FREE
XV-808
Everyone in Estes Park is looking forward to a busy summer season. Next weekend is Memorial Day!
May 20, 2016
Clearing Trail Ridge Road In RMNP Trail Ridge Road is a stretch of U.S. Highway 34 that traverses Rocky Mountain National Park from Estes Park, Colorado in the east to Grand Lake, Colorado in the west. The road crosses the Continental Divide and reaches a maximum elevation of 12,183 feet. Trail Ridge Road is closed during the winter, and remains closed until late spring or early summer depending on the snowpack. On May 12th, 2016, we were fortunate to record the massive snow plows and rotary plows clearing the 19 ft. high snow drifts on a portion of this 48 mile stretch of highway. See more on our Facebook page or website. Photo by Kris Hazelton
Spring Babies
Even though the weather may not show it, spring has arrived in the Estes Valley and with it, new life as evidenced by these cute, fuzzy Canada goose goslings. Photo by Kris Hazelton
See Page 7