ROADS IMPROVEMENT. STRECH: RIPOLL-CAMPDEVÀNOL, SPAIN

Page 1

The aim of the Study is the improvement of existing stretches in the C-26 road (current N-260) and N-152 road in the stretch between the interchange with the C-38 – Ripoll - Camp-devànol road and the implementation of bypasses in Colonia Llaudet, Sant Joan de les Abadesses, Ripoll and Campdevànol, along approximately 20 km, with a design that enables future duplication. •Phase A: It consists of compiling and analyzing required information and determinants to define the most suitable solutions for the N-260 and N-152 roads improvement and the implementation of bypasses in towns within the stretch subject to study. •Phase B: A detailed study on scale 1/5000 will be developed. It will include the “Selected Alternatives” from the previous phase, as well as those that can originate as a result of the Environmental Consultation process. The Environmental Impact Study (EIA in spanish) and the document that will serve as basis to the Public Information and the Environmental Impact Assessment will be included as well. •Phase C: It includes the end of the study management for approval. Arguments obtained after Public Information will be studied. It will be sent to the Environment, Marine and Rural Area Ministry, together with the Environmental Impact Assessment, for the making of the corresponding Environmental Impact Statement (DIA in spanish).

• Habitats of Community Interest map. • Territorial and Cultural Synthesis map (detailed). • Orthophoto of the study area (detailed).

N-260 AND N-152 ROADS IMPROVEMENT. STRETCH: RIPOLL-CAMPDEVÀNOL INFORMATIVE STUDY Gerona, 2009-2012


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.