The main objective of this diversion is to become an alternative to traffic jams in N-634, BI-3302 y BI-2301 roads on its way through the city. It is divided into two stretches: South Deviation and West Deviation, complicated due to Ermua’s rough orography.
ERMUA DIVERSION CONSTRUCTION PROJECT, FEASIBILITY AND DEFINITION OF EXPLOITATION CONDITIONS Ermua, Vizcaya. 2009-2010
The West diversion consists of a new layout which connects BI-3302 and BI2301 roads. At the same time, the city centre is released of the traffic generated in Urtía and Goitondo industrial areas. The South diversion connects the roundabout of the Eibar deviation with N-634 road, coming from Areitio, and thus eliminates the current toll system of the motorway. Then, a new one is created.
WEST DEVIATION
ERMUA DISTRICT OF EIBAR
DISTRICT OF MALLABIA DISTRICT OF ERMUA
SOUTH DEVIATION
DISTRICT OF ZALDÍBAR
•General floor plan orthophoto. •Infographics of one of the structures. •Integration studies of the entrances of the tunnels.