Matrix Model Turbine ESHA Hydroaction Seminar – April 13th, Brussels
New HYDROMATRIX® Project Developments Overview HYDROMATRIX®
Application range
Advantages
Featured Project: Lower St. Anthony Falls
Plant Layout
Design Challenges
Development Process
HYDROACTION
2
Optimization loop
Matrix test rig construction adaptation © ANDRITZ HYDRO, All Rights Reserved
HYDROMATRIX® An innovative way to hydropower generation Conventional
HYDROMATRIX®
An array („Matrix“) of small turbines instead of conventional sized turbines Best suited for low head sites with existing dam and weir structures Most economical in larger numbers -> not a typical „small hydro“ application 3
© ANDRITZ HYDRO, All Rights Reserved
HYDROMATRIX® Application Range
Submergence > 1.5 m
Head 2 - 20 m HWL
TWL
Plant Flow > 60 m³/s Unit flow 5-12 m3/s Unit Output 100 kW up to 1500 kW
4
© ANDRITZ HYDRO, All Rights Reserved
Sill level
HYDROMATRIX® Advantages Use of existing weir structures
No major civil construction –> less cost
Little excavation & no coffer dams –> less geological risk
No additional land usage -> environmentally friendly
Existing river flow pattern can be maintained
HYDROMATRIX® Modules removeable at flood conditions Standardized modular concept
5
Compressed project schedule
High availability & easy maintenance © ANDRITZ HYDRO, All Rights Reserved
HYDROMATRIX® Projects Locations
Nussdorf Freudenau Agonitz Lower St. Anthony Falls Colebrook
Chievo
Ashta I&II
Jebel Aulia
6
© ANDRITZ HYDRO, All Rights Reserved
LOWER ST ANTHONY FALLS - USA Project Location
(3)
(2)
(1) 7
© ANDRITZ HYDRO, All Rights Reserved
LOWER ST ANTHONY FALLS - USA Design Challenges Use existing lock structure without major modifications (no excavation) Maintain flood discharge capability through lock Fulfill grid interconnection requirements No adverse effects on barge and rec. boat traffic Preserve architectural appearance of existing lock
8
Š ANDRITZ HYDRO, All Rights Reserved
LOWER ST ANTHONY FALLS - USA StrafloMatrix™ Plant in Auxiliary Shiplock Technical Data: 16 TG-units (2 rows of 8) H GR max = 7.6 m P Gen = 625 kW Max. Plant Capacity: 10 MW Annual Energy: 62 GWh
9
Project Start:
2007
Commissioning:
2010
© ANDRITZ HYDRO, All Rights Reserved
New HYDROMATRIX速 Developments Summary 7 Projects on 3 continents totaling 234 turbines and 100+ MW HYDROMATRIX速 is a viable option for harnessing hydropower at existing dam sites and greenfield applications Implementation of HYDROMATRIX速 at multi purpose irrigation dams in Asia will become reality in 2 years and will be the start of a quickly growing business.
10
息 ANDRITZ HYDRO, All Rights Reserved
Optimization Loop
11
Matrix testrig construction/adaptation. Inlet Geometry: Large Inlet tank rectangular cross section Including measuring section Different sheet metal coating Mounting parts for the tank and smaller assembly parts
12
Matrix testrig construction/adaptation. Bulb diameter and transmission system: New design of : Horizontal generator and adequate mounting belt-driven bearing system parts Calibration devices for the new measuring measurement equipment system including certified weights assembly parts
13
Matrix testrig construction/adaptation. Runner geometry : New hub design New runner design New discharge ring design
14
Wicket gates : New design of static distributor including different blade-tails.
Matrix testrig construction/adaptation. Additional structure: For testing the influence of side turbines: additional pipes and flowmeters Parts for adaptation and completing the flow geometry Re-working and correcting some Parts Parts for safety issues on test rig
15
Thank you for your attention!