Estrella sanz alonso Architectural Portfolio

Page 1

ESTRELLA SANZ ALONSO ARCHITECTURAL PORFOLIO estrellasanzalonso@gmail.com 0034 653 79 65 36


2

Personal Projects


Renders

Country house in Sierra Norte, Seville.

3


Renders

4 Country house in Sierra Norte, Seville.


Interiorism project

Apartment reform in the center of Seville.

5


6

Renders

Interiorism design

1.

2.

1. Kitchen design for house in the city center. 2. Kitchen for Entrenucleos apartment, Seville. 3. Visiting Center in Guadalquivir river, Seville. 4. Sponza Palace, Dubrovnik.

3.

4.


7

In collaboration


House + Los Faroles Supermarket

8

Renders for MANUEL PINILLA ARCHITECT

House in Los Corrales, Seville.


Renovation appartement

Project for PlanetaCasa, Malaga.

9 After

ESTADO ACTUAL DECORADO

Cocina

Dormitorio 1 Dormitorio Ppal

Sal贸n

Vestidor

Recibidor Ba帽o

ESTRELLA SANZ ALONSO A r q u i t e c t o

e 1/60 m

0

1

2

5

Before

ESTADO ACTUAL DECORADO

Dormitorio 1

Dormitorio 2 Dormitorio Ppal

Sal贸n

Cocina Recibidor Ba帽o


10

Infant and Primary School in Burguillos, Sevilla.

Public Competition for Andalusia Goverment, for UNIA Architect.

LOCATION_ Burguillos, province of Seville. Small agricultural town 30 kms far from the Seville. BUILT AREA_ Â 4.110 m2 PROGRAMME_ 9 children classrooms, 18 primary classrooms, special education classrooms, multipurpose classrooms, library, administration area, gym, kitchen and common services.

section BB'

section AA'

A

GUIDELINES_ On one hand they need a separate entrances for children and teenagers. While they share the using of common areas and services, routes as well.

Ground Floor

 LIMITS_ It's located on a rectangular plot, in the sudrounding of the town, bordering fields. STRATEGY The complex is divided in two different buildings, connected by a gallerie. The infant area is developed in one floor. It's characterized by an individual courtyard for each classroom. On the other hand the primary area is placed in a three floors building. It has a U shape to generate an entrance in the union of the activity spaces. And it allow a direct connection between the infant courtyard and the teenagers one. On the ground floor there are the common services and on the upper floors the theorical classrooms.

B

B' A'


Infant and Primary School inBurguillos, Sevilla.

Public Competition for Andalusia Goverment, for UNIA Architect.

11


12

Infant and Primary School inBurguillos, Sevilla.

Public Competition for Andalusia Goverment, for UNIA Architect. ground floor

LOCATION_ Spain.

San

Bernardo,

Seville,

BUILT AREA_ 4.036 m2 PROGRAMME_ 9 Junior classrooms, 18 primary classrooms, special education classrooms, multi-purpose classrooms, library, administration area, gym, kitchen and common services. A'

A'

GUIDELINES_ Different entrances for the two areas of junior and primary classrooms, the rehabilitation of the existing curved hangar in order to give it a funtional use. LIMITS_ The plot is next to the San Bernardo train station. There is a semicircular hangar made of bricks and metal trusses, belonging to the railway facilities of the early nineteenth century. STRATEGY_ A three floor volume is created to contain all the programme uses, it is connected by a flat cover with the existing hangar. The new building is divided in two parts, one of them is for common activities and the other is where all the main activities are developed. The hangar is refurbished, a new skin is created inside the old walls, generating a central corridor as an entrance to the new volumen. It is in fact the main object in the project, focus the attention in crossing routes.

section AA'


13

Extension of the Primary School , Vélez - Málaga, Málaga.

LOCATION_ Vélez - Málaga, little town near to the coast.

Public Contest for Andalusia Goverment, in collaboration with UNIA Architects.

BUILT AREA_ 3.500 m2 PROGRAMME_ 18 primary classrooms, special education classrooms, multi-purpose classrooms, library, administration area, gym and common services. GUIDELINES_ Expansion of primary classroom block, the existing one is just junion education. In addition to complete the services they offer, it's including a gym, a library and sports facilities. LIMITS_ Free space in the actual plot. The singularity is that the school should keep working during the time the build the new building without interrupt the classes. section AA'

STRATEGY A new building has been created connected to the original one by a covered gallery, that divided the space into two playgrounds, for each of the educational levels. The sport area and gym are located under the difference level wall, it allows to create to levels of playground.


14

Extension of the Primary School , Vélez - Málaga, Málaga.

access floor

Public Contest for Andalusia Goverment, in collaboration with UNIA Architects.

C

B

A'

A C'

B' section BB'

section CC'

ground floor


Office Building in Arcos de la Frontera, Cádiz.

Regional Contest in collaboration with UNIA Architects.

LOCATION_ It is located in a industrial area in Arcos de la Frontera, Cádiz. BUILT AREA_ 7.0 00 m2 PROGRAMME_ comercial shops, offices, multifuntional classrooms.

rental

GUIDELINES_ The project involves multifuntional and commercial uses. It conteins a central covered courtyard. LIMITS_ La parcela de 3.000 m2 de planta, se encuentra entre naves industriales y edificios comerciales, con un desnivel de 3m entre la vía principal y paralela segundaria. STRATEGY_ The main concept is the creation of a patio surrounding with different funtional spaces. The patio is covered by a concrete first skin and a second one made of a supporting structure microperforeted steel. The north and the south facade are covered with steel slats.

15


16

Office Building in Arcos de la Frontera, Cรกdiz.

Regional Contest in collaboration with UNIA Architects.

access floor north elevation

southeast elevation

A

A'

section AA'


17

Residential Housing, Bitterfeld-Wolfen, Germany.

Europan 12 Competition for AUREL VON RICHTHOFEN ARCHITEKTEN

visualization

site plan LOCATION_ Bitterfeld-Wolfen, Germany. BUILT AREA_ 16.000 m2 PROGRAMME_ 150 residential units for new families, young couples and singles. GUIDELINES_ Housing for new sport families. LIMITS_ An empty solar limited on one site by existing houses and on the other site by a low density forest. STRATEGY_ The planning is based on the assumption that the region of BitterfeldWolfen features a particular kind of positive “artificiality“, reflected in the approach to urbanism, landscape and architecture. This “artificiality” confirms the dynamic and innovative heritage of the region and is not to be confused with alienation. In return the design is informal, open and programmable finding a tangible expression the cubic modular volumes.


18

PRODUCIDO POR UN PRODUCTO EDUCATIVO DE AUTODESK

PRODUCIDO POR UN PRODUCTO EDUCATIVO DE AUTODESK

Residential Housing, Bitterfeld-Wolfen, Germany.

Europan 12 Competition for AUREL VON RICHTHOFEN ARCHITEKTEN

100m2

90m2

60m2

110m2 100m2 90m2

110m2 120m2 60m2

60m2 60m2

different typologies PRODUCIDO POR UN PRODUCTO EDUCATIVO DE AUTODESK

PRODUCIDO POR UN PRODUCTO EDUCATIVO DE AUTODESK

ground floor + axonometric view

PRODUCIDO POR UN PRODUCTO EDUCATIVO DE AUTODESK

PRODUCIDO POR UN PRODUCTO EDUCATIVO DE AUTODESK

masterplan PRODUCIDO POR UN PRODUCTO EDUCATIVO DE AUTODESK


19

Academic Projects


Visiting Center in Rio Tinto Geopark, Riotinto Mines, Huelva, Spain.

20

Thesis project

visualizaci贸n


21

Visiting Center in Rio Tinto Geopark, Riotinto Mines, Huelva, Spain. Thesis project

LOCATION_ Rio Tinto Mines, Huelva, Spain BUILT AREA_ 2024 m2 PROGRAMME_ Geopark Visitor Center_ Space for expositions, Suvenirs Shop, Restaurant, Administration Offices, Practical Class, Auditorium.

ground floor

Investigation Center_ Management Offices, Processing Laboratory, Analitic Laboratory Resting area, Microbigyology Laboratory, Geology Laboratory, Archives, Patio, Park, Parking for 100 vehicles. GUIDELINES_ Supporting facilities for the Geopark Public park Planning the ground.

-1 floor

LIMITS_ A rectangular solar, limited only for the English Neighborhood west and public buildings south. STRATEGY_ The building will be an access for the own Geopark. Gate way to the Geopark. The buildings fold themselves to be able to create an entrance and services areas.

roof floor


Visiting Center in Rio Tinto Geopark, Riotinto Mines, Huelva, Spain. Thesis project

elevation

section

22


Visiting Center in Rio Tinto Geopark, Riotinto Mines, Huelva, Spain.

23

Thesis project

constructive section


Visiting Center in Rio Tinto Geopark, Riotinto Mines, Huelva, Spain. Thesis project

visualization

24


Information Center in the fortification of Rada, Navarra, Spain.

25

Hispalyt Contest 2013_Sloped roof.

visualization

LOCATION_ Rada, Navarra, Spain BUILT AREA_ 360 m2 PROGRAMME_ expositions room, administration office, laboratory room, archives, internal patio, 30 parking plots. GUIDELINE_ excavation under the ruins. LIMITS_ the fortification area. STRATEGY _ the project focus in the idea of create a cover for the ruins. This idea develop the concep of cover without touch the ground, taking in consideration the importance of the element that it is covered. In parallel it creates a building for serve the needs of expositions and facilities for the complex meanwhile the proper ruins are cover by a light sloped roof which follow the same idea.


Information Center in the fortification of Rada, Navarra, Spain.

26 roof plan

previus diagram

Hispalyt Contest 2013_Sloped roof.

sections

ground and -1 floor


27

Houses in Berlin

GUIDELINES_ Rectangular solar between medians (30 x 5 m).

Arquia Contest 2011

LOCATION_ Berlin, Germany BUILT AREA_ 250 m2 PROGRAMME_ 2 houses for: - a single novelist who loves cooking - a computer programer who loves sport

LIMITS_ Keep up the ground floor free to permit the access to the interior yard. STRATEGY_ Housing developed in high, with the main axis of the staircase leading to different plants. The Ground floor only has the staircase to staying free the passage to the yard. Homes have large windows, high ceilings and large spaces. The space rotate around a furniture that contain the stairs and create the different spaces in the house.


Houses in Berlin

28 Three levels

Arquia Contest 2011

section


29

Homeless Center, Seville Academic Project

+1

LOCATION_ Seville

0

BUILT AREA_ 950 m2 PROGRAMME_ Social use: Multifuntional room for social activities, internal courtyard, social workshops, dining rooms for the homeless. Private use: Beds for the homeless, treatment room, living room, administration and management offices, specialized care room, lockers, laundry, animal shelter. GUIDELINES_ Recover the public space, welcoming the homeless, occupational activities. LIMITS_ Plot size of Expo `92 currently unused, bordered by roads at two different high. STRATEGY_ The idea is create a big access that allows the views to the river and conform a public space previous to the building. Over it there is a large block that contains the rooms for the homeless. And under it, the social and public activities are developed.

-1


Homeless Center, Seville

30 sections

Academic Project

secci贸n constructiva

model


31

Public Housing I. Old Quarter of Seville.

-1

Academic Project

LOCATION_ Seville BUILT AREA_ 380 m

Roof floor 2

0

PROGRAMME_ 6 social housing (60 m2 each one) GUIDELINES_ Vertical growth, create new common areas for the community neighbours in old quarter. LIMITS_ Housing plot of irregular form, entrance street of 1,33 m. wide. STRATEGY_ The idea is to create a vertical house hungging on the medianera. And depends on the different level the activity and the space change settling to the necesities. The common areas are on the ground floor, where everything starts and the staircase is the common space linking all rooms inside the house. Landscaped areas on deck.

+1

section

+2


32

Public Housing II. Old Quarter of Seville.

+2

Academic Project

sections

+1

0

LOCATION_ Seville BUILT AREA_ 178 m2 PROGRAMME_ 3 social housing (60 m2 each one) GUIDELINES_ Horizontal growth, create new common areas, community neighbors in old quarter.

-1

LIMITS_ Solar between houses and a part of the roman wall. STRATEGY_ Entrance to level -1 that conect with an internal courtyard which conect the building in the different levels. The common areas are on the ground floor and deck, spacious homes with shared spaces. Landscaped areas on deck.

detalle


Tourist Center in Oporto, Portugal. Arquia Constest 2010

LOCATION_ Oporto, Portugal BUILT AREA_ 90 m2 PROGRAMME_ Tourist Information Temporary Exhibition Hall.

Desk,

GUIDELINES_ Singular building LIMITS_ Rehabilitation of the building near to the Bus Station in Oporto. STRATEGY_ Rehabilitation of the building reinforcing the back wall.The front wall is used to create a new structure. The cladding works as a gradient module between the exterior and interior. The building works as a flashlight at night.

funtional diagram

33


34

Tourist Center in Oporto, Portugal.

2

Arquia Constest 2010

secciones

1

0

alzado


LOCATION_ Port au Prince, Haiti

Emergency Housing, Haiti. Academic Project

35

BUILT AREA_ 12m2 PROGRAMME_ Emergency housing module, bedroom, bathroom, kitchen. GUIDELINES_ Manufactured emergency home, easy transport and assembling. LIMITS_ Modular units that allows growth. STRATEGY_ The structure is prefabricated with cladding, activity units that can be combined, the house is divided by the entrance in two differents units. Each units contains a specific and funtional furniture.


36

Emergency Housing, Haiti. Academic Project

elevation

connection

detail

section


Tourist Office in Bregenz, Austria. Academic project

37


Park "The San Miguel Gardens" and the " El Caminito " Urban Garden. Built project for City Hall of Malaga, Spain.

38


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.