Work Samples

Page 1


eugenew91@gmail.com (516) . 712 . 9882 w w w. e u g e n e h w o n g . c o m

education Carnegie Mellon University Bachelor of Architecture Minor in Business Administration Pittsburgh, Pennsylvania | May 2014 CIEE Barcelona Architecture & Design ESARQ - UIC Barcelona, Spain | Spring 2013 Singapore American School Diploma with Honors Singapore | May 2009

skills DIGITAL Adobe Creative Suite Google Sketchup Rhinoceros Grasshopper, Vray, Arduino Microstation AutoCAD 3Ds Max Revit Ecotect ArcGIS Blender MasterCam, RhinoCam Lasercutting, CNC Router ABB Robot, Robot Studio

HAND Perspective drawing Handrendering Watercolor & Aryclic Drafting Model Making Wood Working Digital + B&W Photography LANGUAGES English Cantonese Working Proficiency in Mandarin Chinese Conversant in Spanish


experience DP ARCHITECTS, PTE. LTD., Architectural Trainee Singapore | June - August 2013 Collaborated in the schematic design of BB Plaza Development in Kuala Lumpur, Malaysia, design development and construction phases of Marina Square Shopping Center and construction administrative work for The Minton Condominium UNITOWN DESIGN INC., Architectural Intern Shanghai, China | June - August 2012 Contributed to the schematic design and design development phases of the JiangYin and NanXun Mixed Used Development Projects LEIGH & ORANGE LTD., Architectural Intern Hong Kong, China | June - August 2011 Produced design options, material sampling for clients, and construction documents for the Revitalization of Ping Shek Estate Public Housing Conducted site surveys on building sites and assisted in the production of proposal bid for the Hong Kong University New Post Graduate Dormitory and Chu Hai College of Higher Learning Projects

leadership & honors Spring Carnival Booth Competition 1st Place Design Award + Environmental Award Spring | 2012 Led preliminary design to full scale construction of two storey 18’x18’x20’ themed booth as Booth Design Chairman for the Asian Students Association Dean’s List & School Honors College of Fine Arts | 2012 Work Selected for NAAB Accreditation Review Frick Park Environmental School Model Fall | 2011 Global Business Brigades Panama Corporate Fundraising Committee Spring | 2012 Traveled to Panama with interdisciplinary team of CMU students, working with local indigenous community on initial financial assessment and leading financial workshops The Pi Kappa Alpha Fraternity Beta Sigma Chapter Vice President, Community Service Chairman, Membership Development Chairman, Campus Involvement Chairmain, Historian



2

RIVULET [pittsburgh BOATHOUSE]

OCCUPANCY STUDIO

16

2030 outreach

[ action HOUSING PROPOSAL]

ISSUES OF PRACTICE

26

ACTCC

[aluminum city terrace COMMUNITY CENTER ]

advanced construction STUDIO

34

DESIGN WORKS [VARIOUS PROJECTS]

Relevant research and prevous internships

1


RIVULET [ occupany STUDIO ]

fall 2012

[ INFO ] How can computational

design and fabrication methods significantly transform the design process to advance architectural design that questions traditional assumptions of space, program and notions of inhabitation? Over the course of the studio we investigated this problem through the exploration of design as a synthetic exercise. Through a series of projects and fabrication processes, prototyping was heavily utilized to establish a form finding feedback loop to interrogate the performative capacity of architecture and its relationship to the body, geometric and material systems. A site and program specific synthesized architectural project was the result of these explorations.

2


3


site PLAN Bo

lin

St

ay

o

br

es Ch

ss

re

g ro

W

St

P

16 TH

T

LO

ST BR

Y

PT

GE

ID

fie

e

ld

Av

D

TE

SI

TL

E OS

K

St

er

v Ri

OO

ar

W

EM

OU

OP

PR

Y EN

R

VE

RI

GH

LE

AL

NS

RA

TE

VE BR GE

ID P

RI

ST

The boathouse is located along an

active running and biking path across the Allegheny river from the vibrant Strip District in Pittsburgh. The active path influenced a flowing design, carved between the two dirt streams of running paths.

4

Serving as a rental shop for kayaks with an adjacent existing outlook to a great view of the river, the site is sixteen feet above the river’s water level, on a hundred-year flood plane.

CT

RI

ST

DI

For accessibility to the river as well as water runoff, a ramp is designed to dip underneath one of the existing running paths, forming a tunnel with a view of the only water’s surface.


SITE DIAGRAMS EXISTING PARKING LOT

02. EXISTING PEDESTRIAN & BIKE PATH

01. EXISTING SITE CONDITION existing site condition

existing pedestrian & bike path

CONTINUOUS ACCESSIBILITY

VIEWS TO RIVER

03. PROPOSED SITE LOCATION proposed site location

04. BUILDING ON SITE building on site

5


PROGRAMATIC PLAN

1. 2.

3.

1 BOAT STORAGE 2 TRAINING AREA 3 OUTLOOK 4 DECK

6

4.


WIND ANALYSIS

autumn wind frequency

autumn wind frequency

spring wind frequency

summer wind frequency

7


CONSTRUCTION AXONOMETRIC The boat house’s real beauty is in the roof. Bent wood beams flow overhead the users, directing them to the water. The need for distracting cross bracing is mitigated by secondary beams which bounce back and forth between beams. Fiberglass channels run down the length of each pair of beams, guiding rain water down the ramp and away from the dirt paths. The kayaks are stored vertically, leaning against the thick southern wall which acts as a thermal mass to help cool the boathouse. As kayaks are rented and removed, a slit of southern light is revealed.

8

FIBERGLASS PANEL

1

CROSS BRACING BEAMS

2

WOOD BEAMS

3

KNITWIRE CLEAR MESH SCREEN

4

TUBULAR STEEL COLUMN

5

REINFORCED CONCRETE WALL

6


wall section DETAIL

5

4

3

1

2

1. TUBULAR STEEL COLUMN 2. REINFORCED CONCRETE WALL 3. KNITWIRE CLEAR MESH 4. NEOPRENE BEARING STRIP 5. WOOD BEAM

9


prototype ASSEMBLY BEAM 3 SIDE A

BEAM 2 SIDE A

BEAM 1 SIDE A

BEAM 3 SIDE B

BEAM 2 SIDE B

BEAM 1 SIDE B

1 WOOD BEAM MILLING PROCESS

10

3 FIBERGLASSING PROCESS


BEAM 3

BEAM 2

BEAM 1

2 WOOD BEAMS LAMINATING PROCESS

4 FINAL ASSEMBLY PROCESS

11


CROSS SECTIONAL PERSPECTIVE

LONG SECTIONAL PERSPECTIVE

12


13


ROOF BEAM PROTOTYPE

MODEL INTERIOR

14


VACCUM FORM MOLD

MODEL EXTERIOR

15


2030 outreach [ issues of PRACTICE ] fall 2012 [ INFO ] Comprehensive Proposal

Booklet created for Action Housing on the adaptive transformation of 2030 Forbes in Uptown, Pittsburgh done in collaboration with Sage Altenhofen, Christina Chen, Donald Chow, and Christine Jung. The multiple phased proposal included initial schematic design, design development, construction as well as implementation and cost analysis for the project. 2030 Outreach proposes to create a residence that will promote the growth of a thriving community within the Uptown neighborhood. The property’s location along Forbes Avenue is ideal for easy accessibility within the immediate area. Affordability is a striving goal for the scope of this project. Taking into consideration that the growing family supports itself through the median income rate of Pittsburgh, the new design for the residence must be based on cost-efficiency. This entails retaining much of the existing features of the house, minimizing mechanical systems, and supporting easy maintenance for the building.

16


3 17


72.4% of Bluff Employed Residents work in educational, health, and social services 71abcd

61abcd

65

NDI

LNC

2030 Forbes Avenue / 2031 Tustin Street Public 65 PA 15219 Pittsburgh, Inbound Outbound Transportation

Upper Hill

Zoning Site Context

Polish Hill

Crawford Roberts

Central Business District

Neighborhood Buisnesses

Middle Hill

Terrace Village

Social Services Buildings

West Oakland

Bluff

72.4% of Bluff Employed Residents work in educational, health, and social services

South Oakland

Upper Hill

SouthPolish Shore Hill

Middle Hill

Crawford Roberts

Central Business District

Major Roads University

Terrace Village

South Side Flats West Oakland

Bluff South Oakland

Hospital

South Shore

South Side Flats

Major Roads University Hospital

PS3.00

PS3.00

PROJECT SCOPE: LOCATION

PROJECT SCOPE: LOCATION See Roof Deck Assembly

18


3 19


floor PLANS

8’-7” 8’-7” 3’-2”

3’-8”

2’-0” 3’-2”

4’-0”

3’-2”

3’-10”

3’-2”

2’-2” 3’-2”

3’-8” 2’-2” 3’-2”

3’-10”

3’-2”

3’-10”

3’-2”

3’-10”

3’-2”

3’-10”

3’-2”

3’-8”

2’-2” 3’-2”

3’-10”

3’-2”

3’-10” 9” 3’-2”

3’-8” 8’-3”

3’-8”

201

9”

2’-10 3/4” 1’-1/2” 1’-1/2”

8’-3”

8’-3”

2’-10 3/4” 1’-1/2” 1’-1/2”

9”

8’-3

201

201 202

202

202

301 301 25’-5 3/4”

101

dn

dn

203

dn

up

203

up

5’-3 1/2”

2’-6” 10 1/2” 4’-6”

5’-8 3/4” 3’-3”

303

3’-6”

13’-0”

3’-3” 6’-10”

3/4”

1 1/2”

1 1/2”

1 1/2”

16'-0"

1’-6 3/4” 1’-9 1/2” 1’-9 1/2” 1’-9 1/2” 1’-9 1/2” 1’-9 1/2” 1’-9 1/2” 1’-6 3/4”

23'-5"

2nd floor

3rd floor

5'-7 1/2"

5'-7"

1st floor

5'-7"

23’-8 1/2”

16'-4"

roof deck ELEVATIONS

scale: 1/8” = 1’-0”

23'-8 1/2" 23'-5" CL

5'-4 1/2"

4'-6"

CL

CL

16'-4" CL 4'-6"

CL

8"

CL

4"

CL

4"

CL CL

CL CL

CL

CL CL CL

CL CL

CL CL

CL CL

9'-0"

6"

24'-1 1/2"

4'-6"

16'-0"

CL CL

24'-1 1/2"

CL

8"

eq

4"

CL

CL

6"

eq

CL

4'-1"

CL

4"

eq

8"

CL

3'-8" CL

9'-0"

CL

CL

20

5'-6"

CL

5'-6"

24'-0" CL

5'-6"

CL

5'-6"

eq

CL

4'-0"

6"

scale: 1/8” = 1’-0”

4'-0"

eqCL

CL CL

dn

1’-6 1/2”

3’-0” 2’-0” 3’-0” 2’-0” 3’-0” 1’-4” 1’-11 1/2” 1’-8 1/2” 3/4”

dn

2’-5 1/2” 3’-1” eq 2’-5 1/2” eq 2’-5 1/2” 2'-3" eq eq eq eq 2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 5’-7 1/2” 5’-7 1/2” 5’-7 1/2”1’-6 3/4” 5’-3 1’-9 1/2” 1/2” 1’-9 1/2” 1’-9 1/2” 1’-9 1/2” 1’-9 1/2” 1’-9 1/2” 1’-6 3/4” 23’-8 1/2”

3’-1”

23’-8 1/2”

5’-3 1/2”

303

1 1/2”

18’-4” 1 1/2”

3/4”

1 1/2”

1 1/2”

2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 5’-7 1/2” 5’-7 1/2” 5’-7 1/2”

3’-1”

Open

dn

5'-6"

17’-0”

Open

1 1/2”

3/4”

2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 5’-7 1/2” 5’-7 1/2” 5’-7 1/2”

3’-0” 2’-0” 3’-0” 2’-0” 3’-0” 1’-4” 1 1/2” 1’-11 1/2” 1’-8 1/2”

1 1/2”

3/4”

1 1/2”

1 1/2”

3’-1” 1’-9”

1 1/2”

3/4”

2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 2’-5 1/2” 2’-5 1/2”

1 1/2”

1 1/2”

3/4”

1 1/2”

1 1/2”

1 1/2”

3’-0” 1’-11 1/2”

7’-0”

18’-4”

18’-4”

3’-0” 1’-4” 1’-8 1/2”

3’-0” 1’-4” 1’-8 1/2” 7’-0” 3’-0” 1’-11 1/2” 3/4”

1 1/2”

3/4”

3’-1” 1’-9”

/2”

Open

dn

204

3’-0” 2’-0” 3’-0” 2’-0” 3’-0” 1’-4” 1’-11 1/2” 1’-8 1/2”

204

9’-9 3/4”

302

204

103

30

up

102

up

up

up

9’-9 3/4”

102

203

1 1/2”

dn

scale: 1/8” = 1’-0”

3


critical path ANALYSIS

detail programming

Detailed Programming Days:

1

2 3

4 5

0

5

10

0

1

2

Start Pre-Design Phase Schematic Design Phase Design Development Phase Construction Documents Phase Procurement (Bidding & Negotiation Phase) Notice to proceed and Contract Agreement Submit Bond and Insurance Documents Prepare and Submit Project Schedule Prepare and Submit Values Obtain Building Permits Obtain Electrical Permit Obtain HVAC Permit Obtain Demolition Permit Inspection for Safety Certificate Submit Preliminary Shop Drawings Submit Monthly requests for Payment Submit Drawings & Order Long Lead Items - Wood/Brick Submit Drawings & Order Long Lead Items - Roofing Submit Drawings & Order Long Lead Items - Plumbing Submit Drawings & Order Long Lead Items -Electric Submit Drawings & Order Long Lead Items - HVAC Detailing, Fabricate and Deliver Foundation & Footings Inspection Implementation of Grey Water System Demolish Second Level Flooring Demolish Second Level Interior Walls Demolish First Level Flooring Demolish First Level Interior Walls Replace, Match and Replace Exterior Wall Surfaces Install First Level Floors Install First Level Interior Walls Install Second Level Floors Install Second Level Interior Walls Install Roof Install Window Systems Rough-in Ductwork, Plumbing, and Electrical Install Heatpumps Venting Panelboards Telephone, Security and Electrical Wiring Close-in Inspection Drywall Installation Finish Painting Finish Carpentry Flooring Plumbing, Heating, and Electrical Finish Work Install Appliances, Toilets, sinks and Faucets Install Light Fixtures, Switches, Outlets, and Cover Plates Install Thermostats and Diffusors Walks and Landscaping Final Inspection Punchlist Conclude Works & Clean up Finish Weeks:

15

20

25

30

35

40

45

3

4

5

6

7

8

9

1

50

55

10

60

11

65

12

13

70

14

75

15

80

16

85

17

90

18

95

19

100

20

105

21

110

22

115

23

120

125

24

130

25

26

135

140

27

145

28

29

Times (in Days) Time Distribution:

ID 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 380 390 400 410 420 430 440 450 460 470 480 490 500 510 520 530 540 550

Task Name Start Pre-Design Phase Schematic Design Phase Design Development Phase Construction Documents Phase Procurement (Bidding & Negotiation Phase) Notice to proceed and Contract Agreement Submit Bond and Insurance Documents Prepare and Submit Project Schedule Prepare and Submit Values Obtain Building Permits Obtain Electrical Permit Obtain HVAC Permit Obtain Demolition Permit Inspection for Safety Certificate Submit Preliminary Shop Drawings Submit Monthly requests for Payment Submit Drawings & Order Long Lead Items - Wood/Brick Submit Drawings & Order Long Lead Items - Roofing Submit Drawings & Order Long Lead Items - Plumbing Submit Drawings & Order Long Lead Items -Electric Submit Drawings & Order Long Lead Items - HVAC Detailing, Fabricate and Deliver Foundation & Footings Inspection Implementation of Grey Water System Demolish Second Level Flooring Demolish Second Level Interior Walls Demolish First Level Flooring Demolish First Level Interior Walls Replace, Match and Replace Exterior Wall Surfaces Install First Level Floors Install First Level Interior Walls Install Second Level Floors Install Second Level Interior Walls Install Roof Install Window Systems Rough-in Ductwork, Plumbing, and Electrical Install Heatpumps Venting Panelboards Telephone, Security and Electrical Wiring Close-in Inspection Drywall Installation Finish Painting Finish Carpentry Flooring Plumbing, Heating, and Electrical Finish Work Install Appliances, Toilets, sinks and Faucets Install Light Fixtures, Switches, Outlets, and Cover Plates Install Thermostats and Diffusors Walks and Landscaping Final Inspection Punchlist Conclude Works & Clean up Finish

Predecessors

(Enter one ID per cell)

10 20 20 40 50 60 70 70 80 70 70 70 70 110 90 160 160 180 180 180 180 210 150 110 110 260 270 270 240 290 310 310 330 340 330 340 370 370 370 370 410 420 430 440 450 450 460 460 460 490 500 520 520 540

90 100

110

190 190 190 220 150 240 190

340 350

O

M

Triangular

(min)

(most likely)

(max)

P

Duration

3 5 6 12 6 24 10 10 4 5 5 5 5 5 10 10 7 7 5 5 5 10 3 15 7 10 7 7 5 7 10 5 7 10 7 5 2 2 5 5 3 12 5 4 12 5 2 5 2 3 2 3 2

5 7 10 15 10 30 14 14 6 10 10 10 10 10 15 14 10 10 7 7 7 15 5 20 10 12 9 9 10 10 12 7 10 15 10 10 3 3 7 7 5 15 7 5 14 7 5 7 5 5 3 4 3

5 7 14 24 14 50 16 16 10 15 15 15 15 15 20 20 15 15 8 10 10 20 7 25 12 15 10 10 15 15 15 12 12 20 15 15 5 5 10 10 7 24 10 7 20 10 7 10 7 9 4 5 4

0.00 4.33 6.33 10.00 17.00 10.00 34.67 13.33 13.33 6.67 10.00 10.00 10.00 10.00 10.00 15.00 14.67 10.67 10.67 6.67 7.33 7.33 15.00 5.00 20.00 9.67 12.33 8.67 8.67 10.00 10.67 12.33 8.00 9.67 15.00 10.67 10.00 3.33 3.33 7.33 7.33 5.00 17.00 7.33 5.33 15.33 7.33 4.67 7.33 4.67 5.67 3.00 4.00 3.00 0.00

(exp. time)

ES

EF

0.00 0.00 4.33 4.33 14.33 31.33 41.33 76.00 76.00 89.33 96.00 76.00 76.00 76.00 106.00 106.00 121.00 121.00 131.67 142.33 142.33 142.33 149.67 116.00 116.00 142.33 152.00 164.33 164.33 121.00 173.00 183.67 183.67 191.67 201.33 216.33 201.33 211.33 211.33 211.33 211.33 218.67 223.67 240.67 248.00 253.33 253.33 268.67 268.67 268.67 276.00 273.33 276.33 276.33 279.33

0.00 4.33 10.67 14.33 31.33 41.33 76.00 89.33 89.33 96.00 106.00 86.00 86.00 86.00 116.00 121.00 135.67 131.67 142.33 149.00 149.67 149.67 164.67 121.00 136.00 152.00 164.33 173.00 173.00 131.00 183.67 196.00 191.67 201.33 216.33 227.00 211.33 214.67 214.67 218.67 218.67 223.67 240.67 248.00 253.33 268.67 260.67 273.33 276.00 273.33 281.67 276.33 280.33 279.33 279.33

(M)

Most Likel The most likely complete the tas thing proceeds a may not be on si

(ES)

Early Sta The ES is the ma predecessors, ex first task where

3 21


SECTIONAL PERSPECTIVE

22


3 23


INTERIOR VISUALIZATIONS

24


3 25


actcc [ advanced construction studio ] spring 2012 aluminum city terrace COMMUNITY CENTER

[ INFO ] Looking at the design inten-

tions of Gropious and Brauer’s Aluminum Terrace City Housing scheme in New Kensington, PA, the design approach to this community center draws cues from the existing building networks as well as the figure ground relationship to the site.

The project is orientated to mirror the figure ground V by directing out to New Kensington to take advantage of the views created from being on top of the flat plane along the hill edge. In addition, it is orientated to shield against the strong western winds and southern sun. Programmatically, it is split into three wings with the parking lot entrance leading into the entry plaza with fitness and gymnasium on the left and the main multi purpose functions on the right extending into the hill edge.

26


  

V. SHELL

IV. INTERIORS

  

 

III. EQUIPMENT & FURNISHINGS



 

II. SERVICES

 

 

I. SUBSTRUCTURE

3 27


FIGURE GROUND STUDIES

SITE PROGRAMS

SITE NETWORKS

SITE CONTEXT

28


SITE PLAN

ENVIRONMENTAL SYSTEMS

Summer Sun Mechanically assisted ventilation

Winter Sun

Shading from Trees

Overhang for Summer

Concrete Floor

Exterior inlets for ventilated mass

Exposed,ventilated Thermal mass

3 29


SECTION DRAWINGS

LONG SECTION





CROSS SECTION

30


WALL SECTION DETAILS

DETAIL BB

DETAIL AA

    



    

       





      







 







1. FRIEZE BOARD 2. WALL SHEATHING 3. VAPOR BARRIER 4. 3/4” AIR SPACE 5. FACE NAILS 6. STARTER STRIP 7. SHIPLAP SIDING

1. EXTRUDED ALUMINIUM TRANSOM 2. EXTRUDED ALUMINIUM MULLION 3. DOUBLE GLAZED UNIT 4. OUTER MESH SCREEN 5. THERMAL INSULATION

3 31


INTERIOR & EXTERIOR VISUALIZATIONS

32


BUILDING MODEL

3 33


design works [ professional and independant works ] [ INFO ] My work reflects a strong

interest in urban design and material processes with extensive knowledge of various digital softwares, drawing and modeling experiences. Over the last few years, I have completed various internships from small to large scale architectural firms; with Leigh & Orange Ltd. in Hong Kong, Unitown Design in Shanghai, China, and DP Architects in Singapore. Outside of architecture, I am also inspired by art and various forms of design.

34


3 35


pastel drawings

mixed media

36


COLORED PENCIL DRAWING

DIGITAL MEDIA

3 37


looney tunes

[ design built CMU CARNIVAL BOOTH ]

38


conceptual process works

6’ 0”

6’ 0” 3’ 0”

3’ 0”

6’ 0”

7’ 0” 45º

7’ 0” 6’ 0” 4’0” 2’0”

8’ 0”

7’ 6”

8’ 5”

3 39


internships

[ Leigh & Orange Ltd. ] Summer 2011 [ INFO ] Internship design work done

for Leigh & Orange Ltd. in the Hong Kong office. Work included proposal bid for the New Hong Kong University Post Graduate Residence, the Revitalization of Ping Shek Estate, and the Chu Hai College of Higer Learning

[ Unitown Design Inc. ] Summer 2012 [ INFO ] Internship design work done

for Unitown Design Inc. in Shanghai, China. Work included the Nan Xun Commercial mixed used development

40


[ DP Architects. ]

Summer 2013

[ INFO ] Works included schematic design of BB Plaza Developement in Malaysia and construction administrative work for the Minton Condominium

3 41


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.