System2 Design Guide is based on the guiding principles of structural framing requirements for Rear Ventilated Rain Screen (RVRS) Lightweight Facade systems and the thermal performance requirements applicable for the prescriptive requirements of ASHRAE 90.1-2007/2010.
DISCLAIMER The use of this information shows your acceptance of these terms. The information is intended to provide background information on facade products provided by Engineered Assemblies Inc.. Although Engineered Assemblies Inc. makes reasonable efforts to present information which is up to date and accurate, Engineered Assemblies Inc. makes no representation or warranty as to the adequacy, accuracy, completeness, or correctness of such information, nor does it warrant or represent that the information provided is complete in every respect. Engineered Assemblies Inc. shall not have liability resulting from the use of the information provided, the absence of any specific information, the possible interruptions or technical errors of this information and/or the content herein.
Your Engineered Assemblies Inc. Team
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 2
#brilliantbuildings
p.3
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
For a brief video introduction to this SYSTEM2 Design Guide visit: https://www.engineeredassemblies.com/systems
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.4
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
ENGINEERED ASSEMBLIES (EA) RVRS TcLip™ SYSTEM2 (S2) Executive Summary In response to the rapidly increasing demand for thermally effective wall assemblies to meet the evolving National Building Code, EA has designed a Thermal Clip. The TcLip™ S2 comes in five clear field clip options; T100, T125, T150, T175 and T200 which accommodate 4”, 5”, 6”, 7”, and 8” of exterior insulation. The system comprises aluminum clips connected to horizontal and vertical sub-girts (framing members) that support cladding panels. The clips are designed to attach to a steel stud back-up wall/concrete block/concrete (other substrates may be considered.)
Thermal Performance The TcLip™ S2 meets the prescriptive requirements for non-residential steel stud walls in ASHRAE 90.1-2007/2010 for all climate zones. Performance of the system is validated through Modeling and the Finite Element Analysis (FEA) package completed by Morrison Hershfield. The thermal solver and modeling procedures utilized for this study were extensively calibrated and validated for ASHRAE Research Project 1365-RP “Thermal Performance of Building Envelope Details for Mid- and High-Rise Construction” (1365-RP)1. (See Engineered Assemblies Inc. for full report.)
Structural Performance The TcLip™ S2 is engineered to accommodate facade panels generally 8-26 mm in thickness and up to 35 kg/m2 that require vertical back ventilation of minimum 25 mm free air space. The system provides vertical framing members that allow thermal expansion of both the vertical framing member and the movement of the panel. The vertical framing members are attached to horizontal framing members and may be positioned as required to accommodate panel fastening and vertical joint location. The horizontal framing member attaches to the TcLip™ S2 and can be adjusted to plumb out the structure. The spacing of the horizontal framing is adjustable to suit the design loads imposed on the system. Contact Engineered Assemblies for more information. Visit www.engineeredassemblies.com
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 3
#brilliantbuildings
p.5
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
RVRS TcLip™ SYSTEM2 (S2)ƫD!/%#*ƫS1)) .5 $!ƫ Ăƫ". )%*#ƫ/5/0!)ƫ%/ƫ !/%#*! to meet theƫ 5* )% ƫ,!."+.) * !ƫ.!-1%.!)!*0/ƫ "+.ƫ0$!.) ((5ƫ .+'!*ƫ(%#$03!%#$0ƫ" !ƫ) 0!.% (/ċƫThe principles of the S2 design meet the guidelines of application and warranty requirements for lightweight facade materials including fibre cement, phenolic and HPL veneer, porcelain and other nonstructural facade materials. The S2 system is designed to distribute the imposed loads back to light gauge structural stud framing as well as concrete or block wall structures. The patented TcLip™ supports horizontal framing members that can be adjusted for wall alignment and extend beyond stud location for universal attachment of vertical framing members that support the panel. The TcLip™ comes in five clear field clip options; T100, T125, T150, T175 and T200 which accommodate 4”, 5”, 6”, 7”, and 8” of semi-rigid insulation. The depth is chosen by the required Effective R-Value of the system. S2 framing members remain identical for all system depths and are engineered to meet the following design principles: • • • •
Coefficient movement of individual facade panel Prescribed panel joint size and fastener location Unobstructed rear ventilation of panel Expansion gaps in vertical framing members to allow for deflection and movement of framing members and building structure • Deflection strength L/300 • Adjustable for structure misalignment • Post-disaster design requirement Summary of SYSTEM2 Design Guide: • meets the requirements of ASHRAE 90.1-2007/2010 for all climate zones • is a Rear Ventilated Rain Screen (RVRS) facade assembly • is adjustable to plumb out structure and has adaptable vertical framing members • is lightweight manufactured using low embodied energy, non-combustible and recyclable components • is 'system integrated'
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.6
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
REAR VENTILATED RAIN SCREEN - 6<67(0 TCLIPTM #9 243 399 B2
S2 DESIGN GUIDE IS BASED ON HIGH-DENSITY AND PHENOLIC PANELS SUPPLIED BY ENGINEERED ASSEMBLIES. HOWEVER, IT IS SUITABLE FOR ANY LIGHTWEIGHT FACADE MATERIAL APPLICATION. FOR HIDDEN FIXING APPLICATIONS SEE ENGINEERED ASSEMBLIES BEAR CLAW DESIGN GUIDE
NOTE: FOR PORCELAIN & HIDDEN FIXING SYSTEM, SEE: BEAR CLAW HIDDEN FIXING SYSTEM. ( www.engineeredassemblies.com/resources/design-guides/ )
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 5
#brilliantbuildings
p.7
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
Table of Contents Introduction Table of Contents Effective Assembly R-Value
Pages 1-8 Page 9 Pages 10-13
C1. Clear Field Thermal Performance C2. Slab Edge Thermal Performance
Design Loads and Important Design Concepts
Pages 14-25
Vertical Section for the 'T100' Clip Thermal System Vertical Section for the 'T125' Clip Thermal System Vertical Section for the 'T150' Clip Thermal System Vertical Section for the 'T175' Clip Thermal System Vertical Section for the 'T200' Clip Thermal System Plan Section At Aligned Vertical Joints Plan Section at Staggered Vertical Joints
Detailing for Panel Fixed and Floating Points
Pages 26-32
Rivet Setting Detail and Notes Intermediate Supports at Floating Points, Intermediate Support at Fixed Points Fibre Cement Board Fastener Layouts for Vertical Panel Fibre Cement Board Fastener Layouts for Horizontal Panel Warning: Do Not! Phenolic Fastener Layouts for Vertical Panel Phenolic Board Fastener Layouts for Horizontal Panel
Typical Panel Elevation Vertical Expansion of Sub-Structure Detail at Active Control Joints
Page 33 Page 34 Page 35
Control Joints in the Envelope Structure
Typical Details for EA RVRS Facade System
Pages 36-52
Section Detail at Parapet Section Detail at Closed Horizontal Joint Section Detail at Wall Base Head Section Detail at Opening Greater than 2.0M wide Sill Section Detail at Opening Greater than 2.0M wide Head Section Detail Opening Less than 2.0M wide Sill Section Detail at Opening Less than 2.0M wide Plan Detail - At Typical Opening Plan Detail - Outside Corner Plan Detail - Inside Corner Plan Detail - To Wall End Section Detail - Soffit to Fascia Section Detail - Soffit to Wall Isometric Detail - On Stud Wall Isometric Detail - On Concrete Wall Isometric Detail - On Block Wall
EA Systems Part Specification Tool List
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
Pages 53-56 Pages 57-58
#brilliantbuildings
p.9
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
APPENDIX C - EFFECTIVE ASSEMBLY R-VALUES The following tables represent thermal performance of SYSTEM2 where nominal insulation value translates into effective value through varied TcLip™ vertical spacing. The vertical spacing in the following tables (24”/36”/48”) is determined by the wind load experienced when a facade material dead load of 7.5lb/psf is considered. Structural load tables are available on request for engineering calculations. NOTE: The 48” vertical spacing that follows is based on a facade skin dead load of 7.5lb/psf when wind load is 40lb/psf or lower. Higher wind loads may require tighter vertical TcLip™ spacing. Refer to pages 35, 36, 37 of the design guide, for wind load to vertical spacing ratio.
Table 1:Horizontal Girt & Vertical Girt Spacing Provided by Engineered Assemblies Inc. (Steel Stud Wall Only)
For TcLip™ assemblies with uninsulated steel stud walls the “effective R-value” of the clip systems ranges from 76% to 90% effective, depending on insulation level and spacing, compared to the assembly nominal thermal resistance for all the clip systems. The results show that increasing the vertical spacing from 24 to 48 inches results in up to an 11% reduction in the U-value (R-3 gain). The addition of R-12 batt insulation in the stud cavity adds up to R-6 to the effective R-value of the assembly. This results in a range of 63% to 75% effective due to the thermal bridging effects of the steel studs.
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.10
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM & &OHDU )LHOG 7KHUPDO 3HUIRUPDQFH 7DEOH & Clear Field Effective Assembly R-Values with Uninsulated Steel Stud Wall $VVHPEO\ (IIHFWLYH 5 9DOXH &OLS 6\VWHP
KUÄ&#x192;IW Ä&#x192;R) %78 P . :
1RPLQDO ,QVXODWLRQ KUÄ&#x192;IW Ä&#x192;R) %78 P . :
µ 9HUWLFDO &OLS 6SDFLQJ
µ 9HUWLFDO &OLS 6SDFLQJ
µ 9HUWLFDO &OLS 6SDFLQJ
7
5
5
5
5
7
5
5
5
5
7
5
5
5
5
7
5
5
5
5
7
5
5
5
5
7DEOH & Clear Field Effective Assembly R-Values with Steel Stud Wall with R-12 Batt $VVHPEO\ (IIHFWLYH 5 9DOXH &OLS 6\VWHP
KUÄ&#x192;IW Ä&#x192;R) %78 P . :
1RPLQDO ,QVXODWLRQ KUÄ&#x192;IW Ä&#x192;R) %78 P . :
µ 9HUWLFDO &OLS 6SDFLQJ
µ 9HUWLFDO &OLS 6SDFLQJ
µ 9HUWLFDO &OLS 6SDFLQJ
7
5 5
5
5
5
7
5 5
5
5
5
7
5 5
5
5
5
7
5 5
5
5
5
7
5 5
5
5
5
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.11
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
7DEOH & Clear Field Effective Assembly R-Values with Concrete Wall $VVHPEO\ (IIHFWLYH 5 9DOXH &OLS 6\VWHP
KUÄ&#x192;IW Ä&#x192;R) %78 P . :
1RPLQDO ,QVXODWLRQ KUÄ&#x192;IW Ä&#x192;R) %78 P . :
µ 9HUWLFDO &OLS 6SDFLQJ
µ 9HUWLFDO &OLS 6SDFLQJ
µ 9HUWLFDO &OLS 6SDFLQJ
7
5
5
5
5
7
5
5
5
5
7
5
5
5
5
7
5
5
5
5
7
5
5
5
5
7DEOH & Clear Field Effective Assembly R-Values with Concrete Block Wall $VVHPEO\ (IIHFWLYH 5 9DOXH &OLS 6\VWHP
KUÄ&#x192;IW Ä&#x192;R) %78 P . :
1RPLQDO ,QVXODWLRQ KUÄ&#x192;IW Ä&#x192;R) %78 P . :
µ 9HUWLFDO &OLS 6SDFLQJ
µ 9HUWLFDO &OLS 6SDFLQJ
µ 9HUWLFDO &OLS 6SDFLQJ
7
5
5
5
5
7
5
5
5
5
7
5
5
5
5
7
5
5
5
5
7
5
5
5
5
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.12
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
& 6ODE (GJH 7KHUPDO 3HUIRUPDQFH 7DEOH & : Effective Assembly R-Values including the effects of an insulated slab edge for 9 foot floor to ceiling height with uninsulated Steel Stud wall
&OLS 6\VWHP
1RPLQDO ,QVXODWLRQ KUÃ&#x192;IW Ã&#x192;R) %78 P . :
$VVHPEO\ (IIHFWLYH 5 9DOXH ZLWK 6ODE (GJH KUÃ&#x192;IW Ã&#x192;R) %78 P . : µ 9HUWLFDO 6SDFLQJ
µ 9HUWLFDO 6SDFLQJ
µ 9HUWLFDO 6SDFLQJ
7
5 5 5 5
7
5 5 5 5
7
5 5 5 5
Ψ 6ODE (GJH /LQHDU 7UDQVPLWWDQFH %78 KUÃ&#x192;IWÃ&#x192;R) : P.
- Full thermal reports are available at (http://www.engineeredassemblies.com/resources/design-guides/) -Full structural reports are available at (http://www.engineeredassemblies.com/resources/design-guides/)
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.13
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM EA 'T100' THERMAL SYSTEM - VERTICAL SECTION AT HORIZONTAL JOINT
B
B
SECTION A-A
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.14
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
38 10
18
10
T100 FRONT VIEW
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.15
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM EA 'T125' THERMAL SYSTEM - VERTICAL SECTION AT HORIZONTAL JOINT
B
B
SECTION A-A
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.16
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 38 10
18
10
T125 FRONT VIEW
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.17
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM EA 'T150' THERMAL SYSTEM - VERTICAL SECTION AT HORIZONTAL JOINT
B
B
SECTION A-A
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.18
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 38 10
18
10
T150 FRONT VIEW
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.19
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
8
EA 'T175' THERMAL SYSTEM - VERTICAL SECTION AT HORIZONTAL JOINT
128
3
FRC 100mm PHENOLIC 40mm
50
35
19
15
6 3
8 2
25 35
FOR `T175' SYSTEM 175 [7"] INSULATION
SECTION A-A
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.20
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 38 18
10
10
10
10
67
154
67
128
13
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
T175 FRONT VIEW
#brilliantbuildings
p.21
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM ($ 7 7+(50$/ 6<67(0 9(57,&$/ 6(&7,21 $7 +25,=217$/ -2,17
6(&7,21 $ $
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.22
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
7 )5217 9,(:
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.23
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
$
$
3/$1 6(&7,21 $7 $/,*1(' 9(57,&$/ -2,176
6(&7,21 % %
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.24
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
$
$
3/$1 6(&7,21 $7 67$**(5(' 9(57,&$/ -2,176
6(&7,21 % %
%
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
%
#brilliantbuildings
p.25
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM '(7$,/,1* )25 3$1(/ 029(0(17 $1' /2&. 32,176
5,9(7 6(77,1* '(7$,/ $1' 127(6
' 9,(:
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.26
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
,17(50(',$7( 6833257 '(7$,/6 $7 )/2$7,1* 32,176
,17(50(',$7( 6833257 '(7$,/6 $7 ),;(' 32,176
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.27
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
),%5( &(0(17 %2$5' )$67(1(5 /$<2876 )25 9(57,&$/ 3$1(/
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.28
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM ),%5( &(0(17 %2$5' )$67(1(5 /$<2876 )25 +25,=217$/ 3$1(/
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.29
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM :$51,1* '2 127 x x
$7 12 7,0( 6+28/' 7+( ),;(' 32,176 %( $/,*1(' /,.( 7+,6 :,7+ 7:2 $'-$&(17 ),;(' 32,176 21 7+( 6$0( 9(57,&$/ 5$,/ ,7 ,6 $'9,6(' 7+$7 21 /$5*( 352-(&76 :+(5( 025( 7+$1 21( 7($0 2) ,167$//(56 $5( :25.,1* 7+$7 $ &20021 ),;,1* $55$1*(0(17 ,6 $*5((' %()25( ),;,1* &200(1&(6 72 35(9(17 6,78$7,216 /,.( 7+,6
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.30
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
3+(12/,& 3$1(/ )$67(1(5 /$<287 )25 +25,=217$/ 3$1(/
127( 3$1(/6 29(5 PP 5(48,5( )$67(1,1* 32,176 3$1(/6 /(66 7+$1 PP 5(48,5( 0,''/( 6833257 : 2 )$67(1(56 3$1(/6 /(66 7+$1 PP 5(48,5( 21/< )$67(1,1* 32,176 )25 62)),7 7+(5( 0867 %( $7 /($67 )$67(1,1* 32,176 ,1 ($&+ ',5(&7,21 )25 (9(5< 3$1(/ 0$; PP 63$&,1* )$67(1,1* 32,176 ,6 $&&(37$%/( )25 3$1(/6 83 72 PP 0$;
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.31
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
3+(12/,& %2$5' )$67(1(5 /$<2876 )25 9(57,&$/ 3$1(/
127( 3$1(/6 29(5 PP 5(48,5( )$67(1,1* 32,176 3$1(/6 /(66 7+$1 PP 5(48,5( 0,''/( 6833257 : 2 )$67(1(56 3$1(/6 /(66 7+$1 PP 5(48,5( 21/< )$67(1,1* 32,176 )25 62)),7 7+(5( 0867 %( $7 /($67 )$67(1,1* 32,176 ,1 ($&+ ',5(&7,21 )25 (9(5< 3$1(/ 0$; PP 63$&,1* )$67(1,1* 32,176 ,6 $&&(37$%/( )25 3$1(/6 83 72 PP 0$;
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.32
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
7<3,&$/ 3$1(/ (/(9$7,21
6+2:,1* 9(57,&$/ %$56 /$<287 $ 6,1*/( 3$1(/ &$1127 6+$5( %( )$67(1(' 72 7:2 6(3(5$7( 9(57,&$/ +$7 %$56 ,1 68&&(66,21 +$7 %$56 1((' 72 6723 $1' 67$57 $7 75$',7,21$/ 32,176 2) '()/(&7,21
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.33
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
9(57,&$/ (;3$16,21 2) 68% 6758&785(
127( '(6,*1 9(57,&$/ +$7 %$5 72 63$1 6/$% 72 6/$% 72 $92,' $'',7,21$/ +25,=217$/ )5$0,1* 0(0%(56 6(( 6/$% ('*( '(7$,/
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.34
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM '(7$,/ $7 $&7,9( -2,176
&21752/ -2,176 ,1 7+( (19(/23( 6758&785( $5($6 5(48,5,1* $77(17,21
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.35
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
7<3,&$/ '(7$,/6 )25 ($ 5 9 5 6 )$&$'( 6<67(0
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.36
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
PARAPET DETAIL w/ ACTIVE JOINTS
DETAIL 5.2 ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.37
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 9(57,&$/ 6(&7,21 $7 237,21$/ &/26(' +25,=217$/ -2,17
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.38
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 9(17,1* '(7$,/ $7 :$// %$6(
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.39
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM +($' 6(&7,21 '(7$,/ $7 23(1,1* *5($7(5 7+$1 0 :,'(
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.40
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 6,// 6(&7,21 '(7$,/ $7 23(1,1* *5($7(5 7+$1 0 :,'(
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.41
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM +($' 6(&7,21 '(7$,/ $7 23(1,1* /(66 7+$1 0 :,'(
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.42
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 6,// 6(&7,21 '(7$,/ $7 23(1,1* /(66 7+$1 0 :,'(
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.43
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 3/$1 '(7$,/ $7 7<3,&$/ 23(1,1*
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.44
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 3/$1 '(7$,/ 2876,'( &251(5
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.45
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 3/$1 '(7$,/ ,16,'( &251(5
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.46
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 3/$1 '(7$,/ 72 :$// (1'
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.47
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 6(&7,21 '(7$,/ 62)),7 $7 )$6&,$
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.48
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM 6(&7,21 '(7$,/ 62)),7 $7 :$//6
'(7$,/ ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.49
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
THERMAL CLIP SYSTEM ON STUD WALL
7KH ORDGV LQ WKLV FKDUW DUH DOORZDEOH ORDGV
40 0m m [ 1 MA 6" ] X
4F 1A 600
[23 .5 SE "] MA ET X. PA AB GE LE 13
2A
3A
30 0m m [ 8 MAX "] .
2###
4###
3###
7KLV ORDG FKDUW LV EDVHG RQ W\SLFDO 1### WKLQ SDQHO V\VWHPV 7KH ORDGV DUH IRU WKH VXEVWUXFWXUH DQG DWWDFKPHQW WR EDVH EXLOGLQJ FRQVXOW WKH SDQHO PDQXIDFWXUHU IRU UHTXLUHG VXSSRUW VSDFLQJ
MAX.1220 mm [48"] C UP TO ±1.9 kPa [ 40psf ]
2###
5.15 ISOMETRIC DETAIL ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.50
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
THERMAL CLIP SYSTEM ON CONCRETE WALL 7KH ORDGV LQ WKLV FKDUW DUH DOORZDEOH ORDGV
81 C/C 2mm MA [ 32 XIM " ] UM
4F 1A 600
mm
2A
[23 .5" SE E T ] MAX PA AB GE LE . 13
3A
NOTE: CONCRETE F'c IS ASSUMED TO BE AT LEAST 21 MPa (3000psi) OR GREATER
MA 255m X. CA m [ 1 NT 0" ILE ] VE R
2###
4###
3###
7KLV ORDG FKDUW LV EDVHG RQ typical 1### WKLQ SDQHO V\VWHPV
MAX.1220 mm [48"] C UP TO ±1.9 kPa [ 40psf ]
2###
7KH ORDGV DUH IRU WKH VXEVWUXFWXUH DQG DWWDFKPHQW WR EDVH EXLOGLQJ FRQVXOW WKH SDQHO PDQXIDFWXUHU IRU UHTXLUHG VXSSRUW VSDFLQJ
5.15 ISOMETRIC DETAIL ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.51
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
THERMAL CLIP SYSTEM ON BLOCK WALL
7KH ORDGV LQ WKLV FKDUW DUH DOORZDEOH ORDGV
61 C/C 0mm MA [ 24 XIM " ] UM
4F 1A 600
[23 .5" ]M SE AX ET . PA AB GE LE 13
2A
3A
MA 255m X. CA m [ 1 NT 0" ILE ] VE R
2###
4###
3###
7KLV ORDG FKDUW LV EDVHG RQ W\SLFDO 1### WKLQ SDQHO V\VWHPV 7KH ORDGV DUH IRU WKH VXEVWUXFWXUH DQG DWWDFKPHQW WR EDVH EXLOGLQJ FRQVXOW WKH SDQHO PDQXIDFWXUHU IRU UHTXLUHG VXSSRUW VSDFLQJ
MAX.1220 mm [48"] C UP TO ±1.9 kPa [ 40psf ]
2###
5.15 ISOMETRIC DETAIL ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.52
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
PART SPECIFICATIONS FOR ENGINEERED ASSEMBLIES WALL SYSTEMS
EA STANDARD WALL SYSTEM
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
GENERAL NOTES
#brilliantbuildings
p.53
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
PART SPECIFICATIONS FOR ENGINEERED ASSEMBLIES WALL SYSTEMS
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.54
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
PART SPECIFICATIONS FOR ENGINEERED ASSEMBLIES WALL SYSTEMS
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.55
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM PART SPECIFICATIONS FOR ENGINEERED ASSEMBLIES WALL SYSTEMS
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.56
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
Tools Available from Engineered Assemblies DRILLING EQUIPMENT ID
Image
Description
)LEUH &HPHQW
VHM Drill Bit – Panel Drilling
YES
Linea drill-mill – wider support up to 140mm
YES
Gesipa Powerbird 14.4 V Cordless Rivet Gun (Heavy Duty)
YES
YES
Replacement Battery for Gesipa Powerbird 14.4 V Cordless Rivet Gun (AH Li-Lon)
YES
YES
)LEUH &HPHQW
3KHQROLFV
Centralising Drill – Subgirt pre-drilling
YES
YES
Replacement Drills for Centralising Drill (5 Pack or sold individually)
YES
YES
Rivet Setting Tool – for use with Gesipa Powerbird
YES
YES
3KHQROLFV
10 YES
11
19
26
SUBFRAME DRILLING EQUIPMENT ID
Image
Description
16
17
18
ENGINEEREDASSEMBLIES.COM
EA SYSTEM2 DESIGN GUIDE.indd 4
#brilliantbuildings
p.57
2018-11-10 3:34 PM
2018.11.V1
ENGINEERED ASSEMBLIES THERMAL CLIP RVRS WALL SYSTEM
CUTTING EQUIPMENT ID
Image
Description
)LEUH &HPHQW
3KHQROLFV
YES
YES
21 Bosch T-Shank T-141 Jigsaw Blade (1/pack)
22 Grip Rite Diamond Saw Blade 4.5in (114mm) Grinder
YES
Grip Rite Diamond Saw Blade 7 in (177mm) Skill SDZ
YES
23
25
Tenyru, Industrial Blade 7 ¼ in, Model # 1A-18560D Skill Saw
YES
NOTE: For details about EA’s recommended track saw and tools: Contact your local sales representative or call 1.866.591.7021