CURRENTLY UNDER CONSTRUCTION, THIS ADDITION TO THE ORIGINAL MARION ANDERSON BUILDING INCLUDES A NEW 4-STORY BUILDING WITH PUBLIC PLAZA SPACES AND GREEN ROOFS OVER AN EXISTING PARKING GARAGE, REQUIRING A CAREFULLY DESIGNED RETROFIT OF EXISTING CONDITIONS. FULL DOCUMENTATION WAS PREPARED FROM CONCEPTUAL PLANNING TO CDS AND CONSTRUCTION ADMINISTRATION.
THIS 9-STORY MIXED USE DEVELOPMENT CAPITALIZED ON AN INCREDIBLE LOCATION WITHIN THE HEART OF WEST HOLLYWOOD TO PROVIDE A HIGHEND RETAIL EXPERIENCE, HOTEL AND DESIGN SHOWROOM. ALL PLANTING, HARDSCAPE AND SOFTSCAPE IS LOCATED ON-STRUCTURE, THUS CREATING TECHNICAL CHALLENGES TO BE SOLVED.
PROJECT TYPE: ACADEMIC / RESIDENTIAL
PROJECT ROLE: PROJECT MANAGER
TEAM: OJB, AC MARTIN, CLARK CONSTRUCTION
SAN DIEGO STATE UNIVERSITY UAXACA HALL
SAN DIEGO, CA
AN 800-PERSON DORMITORY WITH AN EMPHASIS ON OUTDOOR LIVING SPACES IS CURRENTLY UNDER CONSTRUCTION ON THE SDSU CAMPUS. LIVELY COURTYARDS, A ROOF LOUNGE, RECREATION SPACE AND OUTDOOR DINING AREAS CREATE A DYNAMIC ENVIRONMENT FOR STUDENTS. PROJECT MANAGEMENT INCLUDED FULL DOCUMENTATION, PRESENTATIONS AND CONSTRUCTION ADMINISTRATION.
PROJECT TYPE: RECREATION / ACADEMIC CAMPUS
PROJECT ROLE: PROJECT MANAGER TEAM: OJB
UC SAN DIEGO GLIDERPORT FEASIBILITY STUDY
LA JOLLA, CA
A FEASIBILITY STUDY WAS REQUESTED FOR THE UNIVERSITY’S HISTORIC OCEAN-FRONT PROPERTY, WHICH IS CURRENTLY USED AS A GLIDERPORT AND OVERFLOW PARKING LOT. AFTER SEVERAL MEETINGS WITH CURRENT USERS AND HISTORIC PRESERVATIONISTS, THE RESULT WAS A CONCEPTUAL PLAN WITH GRADING, THAT WILL ALLOW FOR THE SITE TO BE SIMULTANEOUSLY USED FOR GLIDER USE, PARKING AND RECREATION.
Small Rec Field A: 150’ x 300’
Standard High School Size Field: 195’ x 360’
Play Field Lighting (Lighting Option A shown)
Existing Runway
Flexible Recreation Space - 7.4 acres
Construction Staging Area- 1.4 acres
Parking
Sanford Consortium
Gravel Access Road
Golf Course Access
Bioretention Area - 3.5 acres
Planted Buffer and Sidewalk
Existing Glider Tie-Down
Proposed Curb-cut
Existing Curb-cut
Approach Surface - Normal Winds
Approach Surface - High Winds
Approach Surface - 50’ extent for Model Gliders
LIMIT OF WORK
TORREY PINES GOLF COURSE
SALK INSTITUTE
TORREY PINES SCENIC DRIVE
PROJECT TYPE: MULTI-USE DEVELOPMENT
PROJECT ROLE: DESIGNER
TEAM: OJB, GENSLER, ASPEN
AL-NASR DEVELOPMENT
CAIRO, EGYPT
A GRAPHIC PRESENTATION WAS PREPARED FOR A MULTI-USE DEVELOPMENT IN THE HEART OF CAIRO. WITH TOWERS DEDICATED TO OFFICES AND RESIDENCES, AND RETAIL SHOPPING AT STREET LEVEL, THIS DEVELOPMENT REQUIRED STRONG DESIGN IDEAS FOR AMENITIES AND PROGRAMMING.
EL NASR ROAD
HAFEZ RAMADAN
AL NASR DEVELOPMENT Cairo, Egypt
OJB Gensler
LANDSCAPE - SECTION G
OVERALL - NOT TO SCALE
POOL DECK
OFFICE ROOF
PROJECT TYPE: PARK
PROJECT ROLE: DESIGNER TEAM: OJB, MICHAEL MALTZEN ARCHITECTURE
VISTA CENTRAL PARK
PLAYA VISTA, CA
IMPROVEMENTS TO THE PARK REQUIRED FULL DOCUMENTATION AND DESIGN, INCLUDING UPGRADES TO THE PLANTED BERMS AND PLAYGROUNDS, AN ADDITIONAL SOCCER FIELD, AND NEW DRAINAGE STRATEGIES. DETAILED DOCUMENTATION, INCLUDING DEMOLITION, DRAINAGE, IRRIGATION AND PLANTING PLANS AND CONSTRUCTION DOCUMENTS WERE PROVIDED FOR CONSTRUCTION.
PLAYA
REPAIR DAMAGED PLAY SURFACE AREAS RE: MANUFACTURER'S INSTRUCTIONS; SPECIFICATIONS