 6477 6000 F +61 8 9322 2330

GL01

LA1

ADJ

LA1

2400

OPEN CARCASS FOR FUTURE DISHWASHER

LA1

DRAWER DRAWER

POT DRAWER LA1

POT DRAWER

LA1

DRAWER

LA1

ADJ

Preliminary Issue for Tender Issued for Building Permit DESCRIPTION

CONSULTANT

FL 03

ADJ LA1

DRAWER MW

01.05.13 15.04.13 DATE

HASSELL Limited ABN 007 711 435 PODIUM LEVEL, CENTRAL PARK 152-158 ST GEORGE TERRACE PERTH WA 6000 AUSTRALIA PERTH@HASSELLSTUDIO.COM T +61 8 6477 6000 F +61 8 9322 2330

HASSELL LA1

24.560

Preliminary Issue for Tender Issued for Building Permit DESCRIPTION

CONSULTANT

FL 03

50

24.560

1:20

PROJECT NUMBER

DRAWING NUMBER

REV

001496 A3005 Room Layouts - Apartment Type D

4

3

1

General Notes: DRAWING TITLE 1. Do Not Scale Drawings. Written Dimensions Govern. 2. All Dimensions Are In Millimetres and Levels are In Metres Unless NotedOriginal Otherwise. Sheet Size A0 -1189 x 841mm 3. All Dimensions and Levels Shall Be Verified On Site Before Proceeding With 800 1600mm Construction. Hassell Shall0Be Notified in400 Writing Of Any Discrepancies. 4. The Designer Reserves the Right To Alter Dimensions On Site To Suit Construction, Engineering Or Site Conditions As Required. 1:20 5. This Drawing Must Be Read in Conjunction With All Relevant Contracts, Specifications, Reports And Drawings. General Notes: 6. These Drawings Are The Sole Property Of Hassell And May Not Be Reproduced Or Do Not ScalePermission. Drawings. Written Dimensions Govern. Modified In Whole Or Part 1. Without Written STATUS 2. All Dimensions Are In Millimetres and Levels are In Metres Unless Noted Otherwise. © COPYRIGHT OF THIS DRAWING IS VESTED IN HASSELL. 3. All Dimensions and Levels Shall Be Verified On Site Before Proceeding With Construction. Hassell Shall Be Notified in Writing Of Any Discrepancies. THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS 4. The Designer Reserves the NOTED Right ToOTHERWISE. Alter Dimensions On Site To Suit Construction, Engineering Or Site Conditions DRAWN CO-ORDAs Required. REVIEWED APPROVED SCALE @ A0 5. This Drawing Must Be Read in Conjunction With All Relevant Contracts, Specifications, Reports And Drawings. 6. These Drawings Are The Sole Property Of Hassell And May Not Be Reproduced Or Or Part Without Written Permission. PROJECT NUMBER Modified In Whole DRAWING NUMBER REV

6

5

C:\_Revit Projects\FRESHWATER_ARC_BUILDING_timex.rvt

I was brought onto this project during contract FRESH WATER PARADE documentation stage. My role was to document all 45 apartment room layouts in Revit for construction CLAREMONT, PERTH issue. This included kitchens, bathrooms and wardrobes. I was also asked to give design direction CONTRACT DOCUMENTATION in terms of internal materials and finishes and spacial functions and adjacencies.

10/05/2013 11:57:55 AM

PROJECT 03

C:\_Revit Projects\FRESHWATER_ARC_BUILDING_timex.rvt

1

Type D - Kitchen 3D

5

Lots - 33, 41, 52 Lots (Handed) - 6, 14

6

Type D - Ensuite Plan

Author

1 : 20

1 : 20

001496

2

1

10/05/2013 11:57:55 AM

For Building Permit

2

CheckerApprover

A3005

1

© COPYRIGHT OF THIS DRAWING IS VESTED IN HASSELL.

THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE. Original Sheet Size A0 -1189 x 841mm

Type D - Ensuite Plan 1 : 20

Type D - Ensuite 3D

1

Type D - Ensuite 3D

21.560

3

---

21.560

FL 02

Type D - Ensuite Elevation 1

4

1 : 20

21.560

3

---

---

FL 02

21.560

4

1 : 20

11 9

5

1 : 20

Type D - Ensuite Elevation 1

10

21.560

FL 02

Type D - Ensuite Elevation 2

---

--FL 02

21.560

FL 02

Type D - Ensuite Elevation 3

6

1 : 20

Type D - Ensuite Elevation 2

21.560

5

1 : 20

---

--FL 02

Type D - Ensuite Elevation 3 1 : 20

FL 02

Type D - Ensuite Elevation 4 1 : 20

21.560

6

---

FL 02

Type D - Ensuite Elevation 4 1 : 20

12

10

11 9

1 O REV

12

Preliminary Issue for Tender Issued for Building Permit DESCRIPTION

01.05.13 15.04.13 DATE

CONSULTANT

8

HASSELL Limited ABN 007 711 435 PODIUM LEVEL, CENTRAL PARK 152-158 ST GEORGE TERRACE 1 PERTH WA 6000 AUSTRALIA PERTH@HASSELLSTUDIO.COM O T +61 8 6477 6000 F +61 8 9322 2330

Type D - Bathroom / Laundry Plan 1 : 20

HASSELL 8

REV

Preliminary Issue for Tender Issued for Building Permit DESCRIPTION

01.05.13 15.04.13 DATE

CONSULTANT

HASSELL Limited ABN 007 711 435 PODIUM LEVEL, CENTRAL PARK 152-158 ST GEORGE TERRACE PERTH WA 6000 AUSTRALIA PERTH@HASSELLSTUDIO.COM T +61 8 6477 6000 F +61 8 9322 2330

Type D - Bathroom / Laundry Plan 1 : 20

HASSELL

CLIENT

Aria Land

CLIENT

Type D - Bathroom / Laundry 3D

9

---

Type D - Bathroom / Laundry Elevation 1 1 : 20

21.560

FL 02

21.560

FL 02

10 Type D - Bathroom / Laundry Elevation 2

--21.560

FL 02

1 : 20

11 Type D - Bathroom / Laundry Elevation 3 21.560

FL 02

---

1 : 20

21.560

FL 02

Aria Land

FL 02

PROJECT

Freshwater 1 Freshwater Parade, Claremont, WA

12 Type D - Bathroom / Laundry Elevation 4 ---

1 : 20 21.560 FL 02

21.560

FL 02

PROJECT

Freshwater D Claremont, WA FreshwaterType Parade, 12 Type D - Bathroom / Laundry Elevation 4Room Layouts 1- Apartment DRAWING TITLE

9

---

Type D - Bathroom / Laundry Elevation 1 1 : 20

10 Type D - Bathroom / Laundry Elevation 2 ---

1 : 20

11 Type D - Bathroom / Laundry Elevation 3 ---

1 : 20

---

1 : 20

Lots - 33, 41, 52 Lots (Handed) - 6, 14 DRAWING TITLE

C:\_Revit Projects\FRESHWATER_ARC_BUILDING_timex.rvt

7

21.560

Room Layouts - Apartment Type D For Building Permit

SCALE @ A0

1 : 20

PROJECT NUMBER

001496

Lots - 33, 41, 52 CO-ORD Lots (Handed) - 6,REVIEWED 14

DRAWN

Author

ELOISE TIMMS | FOLIO OF WORK

REV

A3004 For Building Permit

1 : 20

ELOISE TIMMS | FOLIO OF WORK

CheckerApprover

DRAWING NUMBER STATUS

SCALE @ A0

APPROVED

10/05/2013 11:57:44 AM

STATUS

These are drawings from a two bedroom apartment. Drawings (top to bottom): 1. Kitchen axo and construction drawings. 2. Ensuite Bathroom axo and construction drawings 3. Bathroom / Laundry axo and construction drawings

1

Original Sheet Size A0 -1189 x 841mm DRAWN CO-ORD REVIEWED

Author

APPROVED

10/05/2013 11:57:44 AM

Render of proposed apartment developed (HASSELL image)

Type D - Bathroom / Laundry 3D

C:\_Revit Projects\FRESHWATER_ARC_BUILDING_timex.rvt

7

CheckerApprover

PROJECT NUMBER

DRAWING NUMBER

001496

A3004

REV

1 Original Sheet Size A0 -1189 x 841mm


THANK YOU!

If you have any queries regarding my CV or Folio of Work do not hesitate to contact me. ELOISE TIMMS E : E L L I E 1 3 @ I I N E T. N E T. A U M: 0437 0511 53


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.