s
the LUX DRAFT
p
l
i
c
e
e . stevenson 316-200-5200 k. williams 323-251-5784
Schematic Design Development
O ver v i ew
review previous meeting directives new parameters
themes the building becomes aware the re-blossoming at this place
components breath of the building (z axis) luminous flow the hand of the artist
locations elevator lobby ceilings terminal views cafe back-bar artist installations
materials translucent repurposed materials including glass and acrylic panels aluminum truss members LED and sensor system
questions materials procurement plan nacelles rooftop lamp housings electro-static wall units baffle wall units wall panels (wonka room) windows (and frames) schedule and budget development aluminum truss members LED system
SDD Document 07
13.02.26 01 of 42