HIDOENERGIA 06
The Refurbishment of Units 3 and 4 at Cruachan Pumped Storage Scheme Frank Parker, Engineering Manager ALSTOM Power Service - Hydro 1
Cruachan Pumped Storage Scheme
z
Major works refurbishment – – – – –
Replacement of the Main Inlet Valves Replacement hydraulic power pack New electronic governor (NGC compliance) Turbine top cover works New guide vane servo-motors
2
Cruachan Pumped Storage Scheme
3
Cruachan Pumped Storage Scheme
4
Cruachan Pumped Storage Scheme
5
Cruachan Pumped Storage Scheme
6
Cruachan Pumped Storage Scheme
7
Cruachan Pumped Storage Scheme
8
Cruachan Pumped Storage Scheme
9
Cruachan Pumped Storage Scheme - CFD Study
10
Cruachan Pumped Storage Scheme
11
Cruachan Pumped Storage Scheme - f.e. analysis
12
Close
Thank you for your attention
www.alstom.com 13