/ES2_Parker

Page 1

HIDOENERGIA 06

The Refurbishment of Units 3 and 4 at Cruachan Pumped Storage Scheme Frank Parker, Engineering Manager ALSTOM Power Service - Hydro 1


Cruachan Pumped Storage Scheme

z

Major works refurbishment – – – – –

Replacement of the Main Inlet Valves Replacement hydraulic power pack New electronic governor (NGC compliance) Turbine top cover works New guide vane servo-motors

2


Cruachan Pumped Storage Scheme

3


Cruachan Pumped Storage Scheme

4


Cruachan Pumped Storage Scheme

5


Cruachan Pumped Storage Scheme

6


Cruachan Pumped Storage Scheme

7


Cruachan Pumped Storage Scheme

8


Cruachan Pumped Storage Scheme

9


Cruachan Pumped Storage Scheme - CFD Study

10


Cruachan Pumped Storage Scheme

11


Cruachan Pumped Storage Scheme - f.e. analysis

12


Close

Thank you for your attention

www.alstom.com 13


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.