Port Bcn

Page 1

The road accesses project is part of the project of the New Containers Terminal of the Barcelona Port. The study compiles all the existing information of the different works carried out till the date and related to the accessibility to the south extension of the port. Once all the information was compiled, all the future actions were analyzed and a proporsal to incorporate them was developed. It was chosen the solution considered the most adequate from a technical, economical and operational point of view. The new roads will allow the access to the future Tercat Terminal. Two road juctions, connected through the Road Prat, are designed. The section is formed by a rail yard that provides service to the Tercat Terminal and a 3+3 rail axis and a rail service branch line for Decathlon. The complexity of this project is the execution of the different phases of the road and rail layout, taking into account the structures that have to be designed to serve the future containers terminal of the Barcelona Port. The final purpose is the drafting of the detailed design of the phase 1 of the new accesses works to the south extension of the Barcelona Port, in accordance with the specifications of the existing documents.

• View of the south interchange, Prat road, access to Tercat terminal. • View of the north interchange, access to the lorries and inflammable goods motorway.

ACCESSES TO THE NEW CONTAINERS TERMINAL OF THE BARCELONA PORT PRELIMINARY STUDY. CONSTRUCTION PROJECT PHASE 1 Barcelona, 2009. 2010-2012


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.