Commitment is included
T H E R O Y A L S H A K E S P E A R E C O M P A N Y, T H E C O U R T Y A R D T H E A T R E , U K
When the Royal Shakespeare Company commited to renovating the Swan Theatre in Stratfor upon Avon they chose to construct a very high quality “ t e m p o r a r y ” t h e a t r e n e a r b y. Mr Doug King - Building Services Consultant & and his team undertook t h e b u i l d i n g s e r v i c e s d e s i g n & c h o s e E u r o A i r t o h e l p s p e c i f y, d e s i g n & supply the theatre fabric ducting ventilation. Mr Doug King:- “It was a project that demanded flexible and fast supplie r s i f i t w a s t o m a i n t a i n p r o g ra m m e & b u d g e t . E u r o A i r ’s f a b r i c d u c t i n g w a s a n o b v i o u s c h o i c e p r e c i s e l y b e c a u s e i t i s s o f l e x i b l e a n d f a s t .” M r King also commented on some other aspects of the project revealing the r e a s o n s b e h i n d t h e c h o i c e o f E u r o A i r a s t h e f a b r i c d u c t i n g s u p p l i e r. “ They reallyt involved themselves in the project & were very dedicated in their work. The installed system works in an optimum way & and the t h e a t r e a r e v e r y s a t i s f i e d w i t h t h e s o l u t i o n .”
Euro Air A/S
Industrivej Vest 21
DK-6600 Vejen
Tel. +45 74 84 28 80
info@euroair.eu
www.euroair.eu