Y O U FA N G D U A N PORTFOLIO OF SELETED WORKS 2022.9 - 2024.2 AT KLOPFER MARTIN DESIGN GROUP
0
20
N
R=168.34' CB DRAI MANHOLNS INTO E A
R=169.08' I(A)=165.7 6' 12"RC P
I=166.81 '
186
188.1'
R=184.09'
192.9'
190
191
192.5'
GRAVEL
BIT.
194
19 3
8"
S
R=193.15'
9
20
STORAGE TRAILER
S
H/WOOD
BRUS
S
GRAS
GRAVEL
EL
GRAV
207
BB
URCE
RESO PILES
S
18"
18"
18"
8"
18"
15"
6"
10"
10"
#5928
8
20
15"
211
S
GRAS
210
12"
214.8'
24"
S
GRAS
15"x2
24"
UP
SWL
10"x2
S
15"
UP
GRAS
18"
212
24"
4
21
214.5'
12"
3"
204.6'
202
201.4'
203
204
205
206
12"
12"
213.6'
12"
6"
15"
6"
6"
207
208
209
210
211
213
212
10"
18"
10"
15"
8"
BIT.
S
203.5'
S
20"
12"
15"
12"
30"
BOULDER
GRAS
S
12"
12"
12"
214
12"
6"
12"
10"
6"
219.4'
24"
10"
12"
GRAS
12"
15"
8"
8"
6"
6"
36"
8"
12"
8"
15"
6"
6"
EL
GRAV
197
198 207
208
15"
215
215.3'
216
217.6'
218
217
220.4'
12"
12"
10"
219
42"
205
BRUSH
2 ST WO ORY OD
213.4'
BIT.
BRUSH
30"
12"
CONC.
BIT.
S
GRAS
218.6'
S
195
2 STORY WOOD
197
CP
12"R
212
216 224
22 2
223.3'
1
22
#11713
S
GRAS
5
19
21 2 STO RY WO OD
0
20
?
0
CONC. WALL
19
131.92 '
5
18 0
6'
234.5
0
20
190
N
N
o
o ?
I=216.82'
CC
CC
SWL
21 0 22 4
20 5 0
o
o ?
o
CC CONC. WALK
200 220 221
CC
CC D
200 22
o o
CC
CC
5
226
SWL
21 0 225
221 218 217
o o
225.0'
o
GRASS
LK
22
223 222
216
Δ = 6 ° 20 '3 7 " R = 3 89 4. 83 L = 4 31. 2 3'
o
A
B
o
H
BRUS
BRUSH
224
. WA
NC
JOHNSON PARK 1 STORY CONRETE
CC
SWL
4
6"S I=216.38'
220 219
o
EXISTING WOO D BUILDING
R=22 2.96' I(A)=222.1 I(B)=221.6 8' 6"PVC 6' 6"PV C
o
#11713
#11712
CO
223
225.1'
15.03'
o
22
#432 223.3'
BIT.
2"
224
S
GRAS
223.4'
CONC. WALK
CC
22 8
CC
CC 228
222
18 5
o
o
S
GRAS
N
25.18'
18"
6"
CONCRETE
CC CONC. WALK
CC
BIT. WALK CC
SWL
22 3
BB
o o
179.23'
o
I=225.50'
CC
o
BRUSH
18
24"
BIT.
18"
224.4'
6"S
BIT.
#1431
BB
CC
CC
229 23 0
229
o o
EXIST ING WOO D BUILDING
o
GRAS
S
GRAS
?
223
10"
10"
12"
10"
.35'
BIT.
I=216
5.48'
225.4'
BIT.
225.5'
EL
42"
BIT.
GRAV
3 STORY WOOD
220
221
24"
224
GRAS S
S
GRAS 225.6'
18"
18"
6
22
10"
R=22
225.7'
RY 2 STOOD WO
20"
LSA
LSA
BIT.
BRUSH
BOULDER S
TI
10" MUL
18"
BOULDER
BRUSH
226.2'
224.8'
CONC. STEPS
225
227
o
223.7'
CONC
CC
o
223.6'
BIT. WALK
. WA
CC
22 7
CONC. STEPS
0
213
S
GRAS
221.7'
BIT. WALK
12"
6"
H
BRUS
12"
214.5'
8"
18"
6"
8"
BIT.
222
222.3'
222
223
24"
224.4 '
24"
S
BOULDER
GRAS S
GRASS
BRUSH
BIT.
CONC. STEPS
o
10"
24"
GRAS
221.7'
S
36"
BRUSH
4
22
#6036
4.68' .74'
R=22
℄ =204
10"
R=22 5.35' I=222 .25'
227.7'
BOULDER
S
GRAS
CC
22 8 222 223.5'
53.17'
20x3"
BRUSH
0
22 221
224.4'
224
BIT. 224.7'
10"
OODS
BRUSH/W
BOULDER S
228.3'
H
BRUS
228
SWL
CONC. STEPS
LK 230
229
227
o
230
226
STONE WALL
CONC.
o
222
0
22 R=22 1.96' I(A)=220.3 I(B)=221.1 6' 10"M 7' 4"PV TL C
.C O N C.
o
222.3'
o
18" 24"
219 15"
?
6"x4
224.4'
P
15"CP
8"x2
229.4'
OODS
BRUSH/W
CC
BIT.
S 222.1'
GRAS
o
H/WOOD
BRUS
STOR AGE TRAILERS
15"
214.5'
216
WOOD FENCE
36"
CC CC
18"
A
8"
229.8'
S
BOULDER 230
BOULDER
TI
15" MUL
229.5'
S
CC
GRAS
5"
LK
CO NC . WA
o
214
BB
217.1'
S
2 STORY WOOD
4
22
GRAS
CC
225.1'
R=22 5.27' I(A)=221.8 1'
S
226.7'
GRAS
227.8'
229.6'
229.6'
10"
230
CC
SWL
GRAS S BENC HMARK: X-CU T HYDRANSET IN ELEV.=22 T BOLT NAVD 8.43' 88'
SWL CONC. STEPS
230 229
WALL
224
A
o
224
CC
223
S
C
o
210
S
GRAS
SWL
7
21
GRASS
223
223.7'
S
227.6'
GRAS
228.3'
1"
1"
CC
230.5'
CC L
SW
24"
B
6"PV
GRAS
o
BIT.
214
213
212
BRUS
216.0'
WOOD FENCE
6"
.84'
BIT. R=223.48'
℄=207
R=223.62'
224.5'
BIT.
6
22
225.7'
BIT.
226.2'
7
22
BIT.
228.8'
1"
S
BOULDER
CC
CC
GRAS S
B
226
SW
L
CC
C
8"CPP
o o
2.94'
R=22
EXIST ING WOO D BUILDING
R=22 3.41' I(A)=220.3 I(B)=220.7 1' I(C)=220.5 1' 0'
CC
223 I=219.89'
SWL SWL
15"CPP
223
o
SWL
222.6'
CONC.
o
GRAVEL
210.5'
12"x2 H/WOOD S 216.7'
CC
.35'
I=217
227.5'
4"
18"
4"
GRASS
230.5'
30"
24"
10" 8"
223.4'
19
BB
WOOD WALL
10"
20"
42"
S
GRAS
S
CC
6"
230
S
GRAS
24"
12"x3
8"x2
2.87'
R=22
18"
222.8'
175
E
WALK
NC
K
K
AL
.W
NC
CONC. WALK
223.7'
132.83'
215 225
DIR T
BIT.CONC.
BIT.CO NC. CC
DMH
o o o o o
23 0
230
xxxx GARDENS
BIT. WALK 23 1
230
227
180 190
205
o 395.07' 356.02'
o o
o
180
o o
373.48'
o
185
o o o o o
o o o o o
o
STOP LINE
o
STOR AGE TRAILER
8
20
10"
BB
24"
SWL
15"
15"
H
BRUS
8
21
CC
222.6'
223.2'
226.8'
GRAS
S
GRAS
S
GRAS
9
22
229.5'
CC
SWL
CONC.
S
GRAS
CO
.W AL
10"
CO
S
GRAS
EXIST ING MASONR BUILDINGY
?
o
GRAS
4"
210
209
212
211
214
BIT.
213
7
21
S
GRAS
8"CLAY
CC
228.2'
7.31'
R=22
36"
228
S
GRAS
230.1'
230.6'
G
o
S
GRAS
12"
12"
217
222.5'
3
223.3'
22
224
BIT.
225.6'
225
226
228.3'
6 228.7'
229.8'
S
GRAS
G
249
.99' 200
552.08'
0
225
205
223
.86' 220
CC
24 0
235
235
BEN CH
CC
o
o
180 CC
o
190
GRASS
DENSE TREES
DYLL
EOP
BCC
BCC BIT.CONC. PARKING
EOP
o
S
GRAS
18"
15"
217.6'
42"
BIT.
.84'
I=218
R=221.66'
227
BIT.
CC
30"
UTILITY ON CONBOX C. PAD
15"
20
o o
4"
4"x2
12"
24"
30"
8
22
20"
229.0'
30"
BOULDER
228.7'
230
SWL
BB
8"x2
10"
201
12" 10"
196
10"
BB
WOOD WALL
8"
217
9
21
219.2'
219.0'
G
G
222.9'
228.7'
229
S
GRAS
210
WALL
192
WOOD
24"
6"
8"
S
GRAS
1
6"
15"
S
GRAS
216
217.4'
EXIST ING CONC. BUILDING
5
22
228.6'
BIT.
228.7'
BIT.
R=227.95'
CC
230.3'
231
CC
STAIRS
?
o o
EL
GRAV
S
GRAS
BB
205
204
12"
212.5'
215
18"
229.7'
229.3'
229.1'
228.5'
229
209
8"
229.8'
230.7'
231
CONCRETE WALK
185 55.14' CC
167.01'
UP/LP
UP
DWS
750.98'
BCC
N
o
H/WOOD S
BRUS
WOOD WALL
2
20
SWL
208
207
206
12"
12" H
BRUS
204 215.3'
0 228.5'
229.2'
S
CC
GRAS
CC
CC
42" S
GRAS
230.6'
SWL
o
189.2'
GRAVEL
BB
BB
18"
BENC HMA CHISELED RK: SQUARE SET IN ELEV.=20CONC BASE . NAVD 3.31' 88'
209
15"
203
o
192
BIT. 200.5'
201
S
GRAS
15" 18"
0
22
205 229.6
23
228.6'
229
BIT. 230.9'
G
5
188.5'
S
GRAS
S
BB
GRAS
SWL
191
18
192.0'
R=191.7'± I=186.6'±
.6'
I=197
197.4'
201.6'
201
24"
18" 18"
5
22
200
UE CC
228.2'
230
231
SWL
197.5'
202
200
I=198 .6'
202
4
20
4 STORY CONCRETE "HARRIS DINING HALL"
220
UE CC
SS
STAIRS
195
12"RCP
193
194
195
196
197
S
BB
190
BB
OODS
198 197
198
197.5'
197 198 199 200
GRAS
BB
201.6'
30"
227
231
197
S
BRUS H/W
BRUS H/WOOD
10"
203
S
193
SWL
195
R=169.15' I(A)=165.7 9' 12"RC P
196
S
GRAS
196
0
BRUS H/WOOD
204
228
GREEN HOUSE
H
C
N
BE
18
ZACHS HILLEL HOUSE
S
0
222
W
GARDENS
ROPE FENCE
GARDENS
xx xx
BENCH
BE ?
CONCRETE WALK
CONCRETE WALK
223
20
GRAVEL
184 TMH
?
223
STAIRS
222
224
215
RT VE IN
221 220
182 MH
225
182 MH
CC
225
224
'
183
185
SC
?
STEPS
222
P
EAST PARKING LOT Phase 2A Early Summer 2023 221
CC CP 15"
L
215 CRETE ALK
CONCRETE WALK
226
18.80 I=2
CC
195 ?
5 24
226
'
221
221
21.92
222
218
4
212
210
SW
207
210 211
208
BB
202
NORTH LOT
6
8
9 N
BB 217 219
207
P 179
192
19
?
GREEN HOUSE
xx
?
G
BENCH
PICNIC TABLE
G
o o o
?
228 228
22 5
185
I=165.50' I=165.47'
15"CM 190
189
192
196
188 191
BB
185
190 191 190
187
194
245
?
STEPS
GRASS
o o
o
BCC DENSE TREES
o
?
225
224
220
WINTHROP HALL
223 224
225
'
226
227
226
224 2 23
223
20.31 CPP I=2
' I=2
227
SCHEMATIC DESIGN
2 CONNECTICUT COLLEGE CROPLEX
o
o
224
227 227
WINTHROP ANNEX
223
15"
19.79 223
225
LARRABEE HOUSE
227
228
RESERVOIR ST
8
191
20
20
20 SIG
Upper Lawn & Harris Quad - Phase 2B
22
CC
22
BRANFORD HOUSE
220
10"D
I=216.45'
223 224
225
3
BB 211
199
191 190 189
192 193
211 218
226
BB
195
202 206
217
L
20
5
216
SW
22
I=225.35'
221
CC
6"MTL
CC
180
5
o CC
210
213 218 228
220
8" 228
LK . WA BIT
222
SWL
CRO BLVD
229
BB 204
20
BB 205
203 204 205 206 225
198
SHAIN LIBRARY
190 3
195 H
4 20
214
BB
229
UT
229 CB ING
SS MI
BB
199
215
215
HAMILTON HOUSE LAMBDIN HOUSE 229
I=2
KATHARINE BLUNT HOUSE
SMITHG HOUSE
0
209
MORRISSON HOUSE
CRO BOULEVARD Phase 3 Summer 2024
200
HARRIS DINING HALL COLLEGE CENTER AT CROZIER-WILLIAMS
199 200 201 202 203
197 5 20
19
JOHNSON HOUSE 22
East Parking Lot - Phase 2A 0
189
WRIGHT HOUSE
190
SWL
185
xx
BB
180
245
203
BLAUSTEIN CENTER
?
224
192
W
178
19 CC
BIT. CONCRETE
CRO-PLEX CONNECTOR Phase 2B Late Summer 2023
xx
20
5
19
5
Existing Circulation Analysis
o LK
o o o o
300’ 150’ 75’
225 230
Project Manager: Jennifer NG and Daniel Norman
xx xx
?
Location: Connecticut College, New London, CT
o W
xx
?
?
22
0
22
0 220
Project Type: Campus Master Planning and Site Design
229
BURDICK HOUSE BLACKSTONE HOUSE
165
0
215
Project Size: Large
498.34'
444.47'
xx
461.41'
01 Connecticut College CroPlex
21
HARRIS DRIVE EXTENSION
Master Plan
20
268
.15'
Project Phase: SD
xx
xx xx xx
CC
PLANT HOUSE
CHAPEL WAY
xx
NC
20
5
170
160
365.52'
688.16'
22 5
231
235
BEN CH
SS
228 STAIRS
CC
205
5
190
19 5
200
210
205
205
30.32' 196.92'
193.33'
200
155
356.05'
373.44' 780.93'
o
o
LANDSCAPE APPROACH TO EASE THE IMPACT OF PARKING DISPLACEMENT From Master Campus Planning To Site Design Proposed Parking Spaces Displacement Plan
East Parking Lot
1
2
Hillel Lawn
Hillel Lawn 1
2
CONNECTICUT COLLEGE CROPLEX
3
SCHEMATIC DESIGN
MOTIVATING OUTDOOR ACTIVITIES
Through Providing More Programming And Introducing Sustainability Strategies Existing
Proposed
Harris Plaza
WHITE HOUSE
WHITE HOUSE
Upper Lawn
A COLLEGE CENTER AT CROZIER-WILLIAMS
A’
HARRIS DINING HALL
MORRISSON HOUSE
B
WHITE HOUSE
Harris Plaza
B’
HARRIS DINING HALL
COLLEGE CENTER AT CROZIER-WILLIAMS
MORRISSON HOUSE
MORRISSON HOUSE
HARRIS DINING HALL
Existing Sustainability Tool Kit
Tree Planting
A
A’
Reduce paving and vehicle traffic
Proposed
Stormwater management zone
Reduce mowable lawn
B
CONNECTICUT COLLEGE CROPLEX
B’
4
SCHEMATIC DESIGN
Upper Lawn
'
222.8
223.7'
EXIST IN MASO G NR BUILD Y ING
Option 2 | Native Planting Overlook
18"
'
223.4
227
10"
6"PV
C
SW
224
L
10"
224
2 ~200’ X 80’
229.0' 228.2'
229.4'
228.7'
229.3 '
228
228.3'
15"
4"
229
228.7'
36"
UE
UE
220
228.8'
18"
30"
20"
229.7'
'
22
0
CONCRETE
225
E
ET
CO
1" 6"
'
228.7
1"
'
228.5
30"
'
228.7
4"
229.1'
228.8'
R=22
228.3'
35'
I=216.
18"
229.0'
228.2'
228.7'
'
229.3
225.1'
36" 228
EXISTI NG WOO D BUILD ING 229.7'
6"S
4"
229
30"
20"
223
'
223.4
228.3'
15" 228.7'
5.48'
1"
'
229.5
23 0
'
227.8
228.3'
6"S
224
'
227.5
8
22
225.0'
S
VE RT
228.6'
228
228.6'
229 '
'
'
227.5
230
230
228.5
IN
22 8
230.1'
8"
225.4
227.8
228.3'
SWL
229.2'
229.6
8
CONCRETE
'
229.8
'
230.5 '
230.3
228.6'
#1431
'
225.5
229
R NC
0 23 5
SWL
CONCRETE
4"
229.1'
E
230
'
228.7
22
22
CONCRETE
229
1 23
30"
229
'
228.5
'
229.6
228
0
225
1"
UE
CO N C RE TE CONCRETE
CO
6"
'
228.7
23 0
228.2'
42"
229.6
1"
'
230.6
42"
'
'
'
1"
'
229.5
'
230.7
229.8
225.7
CONCRETE
22
230
ET
229 '
230.6'
229.8'
R NC
10"
231 231
229
UE
229.5'
CONCRETE
220
229
230
UE
1
230
230
230
228.5
222
22
226.2'
ULTI
229.2'
228.6'
230
4.8'
8"
229.6
'
226
230
231
222
230.1'
EXIST IN WOO G BUILD D ING
223.7
227
SWL
'
E
6"MTL
I=216.38'
ET
229
224
SWL
SWL
5
NC R
Seatwalls are continuous and biased on the sloped lawn to accomodate more student gathering.
225
228
MORRISSON HOUSE
E
227
WRIGHT HOUSE
CO
229
8"
ET
Upper Lawn has more programmable space.
22
223.6'
222 '
230.3
229.8
UE
'
230.9
231
230.5 ' 229.8'
CO N C RE TE CONCRETE
228 227
23
42"
228.2'
226
228
0.6'
23
227
'
230.7
228
228
9
22
WRIGHT HOUSE
CO NC R
225
226
8
SWL
228 230.6'
229
UE
'
223.5
5"
BENC HMAR K: X-CU T HYDR SET IN AN ELEV.= T BOLT NAVD 228.43' 88'
SWL
15" M
E
SLOPED LAWN
UE
0
229
L
SW
229
Seatwalls with different lengths spread out along length of the slope. Seatwalls are oriented towards the central stage.
225
MORRISSON HOUSE
224
223 222 221
220
229
22
PLANTING
22
230
NATIVE
CONCRETE U
228
225
224
223
222
221
220
229
229
231
4
229
0
CONCRETE UE
227
UE
22
225
224 223
229
228
SWL
230.5'
222.1'
SWL
231
G
SIN
226
223
229
8"
6"MTL
228
8"
Level sloped walk is seperated from the main East/West path by stormwater garden. The path offers an accessible connection to the seating area, an informal gathering space, and a stormwater overlook.
22
8"
224
2"
8 22
227.6'
227
227.6'
227
22
7
7 '
'
226.8
227
220
22
4
SWL
'
226.2
6
22
226.7' 225.7'
226
10"
220 221
222
225.7'
22
#11712
3
18"
226.7'
18"
ULTI
10" M
10"
18"
12"
224
6"
3.3'
22
#432 '
'
225.6
225
6
5
22
#11713
'
223.3
5
22
223.3
218
10"
22
224
221
7 22
6 22
18"
227
Access from the main path to Cro is pulled to east to engage students to central social space and provides direct access to Harris plaza. (See plan comparison on next page for more context.)
225
222
223
'
227.7
'
226.2
8"x2
226
225
'
'
224.4
225
5
225
CONNECTICUT COLLEGE CROPLEX
225.6
10"
SWL
8"x2
Landing extension provides access paths to seating.
226
219
226.8
Access from the main path to Cro is pulled to further west to allow more programmable spacing for slope and lawn.
226
226
226
'
230.9
MIS CB
CB
228
9
22
Stage area on the side of the path allows access from path to amphitheater and interaction between levels.
3
230
L
SW
231
SWL
G
SIN
L
SLOPED LAWN
Upper Lawn has less programmable space.
LAWN
228
30"
24"
222.3'
24"
24"
227
MIS
NATIVE PLANTING
SW
228
12"x3
227
SWL
4
BIT. PATCH
225
3
226
BIT. PATCH
LAWN
UE
2 ~200’ X 60’
227
EXIST IN WOO G BUILD D ING
8" 8"x2 228
224
223
1
UE
226
8"CPP
223
223
225
224
15"C PP
UE
1
222
223
SWL
SWL
223
15"CPP
223
Option 1 | Informal Amphitheater and Stage
231
'
222.6
SWL
UE
UE
Providing Multiple Alternatives To Address Different Design Intentions And Facilitate Conversions With The Audience
UE
UE
GE CENTER AT ER-WILLIAMS
GE CENTER AT ER-WILLIAMS
ITERATIVE DESIGN PROCESS
SCHEMATIC DESIGN
02 Cornell ECE and Quantum Expansion Location: Cornell University, Ithaca, NY Project Scale: Small Project Type: Institutional Landscape Project Phase: SD, DD Project Manager: Jennifer NG
Existing Condition
Proposed Landscape
New Duffield Addition
Site Plan
Proposed Programming
Duffield Hall Expansion Circulation
Proposed ADA-Compliant Route Proposed Stairs Proposed Sidewalk Regrading for Curb Cut Existing ADA-Compliant Path
N
Existing Non-Compliant Path
0
40’
80’
CORNELL ECE AND QUANTUM EXPANSION
160’
L.O.W
6
SCHEMATIC DESIGN
DESIGNING THROUGH MODELING IN PRELIMINARY DESIGN PHASE Mediating The Space Between Sidewalk And Duffield Building
1
Entrance at Hoy Road
2 Sloped Path Along Hoy Road
3
Sunken Plaza Along Campus Road CAMPUS ROAD
3
2
CORNELL ECE AND QUANTUM EXPANSION
7
1
SCHEMATIC DESIGN
Detailed Grading
Providing Exterior ADA-Compliant Access To Duffield Building TC 816.80 TW 816.33 BC 816.30 BW 815.83
L.O.W
2.75%
(820)
(821)
(822)
818
819
820
821
822
(BSW 822.93) (BSW 822.90)
822.88
TC 816.33 815.67 BC 815.83 2 1.80% TC 817.05 815.79 4.22% BC 816.55 TW 816.61 816.61 BS 815.84 BW 815.95 TS 816.67
TC 822.82 (BC 822.82)
7.80%
FFE 816.83
STAIR 2 STEPS, 5" TALL X 1'-3" WIDE
1.80%
816
TC 817.15 BC 816.65
818.35 1.80%
815
TC 817.11 BC 816.61 3
8'-0"
(812.00)
814
(819)
1.70%
7.80%
813
TW 818.35 BW 816.69 822
816.83
L.O.W
TW 817.55 BW 816.55
TW 818.11 BW 816.61
(821)
20" SEATWALL 3
2
(822)
TW 818.35 BW 816.69
821
0.63%
1
1.80%
813.81
1.70%
(1.5%)
812.00
7.20%
813.70
(818)
6'-9"
3.80%
13'-00"
811
1
(814)
(813)
(812) (812.00) 812.01
1.70%
(811) (4.4%)
.05%) (817) (815)(7.4%) (816) (6 817
0
8’
16’
(820)
6'-0"
1.85%
TW 817.97 BW 816.30
819 1.00%
(5.7%)
6'-0"
816.45 FFE 816.83
(819)
L.O.W
8'-0"
(5.7%)
820
(818)
4.88% 818
L.O.W
(817)
CORNELL ECE AND QUANTUM EXPANSION
8
817
DESIGN DEVELOPMENT TC 816.10
6'-0"
(816)
BC 816.10 TC 816.38
(8
SITE OCCUPANCY
Providing An Outdoor Space That Meets Students' And Faculities' Daily Needs KEY PLAN
CORNELL ECE AND QUANTUM EXPANSION
9
DESIGN DEVELOPMENT
03 One Memorial Drive
Existing Condition
West Entry
Location: Boston, MA Project Size: ~ 0.8 acre Project Type: Exterior Improvement Project Phase: SD, DD, CD, CA
MA
IN
ST
RE
ET
N
Project Manager: Erblin Bucaliu
0
4’
8’
16’
0
4’
8’
16’
0
4’
8’
16’
Main Entry
MEMORIAL DRIVE
N
East Corner
West Entry
Main Entry
East Corner
N
N
0
ONE MEMORIAL DRIVE
50’
100’
200’
10
SCHEMATIC DESIGN
GRANITE PAVING
At Front Entry & Exterior Cafeteria
Granite Paving
STONE PAVING & PLANTER WALLS
"BUILDING SITTING IN A BLACK PLINTH" - Black walls + Black paving
N 0
ONE MEMORIAL DRIVE
25’
50’
100’
11
DESIGN DEVELOPMENT
CONCRETE UNIT PAVING At West Entry & Exterior Cafeteria
Concrete Unit Paving
N 0
ONE MEMORIAL DRIVE
25’
50’
100’
12
DESIGN DEVELOPMENT
4
Section - 4
ONE MEMORIAL DRIVE 3 2 1
Section - 3
13 10.15TC 9.78BC EX
4 3 2 1 9
REV DATE
REVISIONS: NOTE
100% CONSTRUCTI DOCUMENTS
METLIFE INVESTMENT MANAGE ONE METLIFE WAY WHIPPANY, NJ 07981 t: 973.355.4549
125 SUMMER STREET | SUITE 1 BOSTON, MA 02110 t: 875.305.8714
CLIENT:
69 CANAL STREET |2ND FLOOR BOSTON, MA 02114 t: 617.227.2560 www.klopfermartin.com
Retaining Walls Built Onto The Existing Structural Slabs
10.18TC EX LINE PROPERTY 9.72BC EX
9.95TC EX 9.57BC EX
SCALE: 1/16" = 1'-0"
ELEVATION KEY PLAN
DESIGNING THROUGH SECTIONS AND ELEVATIONS IN RESPONSE TO SITE CONDITIONS
Section - 2
Existing Garage
Section - 1
CONSTRUCTION DOCUMENTATION
04 Other Projects
Wesleyan Integrative Arts Lab
Wesleyan Integrative Arts Lab
Projects: Forbes Hill Moderna; Norwood, MA Wesleyan Integrative Arts Lab, Middletown, CT Salem State South Campus Redevelopment, Salem, MA Main Role: Modeling Rendering Diagrams Graphic Assistance Forbes Hill Moderna
Salem State South Campus Redevelopment
Forbes Hill Moderna
OTHER PROJECTS
14
GRAPHIC ASSISTANCE