ue to the nature of research, manufacturing, and production, working in the pharma industry demands skilled engineers who understand how to ensure the energy and HVAC systems operate in a manner that meets with federal regulations, global standards, and public expectations. ENERActive Solutions is an industry leader in working in this critical environment and holds the necessary expertise to work with facility teams to develop tailored energy conservation programs. Founded in 2006, ENERActive Solutions is an independent, energy consulting and project development firm specializing in the analysis, development, and implementation of energy conservation projects. Headquartered in Asbury Park, New Jersey, with regional offices in Boston, New York City, Chicago, Philadelphia, Beltsville, Maryland, and Harrisonburg, Virginia, Eneractive brings real energy savings and performance enhancement to clients both nationwide and internationally. This reflects our conviction that great projects cannot happen without passion, intelligence, and personal commitment, which is demonstrated by our portfolio of work. Eneractive leverages both traditional demand side strategies and newly available supply side initiatives to ensure optimum facility performance and lower operating costs. Our experience ranges from large-scale power generation to traditional building and energy systems. Our solutions focus on the domains of building HVAC and controls, new energy technologies,renewable energy, power plant environmental systems (SCR), and energy awareness and education. Through our core services, we are able to work with our clients and develop projects that are thoughtful, prudent, and valuable in their cost effectiveness, as well as their appropriateness with the long range planning for facilities and operations.
CORE SERVICES ENERGY SERVICES
AUDITS & ENERGY MODELING CENTRAL PLANT OPTIMIZATION DIAGNOSTIC TROUBLESHOOTING ENERGY MASTER PLANNING NYC LOCAL LAW 87 COMPLIANCE
BENCHMARKING PROJECT DESIGN, DEVELOPMENT & IMPLEMENTATION TESTING & BALANCING NEBB CERTIFIED
CX SERVICES NEW CONSTRUCTION EXISTING BUILDING FEASIBILITY STUDIES OWNER’S PROJECT REP. DESIGN & CONSTRUCTION REVIEW
VIRTUAL ENERGY MONITORING SOLAR & RENEWABLE ENERGY POWER PLANT SOLUTIONS
PFIZER WORLD HEADQUARTERS
ASHRAE LEVEL II ENERGY AUDIT & RETRO-CX Manhattan, NYC
• OVER 27 ECMS IDENTIFIED FOR IMPLEMENTATION • $966,599 SAVINGS IN ANNUAL UTILITY EXPENSES • 21% REDUCTION IN ANNUAL UTILITY COSTS COMPARED TO BASELINE UTILITY TOTALS • ESTIMATED SAVINGS OF 1,593,967 KWH AND 21,055 MLBS OF STEAM ANNUALLY • PAYBACK PERIOD OF 4.1 YEARS
MERCK
BOILER ENERGY ASSESSMENT DANVILLE, PA
In compliance with US EPA’s MACT Regulation PROJECT HIGHLIGHTS
• Identified 4 quantifiable Energy Conservation Measures ◦◦ Identified another 6 ECMs included as part of a best practices approach to saving energy • 3 quantifiable ECMs impact steam & electric consumption of the central plant & overall campus ◦◦ Implementation of these ECMs is anticipated to reduce expenses by $59,892.52 annually • Payback period: 2.25 years
MERCK
BOILER ENERGY ASSESSMENTS
In compliance with US EPA’s 6J GACT Regulation Arecibo • • • •
PUERTO RICO Arecibo Barceloneta Las Piedras
NEW JERSEY
Kenilworth Summit Whitehouse Station
PUERTO RICO SITE HIGHLIGHTS
11 executed ECMs $606,000 in annual savings Payback period of 1.2 years Projected cost of implementation: $736,000
Las Piedras • • • •
8 executed ECMs $445,000 in annual savings Payback period of 2.2 years Projected cost of implementation: $966,000
Barceloneta • • • •
12 executed ECMs $1.06 M in annual savings Payback period of 1.4 years Projected cost of implementation: $1.47 M
Kenilworth • • • •
3 identified ECMs $66,249 in annual savings Payback period of .68 years Projected cost of implementation: $45,000
Summit • • • •
NEW JERSEY SITE HIGHLIGHTS
10 identified ECMs $173,000 in annual savings Payback period of 1.2 years Projected cost of implementation: $206,000
Whitehouse Station • • • •
3 identified ECMs $21,484 in annual savings Payback period of 2.8 years Projected cost of implementation: $60,500
JOHNSON & JOHNSON WORLD HEADQUARTERS New Brunswick, NJ
over $581,000
IN ANNUAL ENERGY SAVINGS
ENERGY MASTER PLAN
RESULTS Eneractive was commissioned to • 22% ENERGY COST REDUCTION conduct an energy audit for the J&J • IDENTIFIED $390,000 IN O&M MEASURES World HQ in an effort to help them • TOTAL PROGRAM COST: $345,000 reach their Healthy Planet 2015 Goals. • 11 MONTH PAYBACK PERIOD
NEUTROGENA CORPORATION
Los Angeles, CA
• • • • •
ASHRAE Level I & II Energy Audits
7 CAMPUS BUILDINGS 388,155 SQ. FT. IDENTIFIED 39 ENERGY CONSERVATION MEASURES AVERAGE SIMPLE PAYBACK: 2.3 YEARS ANNUAL SAVINGS: ◦◦ $299,322 ◦◦ 1,995,648 kWh of electricity ◦◦ 26% reduction in gas consumption
◦◦ 21% reduction in electricity consumption
JOHNSON & JOHNSON Retro-Commissioning Projects
HORSHAM, PA
ENERActive was contracted to perform a detailed retro-cx study on 3 buildings in the Johnson & Johnson Horsham, PA campus.
• Over 291,000 square feet assessed • Implementation of measures would equate to 894,184 kWh of electricity and 7,791 therms of natural gas in annual energy savings
OUR CORE MARKETS HIGHER EDUCATION COMMERCIAL GOVERNMENT HIGH TECH/DATA CENTERS INDUSTRIAL
HEALTHCARE K-12 MULTI-FAMILY HOUSING MUSEUMS PHARMACEUTICAL
GLAXOSMITHKLINE
Clifton, NJ
PROPOSED A
Solar Consulting
350 kWdc
ROOFTOP SOLAR SYSTEM
Eneractive assessed the solar opportunity in the form of a solar study for the GlaxoSmithKline facility located in Clifton, New Jersey. A full assessment of the structural capacity was performed to determine that the building could support the additional load required by the photovoltaic system. Multiple financing options were provided to allow GlaxoSmithKline to make a fully informed decision on the opportunity.
LYONDELLBASELL INDUSTRIES
ENERGY REDUCTION PLAN Edison, NJ
• 1 MILLION SQ. FT. INDUSTRIAL FACILITY • PLAN HIGHLIGHTS: ◦◦ Large scale boiler changeout ◦◦ Chilled water pump optimization ◦◦ Operational & maintenance improvements ◦◦ + additional ECMs
• SYSTEM ANALYSIS INCLUDED:
◦◦ Chilled water plant and distribution ◦◦ Steam system plant ◦◦ Steam to hot water converters ◦◦ Exhaust fans ◦◦ Fume hoods ◦◦ Steam trap testing ◦◦ Electrical infrastructure analysis
WHY ENERACTIVE? ENERActive is an experienced, independent energy consulting and engineering firm specializing in the analysis, development, and implementation of energy conservation projects. Staffed with highly tenured professionals from the energy engineering and energy project development fields, we have the capability to not only identify energy conservation measures, but our history of bringing these projects full circle to completion has given us a track record of performance that ensures all projects are assessed, developed, and implemented in a manner which consistently exceeds the expectations of our clients.
L’OREAL DISTRIBUTION & CENTRAL HQ Energy Reduction Plan | Cranbury, NJ
60,000 sq. ft. OF OFFICE SPACE & OVER 150k sq. ft. OF WAREHOUSE, PACKAGING, AND DISTRIBUTION AREAS
• Identified both Capital & Operational ECMs • Payback Period: < 4 years • Provided 3 days of energy awareness training to facility staff • Hosted sustainability forum during “bring your child to work day”
VIVARIUM TESTING, ADJUSTING, AND BALANCING PROJECTS MULTIPLE FACILITIES
Eneractive was contracted to perform Testing, Adjusting, and balancing work at the following locations: • Columbia University • Princeton University Icahn Laboratory (pictured) • Columbia University Medical Center • Memorial Sloan-Kettering Cancer Center • Continuum Health Partners - St. Luke’s Hospital
TO BE THE BEST AT WHAT YOU DO, YOU HAVE TO KNOW THE STANDARDS OF YOUR FIELD.
AT ENERACTIVE, OUR TALENTED TEAM PRIDES ITSELF IN BEING CERTIFIED IN THE FOLLOWING AREAS:
CERTIFICATIONS Professional Engineer Certified Energy Manager Certified Energy Auditor Certified Building Commissioning Professional LEED Accredited Professional LEED Green Associate Existing Building Commissioning Professional Demand Side Management Professional Multi-Family Building Analyst Red Seal Boiler Operators License
NEBB Commissioning Technician NEBB Commissioning Professional NEEB HVAC, Plumbing, and Fire Protection NEBB Certified Retro-Commissioning Professional Licensed Refrigeration Handling Star Certification in HVAC Certified Building Systems Professional Siemens Master Operator Siemens Master Programmer Labs 21 EPA Refrigerant License BPI Building Analyst BPI Building Envelope Professional
An EDISON ENERGYSM Company
Energy Solutions... Efficient Results
HEADQUARTERS
700 Mattison Ave., Suite A Asbury Park, NJ 07712 P: (732) 988-8850
MARYLAND
7001 Muirkirk Meadows Dr., Suite E Beltsville, MD 20705 P: (301) 210-9560
NEW YORK
150 Broadway, Suite 802 New York, NY 10038 P: (212) 269-2302
www.eneractivesolutions.com | info@eneractivesolutions.com
VIRGINIA
370 Neff Avenue, Suite E Harrisonburg, VA 22801 P: (540) 434-1178