Ethan Zhang Portfolio Summer 2019 [LEGACY]

Page 1

ETHAN ZHANG PORTFOLIO 2019


ABOUT. My name is Yi Chen (Ethan) Zhang. I am currently a third year architecture student attending the University of Waterloo School of Architecture. I am a hard working, ambitious individual driven to learn. I take pride in my projects with full responsibility and commitment to achieve my goals. Some of my hobbies include drawing and photography. The following projects aim to reflect my abilities, interests and progress I have gained as a student of design. I am always eager to learn and develop new skills. I am also bilingual, being proficent in English, Mandarin and basic French. Thank you for your time. @. ethanzhang22@hotmail.com #. 416 618 6529 www.ezarch.net

i


CURRICULUM VITAE Education

School of Architecture, University of Waterloo Cambridge ON.

2016 - 2021

Wexford Collegiate School of the Arts Toronto ON.

2012 - 2016

Candidate for Bachelor of Architectural Studies Honours Co-op

O.S.S.D. with Specialization in Visual Arts Honours for academic excellence

Experience

SEPT-DEC. 2018

Architectural Assistant

HLW International, corperate/commercial CD and revisions

Architectural Intern

JAN-APR. 2018

Kohn Partnership Architects, residential design and drafting

Skills

Achievements

Rhinoceros 3D AutoCAD Autodesk Revit Photoshop Illustrator InDesign

Maxwell Render V-Ray Render Microsoft Office Hand Drafting Model Making Sketching

Photography Premier Pro Work Shop Tools

Canadian Institute of Steel Construction

Architecture Student Design Competition Finalist

School of Architecture Award for Outstanding Design First year Studio Design course excellence

University of Waterloo President’s Scholarship Achieved Entrance average of 90% - 94.9%

2017 2016 2016

Dean’s Honours List

2016 - 2017

Wexford Artist of the Year Award

2015 - 2016

Academic Achievement above 80% Best Artist voted by student body and community

ii


iii


iv


v


PROJECTS. AGORA

//01

FACADE

//07

OASIS

//11

OFFSET

//15

ALLURE

//21

PARA[SITE]

//27

PROFESSIONAL

//33

ARTWORK

//39

vi


AGORA. The Agora; a public gathering space in ancient Greece which fulfills the function of athletics, art, politics and marketplace within the city. The Romans later adopted the idea of the agora after the conquer of Greece and converted it into something of their own, it was known as the marketplace of Caesar and Augustus.

01

CISC COMPETITION FINALIST IN COLLABORATION WITH MAGDALENA KACZMARCZYK The bus stop is a modern symbol of travel, connection, expansion. This architectural structure is what brings the rest of the city to the user. It shelters from the elements, yet is transparent and open. More often than not, the people collected under this roof are strangers bound together by the mutual goal of traversing the network of the city, enabling it to become a sort of urban assembly. An issue arises to tourists in big cities however; travel is a nuisance. Bus stops are hard to find, paths are not clear, one does not know what to see.


GROUND PLAN

The Metamorphoses by Ovid raises an interesting solution. “Make an amalgamation and give it new meaning�. The traditional structure of the bus stop can now be transformed into a prominent landmark that tourists can understand anywhere. Opening up bike storage, having a ticket dispensary, a small repose, as well as an arid, sheltered hub in the same area allows public transport to become available to anyone. And in combining these elements and making the structure elegant yet hard to miss, a new meaning is derived; it is not just a bus stop, but now a public servant.

02


NORTH ELEVATION

SOUTH ELEVATION

HORIZONTAL SECTION

03


PROGRAM. The structure features three main modular components that may be rearranged and repeated in various ways to form the whole. Based on the context of the site, it may form a long row of interconnecting segments.

EAST ELEVATION

The 3 Modular structures include: [1] A bus shelter that serves as shelter from elements and emphasizes transparency. [2] A sheltered bicycle storage unit that doubles as seating space.

WEST ELEVATION

[3] A hub that provides seating and emphasizes a gathering space which includes maps.

04


STRUCTURE.

05


CLADDING SYSTEM

BRACING SYSTEM

STEEL JOINTS

WALL SECTION

06


FACADE. This project focuses on creating a micro environment in an urban setting such as a city centre or busy street. With the size restriction of 8m by 8m by 4m, the building is a retreat from the concrete jungle for one or two individuals. The program created is based on the habitant’s experience while circulating the interior. Initially from a semi open and public microclimate to a quiet and isolated construct. The façade’s design reflects this principle with the play of platonic surfaces. Such is achieved by composing transparent, translucent, and solid material to frame the outdoor environment.

07


08


FRONT ELEVATION

SECTION A

09


ROOF PLAN

SECOND FLOOR PLAN

FIRST FLOOR PLAN

10


11


OASIS. Located in the Florida Everglades, the Oasis facility serves as an off – grid transportable research station suitable for two residents. Striving for zero net energy, it features 35 photo-voltaic panels and a rainwater collecting roof. The structure’s orientation and dogtrot shape provides air flow and passive ventilation to cope with hot humid temperatures. Furthermore, construction with steel columns, engineered timber, and fiber concrete cladding allows for durability. In collaboration with Magdalena Kaczmarczyk

12


SECTION A

SECTION B

SECTION C

FLOOR PLAN

13


FOUNDATION STRUCTURE DETAIL

WALL SECTION

14


OFFSET. The “Offset� is a studio project set in specific sites of the historic district in downtown Cambridge, Ontario. It challenges a unifying design regarding historic representation and modern architectural moments. The city is known for its Grand River and the bridges that span it. In this design, there is a basis of contrast that emphasizes the spanning elements. One portion of the building is statically grounded, while the other floats like a bridge. It features aspects of both additive and subtractive architecture; creating private living space as addition, and public court space as subtraction. Furthermore, by utilizing materials such as concrete, steel, and timber, the composition choices respect the overall aesthetic of the historic city. 1A Studio Final Design Award

15


16


17


NORTH ELEVATION

WEST ELEVATION

SOUTH ELEVATION

EAST ELEVATION

18


19


20


ALLURE. "The Temple City, where the profane and sacred are coalesced and blurred. This city is derived from the contrasting notions of the city as being preserved, destroyed, sacred, and mundane. Everyday function is graced with the divine, as the navigator throughout their course on a secular path, comes across places of sanctity, articulated through perfect spheres offering moments of repose.�

21


PLAN VIEW

22


Design precedence taken from previous studio project "The Temple City."

23


As a fragment of the Temple City, Allure aims to capture the extended threshold condition of entrance. In a city where the profane spaces dance with the sacred, a choreography of architecture is established. Taking precedence from select clips of Persona (1966) and Last Year at Marienbad (1961), Allure captures the enticing magnetism of entering a threshold.

The form of the pathway mimics a duet of dance between two partners. Inspired from the dance routine of Slip (2015), the pathways act as complimentary partners. Allure strives to actively allow people to become the dance of the city – one step, one rhythm at a time. Guiding the pacing and flow of movement, it is a choreograph of sacred curiosity that slices through the profane cluster of the city.

24


PRECEDENCE AND ROUGH WORK

TEMPLE CITY CONCEPT SKETCH

25


SELECT “ALLURE” PATHWAY SKETCHES

SLIP (2016) DANCE VIDEO COREOGRAPHY SKETCHES

26


PARA[SITE].

KEY PLAN

27


Para[SITE] is a conceptual landscape study set along the Grand River located in Cambridge, ON. This project explores the potentials and possibilities of landscape architecture. The designed structure of this project mimics tendrils of a parasitic organism with vegatative properties. The vine-like pathways connect many existing elements on site; from the natural riverbank, to the man-made industrial bridge, to the historic floodwall bearing historic properties. It acts as an all encompassing public park while doubling as pedestrian walkway. It strives to merge together greenspace without alienating the built environment

28


< SECTIONAL DETAILING OF CONNECTIONS

29


EAST ELEVATION

NORTH ELEVATION

WEST ELEVATION

30


B.

A.

C.

EXPLODED AXONOMETRIC N.T.S.

STRUCTURE. 31


A. HOST: THE HISTORIC

B. HOST: THE INDUSTRIAL

C. HOST: THE NATURAL

32


PROFESSIONAL. HLW INTERNATIONAL LLP NEW YORK CITY 1. CONFIDENTIAL TECH CLIENT This project is set in the Chelsea district of New York City. It is a two-floor renovation consisting of new classrooms and business areas. Tasks included setting up DD and CD drawings for both levels on AutoCAD, to completing/revising and issuing all documentation. All drawings were drawn and issued in a span of 4 months in cooperation with one other architect. Responsibilities also included attendance of client meetings, creation and revision of drawings, and issuing documentation.

Project currently in construction

33


ELEVATOR

DOWN

1ST FLOOR PLAN 18289

12/07/2018

NTS

SKA-01

CCD1 DRAWING - 1ST FLOOR PLAN

c 2009 HLW International LLP

Render of drafted vestibule by Jack Morton

34


HLW INTERNATIONAL LLP NEW YORK CITY 1. CONFIDENTIAL TECH CLIENT Draftings Responsibilites: - CONSTRUCTION PLANS - PTS PLANS - FINISH PLANS - RCP PLANS - ELEVATIONS - FINISH SCHEDULE - DEMOLITION PLANS

G

F

E

D

C

B

NEW SCHEDULED LIGHT FIXTURE TO MATCH WOMEN'S ROOM

PROVIDE STONE THRESHOLD

8

JANITOR CLOSET

PF-7

PF-8

02-002B

TA-6

TA-5 OFFICE

TA-11

TA-5

TA-2

TL-1 P-1 B-1 C-1

TA-8 TA-9

02-007

NO. AC-2 TA-5

E2 A500

02-006 PF-5

TA-9

PAINTED WOOD TRIM TO MATCH EXISTING

IC

PF-3

MEN'S ROOM

111 8TH AVENUE :: NEW YORK, NY 10011

TA-8

NEW MIRROR W/ METAL TRIM

TA-3 TA-15 PROVIDE STONE THRESHOLD

A

PT-1

AC-1

TA-5

PF-1

PF-6

PF-2 TA-14

ISSUE OR REVISION ISSUE FOR CONSTRUCTION ISSUE FOR FILING

PF-6

AC-3

1'-6"

TA-10

DATE 12/07/2018 12/07/2018

PF-5

TA-2

AC-1

PROVIDE STONE THRESHOLD

7

TA-1

PANTRY 02-002

TA-2

TL-1

PF-3

PF-3 E

(N)

TA-2

DOOR OPERATOR

E

TA-2

TA-2

PARTIAL 2ND FLOOR PLAN

E7

ADA BATHROOM ELEVATION

C7

SCALE: 3/8"=1'-0"

SCALE: 3/4"=1'-0"

ADA BATHROOM ELEVATION

B7

SCALE: 3/4"=1'-0"

TA-20 PROVIDE STONE THRESHOLD

TA-11 -

WOMEN'S RESTROOM

-

02-005

-

TL-1 P-1 B-1 C-1

TA-8 PROVIDE 24X36 MIRROR W/S/S TRIM AC-3

PF-5

6

E

N

E

AC-2

PF-6

TA-15 TA-8

URG

TA-9

TA-10

E3 A500

PROVIDE 24"X6'-0" MIRROR WITH METAL TRIM. LOCATION TBD.

TA-5

TA-2

TA-6

LOUNGE 02-008

AC-1

4'-2" _ 3 4" 1'-6

17'-1"

_ 3 12'-6 4"

7'-9

13'-3" 9'-5 7

3 12'-5_ 4"

1

_ 16 " _

17'-10

_" 8

TA-8

AC-1

2'-4"

15'-8"

ALL PLUMBING FIXTURES TO REMAIN. ACID WASH GROUT. PROVIDE NEW PAINT FINISH. PROVIDE NEW SCHEDULED ACCESSORIES.

OPEN TO BELOW

NEW TOILET TISSUE DISPENSERS.

5

16TH STREET 22'-10 5 _ 8"

9'-8"

UP

SCALE: 3/8"=1'-0"

02-004

AREA OF WORK

KEY PLAN

PARTIAL 2ND FLOOR PLAN

E4

MEN'S RESTROOM

9TH AVENUE

TA-11

EXISTING PARTITION MOUNTED TISSUE DISPENSERS TO BE REMOVED. PATCH TOILET PARTITION. PROVIDE

15TH STREET

_ 1 2"

2'-5

_ 1 2"

8TH AVENUE

TA-2

TA-2

N

CLIENT: AC2

PROVIDE STONE THRESHOLD

ONE CITY BLOCK 111 8TH AVE., NY, NY 10011

AC3

ADA BATHROOM ELEVATION

C4

SCALE: 3/4"=1'-0"

SS-01

2ND FLOOR ENLARGED BATHROOMS

G4

PL-01

SCALE: 3/8"=1'-0"

MICROKITCHEN EQUIPMENT AND ACCESSORY SCHEDULE TAG

4

IC URG

Description

PROJECT MANAGEMENT: TACONIC MANAGEMENT CORP 118 8TH AVENUE NEW YORK, NY 10011 212 243 5060

NOTE: NO COMMERCIAL COOKING EQUIPMENT ON EQUIPMENT SCHEDULE

Manufacturer

UNDER COUNTER ICE MACHINE UNDER COUNTER FRIDGE

ADA BATHROOM ELEVATION

B4

SCALE: 3/4"=1'-0"

URG

TBD SUMMIT

Model

Provided by

FF433ESSSTBADA

CONTRACTOR

Comments

Installed by

CONTRACTOR

PROVIDE ELECTRICAL OUTLET. PROVIDE WATER LINE FOR ICE MAKER IF NECESSARY

NEW MIRROR WITH METAL TRIM TO MATCH EXISTING

PT-1 E3

SCALE: 1/2"=1'-0"

ARCHITECT:

NEW TOILET PARTITION TO MATCH EXISTING

NEW SCHEDULE LIGHT LIGHT FIXTURE

HLW INTERNATIONAL LLP 115 FIFTH AVENUE, 5TH FLOOR NEW YORK, NY 10003 212 353 4600

EXISTING TO REMAIN

LOUNGE ELEVATION REMOVE EXISTING LIGHT FIXTURES AND REPLACE WITH NEW TO MATCH EXISTING

MEP ENGINEER:

AC2

TA-1

CODE CONSULTANT:

PF-5

OUTLET LOCATIONS TO BE COORDINATED WITH FINAL COUNTER LAYOUT

TA-2

6"

PF1

PF2

EXISTING SINK AND FAUCET TO REMAIN

SS-01

IC

MILROSE CONSULTING 498 SEVENTH AVENUE, 8TH FLOOR NEW YORK, NY 10019 212 894 0145

PF-6

EXISTING MIRROR TO REMAIN

AC1

3

ROBERT DERECTOR ASSOCIATES 19 W 44TH STREET NEW YORK, NY 10036 212 764 7827

NEW WOOD TRIM TO MATCH

AC-1

PF-3

PL-01

STRUCTURE TONE:

NEW FINISHES PROVIDE NEW COVER PLATE AT OUTLET

EXISTING TILE

330 WEST 34TH STREET, 11TH FLOOR NEW YORK, NY 10001 212 481 6100

EXISTING FINISHES

NEW TILE TO MATCH EXISTING

TL-1

EXISTING TO REMAIN

BASE TO BE TILE

E2

SCALE: 1/2"=1'-0"

LOUNGE ELEVATION

TOILET ACCESSORY SCHEDULE TAG

TA-1

2

TA-2

TA-3 TA-4 TA-5 TA-6 TA-7 TA-8 TA-9 TA-10 TA-11

1 TA-14 TA-15 TA-20

Description

Manufacturer

SEAT COVER DISPENSER BOBRICK WASHROOM EQUIPMENT INC. COMPACT SIDE BY SIDE DOUBLE ROLL GEORGIA PACIFIC BATHROOM TISSUE DISPENSER & QUIK COMPACT CHANGE DISPENSER MOUNTING BRACKET. RECESSED SANITARY NAPKIN DISPOSAL BOBRICK WALL MOUNTED HAND DRYER DYSON ADA GRAB BARS ADA GRAB BARS VERTICAL ADA GRAB BARS AMBULATORY BATTERY OPERATED, RECESSED AUTOMATIC TOWEL DISPENSER BATTERY OPERATED, RECESSED AUTOMATIC TOWEL DISPENSER BATTERY OPERATED SENSOR SOAP DISPENSER WALL MOUNTED HAND DRYER WALL HOOK BABY CHANGING STATIONS BATHROOM PARTITION

BOBRICK BOBRICK BOBRICK GEORGIA PACIFIC

WOMEN'S ROOM ELEVATION

B2

SCALE: 3/4"=1'-0"

WOMEN'S ROOM ELEVATION

PLUMBING FIXTURE SCHEDULE

Model

Finish

B-4221

STAINLESS STEEL

56796A, 54019

STAINLESS STEEL FOR TISSUE DISP. GRAY FINISH FOR QUIK CHANGE DISP. STAINLESS STEEL GRAY FINISH

B-35303 AIRBLADE MK2 AB14 144225-01 B-5806 B-6806 X 18, 36, 42 B-5806X36 59591

C2

SCALE: 3/4"=1'-0"

Type Comments

59466 ENMOTION FG402241

DYSON DAVIS DOTS KOALA KARE TO MATCH EXISTING

AIRBLADE 144225-01 GRAY FINISH B-672 KB101 TO MATCH EXISTING

Manufacturer

SINK LOW FLOW FAUCET TOILET

PF-5

PF-7

PINOIR WALL MOUNT BATHROOM KOHLER SINK WITH SINGLE FAUCET HOLE JULY SINGLE HANDLE FAUCET WITH KOHLER ESCUTCHEON JANITOR'S CLOSET SINK AMERICAN STANDARD

PF-8

JANITOR'S CLOSET FAUCET

Model

ELKAY ELUHAD211555PD AMERICAN STANDARD 4101.301.F15 TO MATCH EXISTING WHITE. K-2035-1-0 K98146-4-CP

Comments STAINLESS STEEL

NEW SCHEDULED DOOR

PT-1

W/FLUSH VALVE TO MATCH EXISTING. OR APPROVED EQUAL TO MATCH EXISTING SINKS. OR APPROVED EQUAL TO MATCH EXISTING FAUCETS.

PT-1

PAINTED WOOD TRIM TO MATCH EXISTING

LAKEWELL SERVICE SINK 7692.008 AMERICAN STANDARD SERVICE FAUCET 8340.235

TA-8

AC-1

NEW WOOD TRIM TO MATCH EXISTING

AC-3 TA-2

TA-11

ACCESSORY TAG

STAINLESS STEEL

GEORGIA PACIFIC

Description

PF-1 PF-2 PF-3

PF-6

SATIN FINISH SATIN FINISH SATIN FINISH STAINLESS STEEL

RUBBERMAID ONE SHOT

TAG

AC-1 AC-2

SHOWER ROOM ADA BATHROOM PROVIDE COAT HOOK WITH BUMPER AT EACH DOOR

AC-3 AC-4

Description AUTOMATED TOUCHLESS BATTERY OPERATED COUNTER MOUNTED SOAP DISPENSER AUTOMATED PAPER TOWEL ROLL DISPENSER AUTOMATED TOUCHLESS SOAP & SANITIZER DISPENSER METRO SHELVING

Manufacturer

Model

Comments

GP ENMOTION

52065

9.125" X 4.625" X 11.563" CHROME FINISH

GP ENMOTION

59466A

GP ENMOTION

52060

16.4" X 13.3" X 8" STAINLESS STEEL FINISH 11.75" X 6.45" X 3.95" STAINLESS STEEL FINISH

TA-1

Drawing Title:

2ND FLOOR ENLARGED BATHROOM PLAN AND ELEVATIONS SCALE:

DATE:

DRAWN BY: EXISTING TILE

TBD

WHERE NEW ACCESSORY INSTALLED PATCH TILES AND TRIM AS REQUIRED

TL-1

1

DRAWING NO.

EZ

12/07/2018

PROJECT NO.

18289

A-500.00

NOTE: PROVIDE BLOCKING AS APPLICABLE FOR ALL SURFACE MOUNTED AND WALL RECESSED MOUNTED TOILET ACCESSORIES.

F1

BATHROOM DETAIL

C1

SCALE: 1/8"=1'-0"

SCALE: 3/4"=1'-0"

G

F

BATHROOM DETAILS AND ELEVATIONS

35

E

D

WOMEN'S ROOM ELEVATION

C

B1

SCALE: 3/4"=1'-0"

B

WOMEN'S ROOM ELEVATION

9 OF 10 A

c 2016-16003-HLW International LLP


B

3 1/2

NORTH EXTENT J

3 3/8

ENSURE COLUMN ENCLOSURE IS COORDINATED WITH NEW PIPING LOCATIONS.

S

N.I.C.

6 1/2

6

HM FRAME TO BE COORDINATED WITH EXISTING PARTITION. PATCH PARTITION AS REQUIRED TO ACCOMMODATE NEW DOOR.

H

AREA OF WORK 23

5

01-004B

2

M1

R

TYP.

04

5

TYP.

9

G

UTILITY CLOSET 1

EXISTING TO REMAIN.

2

PROVIDE GYPSUM BOARD ON METAL STUD FRAMING AT ALL COLUMN LOCATIONS.

3

PROVIDE GYPSUM BOARD HEADER ABOVE TO ACCOMMODATE MOVEABLE PARTITION. PROVIDE (2) 2X6 HEAVY GAUGE STUD WITH BLOCKING. PROVIDE THREADED ROD THROUGHOUT HEADER TO EXTEND TO BOTTOM OF HEADER. COORDINATE WITH OPERABLE PARTITION SPECIFICATIONS.

TYP.

2

01-006

Q

6

MOVEABLE PARTITION BY OTHERS.

7

PROVIDE NEW METAL AND GLASS VESTIBULE ENCLOSURE.

8

PROVIDE LAMINATION AT STAIR TO ACHIEVE LEVEL/FLUSH SURFACE FOR FINISH APPLICATION (BY OTHERS).

THE DISTANCE FROM DOOR JAMBS TO ADJACENT PARTITIONS SHALL NOT BE LESS THAN 6" UNLESS OTHERWISE NOTED OR APPROVED BY ARCHITECT.

5.

WHERE PIPES ARE TO BE CONCEALED, THE HUNG OR FURRED CEILINGS ARE NOT TO BE BUILT UNTIL THOSE PIPES HAVE BEEN TESTED.

6.

SUBSTRATES OF INTERIOR PARTITIONS SHALL NOT BE BUILT TO FULL HEIGHT UNLESS ALL DUCTS, PIPES, ETC. ARE IN PLACE.

7.

FOR THE LOCATION OF ADDITIONAL CLEANOUT DOORS AND ACCESS DOORS IN PARTITIONS AND HUNG CEILINGS NOT SHOWN ON PLANS, REFER TO THE MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL PLANS AND PROVIDE ACCESS DOORS AT LOCATIONS REQUIRING ACCESS TO MECHANICAL EQUIPMENT. THE ARCHITECT SHALL BE CONSULTED FOR FINAL LOCATIONS AND ACCESS DOOR SIZES.

9

ENSURE ALL RESIDUE REMOVED FROM CONCRETE FLOOR.

8.

PROVIDE GYPSUM BOARD HEADER TO RECEIVE SLIDING DOORS BY OTHERS.

THE GENERAL CONTRACTOR SHALL FURNISH AND INSTALL ALL LINTELS, STRUTS, BRACKETS, HANGERS, ETC. WHEREVER NECESSARY TO SUPPORT OR BRACE ALL FINISHES, EQUIPMENT RECESSES. HEADS OVER OPENINGS, FURNITURE, ETC.

13

FURRING EXTENT TO BE COORDINATED WITH EXISTING WALL LANTERNS AND CALL BOTTOMS TO REMAIN.

9.

ALL EXTERIOR CORNERS AT GYPSUM WALLBOARD CONSTRUCTION SHALL HAVE METAL CORNER BEADS INSTALLED.

10.

ALL METAL CASING BEADS AT WINDOWS AND DOORS SHALL BE OF NON-CORROSIVE TYPE.

14

SHOT BLAST EXISTING SLAB/FLOOR FINISH. INFILL HOLES AS REQUIRED. PROVIDE ±2" SELF LEVELING CONCRETE POUR - VERIFY WITH TRANSITION AT STAIRS, LIFTS AND THRESHOLDS.

15

SHOT BLAST EXISTING SLAB TO REMOVE ALL DEBRIS. INFILL NOTES AS REQUIRED. PROVIDE 3/8" SELF LEVELING POUR OVER ENTIRE SLAB. SLOPE TO TRANSITIONS AT DOORS, THRESHOLDS, LIFTS AND STAIR RISER. HEIGHT OF TRANSITION TO BE V.I.F.

16

INFILL GAPS ON FLOOR WITH PLYWOOD AS REQUIRED TO MAKE LEVEL FLOOR.

17

PROVIDE 8" CONCRETE CURB AT EXISTING PARTITIONS. COORDINATE WITH ADJACENT SCHEDULED PARTITION.

18

19

20

PROVIDE 6" GYPSUM BOARD NIB TO UNDERSIDE OF HEADER ABOVE.

AT ALL AREAS WHERE SOFFITS ARE REQUIRED, THE VERTICAL AND HORIZONTAL SURFACES SHALL BE GYPSUM WALLBOARD UNLESS OTHERWISE NOTED.

12.

EXCEPT AS OTHERWISE INDICATED, DOOR SADDLES OR DIVIDING STRIPS ARE REQUIRED AT INTERIOR DOOR OPENINGS WHERE DIFFERENT TYPES OF FLOOR FINISHES OCCUR IN ADJOINING ROOMS. WHERE ADJOINING ROOMS AND SPACES HAVE THE SAME KIND OF FLOOR COVERING OF DIFFERENT COLOR, EXTEND THE FLOOR COVERING THROUGH THE DOOR OPENING AND FINISH AT TRANSITION POINT UNDER CENTERLINE OF DOOR IN CLOSED POSITION.

PROVIDE NEW WOOD SILLS TO MATCH ADJACENT WHERE MECH DUCT WORK REMOVED.

13.

ALL VERTICAL PIPES AND DUCTS ARE TO BE FURRED IN WITH MATERIALS TO MATCH ADJACENT SURFACES.

EXISTING BATHROOM PARTITIONS TO BE EXTENDED TO V/S OF STRUCTURE ABOVE.

14.

ALL EQUIPMENT SECURED TO INTERIOR PARTITIONS SHALL BE FASTENED DIRECTLY TO METAL STUDS. PROVIDE METAL STRAPPING OR PLYWOOD AT ALL WALL MOUNTED EQUIPMENT AND FUTURE (IPTV) LOCATIONS AS SHOWN.

15.

ALL OPENINGS AT GYPSUM WALLBOARD PARTITIONS FOR DUCTS, ELECTRIC PANEL BOARD, ETC. ARE TO BE STEEL STUD-FRAMED OPENINGS.

16.

ALL ITEMS RECESSED INTO RATED PARTITIONS (SUCH AS OUTLET BOXES, PANEL BOXES, ETC.) SHALL HAVE THOSE OPENINGS PROTECTED WITH BACK-UP MATERIALS SO AS TO RETAIN THE INTEGRITY OF THE PARTITION RATING THROUGHOUT. PROTECTION OF THESE OPENINGS SHALL BE IN STRICT CONFORMITY WITH THE NEW YORK STATE BUILDING CODE, LOCAL ORDINANCES, AND BE TO THE SATISFACTION OF THE LOCAL AUTHORITIES HAVING JURISDICTION.

17.

ALL DIMENSIONS SHALL BE TAKEN FROM THE FINISH FACE OF MATERIALS BY THEIR SUBSEQUENT TRADES.

PROVIDE RECESSED WALK OFF MATT. COORDINATE WITH SPECIFICATIONS.

22

SAND AND REFINISH EXISTING WOOD CAP, TREADS AND RISERS.

23

PROVIDE LEVEL 5 FINISH AT NEW OR EXISTING GYPSUM BOARD WALLS.

01-004

23

N.I.C.

8TH AVENUE

04

8'-2"

7 21

01-005

01-004

14 08

04

UP

5'-1 7/16" UP 2 MACHINE ROOM

FE

PROVIDE HEADER AS REQUIRED FOR DOOR BY OTHERS INSTALLATION.

PROVIDE GYPSUM BOARD PARTITION AND ENCLOSURE AT EXISTING POST. 12 WORKROOM 14 01-001

G10

STRUCTURE TONE: 330 WEST 34TH STREET, 11TH FLOOR NEW YORK, NY 10001 212 481 6100

L

SYMBOL

DESCRIPTION

EXISTING PARTITION TO REMAIN NEW PARTITION

B INFILL WALLS AND PROVIDE ACCESS DOOR FOR BASE BUILDING HEATERS. LOCATION AND SIZE TO BE V.I.F. PREPARE TO RECEIVE NEW PAINT FINISH.

K

PARTITION TAG. REFER TO SHEET A-002 FOR PARTITIONS TYPES

XXX

LINE OF SOFFIT ABOVE DETAIL DRAWING WHERE DETAIL IS SHOWN

A SOUTH EXTENT

XX A200

WALL SECTION DRAWING WHERE SECTION IS SHOWN

XX A200

WALL ELEVATION DRAWING WHERE ELEVATION IS SHOWN

OCCUPANT PROTECTION NOTES

6

5

4 1/2

4

3 1/2

3

2 1/2

2

1

6.

7.

Drawing Title:

1ST FLOOR CONSTRUCTION PLAN

SCALE:

DOOR TAG

FE

EZ

DRAWING NO.

12/07/2018

PROJECT NO.

18289

A-101.00

SURFACE MOUNTED FIRE EXTINGUISHER RECESSED FIRE EXTINGUISHER CABINET

FE

DATE:

1/8" = 1'-0"

DRAWN BY:

PROVIDE BLOCKING

FE

G1

4. 5.

MILLWORK 04-XXX

1

ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE NEW YORK CITY BUILDING CODE. ARTICLE 19 AND REGULATIONS OF ALL OTHER AGENCIES HAVING JURISDICTION. ALL EXISTING MEANS OF EGRESS FOR TENANTS OF THE BUILDING SHALL BE MAINTAINED CLEAR AND FREE OF ALL OBSTRUCTIONS. ALL BUILDING MATERIALS IN THE CONSTRUCTION AREA SHALL BE SECURED IN A LOCKED AREA. THE OWNER ASSUMES NO RESPONSIBILITY FOR THE SAFE KEEPING OF BUILDING MATERIALS. CONTRACTOR SHALL PROVIDE ADEQUATE TEMPORARY SHORING AND BRACING WHEREVER STRUCTURAL WORK IS REQUIRED. CONSTRUCTION OPERATIONS SHALL NOT INVOLVE INTERRUPTION OF HEATING, WATER OR ELECTRICAL SERVICES WITHOUT PROPER PRIOR CONSENT FROM THE OWNER AND/OR LANDLORD. TENANT PROTECTION PLAN- GENERAL CONTRACTOR SHALL PROVIDE A TENANT PROTECTION PLAN AS PER BC 28-104.8.4 WHICH SHALL INCLUDE PROVISIONS FOR EGRESS, FIRE SAFETY, HEALTH REQUIREMENTS, COMPLIANCE WITH HOUSING STANDARDS, STRUCTURAL SAFETY & NOISE RESTRICTIONS. THE CONTRACTOR IS TO PROVIDE TEMP. PROTECTION AND BARRIERS AROUND ALL OPENINGS DURING CONSTRUCTION, AS WELL AS TEMP. SIGNAGE DURING INTERIM OCCUPANCY ADVISING OF CONSTRUCTION ACTIVITIES AND ADVISING UNAUTHORIZED PERSONS TO KEEP OUT OF CONSTRUCTION AREAS.

2. 3.

STARTING POINT

6 1/2 7

_ 1 2"

MILROSE CONSULTING 498 SEVENTH AVENUE, 8TH FLOOR NEW YORK, NY 10019 212 894 0145

HATCH PATTERN INDICATES EXTENT OF ± 2" SELF LEVELING CONCRETE POUR FLASH AS REQUIRED AT ENTRANCES AND STAIRS.

1.

7 1/2

2'-5

ROBERT DERECTOR ASSOCIATES 19 W 44TH STREET NEW YORK, NY 10036 212 764 7827

MILLWORK ENCLOSURE TO BE PROVIDED BY OTHERS.

3

N.I.C.

_ 1 2"

22'-10 5 _ 8"

ARCHITECT:

C

2

7'-9

3 12'-5_ 4"

MEP ENGINEER:

PROVIDE ACCESS. PROVIDE LOUVERS AROUND FSD/AD.

04

3 3/8

_ 3 12'-6 4"

9'-5 7

1

9'-8"

N

CODE CONSULTANT:

TYP.

5

15'-8"

HLW INTERNATIONAL LLP 115 FIFTH AVENUE, 5TH FLOOR NEW YORK, NY 10003 212 353 4600

EXTENT OF GYPSUM FURRING TO STOP SHORT OF EXISTING ELEVATOR CALL BUTTON AND HALL LANTERN. LOCATION TO BE COORDINATED ON SITE.

M

06

2'-4"

TACONIC MANAGEMENT CORP 118 8TH AVENUE NEW YORK, NY 10011 212 243 5060

TRIM EXISTING HANDRAIL AS REQUIRED TO ACCOMMODATE NEW FURRING AND SCHEDULED FINISH.

N2

NEW PARTITION TO BE COORDINATED WITH EXISTING POST.

20

03

16TH STREET

CLIENT:

TYP.

2

TYP.

2

20

AREA OF WORK

KEY PLAN

PROJECT MANAGEMENT:

D

01

ISSUE FOR FILING

ONE CITY BLOCK 111 8TH AVE., NY, NY 10011

PROVIDE GYPSUM BOARD HEADER ABOVE NEW METAL AND GLASS VESTIBULE.

N1

TYP.

ISSUE OR REVISION ISSUE FOR CONSTRUCTION

12/07/2018

CONCRETE TO SLOPE TO EXISTING ENTRANCE AS REQUIRED.

E

04

01

DATE 12/07/2018

15TH STREET

P1

23

NO.

REMOVE EXISTING HANDRAIL AND STORE FOR REINSTALLATION AFTER FINISH APPLICATION.

P2

FE

111 8TH AVENUE :: NEW YORK, NY 10011

_" 8

11.

RECEPTION

5

PATCH WALLS AT NICHE AREA AND EXTEND GYPSUM BOARD TO UNDERSIDE OF STRUCTURE ABOVE ALL THREE WALLS IN NICHE.

UNLESS OTHERWISE INDICATED, HEIGHTS NOTED IN SCHEDULES ARE HEIGHTS ABOVE FINISHED FLOOR. EXCEPT WHERE OTHERWISE INDICATED, ALL WALLS AND PARTITIONS ARE DIMENSIONED TO THEIR "NOMINAL" SIZES. WHERE DIMENSIONS ARE NOTED AS MIN., PROVIDE MIN. CLEAR TO FINISHED SURFACES.

4.

11

F

5

05

PROVIDE GYPSUM BOARD ON METAL STUD FRAMING AT ALL PERIMETER WALLS.

2. 3.

PROVIDE REMOVABLE ACCESS DOORS ALONG BENCHES.

04

5

C1

PROVIDE MDF ENCLOSURE ON METAL STUD FRAMING TO RECEIVE SCHEDULED FINISH. PROVIDE S/S GRILLE FOR RADIATOR. COORDINATE WITH DETAIL B6/A-800.

5

THE TERM, "FINISHED FLOOR," WHERE INDICATED ON THE DRAWINGS, REFERS TO THE NORMAL FINISHED FLOOR LEVEL OF THAT FLOOR.

14

1

4

4

21

FE INSTALL TO BE COORDINATED WITH SCHEDULED FINISH.

DOWN

G1

PROVIDE ACCESS. PROVIDE LOUVERS AROUND FSD/AD.

CONSTRUCTION GENERAL NOTES 1.

1

EAST EXTENT

7

A

CONSTRUCTION KEYNOTES

4'-2"

C

1

_ 3 4"

1 1/2

1'-6

2

17'-1"

2 1/2

13'-3"

4 1/2

8

D

3

_ 16 " _

4

17'-10

E 5

UP

6

8TH AVENUE

F 7

9TH AVENUE

G 7 1/2

1ST FLOOR CONSTRUCTION PLAN

5 OF 18

SCALE: 1/8"=1'-0"

G

F

E

D

C

D

C

B

A

c 2016-16003-HLW International LLP

CONSTRUCTION DRAWING

NORTH EXTENT J

PROVIDE GYPSUM BOARD HEADER ABOVE TO ACCOMMODATE MOVEABLE PARTITION. PROVIDE (2) 2X6 HEAVY GAUGE STUD WITH BLOCKING. PROVIDE THREADED ROD THROUGHOUT HEADER TO EXTEND TO BOTTOM OF HEADER. COORDINATE WITH OPERABLE PARTITION SPECIFICATIONS.

5

6

WORKROOM

02-013

22'-0 1/8"

N.I.C.

PROVIDE GYPSUM BOARD ON METAL STUD FRAMING AT ALL COLUMN LOCATIONS.

3

THE TERM, "FINISHED FLOOR," WHERE INDICATED ON THE DRAWINGS, REFERS TO THE NORMAL FINISHED FLOOR LEVEL OF THAT FLOOR.

2.

UNLESS OTHERWISE INDICATED, HEIGHTS NOTED IN SCHEDULES ARE HEIGHTS ABOVE FINISHED FLOOR.

3.

EXCEPT WHERE OTHERWISE INDICATED, ALL WALLS AND PARTITIONS ARE DIMENSIONED TO THEIR "NOMINAL" SIZES. WHERE DIMENSIONS ARE NOTED AS MIN., PROVIDE MIN. CLEAR TO FINISHED SURFACES.

4.

PROVIDE MDF ENCLOSURE ON METAL STUD FRAMING TO RECEIVE SCHEDULED FINISH. PROVIDE S/S GRILLE FOR RADIATOR. COORDINATE WITH DETAIL B6/A-800.

THE DISTANCE FROM DOOR JAMBS TO ADJACENT PARTITIONS SHALL NOT BE LESS THAN 6" UNLESS OTHERWISE NOTED OR APPROVED BY ARCHITECT.

5.

WHERE PIPES ARE TO BE CONCEALED, THE HUNG OR FURRED CEILINGS ARE NOT TO BE BUILT UNTIL THOSE PIPES HAVE BEEN TESTED.

PROVIDE GYPSUM BOARD ON METAL STUD FRAMING AT ALL PERIMETER WALLS.

6.

SUBSTRATES OF INTERIOR PARTITIONS SHALL NOT BE BUILT TO FULL HEIGHT UNLESS ALL DUCTS, PIPES, ETC. ARE IN PLACE.

7.

FOR THE LOCATION OF ADDITIONAL CLEANOUT DOORS AND ACCESS DOORS IN PARTITIONS AND HUNG CEILINGS NOT SHOWN ON PLANS, REFER TO THE MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL PLANS AND PROVIDE ACCESS DOORS AT LOCATIONS REQUIRING ACCESS TO MECHANICAL EQUIPMENT. THE ARCHITECT SHALL BE CONSULTED FOR FINAL LOCATIONS AND ACCESS DOOR SIZES.

6

MOVEABLE PARTITION BY OTHERS.

7

PROVIDE NEW METAL AND GLASS VESTIBULE ENCLOSURE.

8

PROVIDE LAMINATION AT STAIR TO ACHIEVE LEVEL/FLUSH SURFACE FOR FINISH APPLICATION (BY OTHERS).

5

WORKROOM

3 3/8

2

4

B7 A800

18

02-011

3

PROVIDE GYPSUM BOARD HEADER AND NIBS TO ACCOMMODATE SCHEDULED DOOR.

33'-11 5/8"

5

02-012 20

15

20 2

TYP.

S

CLOSET 02-012 G10 02-014

02-010

ENSURE ALL RESIDUE REMOVED FROM CONCRETE FLOOR. PROVIDE GYPSUM BOARD HEADER TO RECEIVE SLIDING DOORS BY OTHERS.

13

FURRING EXTENT TO BE COORDINATED WITH EXISTING WALL LANTERNS AND CALL BOTTOMS TO REMAIN.

14

SHOT BLAST EXISTING SLAB/FLOOR FINISH. INFILL HOLES AS REQUIRED. PROVIDE ±2" SELF LEVELING CONCRETE POUR - VERIFY WITH TRANSITION AT STAIRS, LIFTS AND THRESHOLDS.

15

SHOT BLAST EXISTING SLAB TO REMOVE ALL DEBRIS. INFILL NOTES AS REQUIRED. PROVIDE 3/8" SELF LEVELING POUR OVER ENTIRE SLAB. SLOPE TO TRANSITIONS AT DOORS, THRESHOLDS, LIFTS AND STAIR RISER. HEIGHT OF TRANSITION TO BE V.I.F.

PROVIDE GYPSUM BOARD INFILL AT OPENING TO ALIGN WITH ADJACENT PARTITION.

STORAGE

LOUNGE 3

6 1/2

9 11

ENSURE ACCESS DOOR IS MAINTAINED.

3

48'-4 5/16"

7

EXISTING TO REMAIN.

EAST EXTENT

PROVIDE GYPSUM BOARD ENCLOSURE. WIDTH @ MOVEABLE PARTITION TO BE REQUIRED. PARTITION TO RETURN TO ADJACENT WINDOW MULLION.

A CONSTRUCTION GENERAL NOTES 1.

1

H

OPEN TO BELOW

5

6'-3 11/16" 5

02-010

20

TYP.

2

6

AREA OF WORK G10

G10

R

11

6

FE

02-014

5

PROVIDE GYPSUM BOARD HEADER ACROSS OPENING. PROVIDE 12" HIGH BLOCKING ABOVE OPENING.

G

TYP.

CHECKIN

G1

2

TYP.

15

02-009

NEW FULL HEIGHT GYPSUM BOARD PARTITION. WIDTH TO BE COORDINATED WITH FINAL DESIGN.

TYP.

Q 2

TYP.

THE GENERAL CONTRACTOR SHALL FURNISH AND INSTALL ALL LINTELS, STRUTS, BRACKETS, HANGERS, ETC. WHEREVER NECESSARY TO SUPPORT OR BRACE ALL FINISHES, EQUIPMENT RECESSES. HEADS OVER OPENINGS, FURNITURE, ETC.

9.

ALL EXTERIOR CORNERS AT GYPSUM WALLBOARD CONSTRUCTION SHALL HAVE METAL CORNER BEADS INSTALLED.

10.

AT ALL AREAS WHERE SOFFITS ARE REQUIRED, THE VERTICAL AND HORIZONTAL SURFACES SHALL BE GYPSUM WALLBOARD UNLESS OTHERWISE NOTED. EXCEPT AS OTHERWISE INDICATED, DOOR SADDLES OR DIVIDING STRIPS ARE REQUIRED AT INTERIOR DOOR OPENINGS WHERE DIFFERENT TYPES OF FLOOR FINISHES OCCUR IN ADJOINING ROOMS. WHERE ADJOINING ROOMS AND SPACES HAVE THE SAME KIND OF FLOOR COVERING OF DIFFERENT COLOR, EXTEND THE FLOOR COVERING THROUGH THE DOOR OPENING AND FINISH AT TRANSITION POINT UNDER CENTERLINE OF DOOR IN CLOSED POSITION.

INFILL GAPS ON FLOOR WITH PLYWOOD AS REQUIRED TO MAKE LEVEL FLOOR.

17

PROVIDE 8" CONCRETE CURB AT EXISTING PARTITIONS. COORDINATE WITH ADJACENT SCHEDULED PARTITION.

18

PROVIDE NEW WOOD SILLS TO MATCH ADJACENT WHERE MECH DUCT WORK REMOVED.

13.

ALL VERTICAL PIPES AND DUCTS ARE TO BE FURRED IN WITH MATERIALS TO MATCH ADJACENT SURFACES.

19

EXISTING BATHROOM PARTITIONS TO BE EXTENDED TO V/S OF STRUCTURE ABOVE.

14.

20

PROVIDE 6" GYPSUM BOARD NIB TO UNDERSIDE OF HEADER ABOVE.

ALL EQUIPMENT SECURED TO INTERIOR PARTITIONS SHALL BE FASTENED DIRECTLY TO METAL STUDS. PROVIDE METAL STRAPPING OR PLYWOOD AT ALL WALL MOUNTED EQUIPMENT AND FUTURE (IPTV) LOCATIONS AS SHOWN.

21

PROVIDE RECESSED WALK OFF MATT. COORDINATE WITH SPECIFICATIONS.

15.

ALL OPENINGS AT GYPSUM WALLBOARD PARTITIONS FOR DUCTS, ELECTRIC PANEL BOARD, ETC. ARE TO BE STEEL STUD-FRAMED OPENINGS.

22

SAND AND REFINISH EXISTING WOOD CAP, TREADS AND RISERS.

16.

23

PROVIDE LEVEL 5 FINISH AT NEW OR EXISTING GYPSUM BOARD WALLS.

ALL ITEMS RECESSED INTO RATED PARTITIONS (SUCH AS OUTLET BOXES, PANEL BOXES, ETC.) SHALL HAVE THOSE OPENINGS PROTECTED WITH BACK-UP MATERIALS SO AS TO RETAIN THE INTEGRITY OF THE PARTITION RATING THROUGHOUT. PROTECTION OF THESE OPENINGS SHALL BE IN STRICT CONFORMITY WITH THE NEW YORK STATE BUILDING CODE, LOCAL ORDINANCES, AND BE TO THE SATISFACTION OF THE LOCAL AUTHORITIES HAVING JURISDICTION.

17.

ALL DIMENSIONS SHALL BE TAKEN FROM THE FINISH FACE OF MATERIALS BY THEIR SUBSEQUENT TRADES.

TYP.

15

NEW FULL HEIGHT GYPSUM BOARD PARTITION. WIDTH TO BE COORDINATED WITH FINAL DESIGN AND ACCOMMODATE SPECIFIED FINISHES.

TYP.

5

5

F P2

UP 1

15

E4 A500

02-008

G12

G10

02-007

FE

B7 A800

OFFICE

M

MEN'S ROOM

G12

02-007

S1

5

CODE CONSULTANT: MILROSE CONSULTING 498 SEVENTH AVENUE, 8TH FLOOR NEW YORK, NY 10019 212 894 0145

HATCH PATTERN INDICATES EXTENT OF ± 2" SELF LEVELING CONCRETE POUR FLASH AS REQUIRED AT ENTRANCES AND STAIRS.

C

STRUCTURE TONE: 330 WEST 34TH STREET, 11TH FLOOR NEW YORK, NY 10001 212 481 6100

02-005 E

L

E

SYMBOL

G4 A500

MEN'S RESTROOM

19 02-004

02-004

OPEN TO BELOW

DESCRIPTION

COORDINATE NEW ENCLOSURE WITH DUCTWORK DISTRIBUTION

EXISTING PARTITION TO REMAIN

JANITOR CLOSET 02-002B 02-002B

14'-8 1/8"

02-001 G10

17 M5 17

6 1/2

K

G10 PANTRY

02-002

PARTITION TAG. REFER TO SHEET A-002 FOR PARTITIONS TYPES

XXX

NEW 8" CONCRETE CURB.

M1

G10

NEW PARTITION

B

19

02-002

E4 A500

4'-4 1/2"

FE

LINE OF SOFFIT ABOVE DETAIL DRAWING WHERE DETAIL IS SHOWN

NEW DOUBLE STUD GYPSUM BOARD PARTITION WITH 8" CONCRETE CURB. PROVIDE FLOOR FINISH

XX A200

WALL SECTION DRAWING WHERE SECTION IS SHOWN

XX A200

WALL ELEVATION DRAWING WHERE ELEVATION IS SHOWN

AC4 G10

MECH

STORAGE

02-001

02-003 18

A SOUTH EXTENT

OCCUPANT PROTECTION NOTES

4

3 1/2

3

2 1/2

2

1

6.

7.

FE

FE

1/8" = 1'-0"

DRAWN BY: DRAWING NO.

EZ

DATE:

12/07/2018

PROJECT NO.

18289

A-102.00

SURFACE MOUNTED FIRE EXTINGUISHER RECESSED FIRE EXTINGUISHER CABINET

2ND FLOOR CONSTRUCTION PLAN

6 OF 18

SCALE: 1/8"=1'-0"

G

Drawing Title:

2ND FLOOR CONSTRUCTION PLAN

SCALE:

DOOR TAG PROVIDE BLOCKING

FE

G1

4. 5.

ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE NEW YORK CITY BUILDING CODE. ARTICLE 19 AND REGULATIONS OF ALL OTHER AGENCIES HAVING JURISDICTION. ALL EXISTING MEANS OF EGRESS FOR TENANTS OF THE BUILDING SHALL BE MAINTAINED CLEAR AND FREE OF ALL OBSTRUCTIONS. ALL BUILDING MATERIALS IN THE CONSTRUCTION AREA SHALL BE SECURED IN A LOCKED AREA. THE OWNER ASSUMES NO RESPONSIBILITY FOR THE SAFE KEEPING OF BUILDING MATERIALS. CONTRACTOR SHALL PROVIDE ADEQUATE TEMPORARY SHORING AND BRACING WHEREVER STRUCTURAL WORK IS REQUIRED. CONSTRUCTION OPERATIONS SHALL NOT INVOLVE INTERRUPTION OF HEATING, WATER OR ELECTRICAL SERVICES WITHOUT PROPER PRIOR CONSENT FROM THE OWNER AND/OR LANDLORD. TENANT PROTECTION PLAN- GENERAL CONTRACTOR SHALL PROVIDE A TENANT PROTECTION PLAN AS PER BC 28-104.8.4 WHICH SHALL INCLUDE PROVISIONS FOR EGRESS, FIRE SAFETY, HEALTH REQUIREMENTS, COMPLIANCE WITH HOUSING STANDARDS, STRUCTURAL SAFETY & NOISE RESTRICTIONS. THE CONTRACTOR IS TO PROVIDE TEMP. PROTECTION AND BARRIERS AROUND ALL OPENINGS DURING CONSTRUCTION, AS WELL AS TEMP. SIGNAGE DURING INTERIM OCCUPANCY ADVISING OF CONSTRUCTION ACTIVITIES AND ADVISING UNAUTHORIZED PERSONS TO KEEP OUT OF CONSTRUCTION AREAS.

STARTING POINT

04-XXX

4 1/2

2. 3.

MILLWORK

NEW 6'-0" × 7'-0" HM DOOR WITH SEALS

5

_ 1 2"

MEP ENGINEER:

1.

3 3/8

6

2'-5

ROBERT DERECTOR ASSOCIATES 19 W 44TH STREET NEW YORK, NY 10036 212 764 7827

WOMEN'S RESTROOM

N

7

_ 1 2"

PROVIDE LOUVER TO MATCH EXISTING. COORDINATE WITH HVAC DRAWINGS.

19

E

E

(N)

TYP.

02-005

7 1/2

7'-9

22'-10 5 _ 8"

ARCHITECT:

PROVIDE SLAB PENETRATION FOR NEW DUCTWORK. PROVIDE STEEL FRAMING AS REQUIRED. S1

19

3

1

_ 3 12'-6 4"

3 12'-5_ 4"

9'-5 7

1

9'-8"

N

HLW INTERNATIONAL LLP 115 FIFTH AVENUE, 5TH FLOOR NEW YORK, NY 10003 212 353 4600

D

M

02-006 02-006

N.I.C.

15'-8"

PROJECT MANAGEMENT:

G10

TYP.

2

2

2'-4"

TACONIC MANAGEMENT CORP 118 8TH AVENUE NEW YORK, NY 10011 212 243 5060

MILLWORK BASE CABINET. PROVIDE V/C FRIDGE. COORDINATE WITH SPECIFICATIONS.

N1 02-008

1

02-009

16TH STREET

LOUNGE

ELECTRICAL CLOSET

C1

AREA OF WORK

KEY PLAN

CLIENT:

E

G10

ISSUE FOR FILING

ONE CITY BLOCK 111 8TH AVE., NY, NY 10011

N2

4

ISSUE OR REVISION ISSUE FOR CONSTRUCTION

12/07/2018

15TH STREET

P1

N.I.C.

DATE 12/07/2018

_" 8

16

-

NO.

ALL METAL CASING BEADS AT WINDOWS AND DOORS SHALL BE OF NON-CORROSIVE TYPE.

11.

12.

3

15

8.

111 8TH AVENUE :: NEW YORK, NY 10011

4'-2"

3 1/2

18

B CONSTRUCTION KEYNOTES

1

_ 3 4"

1 1/2

1'-6

2

17'-1"

4 1/2

8

2 1/2

13'-3"

3

_ 16 " _

4

17'-10

E 5

UP

6

8TH AVENUE

F 7

9TH AVENUE

G 7 1/2

F

CONSTRUCTION DRAWING

E

D

C

B

A

c 2016-16003-HLW International LLP

36


HLW INTERNATIONAL LLP NEW YORK CITY 2. NBC UNIVERSAL NBC Office renovation project in New York. Tasks included rendering elevational drawings for presentation purposes.

PANTRY EAST ELEVATION

PANTRY WEST ELEVATION

PANTRY PASSTHROUGH EAST ELEVATION

PANTRY PASSTHROUGH WEST ELEVATION

37


HLW INTERNATIONAL LLP NEW YORK CITY 3. CONFIDENTIAL CLIENT Renovation of a building designed by I.M. Pei and Partners in Stamford, Connecticut. Tasks included drafting a test fit of 6th floor and creating diagrams for presentational purposes.

6TH TEST FIT FLOOR PLAN NTS

38


PERSONAL WORK.

the shanqiu tower. ink on paper.

39


adolecsent scars. pencil crayon on paper.

40


41


42


END.

thank you for your time.


e. ethanzhang22@hotmail.com #. 416 618 6529 www.ezarch.net



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.