Hidroenergia 2008 / Josef Lampl

Newest technologies of turbines for refurbishment of LUDVIKA Power station in Sweden

Kรถssler Hydro Electric Power Plants Josef Lampl


LOCATION Hidroenergia 2008 / Josef Lampl

Capital City Stockholm

Source: Google


OWNER and SCOPE OF BUSINESS Hidroenergia 2008 / Josef Lampl

58%

City of Ludvika 42%

Source: VB Kraft


HISTORY of LUDVIKA HEPP Hidroenergia 2008 / Josef Lampl

First installation 1902 4 Francis Turbines 40Hz 1 Francis Turbine 100Hz Lightning purposes for Ludvika City Refurbishment 1930 to 1941 Replacement by 2 Francis Turbines Combined output 2.600kW 10kV grid connection

Pictures: Kรถssler


CHALLENGE CIVIL WORKS Hidroenergia 2008 / Josef Lampl

Entire Powerhouse is a protected historical building Exterior walls had to remain stabilizing of whole building, special the upstream wall

Installation of Turbine and Generator Opening of Power House roof 400 ton mobile crane Pictures: VB Kraft


HANDLING & TRANSPORT Hidroenergia 2008 / Josef Lampl

Largest Kรถssler Turbine in respect of volume and weight Handling of turbine at Kรถssler factory with air cushions, rolls and 250 ton crane

Transport Land transport by oversized semitrailer truck Pictures: Kรถssler


INSTALLATION Hidroenergia 2008 / Josef Lampl

Installation of Turbine Handling with 400 ton crane through opened power house roof 1st installation step embedment of turbine in concrete

Pictures: VB Kraft


INSTALLATION Hidroenergia 2008 / Josef Lampl

Installation of Generator 55 ton Handling with 400 ton crane through opened power house roof Dismantling of auxiliaries i.e. water cooler

Picture: VB Kraft


TURBINE Hidroenergia 2008 / Josef Lampl

KAPLAN S-TUBE TURBINE • Manufacturer: Kössler • Runner diameter: 2,12 m • Numbers of blades: 6 • Gross Head: 17,54 m • Speed: 273 min-1 • Output: 3.681 kW • Weight: 42 ton

Picture: Kössler


GENERATOR Hidroenergia 2008 / Josef Lampl

SYNCHRONOUS GENERATOR • Manufacturer: Loyd Dynamowerke • Voltage: 10,5 kV • Speed: 273 min-1 • Output: 4.100 kVA • Weight: 55 ton

Picture: Kössler


TURBINE – GENERATOR LAYOUT Hidroenergia 2008 / Josef Lampl

6 Blades Kaplan Runner and chamber

Synchronous MV Generator direct driven

Wicket gates mechanism and regulating ring

Generator HV Leads and neutral cubicles

Bulb with Guide bearing and runner servo motor

Main bearing oil lubricated sleeve bearings

Penstock connection

Hydraulic Power Pack

Picture: KĂśssler


OPERATION PATTERN Hidroenergia 2008 / Josef Lampl

PEAK POWER PLANT • Operation 17 hours per day • Annual energy production 10,4GWh • Energy sold to Swedish spot market for (0,044€/kWh) or Swedish electrical certificates (0,028€/kWh)

Picture: Kössler


INVESTMENT and ROI Hidroenergia 2008 / Josef Lampl

INVESTMENT: • Total Costs: • Civil Works: • Turbine – Generator: • Control System and Infrastructure: • Return of Investment:

7.5 Mio EUR 3.1 Mio EUR 2.5 Mio EUR 1.9 Mio EUR 12-14 Years

Chart: VB Kraft


PROJECT MANAGEMENT Hidroenergia 2008 / Josef Lampl

Roger Sandgren VB Kraft Managing Director

Tommy Hjort VB Kraft Project Manager

Gerald Hochleitner Kรถssler Design Engineer

Karl Henninger Kรถssler Sales and Project Engineer

Pictures: Kรถssler


Hidroenergia 2008 / Josef Lampl