PORTFOLIO 2018
emilia sousa architecture and urban planning
1.
1
1.
2
PORTFOLIO 2018
emilia sousa architecture and urban planning
1.
3
personal informations resumé
architectural projects public theatre social housing selected to EXPO-CAU 2013.1
arts school selected to EXPO-CAU 2012.2
urban projects bom jardim slum upgrading proposal nomineted as one of the 21 best Graduation projects by Archdaily. Brazil
urban plan to historical centre of fortaleza selected to EXPO-CAU 2016.1
competitions cultural centre at senegal
CONTENTS
kaira looro competition
1.
4
workshops housing improvements at nova canudos
1.
5
1.
6
PE R S O NAL I N FO R MATI O N
resumé
1.
7
emilia sousa architecture and urban planning
E D U CATI O N AN D WO R K E X PE R I E N C E
2018
Statute of the City and Urban Inclusion: Study of Formal Planning and Citizens’ Informal Practices in Fortaleza (current) Collaborative research between Federal University of Ceará and University of Illinois at Urbana-Champaign, USA Graduated researcher
Taramela - Non-Governmental Organization (NGO) (current) Technical Assistance at Architecture and Urban Planning Founder member Fortaleza, Brazil
Ideas Competion - Kaira Looro
Prize: Winners to be announced Collaboration with: Fábio Botelho, Hannah Ially, Marcela Monteiro and Natália Medeiros
Workshop: housing improvements at Nova Canudos community (1 month)
Women’s empowerment with respect to the process of designing housing improvements Idealizer-coordinator Fortaleza, Brazil
Federal University of Ceará
Graduation at Architecture and Urban Planning Fortaleza, Brazil
Biia Sales Architecture (8 months)
Development and detailing of Architecture and Interior Desing projects Intern Architect Fortaleza, Brazil
HQ Architects (2 months) Development and detailing of Architecture , Urban Desing & Landscaping projects | Final images and presentations | Physical models Intern Architect Tel Aviv - Israel
2017
Ideas Competion - Sahara EcoHouse
Prize: Honorable Mentions Collaboration with: Fábio Botelho and Marcela Monteiro
Capstone Project
Maximum grade with the Slum Upgrading Proposal: City by people - an experience od advising and participation at Bom Jardim Special Zone of Social Housing 2016
H3D Art Digital (3 months) Development and detailing of Architecture and Interior Desing projects | Models Intern Architect Fortaleza, Brazil 2015
Ideas Competion - {CURA} Transpositions
Collaboration with: Clarisse Figueiredo, Duda Sousa, Yuka Ogawa
University of Salford (1 year)
2014
Pro-Rectory of Research and Graduate Studies Federal University of Ceará (1 year)
Consultec Jr. (1 year)
Architecture Desing and Technology Science without Borders program Manchester, United Kingdom
2013
Architecture survey of the buildings of the university campus for updating proposals Intern Architect Fortaleza, Brazil
Federal University of Ceará Fortaleza, Brazil
1.
8
Development of Architecture and Interior Desing | Installations and Artificial Lighting projects Intern Architect Fortaleza, Brazil 2011
SKILLS AutoCad
Illustrator
ArchiCad
Photoshop
Revit
InDesing
QGis
CorelDraw
Sketchup
Word
Rhino
Power Point
Vray
Excel
RECOGNITIONS
2018
Interview: Architect gives free advice to residents of Bom Jardim to improve their homes. Tribuna do Ceará Journal. Available at: http://tribunadoceara.uol.com.br/noticias/cotidiano-2/arquiteta-da-consultoria-gratuita-a-moradores-do-bom-jardim-para2018
Honorable Mention at Rethinking Competition - Sahara EcoHouse
Available at: http://rethinkingcompetitions.com/previous-competitions/014-sahara-eco-house 2017
Nominated as one as 21 “Best Graduation Projects of Brazil and Portugal” by Archdaily Brazil.
Available at: https://www.archdaily.com.br/br/885183/os-melhores-trabalhos-de-conclusao-de-curso-do-brasil-e-portugal-em-2017 2015
Selected for EXPO-CAU, 2015.1 with Urban Planning for the Historical Centre of Fortaleza Semestral exhibition of works at the Facult of Architecture and Urban Planning of Federal University of Ceará 2013
Selected for EXPO-CAU, 2013.1 with Social Housing project
Semestral exhibition of works at the Facult of Architecture and Urban Planning of Federal University of Ceará 2012
Selected for EXPO-CAU, 2012.2 with Arts School project
Semestral exhibition of works at the Facult of Architecture and Urban Planning of Federal University of Ceará
RECENT EVENTS
March,2018
Lecture at Uni7 University, Brazil
Capstone project presentation: City by people - an experience of adivising and participation at the Bom Jardim Special Zone of Social Housing February,2018
Lecture at Federal Rural University of the Semi-Arid, Brazil
Taramela experience and Technical Assistence in Architecture and Urban Planning importance to “right to the city” struggles September,2017
Lecture at Estácio de Sá University, Brazil
Capstone project presentation: City by people - an experience of adivising and participation at the Bom Jardim Special Zone of Social Housing August,2017
Lecture at Federal University of Ceará, Brazil
Invited to discuss the movie “Um lugar ao sol” and how the social inequalities are produced in Brazilian cities
LAN G UAG E S Portuguese
Spanish
English
Hebrew
1.
9
1.
10
public theatre social housing
ARCHITECTURE
arts school
1.
11
federal university of ceará, brazil discipline: desing project 5 tutor: dr. renan cid 2016 location: serviluz, fortaleza, brazil
PUBLIC
TH EATR E
The challenge proposed in the fifth UFC discipline project was to develop a Theater, located in the ServiLuz neighborhood in Fortaleza. In order to serve a program of more than 8500 square meters, which included administration, test rooms, 200 parking spaces, stage, audience and foyer, I decided to arrange the building on 3 floors. The idea that guided the party was appropriation. By opting for the design of a building consisting of ramps, the purpose was to allow users to take ownership of the entire constructed object.
1.
12
In addition, the ramps guarantee a privileged view of the sea, just ahead of the theater. The building was basically L-shaped, where small formal adjustments were made to fit the program to the terrain. This format allowed for ease of movement, use of natural ventilation and protection of sunlight. In addition, it allowed the creation of a large patio, also with a view to the sea. With regard to the construction system, priority was given to the use of local materials and construction techniques for rapid and inexpensive implementation, such as structural brick and precast concrete slab. In addition, as an alternative to a more sustainable occupation, it was decided to prioritize the use of bicycles instead of automobiles.
1.
13
0 5
1.
14
10
15
20
25m
Formal composition
1.
15
Floor Plans
1 Underground floor- parking lot
3 Second Floor N
2 First floor
4 Roof N
1.
16
N
N
1.
17
Sections
1 Section longitudinal 1
+8.55
2
4
3
5
6
7
8
10
9
11
12
13
14
+8.50
+5.65 +13.85 +3.50
+2.75 0.00 +8.55
0.00 +8.50
+5.65 - 3.50 +3.50
+2.75 0.00
0.00
- 3.50
A
+8.50
Facades 0.00 +8.50
1 Facade South 0.00
2 Facade West
3 Facade East
1.
18
B
C
D
E
F
G
H
I
J
L
M
N
O
P
Q
+5.65 +13.85 +3.50
+2.75 0.00 +8.55
0.00 +8.50
+5.65 - 3.50 +3.50
+2.75 0.00
0.00
- 3.50
2 Section longitudinal
A
B
C
D
E
F
G
H
I
J
L
M
N
O
Q
P
+8.50
0.00 +8.50
0.00
1.
19
federal university of ceará, brazil discipline: desing project 3 tutor: prof. ms. bruno melo braga with clarisse figueiredo 2013 selected for: EXPO - CAU, 2013 location: barra do ceará, fortaleza, brazil
“[...] A space where the symbols, norms, values and experiences allow us to recognize people, establish coexistence and solidarity, recreate an identity that does not depend on that one produced by the society wide “(CHAUÍ, 1987, p. 70). Even in the XXI century, the problem of housing deficit in Brazil remains one of the most worrying. There are millions of people living in an irregular situation and conditions that do not guarantee a good quality of life. The premise of the project developed during the course of architectural design 3, seek to understand and identify the type of relationship between housing projects already implemented in Barro do Ceará, district of Fortaleza (among them, the Vila do Mar Social Complex) with the surroundings, predominantly industrial and commercial.
SOCIAL HOUSING
From the reality found on site, we prepared a proposal for a housing development with 640 units that were consistent with low and informal feedback from the neighborhood, in order to respect the human scale and allow greater interaction between the residents.
1.
20
We developed five typologies, which include the diversity of family units, and from them, were thought five types of buildings characterized by the plurality of forms that easily allow expansion. With respect to the tectonic black, priority was given to using local materials and construction techniques quick and cheap implementation. “The housing deficit in Brazil is estimated at 5.2 million homes (2012). By 2024, this deficit will have grown par to 20 million households in a state of need. (FVG, 2014)
1.
21
Site Plan
Housing complex composition
1.
22
2 QUARTOS -
Typologies
50m² unit - two sleeping rooms
50m² unit - two sleeping rooms
50m² unit - two sleeping rooms + comercial activity option
100m² unit - three sleeping rooms
50m² units - two sleeping rooms + disabled families
In order to allow a greater variety of formal compositions for the housing units, in addition to covering different peculiarities related to the needs and the size of the families, six typologies were conceived, starting from the minimum unit of 50m² (5mx10m), with two rooms, until the maximum typology of 100m² (5mx20m). The typologies also present a possibility of flexibilization, with the objective of allowing commercial activities, besides two of them being adapted for families with disabled family members
1.
23
Housing units composition
1 Formal compositon
1.
24
2 Floor plans
1
5
10
1
5
10
1
5
10
1
5
10
WC
A: 2.50m²
1
5
10
1
5
1
10
5
10 WC
A: 2.50m²
1
5
10 WC
A: 2.50m²
1
5
1
5
1 1
5 5
10 10
1
10 10 5
10 WC
A: 2.50m²
11
5 5
10 10
1
5
10
1
5 5
1
5
5 1
1
5
WC
A: 2.50m²
floor plans - hounsing buldings
1
1
10
5
10
10 10
10
floor plans - hounsing buldings
10
floor plans - hounsing buldings
1
5
10
1
5
10
floor plans - hounsing buldings
1.
25
Housing complex overview
1.
26
Sections
1
5
1
.08
5
.86 3.04
.86 2.10
3.04
2.5
1.00
2.5
.08
1
5
2.5
.39 cm
1.10
.19 cm .09 cm
1
2.5
5
1.
27
federal university of ceará, brazil discipline: desing project 2 tutor: dr. ricardo paiva 2012 selected for: EXPO - CAU, 2012.2 location: benfica, fortaleza, brazil
The challenge proposed in the second discipline project was to develop a School of Arts for the Technology Center of Ceará. In order to attend a program of 2,000 m² capable of covering five main areas - administration, plastic arts, visual arts, dance and music, it was decided to distribute the building on four floors, around a large patio, with the aim of interaction between users.
A R T ‘S
SCHOO L
The building was basically L-shaped, where small formal adjustments were made to fit the program to the terrain. This format allowed for ease of movement, use of natural ventilation and protection of sunlight.
1.
28
One of the main points of the building is the composition of the facade, for which blue and intercalated brises were thought, which can move and generate different compositions, depending on the position of the sun. The stair, which uses the same leaked brise elements, was thought out of the building, so that the relations between interior and exterior are deenerated more intensely. The large patio was designed to allow full integration with the building. Intense arborization, urban furniture and a geometric landscaping make up this meeting and leisure space for users and visitors to the arts school.
1.
29
Floor plans
1 First floor
2 Second floor N
N
Floor plans compositions
1
First floor Admnistration Comom areas
3 Third floor
Scenic arts teaching Music teaching
1.
30
2 Second floor
Scenic arts teaching Admnistration
4 Fourth floor
Art crafts teaching
3 Third floor
4 Fourth floor N
N
1.
31
Sections
1 Perspective
1.
32
2.00
2 Transversal section
3 Transversal section
0
0
2,5m
5m
2,5m
5m
4 Longitudinal section
0
2,5m
5m
1.
33
1.
34
bom jardim slum upgrading proposal
U R BAN PLAN N I N G
urban planning to historical centre of forta leza
1.
35
federal university of ceará, brazil capstone project tutor: dr. clarissa sampaio de freitas 2017 nominated as one as 21 “best graduation projects of brazil and portugal” by Archdaily Brazil.
location: bom jardim, fortaleza, brazil
B O M J A R D I M S L U M U P G R A D I N G P R O P O S AL
The Federal Brazlian Law of Technical Assistance (Law 11.888 / 2008) was the result of a historical struggle of several grassroots movements in partnership with urbanists and engeneers engaged with issues of the right to housing and the city. It provides professional and public services free of charge to the low-income population. Although it was enacted in 2008 it is still very little applied in Brazil
1.
36
As a way to support the struggle of the popular organizations of the Grande Bom Jardim for the right to decent housing and other urban benefits, I developed my capstone project: “City by the people: an experience of technical assistance and participation in Bom Jardim ZEIS. ZEIS Bom Jardim was delimited by the Participative Master Plan of Fortaleza in 2009 as a result of the struggle of organized movements of the GrandeBom Jardim for the right to the city. Since then, residents of this area historically neglected by the government struggle to regulate this instrument. By understanding moradores as the main transforming agents of space and the advising as a possibility of dialogue between the technical knowledge and the informal processes of construction of the city, I sought to experience popular participation in some stages of urban planning for this area. The main result of this work was the Housing Improvement workshop in the Nova Canudos Community, in which a group of women can actively participate in the project improvement stages of their residences, in a process that sought to gain autonomy, individual and collective, and feminine empowerment of this group of dwellers about space and its production. In addition, in the context of the regulation of this ZEIS, a strategic plan was drawn up, based on a participatory diagnosis, which includes land regularization actions, management, access to urbanized land and social housing.
1.
37
Location
Bom Jardim ZEIS and informal settlements Bom Jardim ZEIS area/plots Marrocos comunity Other ZEIS precarious settlements Local hidric resources Local roud system
1.
38
Proposal Guidelines CCVH
1 Housing improvements In order to experience the technical advisory process - the main focus of this work - we propose the Nova Canudos Community Housing Improvement workshop, which is presented as a way of empowering residents about the process of designing their residences
CC
2 Restructuring the road system Related to the implementation of basic infrastructure, urbanization in this work was conceived from the Road Restructuring Plan, which aims to integrate the territory of ZEIS and, especially, the precarious settlements into the urban network of the city, besides improving the mobility of users and allowing the usual ways of integrating residents with the public area can continue to flow more smoothly.
3 Social Housing The acquisition of new housing units also relates to the housing shortage discussed in the Removal and Resettlement Plan. The proposal of Social Housing discusses two typologies that can be employed in the area of the ZEIS respecting the habitual forms of dwelling of the residents.
risk 4 Managing social and environmental CCVH CCVH These are measures to reduce or eliminate risk, such as drainage works, urbanization of the water resources margin and removal of families in areas at risk. Thus, the Environmental Recovery component presented aims to combine environment, education, leisure and income, bringing residents into the process of recovering the local environment as a means to prevent occupations from happening again and to continue the processes degradation of the environment..
5 Public facilities The public facilities designed for the ZEIS were defined based on the needs pointed out by the residents during the participatory diagnosis interviews. Proposals will be presented for four pieces of equipment: a multi-sport gymnasium, a training center, an association of recyclable waste pickers and a community center. .
6 Removal and resettlement plan Linked to the housing deficit, it is related to the need to remove families that are in a situation of environmental and urban inadequacy. In addition, the Removal and Resettlement Plan counts the families removed by the urbanization plans, mainly by the road restructuring plan presented, as well as the removals from the land used for the insertion of social housing...
CCVH
1.
39
Nova Canudos Park
1.
1 Removal of buildings in environmental protection
3 Resettlement of the removed buildings
2 Protection of the hidric local resources
4 Lasuire equipment and income generation iniciatives
40
Water channels proposal
1 Removal of buildings in environmental protection
3 Recovery of the transition green belt
2 Dredging works
4 Landscaping pathway
1.
41
1.
42
2,68m
2,68m
2,50
3,00
2,68m
12m
0,75m 1,2m 1,0m 0,75m
3,00
0,75m
2,40
0,75m
2,80
42m
0,75m
passeio faixa de acesso
2,80
faixa de
canteiro ciclovia canteiro pedestre canteiro
faixa de serviço ciclovia passeio faixa de acesso edificação
canteiro leito carroçável carro leito carroçável carro leito carroçável ônibus faixa de passeio faixa de acesso
pedestre
leito carroçável carro
leito carroçável
2,80
leito carroçável ônibus
1,2m 1,2m 1,0m 0,75m
0,75m
leito carroçável carro
2,75m
edificação
faixa de acesso
leito carroçável carro
canteiro leito carroçável
2,80
leito carroçável carro
1,2m 1,2m 1,0m 0,75m
passeio
ciclovia
leito carroçável ônibus
leito carroçável
0,75m
canteiro
faixa de serviço 2,75m
pedestre
canteiro
3,00
pedestre
0,75m 1,2m 1,0m 0,75m
canteiro
12m
ciclovia
edificação
2,75m
faixa de acesso
0,7m
leito carroçável
2,75m
passeio
2 Shared pathways 0,7m
ciclovia
faixa de
passeio
faixa de acesso
edificação
faixa de serviço leito carroçável
ciclovia
passeio
2,40
3,00
canteiro
leito carroçável carro
leito carroçável carro
canteiro leito carroçável
20m
edificação
faixa de acesso
passeio
ciclovia
leito carroçável 2,75m
faixa de serviço
2,75m
leito carroçável ônibus
faixa de serviço leito carroçável
ciclovia
passeio
faixa de acesso
edificação
0,75m
3,00
equipamentos
2,68m
faixa de serviço
leito carroçável
faixa de serviço leito carroçável
faixa de acesso
edificação
2,75m
ciclovia
2,00
leito carroçável 20m
2,75m
faixa de
passeio
faixa de serviço leito carroçável
0,75m 1,0m 1,2m 1,2m
faixa de serviço
0,75m 1,0m 1,2m
leito carroçável
2,00 3,00
2,50
equipamentos
faixa de serviço
passeio
faixa de acesso
edificação
2,00
ciclovia
0,75m 1,0m 1,2m
passeio
faixa de acesso
edificação
passeio
faixa de acesso
edificação 0,75m 1,0m 1,2m 1,2m
faixa de serviço
edificação
2,00
leito carroçável
faixa de serviço
passeio
edificação
Paisagística
Road system restructuring proposal
1 Arterial pathways
42m 0,75m 3,00 3,00 3,00 2,50 2,00 2,00
0,75m
3,00
3,00
3,00
2,50
2,00
2,00
passeio faixa de leito carroçável ônibus leito carroçável carro leito carroçável carro
canteiro pedestre
passeio faixa de leito carroçável ônibus leito carroçável carro leito carroçável carro canteiro ciclovia canteiro
2,00
pedestre canteiro pedestre
2,00
2,00
2,00
2,50
3,00
3,00
3,00
0,75m
2,40
0,75m
2,80
0,75m
2,50
3,00
3,00
3,00
0,75m
2,40
0,75m
leito carroçável ônibus faixa de passeio faixa de acesso
leito carroçável ônibus faixa de passeio faixa de acesso
2,80
leito carroçável carro
42m
leito carroçável carro
0,75m 1,2m
faixa de acesso
faixa de
leito carroçável ônibus
leito carroçável carro
leito carroçável carro
passeio
equipamentos
ciclovia
faixa de
leito carroçável
faixa de
passeio
canteiro
2,00
leito carroçável carro
3,0m
2,00
canteiro
0,75m
2,50
leito carroçável carro
2,5m
3,00
canteiro
42m 3,00
pedestre
3,00
canteiro
0,75m
ciclovia
2,80
canteiro
faixa de acesso
0,75m
faixa de acesso
canteiro
2,80
pedestre
pedestre
0,75m
edificação
canteiro
2,40
edificação
ciclovia
0,75m
edificação
canteiro
3 Landscaping pathway
16m 7,8m
4 Structuring pathways
2,80
0,75m
3,00
3,00
3,00
2,50
2,00
2,00
42m
0,75m
2,80
0,75m
3,00
3,00
3,00
2,50
2,00
2,00
1.
43
Social Housing - unifamiliar
Two rooms 1 Ground floor - 55m²
2 Ground floor - 55m²
5
5
3
3
4
3 First floor - 55m² 6 7
4 8
2 2 1
1.
44
11
9 10
1 living room 2 dinning room 3 kitchen 4 wc 5 backyard 6 sleeping room 7 wc 8 acess 9 sleeping room 10 balcony 11 store
Three rooms 4 Ground floor - 55m²
5 Ground floor - 55m²
5
5
3
6
3 4
6 First floor - 55m² 7
4 8
2 1
2
11
9
10
1 living room 2 dinning room 3 kitchen 4 wc 5 backyard 6 sleeping room 7 wc 8 acess 9 sleeping room 10 sleeping room 11 store
1.
45
Social Housing - multifamiliar Regular typologies 1 Área 48m²
2 Área 72m²
1
6
3 Área 66m² 1
4
6 5
5
1
4 2
3 2
2 4
4
4
3
Families with special needs typologies 1 Área 48m² 2 Área 72m² 6 1
2 3
46
5
4
4
3 Área 66m² 6
4 1
5
1.
4
3
4
1 dining room - kitchen 2 living room 3 balcony 4 sleeping room 5 wc 6 laundry
2
5
5
3 2 3
4
4
4
1
1 dining room - kitchen 2 living room 3 balcony 4 sleeping room 5 wc 6 laundry
Store typologies 1 Área 24m²
2 Área 72m²
3 Área 48m²
4 Área 48m²
1
1
1
1
4 2 3
2
4 3
2
3
2
3
1 reception 2 storage 3 wc 4 kitchen
2
3
3
2
1
3
3
2
1
2
1.
47
U R BAN PLAN TO TH E H I STO R I CAL C E NTR E O F FO RTALE ZA 1.
48
federal university of ceará, brazil discipline: urban planning 4 tutor: dr. almir farias 2016 location: centre of fortaleza, brazil
The project developed is a Reference Plan for Intervention and Urban Planning (PRIOUS) of the Historic Center of Fortaleza, carried out for the discipline of Urban Planning 4. The objective was to present an urban project integrated to issues and studies on the quality of cities; urban sustainability; density, morphology and urban composition; and green infrastructures. Center of Fortaleza is a privileged neighborhood of the city, with a wide range of jobs, a strong dynamic of popular and specialized commerce, a large public transport service, the presence of government bodies, memory of historical heritage, a wide range of cultural facilities and public spaces. sing. However, due to a process of speculative urbanization, the Fortaleza Center, as well as other metropoles, was marked by the monofunctionality of its uses and the abandonment of activities during non-commercial hours. To try to change this scenario, this project developed five subsystems, : Road Subsistema; Public Transport Subsystem; Free Space Subsystem; Subsystem of Public Equipment; Subsystem of Furniture; and finally, Rainwater Drainage Subsystem.
1.
49
Masterplan of the Historical Centre of Fortaleza N
bicicletar proposal
kindergarten
strutural pathways
bus stations
centre of science and technology
local pathways
programmed stations roller stair
assistence centre to homeless
landscaping pathways
centre of recycling
pedestrian pathways
open bus terminal
1.
50
Proposal main strategies 1
2
promote social housing in empty buildings
3
build more
4
promote comercial facades
5
offer diversity of modes of transportation
6
recover natural resources
create new spaces free public
7
8
deploy new public equipment
offer sustainable architectural diversity
1
2 8
7
4
5
3
6
1.
51
il
eio
eio
pass ada fach
via carro
via can- carro teiro
ass - p ciclo faixa
mob
pr
ativa
Road system : landscaping pathway
1 Location
2 Scheme
3 Section: Senador Pompeu Street
fachada ativa
1.
52
passeio
fachad
via carro
can- via teiro carro
ciclofaixa
passeio
mobiliário
área de preservação
ativa
Road system : shared pathway
1 Location
0
250
500
2 Scheme
fachada ativa
passe
3 Section: Duque de Caxias Avenue
0
fachada ativa
passeio
mobiliário
via ônibus
via via carro can-carro
250
500
via ônibus
ciclo- mo- passeio faixabiliário
fruição pública
1.
53
Urban furniture
1 Lamp post
07) quiosque móvel (usos múltiplos)
em
2 Kiosk
wifi
(55 wp)
feira de livos
elevações quiosque móvel
1.
54
feira orgânica
3 Banches
elevações banco 01 / banco 02 02) balizador + jardim 4 Beacon
03) lixeiras para coleta seletiva
5 Dustbin
6 Bus stop
1.
55
Public equipments : assistance centre to homeless people
1 Location
500
1.
56
2 Scale related to the surrounding
Public equipments : centre of science and technology
1 Location
2 Scale related to the surrounding
1.
57
Public equipments : kindergarten
1 Location
0
1.
58
2 Scale related to the surrounding
Public equipments : centre of reclycling
1 Location
2 Scale related to the surrounding
1.
59
1.
60
COMPETITIONS
cultural centre at senegal
1.
61
kaira looro competition with: fábio botelho, hannah mendes, marcela monteiro and natália medeiros winners to be announced 2018
C U LTU RAL C E NTR E AT S E N E GAL
Studying the socioeconomic, spatial and cultural aspects of Sédhiou and Senegal, the architectural design have a starting theme based on local memory, being possible to empower the inhabitants using elements of significance and representativeness from the project basis.As the local aspects are the background to develop a coherent project, gathering the main regional symbols, it resonates into three main principles: local memory, social sustainability and environmental comfort.
1.
62
Starting from these principles, the developed program intends to reaffirm the Senegalese culture and identity found in the place, by dividing the design in four basic zones: Administration, Education, Exhibition and Performance. The Administration consist of management room and meeting room. The Education has multipurpose rooms, multimedia room, ateliers and library. In turn, the Exhibition happens in a permeable way along the building and finally the Performance is made of dance and music rooms. Besides these areas, we can find living spaces, which could be used also for meetings and performances, assisted by cafeteria and commerce areas. The designed program spreads on the place into a flexible and durable edification. His formal aspects were imagined to be organic, mutable and expandable. It can be divided or built in different stages and its rooms could change the destination according to users will, as the small unitary shapes, united by covered pathways, allow adaptations to future expansions. The materials used were selected from local sources: bricks, bamboos, tiles, shells and palm trees. As soon as these materials refer to the architecture designed on the site, they are re-signified and their cultural values become meaningful. That said, the flexibility and local references in this design proposal aim to allow the inhabitants from the city and even the country to identify the Cultural Center as a place of awareness and be independent agents to appropriate the building space.
1.
63
Floor plan
N
07 08 03 07
03 04
01
02
12
09
06
01
05
12
1.
1
Education
Exhibitions
Performances
Bureau
01 Library 02 Multimedia Room 03 Multipurpose Rooms
04 Art Workshop/Studio 05 Open gallery 06 Local economy market
07 Dressing Rooms 08 Music/Dance Room 09 Patio
10 Direction 11 Meeting Room 12 Cafeteria
64
11
10
0
1
2,5
5
Building composition
1 Roof
4 Blocks
2 Beams
5 Landscaping
3 Pillars
6 Building
Facades
1 Southeast
2 Northeast
1.
65
1.
66
1.
67
1.
68
WORKSHOP
housing improvements at nova canudos
1.
69
federal university of ceará, brazil capstone project main component tutor: prof. dr. clarissa sampaio de freitas 2017 location: nova canudos community, fortaleza, brazil
WORKSHOP HOUSI NG IMPROVEMENTS
As a way to experience technical advice, with possibilities and obstacles, this work proposed the realization of the workshop “Housing Improvements in the Nova Canudos community: an experience of technical assistance and residents participation “in one of the most precarious settlements ZEIS of Bom Jardim.
1.
70
The main objective was to create a group of women within the community, interested in making housing improvements in their residences and willing to participate in an advisory process that is associated, to the gain of autonomy,individual and collective, and to the expansion of the imaginary about space and through the democratization of knowledge. Holding the workshop for the women’s group emerged as an attempt to women’s empowerment and gaining autonomy over decisions to respect of living space from the knowledge about questions regarding the project to improve their residences. At the end of the workshop, it was hoped that this group might have processes such as architectural survey [design and measurement] and housing improvements project, and can become a reproducer of this knowledge within their families and even within the community New Canudos. In addition, this process had the objective of revealing how live the residents of the community, which are the greatest housing precariousness and what can be done to improve the houses of these people.
1.
71
Participants’ houses schems
1 Fátima’s house
1.
72
2 Rosa’s house
3 Marileide’s house
4 Gorete’s house
The workshop took place in the local community centre, Centro de Valorização da Vida Humana (CCVH) and was held once a month for a group of five woman. The initial idea was to show them all the process related to design housing improvements, so we started drawing the floor plan oh wich house, after they learned how to take the measurements and, in the end, they learned which kind of improvements their houses most needed. The main precariunesses of the houses were related to the environmental comfort, such lack of natural light and ventilation, once usually there was not any space between on house and another. In addition, the houses used to smaller for the number of family member, with lack of private spaces. The proposal tried, for which case, decrease this precariousness in order to provide a better life condition to the residentes. 1st meeting
2nd meeting
3rd meeting
presentation of the worshop
learning how the read a tape measure.
drawing floor plans with the measuments
imagination of their houses
measuring of the community centre
studying estrategies to improve the houses
drawing the floor plans of their houses
measuring of their own houses
final project of wich house
1.
73
Rosa’s House Plans
2 Project plan
1 Current plan
6 7
6 6
5
7 5
4 2
1 entrance room 2 garage 3 living room 4 sleeping room
1.
74
5 kicthen 6 wc 7 backyard
3
5
3
4
1 2
1 entrance room 2 garage 3 living room 4 sleeping room
5 kicthen 6 wc 7 backyard
1
Toinha’s House Scheme
1 Current plan
Marileide’s House Plans
2 Project plan
1 Current plan
7 5
4
6
7
6 8
8 9
2 4
1 3
1 entrance room 2 living room 3 sleeping room - couple 4 wc 5 kicthen
4
5
9 4
3
10
1
4 2
6 laundry 7 backyard 8 sleeping room - kids 9 sleeping room - kids
1 entrance room 2 living room 3 sleeping room - couple 4 wc 5 kicthen
6 laundry 7 backyard 8 sleeping room - kids 9 sleeping room - kids 10 storage room
1.
75
Fátima’s House Plans
2 Project plan
1 Current plan
6
8 7
7
5
6
4
4 5
2
4
3
2
3 1
1
1 living room 2 storage room 3 wc 4 sleeping room
1.
76
5 corridor 6 kitchen 7 sleeping room 8 wc
1 living room 2 storage room 3 wc 4 winter garden
5 kitchen and dining room 6 sleeping room 7 wc
Gorete’s House Plans
1 Current plan
2 Project plan
6
6 7 5
7
4 3
5
5 wc 6 kitchen 7 laundry and backyard
1
3
1 2
1 living room 2 sleeping room 3 sleeping room - couple 4 corridor
4
2
1 living room 2 sleeping room 3 sleeping room - couple 4 corridor
5 wc 6 kitchen 7 laundry and backyard
1.
77
1.
78