1 minute read

Eumundi Voice - Issue 96, 27 July 2024

Rickety bridge replacement

The ‘rickety bridge’ playground structure located at Dick Caplick Park in Eumundi has been removed as the structure was deemed unsafe due to significant timber rot.

The SCC design team is seeking input from local park goers on a suitable replacement structure that will create a fun and engaging play experience for visitors to the park. The aim is to design a unique play feature that uses strong, durable, sustainable and low-maintenance materials while meeting safety standards and complementing the park’s existing character.

Visit: t.ly/h73TMto participate in the survey and register for project updates. Survey responses will be reviewed to assist with development of the design. Feedback should be provided prior to 8 July.

The new structure will be built in late 2024 or early 2025, to align with the Eumundi streetscape construction works.

This article is from: