WIND FARM IN AGUADOCE, BRASIL

Page 1

ESTEYCO ENERGÍA has developed the design and carried out the technical assistance for INNEO TORRES for the construction of a wind farm of 54 precast concrete wind towers of 100 m in Agua Doce. In addition to develop the wind towers construction project, ESTEYCO has coordinated the obtention of the certification design and carried out the technical assistance during all phases of the project

• Aerial view of the mobile factory in Agua Doce Wind Farm. • Construction and wind tower assembly.

WIND FARM IN AGUADOCE CONSTRUCTION PROJECT AND TECHNICAL ASSISTANCE DURING MANUFACTURING AND ERECTION Brazil, 2010-2012


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.