PROGRAMME Information
POLICY FORUM
Dainius Tirunas 8-37- 20 69 48, 8-612-75813 Petras Punys
8 -698 -21458
Ida Jarockiene
8-37 -752 337
Small Hydropower Development in Lithuania
http://www.hidro.lt
28 March 2007
Seminaras nemokamas (išskyrus vakarone). Vakaronei registruotis: el. pastu: tirunas@hidro.lzuu.lt tel. 8-37- 20 69 48; 8-612-75813
pietus
ir
Iš Kauno autobusų stoties važiuoti 56 maršruto mikoautobusu arba 18 maršruto autobusu iki Lietuvos žemės ūkio universiteto (Studentų g. 11, Akademijos mst., Kauno r.)
Supported by:
PROGRAMME 28 March, 2007 University of Agriculture Studentų g. 11, Akademijos mst., Kauno r.
930 - 1000 1000 - 1020
Registration Welcome Address
I. HYDROPOWER DEVELOPMENT POLITICAL ASPECTS 25
35
10 - 10 The SHERPA project. P. Punys, Lithuanian Hydropower Association 1040 - 1050 Implementation of RES-E directive in Lithuania . R. Jarmokas. Lithuanian Energy Agency 1055 - 1105 Sustainability of environmental measures. B. Pelikan, ESHA 1110 - 1120 Challenges of SHP development. D.Tirunas, Lithuanian Hydropower Association 1125 - 1135 Green electricity production in Lithuania. Is it still worth develop SHP plants? A. Jakucionis, Achema Hydroplants Ltd. 1140 - 1150 Rivers exempt from damming and their impact on hydropower resources. J. Jablonskis, Lithuanian Energy Institute 1155 - 1205 Discussion 1205 - 1225 Coffee Break
III. TECHNICAL PART II. HYDROPOWER ENVIRONMENTAL INTEGRATION 1225 - 1235 EU Water Framework directive: coordination of water protection policy and water uses. A. Margeriene. Water Director for Lithuania/ Environment Protection Agency
1520 - 1535 SHP plant operation and river level fluctuations. G. Sabas Technical University of Vilnius/ Environment Protection Agency 1540 – 1550 A new type of hydropower plant: no dam and ecologically friendly. R. Selenkovas. Sklypo energija Ltd.
1240 - 1250 SHP and environmental requirements. A. Rimas. Environment Protection Agency
1555 – 1605 Turbine manufacturing in Lithunia. R.Irtmonas, V. Tornau. Vandens jegaine Ltd.
1255 – 1305 SHP cascade of Virvyte river: environmental issues. S. Rukevicius. Regional Environmental Protection Department
1610 – 1620
Discussion
1620 – 1720
Round table
1800 - 2100
Dinner
10
15
13 – 13 Siesarties water mill: 7 years without any authorization. Br. Ruplys, A.Zibas. University of Agriculture 1320 – 1330 SHP plants: pros and contras S.V. Piksrys, Community “Atgaja”/ Baltic Environment Fund/Coalition of the Lithuanian Environmental NGOs 1335 – 1345 Renewable and non renewable energy: external costs of electricity production. D. Streimikiene. Lithuanian Energy Institute 1350 – 1400
Discussion
1400 – 1515
Lunch break and visiting the exposition