euroFOT - European Large-Scale Field Operational Test on In-Vehicle Systems ITS World Congress 2009
Aria Etemad Ford Research & Advanced Engineering Europe Stockholm, September 2009
www.eurofot-ip.eu
Contents • Overview • euroFOT objectives and plans • Project status to-day
September 2009
ITS World Congress
www.eurofot-ip.eu
euroFOT Overview • •
Total indicative budget: Euro 22 million Total indicative funding: Euro 14 million
•
Project duration: May 2008 till August 2011
•
Coordinator: Aria Etemad Ford Research & Advanced Engineering Europe
•
28 partners from 10 different countries: 8 OEMs 4 Suppliers 6 Universities 5 Research Institutes 5 Others September 2009
ITS World Congress
www.eurofot-ip.eu
The Consortium
September 2009
ITS World Congress
www.eurofot-ip.eu
Project objectives and plans
September 2009
ITS World Congress
www.eurofot-ip.eu
euroFOT Objectives (1) • Perform coordinated tests of Intelligent Vehicle Systems with ordinary drivers in real traffic • Investigate performance, driver behaviour, and user acceptance • Assess the impacts on safety, efficiency, and the environment using road data
September 2009
ITS World Congress
www.eurofot-ip.eu
euroFOT Objectives (2) • Apply a common European approach for Field Operational Tests
Test Management Centres
• Create awareness in the public and a wider socioeconomic acceptance
September 2009
ITS World Congress
www.eurofot-ip.eu
Functions under test • Longitudinal control functions FCW ACC SRS
Forward Collision Warning Adaptive Cruise Control Speed Restriction System
• Lateral control functions BLIS LDW IW
Blind Spot Information System Lane Departure Warning Impairment Warning
• Advanced applications CSW Curve Speed Warning FEA Fuel Efficiency Advisor SafeHMI Safe Human Machine Interaction
September 2009
ITS World Congress
www.eurofot-ip.eu
Functions under test
September 2009
ITS World Congress
www.eurofot-ip.eu
Project plan
September 2009
ITS World Congress
www.eurofot-ip.eu
Project status
September 2009
ITS World Congress
www.eurofot-ip.eu
Next planned results M1.7
Function identification and description
Socio-economic Impact Assessment System and Function Analysis
Use cases
Research Questions and Hypotheses
M1.1
M1.2 Reasearch Question and Hypothesis Analysis
M1.3 Performance indicators
Study DesignM1.4
Ethical legal issues
M1.6
IP Milestones
Data base
M1.1 First FOT plan is defined
Measures and Sensors
01/09
M1.2 Systems are specified
03/09
M1.3 Second FOT plan is defined 08/09 M1.4 Prototypes are validated
12/09
M1.5 Vehicle fleets are ready
01/10
M1.6 All data are available
02/11
M1.7 Evaluation is concluded
08/11
September 2009
Data Analysis
ITS World Congress
Measures
M1.5
Performance indicators
Data Acquisition
www.eurofot-ip.eu
Aria Etemad Ford Research & Advanced Engineering Europe Email: aetemad1@ford.com
September 2009
ITS World Congress
www.eurofot-ip.eu