45k

Page 1



Mission Statement


EXISTING

PROPOSED


Through the study of existing program and Philadelphia University’s strategic plan for growth of the University of the next 10-15 years 45k building seeks to address these issues and propose solutions to space and programatic requirements. This building also looks to address issues raised by the NAAB team one their inspection of the program during the spring of 2012. With the main concern being the spread out nature of the C_ABE college and out of date technology and safety systems the new 45k building condenses the C_ABE college on main campus and from a series of 6 buildings down to only 3.



In addition to looking at programatic requirements and site logicistics for this project it was also helpful to look at outside images to get a better understanding of issues and ideas that the team wished to explore in the planning and form generating stages of the project. Ideas of circulation and movement as well as layering and compact packaging and effiecent design were a few of the many topics that were explored through these images and studies.

CORE I MOVEMENT I LAYERING I WEAVING I CONNECTION I THIN SPACE I PUSH/PULL I LOCKING


site

40.022934N -75.193512


Program Campus Area This diagram diag focuses on the aea of each college created by the various locations of the colleges buildings on campus. While all colleges overlap within the central portion of campus it is interesting to notice that their is a correlation between level of focus of each program and amount of area. For C+ABE which is a extremely focused and limited college colle the area is the least while the largest college relates to the college of Health Science + Liberal Arts by far the most diverse college on campus.

C_ABE SITE

C+ABE:

sq ft

qft

K+DEC Animation Fashion Design Graphic Design Industrial Design Interactive Design Textile Design Engineering Mechanical Engineering Business Fashion Merchandising+ Managment

0 ,0 0 90 0 ge

ft

Co lle

4

LA

5

HS

Philadelphia University is spread across over 100 acres in the East Falls section of Philadelphia. The University owns more than fifty buildings, housing the College of Design Engineering + Commerce, the College of Health Sciences + Liberal Arts, and the College of Architecture + the Built Environment. Buildings within the campus range from historic Victorian mansions to contemporary classrooms, research and experimental design spaces, and studio facilities.

C+HSLA Biochemisty Biology Biopsychology Chemistry Environmental Biology Environmental Sustainablity Health Sciences Law + Society Pre-Medical Studies Professional Communication Psychology Physcian Assitant Occupational Therapy

C+

3

2

ge 3 50,00 0s

SEED Center Architecture + Design Center Smith House Ravenhill Design Center Weber Design Center = Fabrication Shop

Colle

1. 2. 3. 4. 5.

1

C+AB E

The current College of Architecture + the Built Environment is spread out across a series of buildings and across both Ravenhill and Main Campus. With a total square footage for the college around 350,000 square feet is is easy to see why a new building is needed to consolidate and condense the College into a more productive and manageable size. Current buildings in use by the college include:

Architecture Landscape Architecture Interior Design Construction Managment Historical Preservation

EC

D K+

Co

l

e leg

0

q 0s

4

,0 45





Other important elements with the siting of the building included the zoning structure of the site which required 25’ setbacks on the front of any existing buildings and 15’ set-backs on the sides. This zoning study helped to determine the current zoning regulations as well help evolve the building footprint and shape which can be seen later in this section. These pages also look at the issue of parking around the building site and determine where parking issues occur and where there could potentially be areas for additional parking to be added.


hayward hall 100%

gallagher center_back 50% 50%

search hall 100%

search hall 100%

scholler hall 100%

gallagher center 20% 80%

ng_student parking

PARKING AVAILABILITY This graph illustrates the quantity of parking spaces available in lots with close proximity to our selected site. The blue shows accessible spots for both faculty and students, while the orange lots are close but would not be used as frequently. The width and height demonstrated in the graph show the overall lot footprint that currently exists.


Building Density Per Side of Campus Building Density Along Major Roads

17 S

DE

NS

Y

NS

IT

DE

38

PU

ER

M

RD

CA

BO

B co y lo bu ns ok C ild ide ing a am u ra a Sc lly c pu p th tion t th T ho ho s M e t e o he lle os B ac he exi on n ca site r H ing E s ade Un stin re m m lo al th tud m ive g ul ma ain pu ca l, G e c ios ic d rsi site t ty in c s , + o a a n t i o n a l l a u r r l o o e n s y ’s c o e co pe mp d c loo ghe nt ke ity Str ndi d o at tio m n a us on ks r lo e n m n w ti C c a f un d h nu int en ati t a bui gic s a o i ity co le in o o te n va ldi pl nd m n t i n a l l g t o p t r, + b e r i e n g s a n b y em u ow b im K tw ty o to t be e t ing uil izin an ee of n M co aki rs o b la d u g ba n R sit a nt ng . e rg p un r C e es in inu in ut e th d a ich e e to ili g e er m li ve to ze re le u pu n n d en ve tili s Ho tuby s l ze C u o e st pac f d d s nt se, ud e e p er en s t ns ac . ts o ity e ,f ac -

C_ABE Buildings centralized facilities

SITE SEED Center

A+D Center

MAIN CAMPUS This diagram looks at the correlation between the new 45k C_ABE building and the remaining buildings with the College: the Architecture and Design Center (A+D) and the SEED Center.

I


GALLAGHER CENTER 45k REICHLIN ADDITION

REICHLIN HOUSE KANBAR CENTER SCHOLLER HALL geothermal field

A+D CENTER HAYWARD HALL

HE NR YA VE

With the siting of the 45k building on such a dense and tight site it was necessary to look to the programs and sizes of the surrounding buildings to get a better understanding of spacial cues and existing conditions. From this study it was possible to determine how the 45k building would fit within this area and help realize the potential for collaboration between other buildings on campus. Since the 45k C_ABE building will house program that will have students in studio until late in the evening an conscious design strategy was to site the new building near the Kanbar Campus Center one of the late night dinning facilites as well as near to other program like the athletic facilities and the other buildings within the college.

.


CONTEXT

TER

DDITION

al field

HE NR YA VE .


PANAROMAS


Solar studies for both the winter and summer months helped to realize the placement of studios and orientation of building program within the 45k project. By placing the studio program on the norther portion of the building it was possible to maximize the amount of diffused northern light that could permate into the studios and provide the best possible lighting conditions for students working in the building.


NORTH

15% 12% 9% 6% 3%

A unique feature of the Philadelphia University campus is its location which throughout the seasons is caplable of producing average to above average wind speeds that could be used as a sustainable system within the building. By studying the directions and speeds that these winds are traveling it was possible to determine which sides of the building would benefit the most from having passive systems like operable windows in order to maximize the wind potential. This study also including look at the direction and speeds of winds at different times of year which would prove helpful in futher determing the success of sustainable strategies by season. Wind also played a large role in the design of the project from another perspective. Since an increase in building denisty in this area would increase wind speeds and cause distrubances to other campus program it was necessary to look landscaping strategies to minimize the effect of this wind on unbeneficial areas.

southwestern summer winds northwestern winter winds

PREVAILING WINDS

Wind Studies


FOOTPRIN

While touched on earlier in this project site analysis the issue of zoning and set-backs was a large design challenge and oppurtunity with the siting of the 45k building at its current location. With set-backs of 25’ on the front and back and 15’ on the sides the fitment of a 45 thousand square foot building would need to focus on maximizing space and program both on the interior and exterior of the building. Through looking at various precedents in tight building desing mainly from an urban perspective it was possible to realize new ways to approach the buildign and its form. The following page showcases the possible building form on the site pushed up to the allowable zoning setback and was a crucial element in the design process and exploration of this site.


REICHLIN HOUSE existing conditions stairwell

Based on the close proximity generated by this building to existing buildings exterior treatments of the building in relationship to the surrounding buildings was a necessary study in itself. By looking at various sources of inspiration including urban pocket parks the goal was to create meaningful outdoor spaces that could be utilized by both the students and faculty within the 45k building as well as those faculty and staff members in the surrounding buildings including Reichlin House, and Scholler Hall.

storage room

boiler room ceiling


Existing Program

Bathroom Conference Room

Circulation

Reichlin Renovation Addition One of the major controversial design choices made within the project was the teardown of the rear wing of Reichlin House and the following addtion and renovation to the building to occur simultnaeously with the construction of the new 45k building. Through careful documentation and research of the building which can be seen in photographs on the previous page the rear wing was deemed ineffiecent and hazardous to employees and staff. Issues within the Reichlin wing including problems with accessibility, fire safety, and overall building degredation. Another critical issue was the ineffiecent design of the wing to its new program as offices for public affairs and the provosts office where access to rear offices could only be achieved by walking through the presidential conference room or through an underground boiler room if a meeting was occuring in the conference room. The solution for this major issue within the building was a 90 degree turn of the wing. In doing this the program requirements were able to stay virtually unchanged in regards to space requirements, but additional safety and accessiblity issues were able to be addressed including: an elevator to move disabled staff and visitors from the first to second floor, a to code fire stair in the case of emergency, and increased office and conference space to allow for better daily useage and occupancy of the building. As the Reichlin House is listed as a Historic building through the city of Philadelphia various permits would need to be attained to secure the addition as a viable option. With the various safety and building issues raised throughout this piece the team felt that this addition and renovation was still necessary and a major design goal.

A+D Center

In addition to the renovation to Reichlin House a proposed addtion/renovation of the Architecture + Design Center was investigated. As A+D currently houses the third through fifth year architecture and the third to fourth year interior design students as well as being an iconic and well known building on campus the team decided to keep this building within C_ABE. In the updated program of the C_ABE college A+D will be utilized for first and second year studios for all majors within C_ABE as well as serving as a location for the fabrication lab and classroom spaces for various addtional program requirements like building technologies and visual communication classes. This infused program will allow for upper level student from all majors within the college to have access to this building and be able to share insight and ideals with under classmen.




form


Conceptual Plan Sketches Through a combination of mixed media techniques from exploration was to occur through a process that relied heavily on detailed sketches to study ideas of program, space, + densities. By being able to design through the process of sketching before moving into the use of computers the project was able to evolve more quickly and with better communication between group members and professors.



Conceptual Section Sketches Through the use of conceptural Section sketches the group was able to quickly move between computer and hand drawing allowing for more eďŹƒcient time managment useage. By working heavily in section similar to plan the group was able to explore idea of space and program with special regard to the human scale. These studies allowed for a better understanding and realization of project goals and strategies that would prove impactful in the nal design renderings and iterations.



In this series of exploratory studies models hand built models of the sketches were built and then photographed. Once brought into the computer the images were adjusted and once again printed out to be sketched over top of to explore ideas of enclosure, skin systems, and ultimately the perforations that would become a pivotal element within the project and its iconic nature on campus.


initial renderings midreview perspectives

Henry Ave. Entry

3/4 review

Kanbar Path

Kanbar Path

A+D Addition


STRUCTURE

the structure of 45k is based on a 32’-0” grid. Though the grid is not a square32’x32’ design, the structure in the opposite direction does follow the segmented layout of the building form.


GEOTHERMAL energy field supply 45k.kanbar.reichlin house. scholler

THIRD FLOOR

WET SPRINKLER SYSTEM LAYOUT

FIRST FLOOR

GROUND FLOOR


GREEN LAWN layering structure.skin.green roof

plant layering detail

pedestrian lawn detail


original


HVAC AIR HANDLING UNIT CIRCULATION ZONE B HVAC SUPPLY DUCT ZONE B HVAC RETURN DUCT

ZONE A HVAC RETURN DUCT ZONE A HVAC SUPPLY DUCT

BUILDING CIRCULATION

CIRCULATION + MECHANICAL HVAC SYSTEM


ZONE A HVAC SUPPLY DUCT ZONE A HVAC RETURN DUCT

ZONE B HVAC SUPPLY DUCT

ZONE B HVAC RETURN DUCT AIR HANDLING UNITS

ZONES B + A

B

MECHANICAL HVAC SYSTEM DIAGRAMATIC LAYOUT

A


PERFORATIONS connection detail

rubber 1/2� spacer

powder coated aluminum perforated panel

steel point fixed casting spider connection mullion lines

insulated glass panel steel access grate




RAIN WATER COLLECTION 6500sqft roof surface for water collection .4x42�x6,500sqft=109,000 gl/yr=9,000 gl/month reichlin house


SECTION

SECTION

north/south section through lecture hall southwest elevation

lecture hall

east/west section through studios

lecture hall

geothermal wells


henry ave. entry


NIGHT PERSPECTIVE north facade


STUDIO CIRCULATION

STUDIO CIRCULATION




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.