Estimating Today April 2017

Page 1

Estimating Today

April 2017

THE MILE HIGH SUMMIT The Art and Science of Estimating

Denver, Colorado July 12- July 15, 2017

ET 2017

Page 1



President’s Message Marcene N. Taylor, CPE

ASPE National President mtaylor@mticost.com

I am so excited about this year’s A Mile High Summit in Denver. The plans for the Summit embody our Core Values. We care passionately about.... Education: Educating and mentoring the next generation of professional estimators. Professionalism: Promoting professional estimating as a lifelong pursuit of excellence and credibility. Fellowship: Developing a network of industry leaders and peers to which belonging is worthwhile. In years past, the focus of our Annual Meeting and Estimating Summit was on the internal Society business. This is the first year under our new bylaws and our attention can be spent truly dedicated to the Core Values. The theme of this year’s Summit is the Art and Science of Estimating. This theme recognizes that being an estimator requires not just technical skills, such as knowledge of software trends and estimate analysis, but also personal skills such as team building and presentations. The educational lineup at this year’s Summit is top notch. Not only will you earn Professional Development Units toward your CPE renewal, but you will also be taught relevant skills that will help you individually in your work as a professional estimator. In addition to the educational offerings, the Summit is our opportunity to renew relationships and develop new ones with our peers throughout the country. This year’s Summit has been professionally planned to provide opportunities for fellowship with sponsors and other estimators. We are also excited about the opportunity to spend some time away from the host hotel in the City of Denver. I encourage you to look at the agenda for the Summit and seriously consider attending this year. It will be valuable to you as an individual for professional development. This is our first year of the new Summit and just the beginning of what we are planning to offer in upcoming years. I believe that we will sell out the available slots this year, so register early; and I look forward to seeing you in Denver!

ET 2017

Page 3


ASPE

Board of Directors 2016-2017 President

Marcene N. Taylor, CPE mtaylor@mticost.com

First Vice President

CONTENTS

Bruce A. Schlesier, CPE bruce_schlesier@msn.com

Second Vice President

Mel G. Cowen, CPE MDCowen@leopardo.com

Northwest Governor Kris Larson, CPE klarson@cccutah.com

Interim Southwest Gov. Kris Larson, CPE klarson@cccutah.com

Central Plains Governor

Dave Westfall, CPE dwestfall@aspengroup.com

Southeast Governor

Chuck Hesselbein, CPE chesselbein@baldwinshell.com

Northeast Governor James G. Hanna, CPE jgh@dhuy.com

Immediate Past President Doyle T. Phillips, FCPE doyle.phillips@nabholz.com

Treasurer (Appointed) Chris Morton, FCPE cmortoncpe@comcst.net

3

President’s Message

5

Member Project Profile

7

HTETCO New Air Condition System To An Existing Storage Warehouse

17

The Reality of 5D BIM

19 20

Executive Director Corner

26

Chapter Meetings

A Mile High Summit: The Arts and Science of Estimating

C ontact U s Society Business Office American Society of Professional Estimators 2525 Perimenter Place Drive, Suite 103 Nashville, TN 37214 Ashley Stone 615.316.9200 ashley@aspenational.org www.aspenational.org Certification Tina Cooke tina@aspenational.org Standards Committee Bookkepping Publications Website Management

ET 2017

Jennifer Cochran Jennifer@aspenational.org Membership Online Classes PIE Exam Merchandise Page 4


Member Project Profile

Libbie Mill Library

Contractor: Gulf Seaboard General Contractors, Inc. Owner: Henrico County – Department of General Services Architect: BCWH

Size: 3-Story / 60,000 sf Disturbed acreage: 3.3 acres. Construction Cost: $15,050,000 Construction Time: Summer 2014 – Fall 2015 Delivery Method: Design-Bid-Build Project Description: Gulf Seaboard with a team comprised of two generations of family members and field personnel; had the responsibility of managing over 35 subcontractors and coordinating efforts with the land developer Gumenick Properties effectively towards project completion. Libbie Mill Library is strategically placed with lakefront views in the middle of a larger urban mixed-use development called Libbie Mill Midtown. This project embodies all elements of complexity in design and construction which include robust concrete footings, massive interconnecting steel framed/joist/ deck structure and in a few locations cantilevered overhangs, casework, wood panelling, waterproofing, air barriers, metal wall panels, high performance concrete wall panels, terra cotta wall panels, fiber-reinforced cementitious wall panels, PVC roofing, sophisticated MEP systems, and high tech communication systems. Many of the functions for the Libbie Mill Library will be to provide a welcome zone, public meeting rooms, periodical area, children/teen/adult areas, group study rooms, and a digital media lab with 3D printers. Another notable feature of the building requiring considerable coordination in construction is the “Heritage Wall”; which is an interactive digital display that provides an entertaining way of teaching the history of Henrico County. Along with this library seeking LEED Silver certification, this is a building on the cutting edge of building construction and we at Gulf Seaboard are proud to be part of its success. J ET 2017

Page 5


In Memory Doug Henson, CPE -- Jester, Mentor & Friend Words can hardly do justice to the memories and gratitude I owe this gentleman. I have had the privilege of knowing Doug since 1997. Working together with Doug at Baldwin & Shell was a life changing experience. He had a quick wit and was quite the practical joker, but when it came to work he was a ferocious lion. He was awesome with clients, stern with employees but fair as anyone could be. If you chose to pay attention, you could learn a lot from Doug. He exemplified the leadership qualities that one would hope to emulate. I am indebted to him for getting me involved in ASPE. His encouragement and motivation helped me attain by personal best and led me into the leadership roles not only locally but nationally as well. I had the honor of having Doug attend our Annual Meeting in Indianapolis and install the ASPE officers the year I took over the helm as President. Receiving my Fellow in his presence meant the world to me. I was very emotional and I will cherish for a lifetime that I was able to share those days with my long time mentor in the industry. I learned so much from Doug. He and his lovely wife Vicki are the true definition of friend ship. They both always looked out for others and put those needs above their own. Life passes oh so quickly. We need to take time to cherish friendships and make an extra effort to hold on to them in our lives. Kelly and I had just recently talked about going to visit Doug and Vicki and we regret not making that journey earlier. ASPE has lost a dear friend and lifetime advocate for our Society. Doug always was an encourager to individuals in the industry to get involved and he truly believed in our Mission. He was excited about our new direction. I will miss my practical joker, my friend and my mentor, but he and Vicki will forever hold a special place in my heart and with anyone that had the privilege of knowing them. Rest in Peace my Friend! By: Doyle T. Phillips, FCPE

ET 2017

Page 6


HTETCO New Air Condition System To An Existing Storage Warehouse By:Isam Ghandour, CPE Arizona Chapter 6

Table of Contents Section 1

Introduction

Section 2

Types of Methods of Measurements

Section 3

Project Specific Factors to Consider in Takeoff and Pricing

Section 4

Overview of Labor, Material, Equipment, Indirect Costs

and Approach to Markups

Section 5

Special Risk Considerations

Section 6

Ratios and Analysis – Testing the Bid

Section 7

Other Pertinent Information

Section 8

Sample Plan for an Existing Warehouse

Section 9

Sample New Floor Plan

Section 10 Sample Estimate – Takeoff and Pricing Sheets Section 12 Terminology-Glossary

ET 2017

Page 7


Section 1 Introduction

The use of many storage warehouses in city centers is being adapted to office or manufacturing use. There is a high demand for office space and many industrial areas near downtown are being transformed to office space. This paper provides the understanding of the challenges on adding an air-conditioning system to single story ambient warehouse storage to be used as an occupied space. This adaptive reuse has many factors to be considered for construction estimators and developers. Existing roof conditions, insulation, optimum air-conditioning system selection, available electrical power, are all factors that need to be addressed by the estimator along with the design team. Main CSI (Construction Specifications Institute 2016 MasterFormat) Division01 General Requirements Main CSI (Construction Specifications Institute 2016 MasterFormat) Subdivision 01 31 00 Project Management and Coordination Main CSI (Construction Specifications Institute 2016 MasterFormat) Division 06 Wood, Plastics, and Composites Main CSI (Construction Specifications Institute 2016 MasterFormat) Subdivision 06 10 00 Rough Carpentry Main CSI (Construction Specifications Institute 2016 MasterFormat) Division 07 Thermal and Moisture Protection Main CSI (Construction Specifications Institute 2016 MasterFormat) Subdivision 07 21 00 Thermal Insulation 07 50 00 Membrane Roofing Main CSI (Construction Specifications Institute 2016 MasterFormat) Division 09 Finishes Main CSI (Construction Specifications Institute 2016 MasterFormat) Subdivision 09 20 00 Plaster and Gypsum Board Main CSI (Construction Specifications Institute 2016 MasterFormat) Division 23 Heating, Ventilation and Air Conditioning (HVAC)

Main CSI (Construction Specifications Institute 2016 MasterFormat) Division 26 Electrical Main CSI (Construction Specifications Institute 2016 MasterFormat) Subdivision 26 05 00 Common Work Results for Electrical Brief Description In this paper the writer will describe the all factors that will need to be considered when preparing an estimate for new air conditioning system. The estimator should examine existing site conditions, review as-built drawings, review new plans and specifications, complete quantity takeoffs for materials, and accommodate all factors to finish a complete cost estimate. The estimate is for a general contractor who is preparing a competitive proposal for a private client, usually a developer, investor or a property manager who owns a single story warehouse facility with ambient temperature – not controlled temperature interior space. The general contractors will be using his/her own forces in addition to hiring subcontractors for specialty trades. It is assumed that the construction documents will be prepared by a designer working with the owner. It is also assumed that this scope is for the landlord responsibility for changing the space use to an occupied facility. Additional work will need to be done by the future tenant of the building or suite for a complete build out. Finish carpentry, doors and windows, glass and glazing, interior partitions, painting, finishes, plumbing, mechanical distribution, light fixtures, and electrical power distribution will not be part of this project. Although the contractor will provides a lump sum proposal based on construction documents, he/she should have full understanding for the basic estimating knowledge for all sub trades used to double check their quotes, complete scope reviews, and prepare budget estimates before receiving actual bids from subcontractors. The contractor should also be prepared to provide preliminary budgets for his clients before they hire a design team to complete the construction documents.

Main CSI (Construction Specifications Institute 2016 MasterFormat) Subdivision 23 74 00 Packaged Outdoor HVAC Equipment

ET 2017

Page 8


Section 2 Types of Methods of

horizontal and vertical runs, quantities by EA for breakers, disconnects and all fittings.

Measurements Quantity takeoffs for interior improvements are measured in several ways including; air conditioning units by Each (EA.), roof deck insulation by Square Feet (SF), wall insulation, by SF, roof structure supports by EA., roof patching by EA., metal studs and drywall by SF, condensate drains by Linear Feet (LF), electrical circuits by EA, and subcontrators pricing by Lump Sum (LS). There are many takeoffs tools to be used, from the traditional drawing takeoffs, two dimensional takeoffs (2-D) software, or three dimensional takeoffs (3-D) also known as Building Information Modeling (BIM). With the advances in computer technologies, estimating software is very common in the market. One of the leading software in 2-D is On-Screen Takeoff (OST) by On-Center Software. BIM estimating is used on larger and more complex projects throughout the lifecycle of the project. Whatever tool is used, the role of the estimator is still very important when transferring data on his estimate sheet as estimating is both an art and a science. Items that are measured by EA, should be separated by types. If the air conditioning units (AC Units) are different in size, each size should have a separate condition. Wall insulation should be separated from deck insulation, and wall types should have separate conditions considering types and heights. Waste factors should be considered by the estimators for materials when finishing his takeoffs or assigning unit costs. An insulated wall with many bends, corners and varying heights will have more waste compared to a straight full height separation wall. For deck insulation, the existing roof structure will affect the amount of cutting and waste to make sure all areas between purlins and trusses are being filled with insulation. Electrical circuits could be measured by EA to simplify the average cost of each circuit including conduit, wiring, breakers, disconnects and electrical hook-up. A subcontractor will breakdown the cost of the circuit to more details for exact takeoffs of the wiring and conduits in LF including ET 2017

Contractor general conditions and supervision will be time driven, and will be measured by Weeks (WKS) or Month (MO.)

Section 3 Project Specific Factors to Consider in Takeoff and Pricing Small Quantities vs. Large Quantities A larger warehouse will help reduce the unit costs assigned to the unit measure. For the mechanical scope, the cost of the installation crane is a fixed cost and will usually be a minimum trip charge of one day regardless of the number of AC units being installed. Scissor lifts and other equipment will also have fixed delivery and pick up charges that would be spread over many units to reduce the cost per unit. The learning curve for labor will improve as they do more of the same task. Geographic Location Location of the project will have a significant impact on the project cost. Union labor rates vs non union labor rates is a major cost factor. In downtown areas, many metropolitan city centers have regulations and agreements with certain labor union groups especially for carpentry, plumbing, mechanical and electrical. The AC units will have the longest lead time for order, fabrication and delivery. The location of the project site in relationship to the AC unit manufacturer factory location will affect delivery time and should be incorporated into the project schedule. Seasonal Effect on Work Cost of labor and materials is affected by the season the projected is being constructed. In the summer, many schools have major projects during school recess and this will result in labor shortage. The contractor should understand the current market conditions to forecast availability of materials and labor. A boom in residential construction or multi family projects will affect commercial construction. AC unit delivery and fabrication times will also be affected due to higher demand, and manufacturers will have bigger

Page 9


backlog for orders. Installation of new AC units will require new penetrations on the roof deck. Rain days will affect the time of making these penetrations. The contractor may expedite the installation of the roof curbs for the mechanical units and provide the proper seal to prevent any roof leaks. Special Conditions Affecting Installation of New Air Conditioning System to an Existing Warehouse Improvements in an existing building require special attention to many factors. Older buildings may contain asbestos, and getting an environmental testing and investigation report is important before starting construction. Roof penetrations for the new AC units will require partial tear of the existing roofing materials, and in many old buildings the roof mastic material was found to be hot (containing asbestos). The testing is recommended to have as many samples for any areas that are going to be disturbed during construction including but not limited to: drywall, flooring, ceiling tiles, and exterior walls. The contractor should schedule a job walk to review existing conditions along with his subcontractors. Many field conditions are not shown on the drawings and visiting the site prior to preparing a bid is very important. The mechanical contractor will review access for his crane and insure he has enough clearances. The insulation subcontractor will need to check the roof structure and decide how the insulation boards will be attached to the deck. The design team should also arrange for a site visit before finishing the construction documents as the building asbuilt drawings may not be accurate due to undocumented remodels. Current building codes will be different from the codes when the existing building was constructed. Modifications to the roof structure to accept new loads for the AC units will be a challenge. In addition to the additional roof supports, the existing roof structure may not be up to the current codes. The city code review and field inspectors might require the contractor and owner to bring the structure up to the current codes since modifications are be done. This could be a significant cost impact to the construction budget. Changing the building occupancy and use from industri-

ET 2017

al to office use will require many modifications and new calculations to be done to obtain occupancy change and a building permit. Since office use will have more occupancy, the drawings should show that the; fire exits, number of restrooms, number of parking spaces are all adequate for the new occupancy. Suite accessibility should also be reviewed by the design team. Current building codes and ADA (American with Disabilities Act) requirements will trigger additional improvements. Another building code that the team will need to satisfy, is the mechanical energy codes. New mechanical units should be energy efficient, and provide for outside air. The building envelope that the air conditioning system is to be installed, should have the proper thermal insulation to prevent energy loss. Insulation of roof deck and exterior walls are always associated with new mechanical system installation. R-Value for roof deck insulation should be a minimum of R-38 and exterior walls should be R-19. Existing roofing system might have an insulation value that would help reduce the R-Value for the new deck insulation. The mechanical engineer will run his calculations to determine if the existing exterior wall system has an established R-Value to reduce the insulation requirement for the exterior walls. Although contractors are not responsible for the design, they should be aware of the current building codes and bring any potential issues to the owner and design team to help avoid any surprises during construction. After reviewing the existing site conditions with subcontractors, the contractors should provide the owner and design team all his concerns and questions to be addressed before the start of the construction. Any stoppage by the building officials and city inspectors during construction, will cause delays and increase the project cost for all parties. Contractors are now being used in many projects in a design assist role and their professional knowledge is a key factor to the success of every project.

Section 4 Overview of Labor, Material, Equipment, and Indirect Costs and Approach to Markups The contractor will start the estimate by calculating his/her

Page 10


site supervision and general conditions cost. The project team usually consists of a project superintendent, project manager and project engineer. This team will be responsible for the delivery and execution of the project in a timely matter, within the budget, per the drawings and specifications and in a safe work environment. The number of the project team and the percentage of their time assigned to the project will also need to be decided. The project superintendent will be assigned fulltime to the project from start to finish to insure safety of all personnel at the job site, manage the schedule, monitor quality of the work, meet with building officials, represent the contractor and protect the owner’s interests at all time. The percentage of the project manager and project engineer will depend on the complexity of the project and other projects they are managing. A project manager will have an average of four projects running at the same time, so 25% of his/ her time will be assigned to this project. The same applies to the project engineer. A labor burden will be added to the weekly rates of project team. The burden is an added

into considerations material delivery, lead time, field installation, and proper inspections. Since the AC units have the longest lead time for fabrication, the mechanical work will be part of the critical path when developing the project schedule. The estimator will calculate the durations for activities before and after the installation of the AC units to come up with the project overall duration. Average lead time for fabrication and delivery of AC units is 6 weeks. The estimated project duration for this installation is 8 weeks.

percentage of the employee’s salary to cover the payroll taxes, insurances, vacation, company truck, gas, phone, and fringes. The percentage is based on historical accounting data of the company and the benefits provided by the company to it’s employees. For this project 40% will be added to the project team weekly rates.

Direct costs from subcontractors will be requested via bid solicitation from multiple subcontractors. After the initial review of the construction documents by the estimator, he/ she will make a list of trades that will be required to complete the project. For this project we will need mechanical, electrical, drywall, insulation, rough carpentry, and roofing subcontractors. Since the mechanical scope is the biggest line item in the project, it is recommended to send bid solicitations to more than five mechanical subcontractors. All subcontractor will provide lump sum proposals and the estimator will review their bids to verify they are complete

The project duration is a key factor for calculating site supervision, project management, and general conditions. The estimator, with the help of the subcontractors, will need to come up with the optimum project duration taking ET 2017

Job site general conditions will be included to cover safety supplies and signage, progress clean up, final clean-up, temporary toilets, dumpsters/trash removal, and small tools. The extent of general conditions for an interior improvement project is much less compared to a new ground up construction. For this project the estimated supervision and general conditions are per Table 1. Table 1

Page 11


and per plans and specifications.

business interruptions.

Once all direct costs are calculated, the estimator will finalize indirect expenses including insurances, overhead, profit and taxes. Contractor liability insurance is required and the estimator will confirm if him current liability coverage is adequate for the project or if should buy additional coverage for the project. Builder’s risk insurance will also need to be addressed if it is provided by the owner or contractor. The estimator should be aware of the tax laws for the project location to confirm if he is responsible for the taxes as the prime contractor, or material taxes are to be paid at the point of sale for all materials purchased for the project. If the subcontractors are responsible for the taxes, this should be reviewed when doing scope reviews for all subcontractors’ bid proposals.

Section 6 Ratios and Analysis – Testing the Bid

Section 5 Special Risk Considerations Older warehouses that are used for storage have relatively higher roof clearances to allow for storage racking and forklift operations. Installation of rooftop mounted heat pump package units on high roofs will expose workers to the risk of fall injuries due to the roof penetrations. According to OSHA, falling is the most prevalent cause of fatal accidents in construction. Anyone working on the roof should be tied off and access to the roof should be limited to construction workers. Many older buildings have no parapets and that will increase the fall hazards. Contractors should anticipate and inforce the use of proper personal protection equipment (PPE). In some cases these remodels will be done in an occupied space that is expanding its office area. Doing construction in occupied spaces will be very challenging to insure the public protection. Barricades and signage should be provided and continuous communications about the project progress and areas of construction should be conducted on daily basis with the tenants. Electrical shut downs will need to be scheduled off-hours to avoid

ET 2017

Although the subcontractors will provide bids for their specialty trades, the estimator should understand the basis for the subcontractors’ estimate calculations and how they are developed to enable him/her to review and ask questions. The estimator should actually complete his own estimate before receiving subcontractor bids and compare both estimates to insure complete scope. For the mechanical scope, the mechanical subcontractor will solicit supplier’s quotes for the AC units, provide installation labor, fabricate duct drops with sheet metal, purchase copper piping for the condensate drains, and use rental equipment rates for cranes and scissor lifts. For this project there are total of eleven (11) 6.5-ton AC units. There are no registers, diffusers, main ducts or any ductwork distribution as this project doesn’t include the tenant built-out package. The general contractor preliminary estimate for the mechanical scope is per Table 2. A similar exercise will be done for other sub trades to come up with unit rates. The estimator will develop unit cost rates for each sub trade to complete the overall project cost. Table 2

Another calculation that will be helpful on future projects, is to get the ratio of air-conditioning tonnage in relationship with the warehouse square footage. In this project there

Page 12


are 11x6.5-ton AC units for a total of 71.5 tons of cooling. The warehouse area is approximately 18,260 SF, and this will make the ratio approximately 255 SF per ton of cooling. If the estimator is doing a budget for a similar project, this ratio will help in calculating how many AC units are required for cooling an existing warehouse

Section 7 Other Pertinent Information The general contractor estimator must think about the constructability of the project and all the means and methods for execution of the work. Installing new AC units might require the demolition and restoration of an existing ceiling. New interior drywall furring might affect existing electrical outlets that would need to be adjusted. Documenting all existing site conditions during a pre-bid job walk will help resolve future claims and disputes. The roofing system in an older building might have leaks that had not been noticed. The roofing subcontractor should make a quick survey of the existing roof conditions to insure there are not leaks or unacceptable roof patches from previous

improvements. If the roofing system is still under warranty from the manufacturer, then an approved applicator by the roofing manufacture should be used to perform the new roof patches and to maintain the long term warranty. The estimator should also be aware of mechanical screening requirements in the jurisdiction of the project. Some municipalities require mechanical units on the roof to be screened by a parapet or new mechanical screens. Low profile AC units may also be used. The estimator must send bid solicitations to multiple subcontractors. Due to construction industry market conditions, certain subcontractors might get very busy and would not have enough manpower to perform all their projects on time. A low subcontractor on one project doesn’t mean they would be low on another project. Having at least three subcontractors’ bids will make the general contractor estimate very competitive.

Section 8 Sample plan for an Existing In dustrial Warehouse. Figure 1

ET 2017

Page 13


As-Built drawing for an existing warehouse in a distribution center. The suite is empty and the owner of the property would like to change the use of the warehouse from storage to office space. There is a high demand for office spaces near the city center and once the space occupancy is changed by adding air conditioning and insulation, the owner will find a tenant to lease the space.

Section 10 Sample Estimate – Takeoff and Pricing Sheets Figure 3

Section 9 Sample New Floor Plan Figure 2 Floor plan of the construction drawings showing new insulated full height separation wall, insulated drywall furring, and 11 new 6.5-ton rooftop package AC units.

Figure 4

The takeoff plan and table developed by On Screen Takeoff (OST) will help he estimator get quantities for materials and measurements needed. Based on the table the following quantities/measurements will be used in the estimate:

Click Here for PDF Drawings

06 10 00 Rough Carpentry 11 EA Roof framing for 11 AC Units. 07 21 00 Thermal Insulation 18,260 SF Insulate Underside Deck - R-38 Wired w/Scrim

ET 2017

Page 14


7,694 SF Insulate In Walls - R-11 - Exterior Wall Furring 3,932 SF Insulate In Walls - R-19 - Full Height Separation Wall 07 50 00 Membrane Roofing 11 EA Roof patches for 11 new AC units. 09 20 00 Plaster and Gypsum Board 3,932 SF Full Height separation wall 6” 20ga 16” oc 5/8 drywall 2 side 24’ 7,694 SF Full Height drywall furring 24’ 23 74 00 Packaged Outdoor HVAC Equipment 11 EA 6.5 Ton Package RTU’s AC Unit

Detailed Estimate page 1

Section 11 Glossary/Terminology MasterFormat MasterFormat is a standard for organizing specifications and other written information for commercial and institutional building projects in the U.S. The purpose of this format is to assist the user to organize information into distinct groups when creating contract documents, and to assist the user searching for specific information in consistent locations. Information contained in MasterFormat is organized in a standardized outline format within 50 Divisions (16 Divisions pre2004). Each Division is subdivided into a number of Sections. R-Value: An R-value is a unit of thermal resistance for a particular material or assembly of materials (such as an insulation panel). The term is used in the building and construction industry. The R-value depends on a solid material’s resistance to conductive heat transfer. The higher the value of R, the better the building insulation’s theoretical effectiveness. Drywall Furring: Furring are thin strips of Metal to level or raise surfaces of another material to make space for insulation, or to level and resurface ceilings or walls. Metal furring strips can be used for commercial projects. Often called “hat channels” to describe the profile (cross section), they consist of two flanges on each side of a trapezoid shape, 7/8” thick. J

ET 2017

Page 15


.


The Reality of 5D BIM The use of building information modeling (BIM) in construction continues to grow. In fact, 34 percent of contractors expect the number of projects involving BIM to increase in the coming year, according to the 2017 Construction Hiring and Business Outlook report conducted by the Associated General Contractors (AGC) of America and Sage. For estimators, electronic models are not likely to totally replace 2D drawings anytime soon. However, model-based estimating (also known as 5D BIM) is gaining momentum as a way to improve efficiency and provide greater project cost savings and predictability. “5-D BIM is being adopted on all fronts,” says Kevin Miller, construction management professor at Brigham Young University, who specializes in estimating from building models. “Where you have a relationship between the contractor and the designer—more of a design-build approach—we see bigger strides being made than the traditional design-bid-build delivery method. But all fronts are advancing, just at different paces.”

5D BIM Possibilities The McKinsey Institute, a global management consulting firm, lists 5D BIM as one of the “five big ideas” that can help the construction industry transform itself over the next five years. Many estimators see the same possibility.

Clark Construction Group, has long embraced the use of models in his estimating work. “It’s how my head works,” he explains. “I like being able to visualize things. It’s exciting to see the industry ramp up and realize that this is the future.” Lange first used models to do structural steel and concrete takeoffs. Later he moved on to performing takeoff for all parts of the building. BIM, he says, is especially helpful for better understanding a project. He often uses models as a checklist to make sure nothing is left out of the estimate. “Even if it’s a tiny speck on the drawing, it will have its own line item categorized in the model’s selection tree so it can be found easier.” Especially on complicated projects, models can tell estimators things that 2D plans often can’t. Lange describes how a model lets him visually see that a wall is slanted, where there are soffits, and other ins and outs that aren’t apparent on 2D plans. “You can understand if something could be difficult to build so you can account for that in your estimate,” he says. Lange prefers to start his estimates with a model not only for visualization purposes, but to take off as much information from the model as possible. When dealing with bid projects that have very developed models he says he can get enough information to outline his entire estimate. Models also facilitate collaboration, giving estimators the ability to provide valuable cost-saving feedback earlier in the planning process. In the future, Lange hopes to sees models progressing to a point where even very early sketch-up models could provide the information estimators need.

Stuart Lange, preconstruction and VDC manager with ET 2017

Page 17


Current Challenges Lange admits that models pose some estimating challenges. For example, certain information is rarely, if ever, modeled. Flashing and sheet metal, waterproofing, door hardware, and floor and wall finishes are just some of things that he hasn’t been able to get from a model. Also, some models are not as developed as others, again restricting the amount of information estimators can rely on. Miller agrees. He sees the difference in the quality of estimating information coming from models as one the biggest challenges to achieving the benefits of 5D BIM. “We’re going through a transitional period where some designers are advanced at using BIM and some are still learning it,” he explains, “so the amount of estimating-related information included in a model can vary greatly.” As a result, estimators have to refer to 2D drawings to get details that are often missing from the model. Many 3D modeling tools will generate 2D information from the model, including floor plans, specifications and notes. However, the workflow to extract that 2D information from the model for full-blown production estimates isn’t an easy process. “It’s much quicker for estimators to use the 2D takeoff tools they’re used to,” he says. Consequently, estimators currently have to use multiple, unconnected 2D and 3D takeoff systems, complicating the process and increasing the chances for error.

The need for standards In addition to technology advances, strides are being made to create industry standards that will further push 5D BIM into mainstream use. The BIMForum, for example, is helping to specify and communicate the content and reliability of building information models at various stages in the design and construction process. The specification allows model authors to define models for specific information exchange, milestones in a design work plan, and deliverables for specific functions. Quantity takeoff is one of those functions.

Conclusion Models are rich with information that can be used effectively by estimators today, with even greater possibilities for tomorrow. “We’re knocking at the door (of 5D BIM),” says Lange. “There’s some really good things happening. And it’s going to keep progressing.” For estimators, that door promises to open up a better understanding of planned projects, earlier cost feedback into the design process, and more cost-effective ways to complete construction. J Authors:

Technology Advances 5D BIM is entering a new level of sophistication, however, this time focused squarely on the needs of estimators. While the information contained in a 3D model will continue to advance, estimators will realistically still rely on 2D information to supplement models for some time to come. New technology addresses this by making it possible to do production estimating work simultaneously using both 2D and 3D content. Essentially, estimators no longer have to learn and use more than one takeoff tool to work with models, or rely on other cumbersome procedures. This streamlines the now fragmented takeoff process, eliminates additional error-prone work, and allows estimators to speed up and better visualize their takeoff from models. ET 2017

The ability to link construction objects in a model to assemblies in a customized estimating database is also now possible, providing the estimator with the specification variables that are often missing in models.

Walt Davis is Estimating Market Manager for Sage, creator of the most-used project accounting and estimating software in the construction industry. Email: walter.davis@sage.com Website: sagecre.com John Adams is Industry Strategy Manager for Autodesk. Autodesk makes software for people who make things. Email: john.adams@autodesk.com Website: autodesk.com Curtis Peltz is CEO of eTakeoff, a leading provider of construction quantity takeoff software, including technology that tightly integrates the 2D/BIM takeoff and cost estimating process. Email: curtisp@etakeoff.com Website: etakeoff.com

Page 18


Executive Director Corner

T

• Complete phone interviews with finalists; narrow down to two candidates – by May 5, 2017.

he Board met in Nashville on March 11, 2017. One of the main areas of focus of the meeting was continued planning for the Society. We reviewed our progress toward goals set as part of the Strategic Plan presented to members in July 2016 and set new goals to be presented to the membership at the Mile High Summit in Denver. Most importantly, we set a timeline for the hiring of a new Executive Director to represent and lead the Society.

• Complete in person interviews with finalists in Nashville; offer job to chosen candidate – by May 26, 2017 It is our goal to have our new Executive Director in place and oriented so that everyone can meet him/her at the Summit in Denver. We are looking for a person who is passionate about our mission, is forward-thinking and able to inform and implement the Strategic Plan, can communicate our organization’s value, and enhance our stature in the industry.

• Develop and approve job description for Executive Director position – by April 3, 2017. • Post job opening in both Nashville and national recruiting sites – by April 3, 2017.

We are looking forward to our organization’s future. As always, if you have any specific ideas or concerns, please contact me directly.

• Collect and review resumes; narrow down to no more than five candidates – by April 28, 2017.

Design Co

Free Subscription to Design Cost Data™ Sign up today for your Free subscription to DCD magazine, the leading industry resource for actual construction costs. Delivered electronically each issue of DCD provides you:

The #1 Ind ustry Sourc January-F ebruary 2013 e for Actua $17.00 l Square Foot Cost Data

• Actual buildings and their cost to build • Square Foot Cost Reports • Material Cost Trends • National Building Cost Reports • “Legally Speaking” by Matthew J. DeVries on Green Building and more Go to www.dcd.com/aspe to sign up. Please call us at 800-533-5680 if we can help.

ET 2017

DCD

st Data ™

ASPE Member Benefit!

No From Preconwhere to Hide : BIM Mak struct ion to Fa es In cilit ies Manag roads em ent A Busted Bu dget : What Do es It Cost?

Architect:

Bryant Hig Jackson

h School Addition Bryant, culict Arc Arkansas hitects, Inc .

Brown Pal

Page 19


Conference 2017

SUMMIT A Mile High

The Art & Science of Estimating July 12 - July 15, 2017 Denver, Colorado

Welcome to our Annual Summit Are you ready?

We are excited

to announce this year’s annual conference: A Mile High Summit in

Register Today!

www.aspenational.org/2017summit

Denver, Colorado (July 12 thru July 15, 2017). The theme is an engaging one: The Art and Science of Estimating. Estimators face new and diverse challenges every day. Technical

DENVER 2017: A MILE HIGH SUMMIT The Art & Science of Estimating

Guest Speakers

obstacles range from BIM and other software trends to a lack of standards facing the estimating industry. Other challenges are what we refer to as ‘soft- skill’ challenges ranging from professional team work, practical business presentation skills, and maximizing productivity and efficiency in an ever-chaotic workday. The goal of ASPE is to help equip estimators with the skills, knowledge, and tools to face and master these very challenges. Having found many of the best experts in these fields and more to offer insight

Networking with ASPE Members The future awaits Green light for building commencement date Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh

and practical implementation to support and enhance an estimator’s skillset, we invite you to join us in Denver for an exciting and engaging conference!

You won’t want to miss out on everything we have planned for this years conference!

euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper suscipit lobortis nisl ut aliquip ex ea commodo consequat. Duis autem vel eum iriure dolor in hendrerit in vulputate velit esse molestie consequat, vel illum dolore eu feugiat nulla facilisis at vero eros et accumsan et iusto odio dignissim qui blandit praesent luptatum zzril delenit augue duisi.

Product Demos ET 2017

Page 20


Meet the speakers...

This year’s list of speakers is sure to keep you on the edge of your seats.

Lorem ipsum dolor sit amet, con-sectetuer adipiscing elit, sed

Andy is noted for his precision in the planning and design phases of projects. He uses his technical experience to assist project managers during the preconstruction phase of a project, focusing on design, budgeting and value engineering. Andy specializes in evaluating the aesthetic and functional, as well as the schedule and cost implications of all design options a customer may be

aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper suscipit commodo consequat. Duis autem vulputate velit esse molestie

clear goals and expectations early in the process will allow him to

consequat, vel illum dolore eu.

make the most impact on the overall success of a project.

CAREER AVENUES POINT POSITIVE

Tincidunt ut laoreet dolore magna

vel eum iriure dolor in hendrerit in

considering. He knows listening to the customer and establishing

Read more about our speakers at: www.aspenational.org/2017summit

diam nonummy nibh euismod.

Andy Moffitt, LEED AP DIRECTOR OF PRECONSTRUCTION

The importance of CPE Change orders. Budget overruns. Scheduling delays. If these words sound like “business as usual” in the construction industry, the words Certified Professional Estimator (CPE) will change your point of view. The CPE designation is one of the most respected credentials in the estimating profession. Hiring an estimator who has earned the CPE designation is a reliable indicator that the budget estimate you receive will result in a completed project that meets your expectations for quality, cost, and on-time completion.

Don’t miss the opportunity to connect!

ARE YOU ON THE RIGHT PATH? Don’t miss out on early registration!

Committed to building a lifelong model of learning The objective of the ASPE is to promote the development and application of education, professional judgment and skills within the industry we serve. Estimators, as well as other trades of Construction Engineering, must perform under the highest principles of ethical conduct as it relates to the protection of the public, clients, employers and others in this industry and in related professions. The professional estimator must fully utilize education, years of experience, acquired skills and professional ethics in the preparation of a fully detailed and accurate estimate for work in a specific discipline. This is paramount to the development of credibility by estimators in our professional service. Estimating is a highly technical and learned profession, and estimators must understand their work is of vital importance to the clients and to the employers they serve. Accordingly, the service provided by the estimator should exhibit honesty, fairness, trust, impartiality and equity to all parties involved.

Get involved at www.aspenational.org

ET 2017

Page 21


Summit Agenda 2017 Catch a brief glimpse at everything there is to look forward to at this years annual summit. Wednesday July 12, 2017 03:00 – 08:00

Registration

06:00 – 08:00

Welcome Reception

Thursday July 13, 2017 08:30 – 10:00

Two Concrete Things That Accelerate Transformation

10:15 – 11:45

The Leadership Advantage - How to Connect, Communicate &

12:00 – 12:30

Demonstration

12:30 – 02:00

Keynote Lunch

02:00 – 02:30

Workshop

02:30 – 04:00

Leveraging Historical Costs to Maximize Cost Intelligence

04:15 – 05:45

Microsoft Excel Skills For Estimators

Influence Different Personalities

Friday July 14, 2017 08:30 – 10:00

BIM: Case Study

Special discounted pricing for undergrad and graduate level students Fun Filled events sure to keep you busy during the entire weekend!

10:15 – 11:45

BIM Expert Panel Discussion

12:00 – 12:30

Demonstration

12:30 – 02:00

Lunch

02:00 – 02:30

Workshop

02:30 – 04:00

It’s Not Actually Worse Than Death: Surviving (and THRIVING

turning up the fun! With social events ranging from a

at) Public Speaking

downtown Denver brewery visit, to a private function at the

04:15 – 05:45

Creating Time Efficiency & Managing Multiple Priorities

07:00 – 10:00

Awards Dinner

Denver Art Museum, and a diverse exhibit fair to meet

This year’s conference isn’t just educational because we’re

expert companies delivering solutions and applications for estimators, every moment will be packed with fun,

Saturday July 15, 2017 08:00 – 09:30

State of the Society Address and Q&A

09:45 – 10:45

Higher Education Panel Discussion

11:00 – 12:00

Estimating Textbook Discussion (Invitation Only)

12:30 – 01:30

Regional Breakouts

02:00 – 04:30

Rock Bottom Brewery Experience

06:00 – 10:00

President's Dinner at the Denver Art Museum

ET 2017

fellowship, and educational advantages.

Can’t wait to see you in July!

Register Today!

www.aspenational.org/2017summit

Page 22


Meet some of our Speakers Josh Bone, BIM Services Manager, JBKNOWLEDGE For more than a decade Josh Bone has been implementing, training and presenting construction technology solutions to AECO (Architecture, Engineering, Construction, Owners) professionals. Having worked with some of the top technology leaders in the industry, Josh specializes in identifying best practices and methodologies for integrating BIM and mobile applications into everyday workflows. Josh started his career working with design teams, then transitioned into helping construction professionals leverage technology in both the preconstruction and construction phases.

Nora Burns, Speaker & Hiring Consultant Since stepping into the world of human resources more than two decades ago, Nora A Burns, SPHR has interviewed and on-boarded thousands of candidates and new hires for positions ranging from file clerk to executive vice president. Along the way, she decided to study and evaluate the hiring process from a different perspective, by participating in job interviews across the country. She did this not in her usual role of interviewer or hiring consultant, but as a candidate for administrative, supervisory and managerial roles. As The Undercover Candidate™, Nora has participated in over a hundred interviews to gain insight into the hiring process from the candidate’s perspective.

Kenyon Salo, The James Bond of Speaking and Engagements Kenyon Salo is one of the top trainers, facilitators and keynote speakers in his field of adventure, leadership, team building, sales, inspiration and motivation. One of only six members on the Denver Broncos Thunderstorm Skydive Team he is seen each week flying into Sports Authority Field at 60+mph, ending with a soft tip-toe landing on the ten yard line. He brings to the stage over 20+ years of successful audience engagement through humor, awe-inspiring moments, prolific storytelling and edge-of-the seat content. His goal is to deliver high caliber, powerful and heart touching content to each person in the room.

Register Today!

www.aspenational.org/2017summit

Don Henrich, President and CEO, Assemble Don Henrich is an accomplished technology veteran in both the MCAD and the AEC industries. As President and CEO of Assemble he brings an distinguished track record of innovation, winning strategies, team building, and the ability to quickly grow revenue and market share. Don and his wife Noel have three children, reside in Marblehead, MA and spend as much time as possible sailing on Massachusetts Bay.

ET 2017

Page 23


LEARNING HAPPENS EVERYWHERE ASPE’s Annual Summit will focus on continued education in the world of Estimating Having found many of the best experts in these fields and more to offer insight and practical implementation to support and enhance an estimator’s skillset, we invite you to join us in Denver for an exciting and engaging conference! Some of the things you’ll learn in Denver: •

Two unique leadership models that focus on building innovative and competitive systems and processes to bolster organizational success, and culture building within an organization from a leadership perspective.

As a leader and team member, learn how to understand your strengths and weaknesses in a workplace situation in order to build better working relationships and team workplace dynamics.

Ever feel like your to-do list constantly grows but time continues to run out? Hear from a leading expert on time efficiency and workplace productivity while learning practical tools you can use in your daily work to

Book your room today! Before its too late!

increase productivity and decrease stress. •

Everyone wants to know more about BIM and that’s exactly what we’re bringing to the table this year. We’ll hear from an expert panel on the use of BIM in construction and estimating that is specifically geared to address

Book your stay under the ASPE room block at the Embassy Suites Downtown Denver by June 22, 2017. Book online at ASPE's Group Webpage.

what estimators want to know more about. Wednesday, July 12, 2017 @ 6pm - Saturday, July 15, 2017 @ 10pm •

Learn from a leading construction company that searched, found, and implemented the answer to leveraging historical costs for current and future projects.

Book by phone by calling 1 (800) 774-1500 for the Embassy Suites Denver Downtown Convention Center, or DENES, and mention the

Do you use Microsoft Excel in your daily work? Join us for an engaging

group code “ASP” to receive the ASPE room block rate.

high-level Excel training and presentation built specifically to address how estimators can maximize their understanding and use of Excel in estimating. •

Learn from one of the best to communicate and present work projects and presentations in an engaging and informative manner that will impress your

www.aspenational.org/2017summit

peers, leaders, and future clients, and ultimately add value to your career.

Office Tel: 615.316.9200 (Mon-fri 9am – 6pm)

Society Business Office 2525 Perimeter Place Drive • Ste 103 NASHVILLE, TN 37214

ET 2017

Page 24


Welcome New Members! Name

Company

Chapter

Derek Kirkbride Dan Dougherty Jim Arcara Mark Tarver Raj Sayal Steven Lott Matthew Miles John Morse Steve Knotts Christopher Schmeelk Trevon Gaston Mike Morwin Scott Cartica Sonia Douglass Joseph E Gray

TIS Construction RK Steel Ragnar Benson Construction, LLC The Rinaldi Group, LLC VJ Associates California High Speed Rail Program Indiana State University Trussway Manufacturing Inc. KAI/Square Up Jacobs Construction Ballard Architectural Studio Mechanical Testing, Inc. Holman Inc Johnson Melloh Joseph E Gray Inc

Los Angeles 1 Denver 5 Chicago 7 New York 10 New York 10 Sacramento 11 Detroit 17 Houston 18 St. Louis Metro 19 Greater D.C. 23 Southwestern Ohio 38 Empire State 43 Tampa Bay 48 Central Indiana 59 Nutmeg 60

ASPE Scholarship Program $5,000.00 Click Here for More Information ET 2017

Page 25


arizona

Chapter Meeti ngs

Arizona #6

Where: Double Tree Hotel 320 N 44th Street Phoenix- 85008 Date: 2nd Tuesday Time: 5:30 Social Hour Meeting Contact: Tom Norton,CPE cpeaspe6treasurer@gmail.com

Old Pueblo # 53 Where: Varies Date: 1st Wednesday Meeting Contact: Trip McGrath,CPE CPE tripm@aol.com

Arkansas Arkansas # 33 Where: Baldwin & Shell 1000 West Capital Ave. Little Rock -72201 Date: 3rd Friday Time: 12: 00 Social Hour Meeting Contact: Mickey Perez mperez@baldwinshell.com

NW Arkansas # 79

Where: Varies Date: Varies Time: 11:30 am Social Hour Meeting Contact: Thom Thibodeau thom.thibodeau@cox.net

California Los Angeles # 1

Where: The Barkley Restaurant 1400 Huntington Drive South Pasadena - 91030 Date: 4th Wednesday Time: 6:00 pm Social Hour Meeting Contact: Joe Miller, CPE njoemiller@yahoo.com

Golden Gate # 2

Where: AIA Eastbay 1405 Clay Street Oakland- 94612 Date: 3rd Wednesday Time: 6pm Social Hour Meeting Contact: Gustav Choto gchoto@buildingpointpacific.com

Orange County # 3

Where: Ayres Hotel 325 Bristol Ave. Costa Mesa - 92626 Date: 2nd Wednesday Time: Vaires Meeting Contact: Tom Smithson tedwardsmithson@gmail.com

San Diego # 4

Florida

michael.moyers@bestinteriors.net

Where: Grill 116 612 N. Dale Mabry Tampa - 33609 Date: 3rd Thursday Time: Varies Meeting Contact: Bob Nidzgorski, CPE bob.nidzgorski@skanska.com

Where: Varies Date: 3rd Tuesday Time: 5:30 Social Hour Meeting Contact: Mike Moyers, CPE

Tampa Bay # 48

Sacramento # 11

Where: Rancho Cordova City Hall 2729 Prospect Park Dr. Rancho Cordova - 95670 Date: 2nd Friday Time: 11:30 am Social Hour Meeting Contact: Jared Wright jwright@fllintbuilders.com

Silicon Valley # 55

Orlando # 50

Where: Varies Date: Varies Time: Varies Meeting Contact: Alan Jacobs, CPE info@aspe55.org

Where: TBD Date: TBD Time: TBD Meeting Contact: Danny Chadwick, CPE dkchadwick@bellsouth.net

Colorado

Georgia

Denver # 5

Where: Urban Roadhouse 999 18th Street Denver - 80202 Date: 2nd Tuesday Time: Varies Meeting Contact: Matthew Rasmussen mrasmussen@henselphelps.com

Connecticut

Chicago # 7

Information not submitted Contact: Northeast Governor James Hanna, CPE jgh@dhuy.com

Yankee # 15

Not Active

Delaware Where: Varies Wilmington, DE Date:2nd Wednesday Time: 5:30pm Social Hour Meeting Contact: Jason Gordon jgordon@pennlighting.com

District of Columbia Great D.C. # 23

Where: Jacobs 1100 North Glebe Rd., Ste 12 Date: 3rd Thursday Meeting Contact: Maurice Touzard, CPE mtouzard@gmail.com

ET 2017

Atlanta # 14

Where: Sage Woodfire Tavern 4505 Ashford Dunwoody Rd Atlanta - 30346 Date: 2nd Monday Time: 11:30am Social Hour Meeting Contact: Clinton Aldridge clinton.aldridge@skanska.com

Illinois

Nutmeg # 60

Delware # 75

Gold Coast # 49

Information not submitted Contact: Southeast Governor Chuck Hesselbein, CPE chesselbein@baldwinshell.com

Iowa

Quad Cities # 71

Where: Granite City Food & Brewery 5270 Utica Ridge Rd Davenport - 52807 Date: 4th Tuesday Time: Varies Meeting Contact: Ryan Andresen randresen@russellco.com

Greater Des Moines # 73

Where: Varies Date: 3rd Thursday Time: Varies Meeting Contact: Ryan Haaland rhaaland@eliteglassandmetal.com

Louisiana New Orleans # 9

Information not submitted Contact: Southeast Governor Chuck Hesselbein, CPE chesselbein@baldwinshell.com

Maine Maine # 37

Where: Woodard & Curran 41 Hutchins Drive Portland - 04102 Date: 1st Wednesday Time: Varies Meeting Contact: John Brockington, CPE jbrockington@woodwardcurran.com

Where: Barbakoa Tacos & Tequila 1341 Butterfield Rd Downers Grove - 60515 Date: 3rd Thursday Time: 6:00pm Social Hour Meeting Contact: Bob Svoboda, CPE bsvoboda@ccsdifference.com

Maryland

Indiana

Massachusetts

Central Indiana

Where: Varies Date: 3rd Thursday Time: Varies Meeting Contact: Jeremy Adkins, CPE jadkins@theadkinsgroup.net

Old Fort # 65

Baltimore # 21

Where: Varies Date: 2nd Thursday Time: 6:00pm Social Hour Meeting Contact: Steve Krell, CPE skrell@oakcontracting.com

Boston # 25

Where: Courtyard by Marriott Boston-Cambridge Hotel 777 Memorial Drive Cambridge - 02139 Date: 3rd Wednesday Time: Varies Meeting Contact: Ryan Dogil Rdogil@selectdemoservices.com

Information not submitted Contact: Central Plains Governor Dave Westfall, CPE dwestfall@aspengroup.com

Page 26


Michigan Detroit # 17

Where: visit www.aspe17.org Date: Varies Time: Varies Meeting Contact: Patrick Todd, CPE patrick.todd@aspe17.org

Western Michigan # 77

Where: Varies Date: 1st Thursday Time: Varies Meeting Contact: Brent Balkema, CPE

bbalkema@rockfordconstruction.com

Minnesota Viking # 39

Information not submitted Contact: Central Plains Governor Dave Westfall, CPE dwestfall@aspengroup.com

Missouri St. Louis Metro # 19

Where: Varies Date: 4th Thursday Time: 6:00pm Social Hour Meeting Contact: Jerry Dorhauer, Sr. jerry.dorhauer@bellelectrical.com

Heartland # 32

Where: Uncle Buck’s Grill or Bass Pro Shops -See meeting contact Date: 3rd Wednesday Time: evenings-varies Meeting Contact: Kelly Jarman, CPE Kelly.Jarman@jedunn.com

Nebraska Great Plains # 35

New Jersey

Oklahoma

Garden State # 26

Landrun-OK City # 80

Where: The Appian Way 619 Langdon Street Orange - 07050 Date: 4th Tuesday Time: Varies Meeting Contact: Jeffery Senholzi costnav@ptd.net

Where: Ingrid’s Kitchen 3701 N. Young Blvd Oklahoma City - 73112 Date: 1st Wednesday Time: 11:30 am Social Hour Meeting Contact: Ed Harris ed.harris@dormakaba.com

Oregon

New Mexico

Columbia-Pacific # 54

Roadrunner # 47

Where: University Place 310 W. Lincoln St. Portland - 97201 Date: 3rd Tuesday Time: Varies Meeting Contact: Chana Frederick, CPE frederick.chana@gmail.com

Where: Fiestas Restaurant 4400 Carlise NE Albuquerque - 87107 Date: 1st Wednesday Time: 5:30 Social Hour Meeting Contact: Joshuah Crooker-Flint, CPE joshc@auiinc.net

Pennsylvania

New York

Greater Lehigh Valley # 41

New York # 10

Not Active

Empire State # 42

Where: Athos Restaurant 1814 Western Ave Albany - 12203 Date: 4/6/17-5/4/17 Time: 6:00pm Social Hour Meeting Contact: James Madison, CPE jmadison@arriscontracting.com

Western NY # 77

Where: Panera Bread 1501 Howard Rd Rochester - 14626 Date: 2nd Thursday Time: Varies Meeting Contact: Ben Nodine, CPE aspewny@mail.com

Information not submitted Contact: Central Plains Governor Dave Westfall, CPE dwestfall@aspengroup.com

Ohio

Nevada Reno # 12

Information not submitted Contact: Central Plains Governor Dave Westfall, CPE dwestfall@aspengroup.com

Las Vegas # 72

Where: Varies Date: 3rd Thursday Time: Varies Meeting Contact: David Rowland drowland@ctleng.com

Where: TBD Date: TBD Time: TBD Meeting Contact: David Evans, CPE davidaevans@charter.net Where: Desert Pines Golf Club 3415 E. Bonanza Rd Las Vegas - 89101 Date: 2nd Thursday Time: 5:30pm Social Hour Meeting Contact: Charlie Stewart, CPE charlies@buildwithdcbg.com

Buckeye # 27

Southwestern Ohio # 38

ET 2017

Information not submitted Contact: Northeast Governor James Hanna, CPE jgh@dhuy.com

Three Rivers # 44

Information not submitted Contact: Northeast Governor James Hanna, CPE jgh@dhuy.com

Philadelphia # 61

Texas Houston # 18

Where: Spaghetti Western’s 1608 N Shepard Houston - 77007 Date: 2nd Monday Time: 6:00pm Social Hour Meeting Contact: Kenneth Barnes kabarnes@valerus.com

Rio Grande # 40

Where: Geogeske Restaurant 2701 North Stanton El Paso - 79902 Date: 1st Thursday Time: Varies Meeting Contact: Rodolfo Barba, CPE rodolfobarba1@gmail.com

Dallas/ Ft.Worth # 43

Where: TBD Meeting Contact: Rick Wyly, CPE rick.wyly@gmail.com

Utah Salt Lake City # 51

Where: TBD Meeting Contact: John Shampton, CPE president@aspe51.org

Virginia Richmond # 82

Where: Williamson 500 Blair Mill Rd Willow Grove - 19090 Date: 3rd Wednesday Time: Varies Meeting Contact: Lydell Williams ktm_perfection@msn.com

Where: Baskervill 101 South 15th Street Ste. 200 Richmond - 23219 Date: 4th Wednesday Time: Varies Meeting Contact: Jacob Dyer jacob@gulfseaboard.com

Central Pennsylvania # 76

Washington

Where: Loxley’s Resturant 500 Centerville Road Lancaster - 17601 Date: 2nd Wednesday Time: 6:00pm Social Hour Starts Meeting Contact: Dan Dennis, CPE dd@EGSConstruction.com

Tennessee Middle Tennessee # 34

Where: Adventure Science Center 800 Fort Negley Blvd. Nashville - 37203 Date: 1st Friday Time: Varies Meeting Contact: Ricky Sanford rsanford7159@hotmail.com

Puget Sound # 45

Where: Hales Ales Date: 3rd Tuesday Time: Varies Meeting Contact: William Pace wpace@nelsonelec.com

Wisconsin Brew City # 78

Where: Varies Date: 2nd Tuesday Time: 5:30pm Social Hour Meeting Contact: Chris Rozof, CPE crozof@berghammer.com Please NOTE: Information is subject to change. Any changes to your chapters information email jennifer@aspenational.org

Page 27


A MILE HIGH SUMMIT

2017 ANNUAL MEETING AND ESTIMATORS SUMMIT JULY 12-15, 2017