Professional Work Sample

Page 1

Y O U FA N G D U A N PORTFOLIO OF SELETED WORKS 2022.9 - 2024.2 AT KLOPFER MARTIN DESIGN GROUP


0

20

N

R=168.34' CB DRAI MANHOLNS INTO E A

R=169.08' I(A)=165.7 6' 12"RC P

I=166.81 '

186

188.1'

R=184.09'

192.9'

190

191

192.5'

GRAVEL

BIT.

194

19 3

8"

S

R=193.15'

9

20

STORAGE TRAILER

S

H/WOOD

BRUS

S

GRAS

GRAVEL

EL

GRAV

207

BB

URCE

RESO PILES

S

18"

18"

18"

8"

18"

15"

6"

10"

10"

#5928

8

20

15"

211

S

GRAS

210

12"

214.8'

24"

S

GRAS

15"x2

24"

UP

SWL

10"x2

S

15"

UP

GRAS

18"

212

24"

4

21

214.5'

12"

3"

204.6'

202

201.4'

203

204

205

206

12"

12"

213.6'

12"

6"

15"

6"

6"

207

208

209

210

211

213

212

10"

18"

10"

15"

8"

BIT.

S

203.5'

S

20"

12"

15"

12"

30"

BOULDER

GRAS

S

12"

12"

12"

214

12"

6"

12"

10"

6"

219.4'

24"

10"

12"

GRAS

12"

15"

8"

8"

6"

6"

36"

8"

12"

8"

15"

6"

6"

EL

GRAV

197

198 207

208

15"

215

215.3'

216

217.6'

218

217

220.4'

12"

12"

10"

219

42"

205

BRUSH

2 ST WO ORY OD

213.4'

BIT.

BRUSH

30"

12"

CONC.

BIT.

S

GRAS

218.6'

S

195

2 STORY WOOD

197

CP

12"R

212

216 224

22 2

223.3'

1

22

#11713

S

GRAS

5

19

21 2 STO RY WO OD

0

20

?

0

CONC. WALL

19

131.92 '

5

18 0

6'

234.5

0

20

190

N

N

o

o ?

I=216.82'

CC

CC

SWL

21 0 22 4

20 5 0

o

o ?

o

CC CONC. WALK

200 220 221

CC

CC D

200 22

o o

CC

CC

5

226

SWL

21 0 225

221 218 217

o o

225.0'

o

GRASS

LK

22

223 222

216

Δ = 6 ° 20 '3 7 " R = 3 89 4. 83 L = 4 31. 2 3'

o

A

B

o

H

BRUS

BRUSH

224

. WA

NC

JOHNSON PARK 1 STORY CONRETE

CC

SWL

4

6"S I=216.38'

220 219

o

EXISTING WOO D BUILDING

R=22 2.96' I(A)=222.1 I(B)=221.6 8' 6"PVC 6' 6"PV C

o

#11713

#11712

CO

223

225.1'

15.03'

o

22

#432 223.3'

BIT.

2"

224

S

GRAS

223.4'

CONC. WALK

CC

22 8

CC

CC 228

222

18 5

o

o

S

GRAS

N

25.18'

18"

6"

CONCRETE

CC CONC. WALK

CC

BIT. WALK CC

SWL

22 3

BB

o o

179.23'

o

I=225.50'

CC

o

BRUSH

18

24"

BIT.

18"

224.4'

6"S

BIT.

#1431

BB

CC

CC

229 23 0

229

o o

EXIST ING WOO D BUILDING

o

GRAS

S

GRAS

?

223

10"

10"

12"

10"

.35'

BIT.

I=216

5.48'

225.4'

BIT.

225.5'

EL

42"

BIT.

GRAV

3 STORY WOOD

220

221

24"

224

GRAS S

S

GRAS 225.6'

18"

18"

6

22

10"

R=22

225.7'

RY 2 STOOD WO

20"

LSA

LSA

BIT.

BRUSH

BOULDER S

TI

10" MUL

18"

BOULDER

BRUSH

226.2'

224.8'

CONC. STEPS

225

227

o

223.7'

CONC

CC

o

223.6'

BIT. WALK

. WA

CC

22 7

CONC. STEPS

0

213

S

GRAS

221.7'

BIT. WALK

12"

6"

H

BRUS

12"

214.5'

8"

18"

6"

8"

BIT.

222

222.3'

222

223

24"

224.4 '

24"

S

BOULDER

GRAS S

GRASS

BRUSH

BIT.

CONC. STEPS

o

10"

24"

GRAS

221.7'

S

36"

BRUSH

4

22

#6036

4.68' .74'

R=22

℄ =204

10"

R=22 5.35' I=222 .25'

227.7'

BOULDER

S

GRAS

CC

22 8 222 223.5'

53.17'

20x3"

BRUSH

0

22 221

224.4'

224

BIT. 224.7'

10"

OODS

BRUSH/W

BOULDER S

228.3'

H

BRUS

228

SWL

CONC. STEPS

LK 230

229

227

o

230

226

STONE WALL

CONC.

o

222

0

22 R=22 1.96' I(A)=220.3 I(B)=221.1 6' 10"M 7' 4"PV TL C

.C O N C.

o

222.3'

o

18" 24"

219 15"

?

6"x4

224.4'

P

15"CP

8"x2

229.4'

OODS

BRUSH/W

CC

BIT.

S 222.1'

GRAS

o

H/WOOD

BRUS

STOR AGE TRAILERS

15"

214.5'

216

WOOD FENCE

36"

CC CC

18"

A

8"

229.8'

S

BOULDER 230

BOULDER

TI

15" MUL

229.5'

S

CC

GRAS

5"

LK

CO NC . WA

o

214

BB

217.1'

S

2 STORY WOOD

4

22

GRAS

CC

225.1'

R=22 5.27' I(A)=221.8 1'

S

226.7'

GRAS

227.8'

229.6'

229.6'

10"

230

CC

SWL

GRAS S BENC HMARK: X-CU T HYDRANSET IN ELEV.=22 T BOLT NAVD 8.43' 88'

SWL CONC. STEPS

230 229

WALL

224

A

o

224

CC

223

S

C

o

210

S

GRAS

SWL

7

21

GRASS

223

223.7'

S

227.6'

GRAS

228.3'

1"

1"

CC

230.5'

CC L

SW

24"

B

6"PV

GRAS

o

BIT.

214

213

212

BRUS

216.0'

WOOD FENCE

6"

.84'

BIT. R=223.48'

℄=207

R=223.62'

224.5'

BIT.

6

22

225.7'

BIT.

226.2'

7

22

BIT.

228.8'

1"

S

BOULDER

CC

CC

GRAS S

B

226

SW

L

CC

C

8"CPP

o o

2.94'

R=22

EXIST ING WOO D BUILDING

R=22 3.41' I(A)=220.3 I(B)=220.7 1' I(C)=220.5 1' 0'

CC

223 I=219.89'

SWL SWL

15"CPP

223

o

SWL

222.6'

CONC.

o

GRAVEL

210.5'

12"x2 H/WOOD S 216.7'

CC

.35'

I=217

227.5'

4"

18"

4"

GRASS

230.5'

30"

24"

10" 8"

223.4'

19

BB

WOOD WALL

10"

20"

42"

S

GRAS

S

CC

6"

230

S

GRAS

24"

12"x3

8"x2

2.87'

R=22

18"

222.8'

175

E

WALK

NC

K

K

AL

.W

NC

CONC. WALK

223.7'

132.83'

215 225

DIR T

BIT.CONC.

BIT.CO NC. CC

DMH

o o o o o

23 0

230

xxxx GARDENS

BIT. WALK 23 1

230

227

180 190

205

o 395.07' 356.02'

o o

o

180

o o

373.48'

o

185

o o o o o

o o o o o

o

STOP LINE

o

STOR AGE TRAILER

8

20

10"

BB

24"

SWL

15"

15"

H

BRUS

8

21

CC

222.6'

223.2'

226.8'

GRAS

S

GRAS

S

GRAS

9

22

229.5'

CC

SWL

CONC.

S

GRAS

CO

.W AL

10"

CO

S

GRAS

EXIST ING MASONR BUILDINGY

?

o

GRAS

4"

210

209

212

211

214

BIT.

213

7

21

S

GRAS

8"CLAY

CC

228.2'

7.31'

R=22

36"

228

S

GRAS

230.1'

230.6'

G

o

S

GRAS

12"

12"

217

222.5'

3

223.3'

22

224

BIT.

225.6'

225

226

228.3'

6 228.7'

229.8'

S

GRAS

G

249

.99' 200

552.08'

0

225

205

223

.86' 220

CC

24 0

235

235

BEN CH

CC

o

o

180 CC

o

190

GRASS

DENSE TREES

DYLL

EOP

BCC

BCC BIT.CONC. PARKING

EOP

o

S

GRAS

18"

15"

217.6'

42"

BIT.

.84'

I=218

R=221.66'

227

BIT.

CC

30"

UTILITY ON CONBOX C. PAD

15"

20

o o

4"

4"x2

12"

24"

30"

8

22

20"

229.0'

30"

BOULDER

228.7'

230

SWL

BB

8"x2

10"

201

12" 10"

196

10"

BB

WOOD WALL

8"

217

9

21

219.2'

219.0'

G

G

222.9'

228.7'

229

S

GRAS

210

WALL

192

WOOD

24"

6"

8"

S

GRAS

1

6"

15"

S

GRAS

216

217.4'

EXIST ING CONC. BUILDING

5

22

228.6'

BIT.

228.7'

BIT.

R=227.95'

CC

230.3'

231

CC

STAIRS

?

o o

EL

GRAV

S

GRAS

BB

205

204

12"

212.5'

215

18"

229.7'

229.3'

229.1'

228.5'

229

209

8"

229.8'

230.7'

231

CONCRETE WALK

185 55.14' CC

167.01'

UP/LP

UP

DWS

750.98'

BCC

N

o

H/WOOD S

BRUS

WOOD WALL

2

20

SWL

208

207

206

12"

12" H

BRUS

204 215.3'

0 228.5'

229.2'

S

CC

GRAS

CC

CC

42" S

GRAS

230.6'

SWL

o

189.2'

GRAVEL

BB

BB

18"

BENC HMA CHISELED RK: SQUARE SET IN ELEV.=20CONC BASE . NAVD 3.31' 88'

209

15"

203

o

192

BIT. 200.5'

201

S

GRAS

15" 18"

0

22

205 229.6

23

228.6'

229

BIT. 230.9'

G

5

188.5'

S

GRAS

S

BB

GRAS

SWL

191

18

192.0'

R=191.7'± I=186.6'±

.6'

I=197

197.4'

201.6'

201

24"

18" 18"

5

22

200

UE CC

228.2'

230

231

SWL

197.5'

202

200

I=198 .6'

202

4

20

4 STORY CONCRETE "HARRIS DINING HALL"

220

UE CC

SS

STAIRS

195

12"RCP

193

194

195

196

197

S

BB

190

BB

OODS

198 197

198

197.5'

197 198 199 200

GRAS

BB

201.6'

30"

227

231

197

S

BRUS H/W

BRUS H/WOOD

10"

203

S

193

SWL

195

R=169.15' I(A)=165.7 9' 12"RC P

196

S

GRAS

196

0

BRUS H/WOOD

204

228

GREEN HOUSE

H

C

N

BE

18

ZACHS HILLEL HOUSE

S

0

222

W

GARDENS

ROPE FENCE

GARDENS

xx xx

BENCH

BE ?

CONCRETE WALK

CONCRETE WALK

223

20

GRAVEL

184 TMH

?

223

STAIRS

222

224

215

RT VE IN

221 220

182 MH

225

182 MH

CC

225

224

'

183

185

SC

?

STEPS

222

P

EAST PARKING LOT Phase 2A Early Summer 2023 221

CC CP 15"

L

215 CRETE ALK

CONCRETE WALK

226

18.80 I=2

CC

195 ?

5 24

226

'

221

221

21.92

222

218

4

212

210

SW

207

210 211

208

BB

202

NORTH LOT

6

8

9 N

BB 217 219

207

P 179

192

19

?

GREEN HOUSE

xx

?

G

BENCH

PICNIC TABLE

G

o o o

?

228 228

22 5

185

I=165.50' I=165.47'

15"CM 190

189

192

196

188 191

BB

185

190 191 190

187

194

245

?

STEPS

GRASS

o o

o

BCC DENSE TREES

o

?

225

224

220

WINTHROP HALL

223 224

225

'

226

227

226

224 2 23

223

20.31 CPP I=2

' I=2

227

SCHEMATIC DESIGN

2 CONNECTICUT COLLEGE CROPLEX

o

o

224

227 227

WINTHROP ANNEX

223

15"

19.79 223

225

LARRABEE HOUSE

227

228

RESERVOIR ST

8

191

20

20

20 SIG

Upper Lawn & Harris Quad - Phase 2B

22

CC

22

BRANFORD HOUSE

220

10"D

I=216.45'

223 224

225

3

BB 211

199

191 190 189

192 193

211 218

226

BB

195

202 206

217

L

20

5

216

SW

22

I=225.35'

221

CC

6"MTL

CC

180

5

o CC

210

213 218 228

220

8" 228

LK . WA BIT

222

SWL

CRO BLVD

229

BB 204

20

BB 205

203 204 205 206 225

198

SHAIN LIBRARY

190 3

195 H

4 20

214

BB

229

UT

229 CB ING

SS MI

BB

199

215

215

HAMILTON HOUSE LAMBDIN HOUSE 229

I=2

KATHARINE BLUNT HOUSE

SMITHG HOUSE

0

209

MORRISSON HOUSE

CRO BOULEVARD Phase 3 Summer 2024

200

HARRIS DINING HALL COLLEGE CENTER AT CROZIER-WILLIAMS

199 200 201 202 203

197 5 20

19

JOHNSON HOUSE 22

East Parking Lot - Phase 2A 0

189

WRIGHT HOUSE

190

SWL

185

xx

BB

180

245

203

BLAUSTEIN CENTER

?

224

192

W

178

19 CC

BIT. CONCRETE

CRO-PLEX CONNECTOR Phase 2B Late Summer 2023

xx

20

5

19

5

Existing Circulation Analysis

o LK

o o o o

300’ 150’ 75’

225 230

Project Manager: Jennifer NG and Daniel Norman

xx xx

?

Location: Connecticut College, New London, CT

o W

xx

?

?

22

0

22

0 220

Project Type: Campus Master Planning and Site Design

229

BURDICK HOUSE BLACKSTONE HOUSE

165

0

215

Project Size: Large

498.34'

444.47'

xx

461.41'

01 Connecticut College CroPlex

21

HARRIS DRIVE EXTENSION

Master Plan

20

268

.15'

Project Phase: SD

xx

xx xx xx

CC

PLANT HOUSE

CHAPEL WAY

xx

NC

20

5

170

160

365.52'

688.16'

22 5

231

235

BEN CH

SS

228 STAIRS

CC

205

5

190

19 5

200

210

205

205

30.32' 196.92'

193.33'

200

155

356.05'

373.44' 780.93'

o

o


LANDSCAPE APPROACH TO EASE THE IMPACT OF PARKING DISPLACEMENT From Master Campus Planning To Site Design Proposed Parking Spaces Displacement Plan

East Parking Lot

1

2

Hillel Lawn

Hillel Lawn 1

2

CONNECTICUT COLLEGE CROPLEX

3

SCHEMATIC DESIGN


MOTIVATING OUTDOOR ACTIVITIES

Through Providing More Programming And Introducing Sustainability Strategies Existing

Proposed

Harris Plaza

WHITE HOUSE

WHITE HOUSE

Upper Lawn

A COLLEGE CENTER AT CROZIER-WILLIAMS

A’

HARRIS DINING HALL

MORRISSON HOUSE

B

WHITE HOUSE

Harris Plaza

B’

HARRIS DINING HALL

COLLEGE CENTER AT CROZIER-WILLIAMS

MORRISSON HOUSE

MORRISSON HOUSE

HARRIS DINING HALL

Existing Sustainability Tool Kit

Tree Planting

A

A’

Reduce paving and vehicle traffic

Proposed

Stormwater management zone

Reduce mowable lawn

B

CONNECTICUT COLLEGE CROPLEX

B’

4

SCHEMATIC DESIGN


Upper Lawn

'

222.8

223.7'

EXIST IN MASO G NR BUILD Y ING

Option 2 | Native Planting Overlook

18"

'

223.4

227

10"

6"PV

C

SW

224

L

10"

224

2 ~200’ X 80’

229.0' 228.2'

229.4'

228.7'

229.3 '

228

228.3'

15"

4"

229

228.7'

36"

UE

UE

220

228.8'

18"

30"

20"

229.7'

'

22

0

CONCRETE

225

E

ET

CO

1" 6"

'

228.7

1"

'

228.5

30"

'

228.7

4"

229.1'

228.8'

R=22

228.3'

35'

I=216.

18"

229.0'

228.2'

228.7'

'

229.3

225.1'

36" 228

EXISTI NG WOO D BUILD ING 229.7'

6"S

4"

229

30"

20"

223

'

223.4

228.3'

15" 228.7'

5.48'

1"

'

229.5

23 0

'

227.8

228.3'

6"S

224

'

227.5

8

22

225.0'

S

VE RT

228.6'

228

228.6'

229 '

'

'

227.5

230

230

228.5

IN

22 8

230.1'

8"

225.4

227.8

228.3'

SWL

229.2'

229.6

8

CONCRETE

'

229.8

'

230.5 '

230.3

228.6'

#1431

'

225.5

229

R NC

0 23 5

SWL

CONCRETE

4"

229.1'

E

230

'

228.7

22

22

CONCRETE

229

1 23

30"

229

'

228.5

'

229.6

228

0

225

1"

UE

CO N C RE TE CONCRETE

CO

6"

'

228.7

23 0

228.2'

42"

229.6

1"

'

230.6

42"

'

'

'

1"

'

229.5

'

230.7

229.8

225.7

CONCRETE

22

230

ET

229 '

230.6'

229.8'

R NC

10"

231 231

229

UE

229.5'

CONCRETE

220

229

230

UE

1

230

230

230

228.5

222

22

226.2'

ULTI

229.2'

228.6'

230

4.8'

8"

229.6

'

226

230

231

222

230.1'

EXIST IN WOO G BUILD D ING

223.7

227

SWL

'

E

6"MTL

I=216.38'

ET

229

224

SWL

SWL

5

NC R

Seatwalls are continuous and biased on the sloped lawn to accomodate more student gathering.

225

228

MORRISSON HOUSE

E

227

WRIGHT HOUSE

CO

229

8"

ET

Upper Lawn has more programmable space.

22

223.6'

222 '

230.3

229.8

UE

'

230.9

231

230.5 ' 229.8'

CO N C RE TE CONCRETE

228 227

23

42"

228.2'

226

228

0.6'

23

227

'

230.7

228

228

9

22

WRIGHT HOUSE

CO NC R

225

226

8

SWL

228 230.6'

229

UE

'

223.5

5"

BENC HMAR K: X-CU T HYDR SET IN AN ELEV.= T BOLT NAVD 228.43' 88'

SWL

15" M

E

SLOPED LAWN

UE

0

229

L

SW

229

Seatwalls with different lengths spread out along length of the slope. Seatwalls are oriented towards the central stage.

225

MORRISSON HOUSE

224

223 222 221

220

229

22

PLANTING

22

230

NATIVE

CONCRETE U

228

225

224

223

222

221

220

229

229

231

4

229

0

CONCRETE UE

227

UE

22

225

224 223

229

228

SWL

230.5'

222.1'

SWL

231

G

SIN

226

223

229

8"

6"MTL

228

8"

Level sloped walk is seperated from the main East/West path by stormwater garden. The path offers an accessible connection to the seating area, an informal gathering space, and a stormwater overlook.

22

8"

224

2"

8 22

227.6'

227

227.6'

227

22

7

7 '

'

226.8

227

220

22

4

SWL

'

226.2

6

22

226.7' 225.7'

226

10"

220 221

222

225.7'

22

#11712

3

18"

226.7'

18"

ULTI

10" M

10"

18"

12"

224

6"

3.3'

22

#432 '

'

225.6

225

6

5

22

#11713

'

223.3

5

22

223.3

218

10"

22

224

221

7 22

6 22

18"

227

Access from the main path to Cro is pulled to east to engage students to central social space and provides direct access to Harris plaza. (See plan comparison on next page for more context.)

225

222

223

'

227.7

'

226.2

8"x2

226

225

'

'

224.4

225

5

225

CONNECTICUT COLLEGE CROPLEX

225.6

10"

SWL

8"x2

Landing extension provides access paths to seating.

226

219

226.8

Access from the main path to Cro is pulled to further west to allow more programmable spacing for slope and lawn.

226

226

226

'

230.9

MIS CB

CB

228

9

22

Stage area on the side of the path allows access from path to amphitheater and interaction between levels.

3

230

L

SW

231

SWL

G

SIN

L

SLOPED LAWN

Upper Lawn has less programmable space.

LAWN

228

30"

24"

222.3'

24"

24"

227

MIS

NATIVE PLANTING

SW

228

12"x3

227

SWL

4

BIT. PATCH

225

3

226

BIT. PATCH

LAWN

UE

2 ~200’ X 60’

227

EXIST IN WOO G BUILD D ING

8" 8"x2 228

224

223

1

UE

226

8"CPP

223

223

225

224

15"C PP

UE

1

222

223

SWL

SWL

223

15"CPP

223

Option 1 | Informal Amphitheater and Stage

231

'

222.6

SWL

UE

UE

Providing Multiple Alternatives To Address Different Design Intentions And Facilitate Conversions With The Audience

UE

UE

GE CENTER AT ER-WILLIAMS

GE CENTER AT ER-WILLIAMS

ITERATIVE DESIGN PROCESS

SCHEMATIC DESIGN


02 Cornell ECE and Quantum Expansion Location: Cornell University, Ithaca, NY Project Scale: Small Project Type: Institutional Landscape Project Phase: SD, DD Project Manager: Jennifer NG

Existing Condition

Proposed Landscape

New Duffield Addition

Site Plan

Proposed Programming

Duffield Hall Expansion Circulation

Proposed ADA-Compliant Route Proposed Stairs Proposed Sidewalk Regrading for Curb Cut Existing ADA-Compliant Path

N

Existing Non-Compliant Path

0

40’

80’

CORNELL ECE AND QUANTUM EXPANSION

160’

L.O.W

6

SCHEMATIC DESIGN


DESIGNING THROUGH MODELING IN PRELIMINARY DESIGN PHASE Mediating The Space Between Sidewalk And Duffield Building

1

Entrance at Hoy Road

2 Sloped Path Along Hoy Road

3

Sunken Plaza Along Campus Road CAMPUS ROAD

3

2

CORNELL ECE AND QUANTUM EXPANSION

7

1

SCHEMATIC DESIGN


Detailed Grading

Providing Exterior ADA-Compliant Access To Duffield Building TC 816.80 TW 816.33 BC 816.30 BW 815.83

L.O.W

2.75%

(820)

(821)

(822)

818

819

820

821

822

(BSW 822.93) (BSW 822.90)

822.88

TC 816.33 815.67 BC 815.83 2 1.80% TC 817.05 815.79 4.22% BC 816.55 TW 816.61 816.61 BS 815.84 BW 815.95 TS 816.67

TC 822.82 (BC 822.82)

7.80%

FFE 816.83

STAIR 2 STEPS, 5" TALL X 1'-3" WIDE

1.80%

816

TC 817.15 BC 816.65

818.35 1.80%

815

TC 817.11 BC 816.61 3

8'-0"

(812.00)

814

(819)

1.70%

7.80%

813

TW 818.35 BW 816.69 822

816.83

L.O.W

TW 817.55 BW 816.55

TW 818.11 BW 816.61

(821)

20" SEATWALL 3

2

(822)

TW 818.35 BW 816.69

821

0.63%

1

1.80%

813.81

1.70%

(1.5%)

812.00

7.20%

813.70

(818)

6'-9"

3.80%

13'-00"

811

1

(814)

(813)

(812) (812.00) 812.01

1.70%

(811) (4.4%)

.05%) (817) (815)(7.4%) (816) (6 817

0

8’

16’

(820)

6'-0"

1.85%

TW 817.97 BW 816.30

819 1.00%

(5.7%)

6'-0"

816.45 FFE 816.83

(819)

L.O.W

8'-0"

(5.7%)

820

(818)

4.88% 818

L.O.W

(817)

CORNELL ECE AND QUANTUM EXPANSION

8

817

DESIGN DEVELOPMENT TC 816.10

6'-0"

(816)

BC 816.10 TC 816.38

(8


SITE OCCUPANCY

Providing An Outdoor Space That Meets Students' And Faculities' Daily Needs KEY PLAN

CORNELL ECE AND QUANTUM EXPANSION

9

DESIGN DEVELOPMENT


03 One Memorial Drive

Existing Condition

West Entry

Location: Boston, MA Project Size: ~ 0.8 acre Project Type: Exterior Improvement Project Phase: SD, DD, CD, CA

MA

IN

ST

RE

ET

N

Project Manager: Erblin Bucaliu

0

4’

8’

16’

0

4’

8’

16’

0

4’

8’

16’

Main Entry

MEMORIAL DRIVE

N

East Corner

West Entry

Main Entry

East Corner

N

N

0

ONE MEMORIAL DRIVE

50’

100’

200’

10

SCHEMATIC DESIGN


GRANITE PAVING

At Front Entry & Exterior Cafeteria

Granite Paving

STONE PAVING & PLANTER WALLS

"BUILDING SITTING IN A BLACK PLINTH" - Black walls + Black paving

N 0

ONE MEMORIAL DRIVE

25’

50’

100’

11

DESIGN DEVELOPMENT


CONCRETE UNIT PAVING At West Entry & Exterior Cafeteria

Concrete Unit Paving

N 0

ONE MEMORIAL DRIVE

25’

50’

100’

12

DESIGN DEVELOPMENT


4

Section - 4

ONE MEMORIAL DRIVE 3 2 1

Section - 3

13 10.15TC 9.78BC EX

4 3 2 1 9

REV DATE

REVISIONS: NOTE

100% CONSTRUCTI DOCUMENTS

METLIFE INVESTMENT MANAGE ONE METLIFE WAY WHIPPANY, NJ 07981 t: 973.355.4549

125 SUMMER STREET | SUITE 1 BOSTON, MA 02110 t: 875.305.8714

CLIENT:

69 CANAL STREET |2ND FLOOR BOSTON, MA 02114 t: 617.227.2560 www.klopfermartin.com

Retaining Walls Built Onto The Existing Structural Slabs

10.18TC EX LINE PROPERTY 9.72BC EX

9.95TC EX 9.57BC EX

SCALE: 1/16" = 1'-0"

ELEVATION KEY PLAN

DESIGNING THROUGH SECTIONS AND ELEVATIONS IN RESPONSE TO SITE CONDITIONS

Section - 2

Existing Garage

Section - 1

CONSTRUCTION DOCUMENTATION


04 Other Projects

Wesleyan Integrative Arts Lab

Wesleyan Integrative Arts Lab

Projects: Forbes Hill Moderna; Norwood, MA Wesleyan Integrative Arts Lab, Middletown, CT Salem State South Campus Redevelopment, Salem, MA Main Role: Modeling Rendering Diagrams Graphic Assistance Forbes Hill Moderna

Salem State South Campus Redevelopment

Forbes Hill Moderna

OTHER PROJECTS

14

GRAPHIC ASSISTANCE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.