SERBIA
MONTENEGRO
© SSHA
Numbers Potential
km2 MW
Š SSHA
GWh
No.
Exploited GWh/km2
MW
GWh
No.
W vs W GWh/km2
Slovenia*
20.273
180
700
n/a
0,035
85
270
400
0,013
Croatia
56.542
180
720
699
0,013
29
116
10
0,002
BiH
51.129
450
1575
250
0,031
33,82
195
17
0,004
Serbia
88.528
450
1500
850
0,017
13
45,5
2
0,001
Montenegro
13.812
231,72
644
70
0,047
9
21,4
7
0,002
Macedonia
25.333
255,5
1103
403
0,044
45
136
11
0,005
255.617 1.567,22 5.542
2.272
0,022
214,82
783,9
447
0,003
14,1%
SLOVENIA
© SSHA
Precipitation map
Š SSHA
SLOVENIA UAP
Premium
LTMP (=UAP – Premium)
€ cents
€ cents
€ cents
New (< 5y)
6,16
2,40
3,75
> 5 years
5,85
2,28
3,57
> 10 years
5,54
2,16
3,38
Age of SHP
Concession Water rights
Procedure
Annual Fee
Duration years
Application*
3%
30+
UAP … Unified Annual Price LTMP… Long-Term Market Price * … followed by public tender 40 30 20 10
© SSHA
50
60 70 80 90
0 100 Technically Exploitable Hydro Potential
POTENTIAL
180 MW
CROATIA
© SSHA
Water map
Š SSHA
CROATIA Single buyer – Market Operator
Support System PPO 12 years & inflation - 0,13 €c/kWh to LC
Installed power
Price € cents
MWh
< 1 MW YES
9,24
> 1 MW
≤ 5.000
9,24
5.000 – 15.000
7,36
> 15.000
5,62
Concession Water rights Procedure
Annual Fee
One-time fee
Duration years
0 – 5 MW
Public Tender
1%
> 5x annual fee
30
5 – 20 MW
Public Tender
1%
> 10x annual fee
60
40 30 20 10
© SSHA
50
60 70 80 90
0 100 Technically Exploitable Hydro Potential
POTENTIAL
180 MW
BOSNIA AND HERZEGOVINA
© SSHA
Federation of BiH Single buyer – Elektroprivreda BiH Support System*
PPO
Price € cents
Feed-in YES, 80% of the
YES
4,1
price for households
Concession Water rights
0 – 5 MW
Procedure
Annual Fee
Duration years
Public Tender
n/a
30 max
* … Only < 5 MW
40 30 20 10
© SSHA
50
60 70 80 90
0 100 Technically Exploitable Hydro Potential
POTENTIAL
450 MW
SERBIA
© SSHA
Water map
Š SSHA
SERBIA Single buyer – Elektroprivreda Srbije Support System
PPO
Feed-in
Price
NO
NO
negotiated
Concession Water rights
0 – 10 MW
Procedure
Annual Fee
Duration years
Public Tender
n/a
30
40 30 20 10
© SSHA
50
60 70 80 90
0 100 Technically Exploitable Hydro Potential
POTENTIAL
450 MW
MONTENEGRO
© ZDMHE
MONTENEGRO Single buyer – Elektroprivreda CG Support * System
PPO
Feed-in
Price
YES
YES
6,7
Concession Water rights*
0 – 10 MW
Procedure
Annual Fee
Duration years
Public Tender
2%+
30
* … System is in preparation
40 30 20 10
© SSHA
50
60 70 80 90
0 100 Technically Exploitable Hydro Potential
POTENTIAL
231 MW
MACEDONIA
© SSHA
MACEDONIA Single buyer – Elektrostopanstvo na Makedonia (ESM) Support System
PPO
Feed-in
Price
YES
YES
4,5 – 12,0
Concession Water rights Procedure 0 – 2 MW 2 – 10 MW
20+
Public Tender*
2% 40
*16.3.-16.6.07 Cond. - 500 €/kW in 2006 - 3% of investment =perf.security - Upfront fee 43,5-72 €/kW
40 30 20 10
© SSHA
Duration years
Annual Fee
50
60 70 80 90
0 100 Technically Exploitable Hydro Potential
POTENTIAL
255 MW
Feed-in vs. Households (€/MWh) Feed-in
€/MWh
Households
120
104,67 100
92,37
96,75
76
80
64,00
61,6
65
60,16
60
45,80 41
40,70
40
20
0 0 Slovenia
© ZDMHE
Croatia
BiH
Serbia
Montenegro
Macedonia
Specific Potential GWh/km2/y Macedonia; 0,044
Slovenia; 0,035
Croatia; 0,013
BiH; 0,031 Montenegro; 0,047
Š SSHA
Serbia; 0,017
SHP Potential in MW Macedonia; 255,5
Slovenia; 180
Croatia; 180
Montenegro; 231,72
BiH; 450 Serbia; 450
POTENTIAL
1.567 MW 5.542 GWh Š SSHA
New capacities on … Mars ;)