EMERSON PARK CECIILA RUIZ LEAL
SITE LOCATION
SITE LOCATION
Luis
0
MILES
0.5
1
N
Green Space downtown area and old town area are below the World Organisation Standards
SPORTS FACILITIES AT SAN LUIS OBISPO SLO Population
Sport Facilitiess
The main Sports Facilities SLO has, is CalPoly’s facilities. SLo has no public sapces with recreative activities. The small southern facilities provide for certain group and specific activities.
0
MILES
0.5
1
N
Sport Facilities Site
STUDY CASES
CENTRO CULTURAL SESC of Pompeia [Sport Facilities]
ARCHITECTS: Lina Bo-Bardi PLACE: Pompeia, Sao Paulo, Brasil DATE: 1986
Floor Plan
Sports Block elevation
Program:
1. Sports block- pool,gym & courts 2. Snack Bar: dressing rooms, gymnastics room, wrestling and dance. 4. Mirrors,solarium and waterfall 5. Storage and maintenance 6. Studios (artist) 7. Photography labs 8. Theater 9. Foyer 10. Restaurant-bar, beer hall. 11. Cocina 12. Dressing rooms and dinning room Zoning (workers) 13. Sitting area 14. Library 15. Expo area 16. Offices
Proyect elevation
Privado Private
19.6%
Public Público
62.4%
Services Servicios
8.8%
Circulations 9.2% Circulación
Sport Block section
CENTRO CULTURAL SESC
The SECS Pomeiia Cultural Center, is located in a old drums factory. The cultural center was complemented by the architect with two large vol umes of exposed concrete. The cul tural center began with the idea of being architecture for leisure. The program offers different spaces for sports, culture, restaurants and offic es. The two large volumes emerged from the demand in the area.
PABELLÓN DE CUATRO USOS of Chile [Sport Facilities] ARCHITECTS: Felipe Assadi + Francisca Pulido PLACE: Los Vilos, Región de Coquimbo, Chile DATE: 2014
Floor Plan
Zoning
Privado
30%
Private Público
20%
Public Servicios Services
50%
SPORT FACILITY
Barcelona ARCHITECTS: FBatlle i Roig Architects PLACE: Barcelona, Spain DATE: 2005
Privado
30%
Público
60%
Circulación
10%
Zoning Master Plan
Section II
Section 1
WHY?
ACTUAL SITE Emerson Park is destined to public space with outdoor basic sports facilities. This park provides with an urban orchard guarded by the community, a basketball court among others. A disuse of these spaces and the physical limits like a fence has caused the park to become solitary and a dysfuntional space.
TODAY
Today, Emerson Park a useless concrete slab extends through a large space along the only existing edification the parks and recreation office. has physical boundaries like a fence and nature handled by man creating an enclosed and abandonned space that is destined for the community.
SLO’S POPULATION
DESIGN INTENTION Based on the study of San Luis Obipo’s population and due to CalPoly, a great percentage of the population are students. Being SLO a small city many students and the ret of the community live nexto to each other, without having any type of interaction. The porject aims to increase this interaction between the community and Cal Poly students. Being this the users of the pubils space, from children to elderly..
URBAN DESIGN STRATEGY Slo’s population has a large percentage of students, causing segregation between CalPoly students and the rest of the community. This projects aims to promote social cohesion between Cal Poly students, and Slo’s community through open and enclosed complimentary leisure spaces respecting the exisitng uses.
SITE ANALYSIS
SITE ANALYSIS Transport Accesibility
Land Uses
Office Residencial
Bus Routes Downtown Trolley Bike Routes Pedestrian Routes Bike Parking Bus Stop
Commercial Commercial/Service Public Facility Conservation Area
Main Streets & Natural Conditions
M on te re
yS t.
Exisiting Uses
w H
Broad St.
y
1 10 er a
St .
Nipomo St..
Buc h
on
St.
St.
mo PIs
St . Pa cifi c
Ma rs
SLO Mission Museums Episcopal Church Office Services Retail/Restaurants Parking Residential Walking radius= 5min Bike radius 3 min
hS t.
Hi gu
Beach St..
Farmer’s Market Area Old Town District Downtown District
IMMEDIATE CONTEXT ANALYSIS Dimensions
Existing Circulations CIRCULATIONS
CIRCULATIONS 1 2.2 49 / 1m 0.2 5 1
ft
10 4.4
4m /
34 2
.65
ft
Context Building Hieghts
Existing Uses
& n ks atio Par ecre R
’s en ildr rea Ch lay A P
Of
fice
ki Par s t ea Re Ar
ior ter Ex Gym
ng n ba s Ur a r m F
1 Story Building 2 Story Building 3 Story Building Episcopal Church P
MASTER PLAN SITE ON MASTERPLAN
N
PROGRAMATIC MASSING
NOLLI PLAN
URBAN DESIGN STRATEGY Guiding Circulation Axis The urban design idea is based on the strongest element of the context, Saint Joseph’s church. The principal circulation axis is given by the church , the exisiting basketball court limits the secondary circulation axis. The main axis is part of a permiteral circualtion. crossing the whole block giving indirect Access to the different spaces.
URBAN DESIGN STRATEGY Guiding Circulation Axis
PROGRAMMATIC MASSING
The starting point of the program is based on the existing uses and activites, then complimented with sports facilities. The program is divided in three senctions, indoor program, community program and outdoors program, each with specific spaces and uses complimenting each other.
PROGRAMATIC MASSING Indoor Spor Progra ts m
Heal
th
Child ca r e
Adm & in.
1
qm 50 s
Studio R
sqm 200
o om
Comm unity Progra Facilities m
Gy m
350
Outdo
Co m sqm Rooms munity Ser vice Cafe s
sqm 220
140 55
ren’s P
Urb an
Farm
Pool
Semio
all Co
limpic
Pool
ur t
lay Ar e
a 20 0 s
qm
40 0 s
s 1550
Total sqft: Total sqm:1,200 sqm
Baske tb
sqm
Child
Public
sqm
or s Pro gram
m2
65 0 s
qm
qm
EXISTING USES
PROPOSED PRGRAMATIC MASSING
PROPOSED PROGRAMATIC MASSING
TING USES
Sports Program
Community Program n ks & tio Par ecrea R
Community Rooms Service Cafeteria Restrooms Community Pools Children’s Play Area
ice Off
g kin Par en’s ildr ea Ch lay Ar P
st e a Re Ar
ior terym x E G
nO ks & tio Par ecrea R
ffice
ar nF ba r U
Existing uses: Basketball court, children’s play area, exterior gym, parking and urban farms.
r ki Pa
n ba Ur rms Fa
ng
Gym Studio Rooms Health Program Administration Childcare Room IT Office Lockers and Bathrooms Urban Farms
ms
The interaction will be given not only by the energy production but also by the architectural program. The Facilities have been chosen to satisfy CalPoly’s programs like STRIDE, POLYFIT and PHYSICAL EDUCATION WORKSHOP at the community with SLO’s facilities. The health program and childcare also, aremanged by CalPoly students, helping the community with their education at the same time impproving knowledge.
PROPOSED USES
PROPOSED CIRCULATIONS
Emergency Exit
Restrooms Community Rooms Cafeteria Service Community Pools Parks & Recreation Office
Gym Studio Rooms Health Program Administration Lockers and Bathrooms IT Office Basketball Court
The connection of the two spaces complemented by an open space create multiple nodes of interaction and experiences. The urban farms run along th principal circulation axis to create a liveable space through the complete block
MASTER PLAN
SC 1:500 N
MATERIALITY
Dan Palon translucent panel
Timber Cladding Facade
INDOORS SPORTS PROGRAM
Gym
Upper Floor
Childcare
Ground Floor Administration
Keyplan Health Program
SECTIONSECTION SECTION
Keyplan
Keyplan GSEducationalVersion
GSEducationalVersion
COMMUNITY ROOMS PROGRAM
Cafeteria Community Rooms
Children’s Play Area
Basketball Court ationalVersion GSEduc
SECTION COMMUNITY ROOMS
Cafeteria Community Rooms
Children’s Play Area Keyplan
GSEducationalVersion
ationalVersion GSEduc
Basketball Court
SC 1:150
ENERGY PRODUCTION
ENERGY PRODUCTION DIAGRAM Interaction nodes Gym Children’s play area Machinery Lighting Sound System
Main Axis
Park Lighting
Walking & Jogging
Park Lighting
Park Lights
HOW?
Spinning Charging Playing
Energy Production Tile
EXTERIOR VIEW
CONTEXT PERSPECTIVE
CONNECTIONS
N
INTERIOR PERSPECTIVE
ARCHITECTURAL PLANS
AR-01
SPORTS CENTER FLOOR PLAN
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL
UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
AR-02
SPORTS CENTER FIRST PLAN
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
AR-03
COMMUNITY ROOMS FLOOR PLAN
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
AR-04
SPORTS CENTER ROOFTOP PLAN
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
AR-05
COMMUNITY ROOMS ROOFTOPPLAN PROYECTO INTEGRADORES III
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
CECILIA RUIZ LEAL
UNITS:METRE
06.05.2016
SC 1:125
0
1
2
5
12
1
32.00
L+ 8.50
L+ 2.40
L+ 2.50
L+ 2.40 L+ 1.80
L+ 0.50
NORTH-WEST FACADE
1
12
32,00
L+8.00 L+6.60 L+5.10 L+4.00 L+2.50 L+ .50
SOUTH-EAST FACADE
AR-06
SPORTS CENTER FACADES
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
A
K
20,00
L+ 8.50
L+ 4.00 L+ 2.00 L+ 2.10 L+ 0.50
NORTH-EAST FACADE
SC 1:125
ucationalVersi
K
A
20,00
L+ 8.50
L+ 4.00 L+ 2.10
L+ 2.10
EAST FACADE
SC 1:125
ucationalVersi
AR-07
SPORTS CENTER FACADE
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
9
1
28,00 L+ 8.00 L+6.00 L+ 4.00 L+ 3.00
SOUTH-EAST FACADE
1
9
28.00
L+ 8.50
L+ 4.00
NORTH-WEST FACADE SEducationalVersion
AR-08
COMMUNITY ROOMS FACADES
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
G
A
12.40
L+ 8.00
L+ 4.00
AR-09
COMMUNITY ROOMS FACADES
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
G
A
20.00 4
8
H
J 8
FCL+ 8.15 FFL+ 7.50
Gym
Studio 1
FCL+ 4.15 FFL+ 3.50
Administration
Childcare
FFL+/- 0.00
SECTIONTION B-B’ 12
10 8
8
7 32.00
2
5 8
8
FCL+ 4.15 FFL+ 7.50
Gym
Studio
FCL+ 4.15 FFL+ 3.50
Childcare
Administration
Nutrition
FFL+/- 0.00
SECTION A-A’
AR-10
SPORTS CENTER SECTIONS
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
G
A
12.40
FCL+ 8.00
FFL+/- 0.00
SECTION A-A’ 1
3
4
9
28,30
9,30
9,30
9,30 FCL+ 8.00
FFL+/- 0.00
SECTIONTION B-B’
AR-11
COMMUNITY ROOMS SECTIONS
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
Wood Floor
ST-12
COMMUNITY ROOMS SECTION DETAIL PROYECTO INTEGRADORES III
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
CECILIA RUIZ LEAL
UNITS:METRE
06.05.2016
SC 1:25
0
1
EMERSON PARK, SLO
Wood Floor
Rubber Mat Floor
ST-13
SPORTS CENTER SECTION DETAIL
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL
UNITS:METRE
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:25
0
1
STRUCTURAL CRITERIA
ST-14
SPORTS CENTER STRUCTURAL PLAN
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
ST-14
SPORTS CENTER SECOND FLOOR STRUCTURAL PLAN
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
ST-16
COMMUNITY ROOMS STRUCTURAL PLAN
PROYECTO INTEGRADORES III
CECILIA RUIZ LEAL UNITS:METRE
EMERSON PARK, SLO
ITESM CAMPUS QUERÉTARO
06.05.2016
SC 1:125
0
1
2
5
SPORTS CENTER STRUCTURE
Steel Structure
sc 1:150
Keyplan
SC 1:200
NATURAL & ARTIFICIAL LIGHTING CRITERIA
A.C SYSTEM CRITERIA
SC 1:150
A.C Mechanical Room
HIDRAULIC ISOMETRICS Community Rooms Hidraulic Isometric
Sports Center Hidraulic Isometric
SANITARY ISOMETRICS
Community Rooms Hidraulic Isometric
Sports Center Sanitary Isometric
Sewage Greywater