BESSÈ SHP REFURBISHMENT & DAM SAFETY HOW AN EXPENSIVE IMPOSITION COULD BECOME AN OPPORTUNITY Sergio MAZZOLENI Studio Frosio


Bessè SHP & Leda Dam Leda Dam

BESSE’ Trieste

Vicenza Venice

Studio Frosio

Verona

Sergio Mazzoleni


Uplifting pressure elevation 1994 Piez.

Elevation

2007 Piez.

2007-1994

Elevation

Elevation

5

222,54

1

222,27

-0,27

1

217,69

2

216,27

-1,42

D3

216,17

3

216,57

0,40

2

217,74

4

216,08

-1,66

3

218,01

5

215,51

-2,50

4

225,15

6

215,41

-9,74

D1

215,70

7

216,55

0,85

S2

216,68

8

215,92

-0,76

7

229,14

9

228,02

-1,12

3

1

5

6 231

7

8

9

4

2

water surface elevation (229.70)

227 1994

225

2007 223

221

Studio Frosio

Uplifting pressure elevation (m)

229

219

217

215 1

2

3

4

5

Piezometers

6

7

8

9

Sergio Mazzoleni


The scheme and the water level reduction

Studio Frosio

Water surface elevation

Sergio Mazzoleni


Consolidation works & costs TASK

COST [â‚Ź]

Mortar injection

174,000.00

Drains, piezometers and measuring system

143,000.00

Repair of the damaged concrete

185,000.00

Impermeabilization of diverting tunnel

58,000.00

Other works

70,000.00 630,000.00

Studio Frosio

TOTAL

Sergio Mazzoleni


Italian RES support system INCENTIVES Power

Energy

 1 MW

progressive tariff (first 2,000 MWh)

> 10 MW

new plant: whole production

all-inclusive tariff Optional (220 €/MWh)

powered plant: 5% production

 10 MW (& run-off-river plants of any power)

Green Certificates

hourly zonal price (Exchange price)

market price

refurbished plant:

-

Intensive costs ≤ 2 M€/MW % of historical production + additional production Intensive costs > 2 M€/MW whole production

-


Cost & green certificates 55% With dam consolidation

50% 45% 40% 35% 30% 25% 20% 0,0

0,5

1,0

1,5

2,0

2,5

3,0

3,5

4,0

Cost [10^6 â‚Ź]

Sergio Mazzoleni

Studio Frosio

Green Certificates [% energy production]

Without dam consolidation


Financial parameters of each option Plant refusbishment with dam consolidation

630,000.00

2,030,000.00

2,660,000.00

Additional production per year [kWh]

0

920,000

920,000

Green certificates per years [1 GC = 1 MWh]

0

4,611

5,756

Additional cash-flow per year [€]

0

520,800.00

635,400.00

- 630,000.00

2,215,419.00

3,125,651.00

Costs [€]

Project NPV [€]

Sergio Mazzoleni

Studio Frosio

PARAMETER

Plant refusbishment without dam consolidation

Dam consolidation


BESSÈ SHP REFURBISHMENT & DAM SAFETY HOW AN EXPENSIVE IMPOSITION COULD BECOME AN OPPORTUNITY Sergio MAZZOLENI Studio Frosio

Via Calvi, 9 25123 Brescia (Italy) sergio.mazzoleni@studiofrosio.it www.studiofrosio.it