PORTFOLIO.
EVA BEHRINGER DIPL.-ING. INTERIOR ARCHITECT
eb
Archicad /G Allplan/ N raphisoft emetsche k Autocad Cinema 4 d/ Maxon & Artlanti Adobe C reative Su s ite: Photosho p, InDesig n, Illustra Premiere tor Pro/ Ado be
SOFTWARE
Date of birth: July 17, 1980 in Stade (Germany) cell 864-328-7213 evabehringer@gmx.de
cv
PROFESSIONAL EXPERIENCE
STUDIES/EDUCATION Since 08/2009
as a Fulbright Scholar: Graduate Studies in Architecture & Health, pursuing Master of Architecture degree, School of Architecture/ Clemson University, SC
07/2009-08/2009
Fulbright Pre-Academic Program, Monterey Institute of International Studies, Monterey, CA
07/2009
Diplom (Dipl.-Ing. (FH)) ( Master of Interior Design/ Architecture/ Engineering equivalent) graduated with honors: GPA: 4,0 University of Applied Science Wismar| Germany
02/2007
Preliminary Diploma University of Applied Science Wismar| Germany
01/2005
Gesellenbrief (Bachelor of Furniture Design equivalent) Jobelmannschule Stade| Germany
01/1998-04/1998
Exchange student of AFS at Pioneer High School, Queensland, Australia
CURRICULUM VITAE
Since 08/2009
Assistantship for Professor David Allison Director of the Architecture + Health Concentration, School of Architecture| Clemson University
05/2010-08/2010
Research Assistant Development of Daylight Guidelines for the Department of Defense Clemson University | School of Architecture
09/2007-03/2008
Internship at Nickl & Partner Architects in Munich, Germany
08/2002-08/2005
Cabinet Maker carpentry of Matthias Sieg, Buxtehude|Germany
11/2001-05/2002
Social Work Carpentry at Community Hospital Stade, Germany
AWARDS 2011
Henry Adams Medal 2011 Clemson University | School of Architecture
2010
2010-2011 AIA Arthur N. Tuttle, Jr. Graduate Fellow in Health Facility Planning and Design Award for the thesis “The Daylight Imperative�
2009
Fulbright Fellowship Grant from the U.S. Department of State and German government to conduct graduate research and study in the United States.
sc
GRADUATE STUDIES IN ARCHITECTURE AND HEALTH SCHOOL OF ARCHITECTURE CLEMSON UNIVERSITY, SOUTH CAROLINA
ASSISTED LIVING
FALL 2010
new identity for a historic neighborhood
site plan
COMPLETING A NETWORK OF SERVICES
FALL 2010 STUDENT DESIGN CHARRETTE
a new emergency and primary care centre for downtown las vegas healthcare design conference 2010 CONTEXT/ CONCEPT SITE: Las Vegas Boulevard BUILDING, current use: Casino and Hotel
KEY SERVICES: PROVIDE EMERGENCY AND URGENT CARE PROVIDE PRIMARY AND PREVENTATIVE CARE PROVIDE WELLNESS AND PHYSICAL THERAPY DESIGN TEAM: Eva Behringer Ryan Remsey Derrick Simpson Sarah Wade Patrick Willke
REVENUE GENERATING/ INTEGRATING IN ITS CONTEXT ENVIRONMENTAL AWARENESS/ RETREAT
REUSE/ADAPT the current spatial program and building infrastructure to accomodate new service typology (health + commercial). REVIVE the existng structural system to create a new pedestrian pathway. REPLACE the existing skin with a new skin system, addressing local climate condition.
SPRING 2010 INCREMENTAL URBANISM a community-based approach The primary driver of the project is the addition of overall value to the community. This is accomplished by concentrating the efforts on people, profits, and the planet.
SPRING 2010 INCREMENTAL URBANISM an interactive tool for community visioning
Local participation and investment are crucial elements to adding community value. For this project a game was developed to get residents involved in the process of planning. Designed symbols and cards giving them the tools they may not otherwise have to express themselves architecturally.
SPRING 2010 INCREMENTAL URBANISM design proposal
SPRING 2010 INCREMENTAL URBANISM design proposal
A HOSPITAL FOR THE CITY
FALL 2009
Topic and challenge
Urban analysis: greater Philadelphia area
The analogy between the design of buildings and cities is one that architects have recognized throughout centuries of architectural history. The project includes an urban analysis including large health facilities and their interaction with the environment and communities. A redevelopment of a community hospital in Norristown, PA follows the analysis.
BUILDING: ...IN THE CITY ...A CITY ...AS A CITY ...FOR THE CITY: A NEW COMMUNITY HOSPITAL FOR NORRISTOWN
ORGIGRAM functions
she wants to go out for lunch during her break
they are waiting for their treatment
A HOSPITAL FOR THE CITY
CONCEPT DIAGRAMS: needs and characteristics of a healthy environment
she just arrived with the bus and wish to have a place to rest
HEALTHY ENVIRONMENT
CENTER FOR HEALTH
HEALTH CENTER
NATURE
he wants to buy some food
GREEN ENVIRONMENT
EDUCATION
HEALTHY LIVING
LIVING SCHOOLS LIBRARY
PARKS
WORKING
FARMERS MARKET
IA
PH
EL AD IL PH
TRAINSTATION
TO
INFRASTRUCTURE
he wants to play
it wishes there is a water place
FALL 2009
she wants to spent time in a park
0' they want to save a life
HE IS LOOKING FOR A FREE PARKING LOT
A HOSPITAL FOR THE CITY
ITAL FOR NORRISTOWN
OASIS
WINTER SUN _ABSORB
PATIENT UNIT 3
PATIENT UNIT 2
OASIS
WOOD ST.
PATIENT UNIT 4
EMERGENCY
PATIENT UNIT 1
MAIN STREET
ON THE STREET
CONCEPT DIAGRAMS
SUMMER SUN _REFLECT
AND INSIDE
FALL 2009
IT RESTS AT THE WATERPLACE
EMERGENCY
THEY SAVE A LIFE
THE SURGEON CAN WALK OUTSIDE AND RELAX
CONCEPT MODELS INFRASTRUCTURE
PUBLIC PARK
TAKE A BREAK
HEALTHY LIVING
RETAIL/SERVICE
COURTYARD_ ACCESS TROUGH THE CAFETERIAS
HEALTH CENTER
MAIN CONNECTION BETWEEN PUBLIC/OUTPATIENT AND INPATIENT/SURGERY
THEY SAVE A LIFE
DEKALB ST.
PUBLIC STREET
GREEN ENVIRONMENT
DAYLIGHT
HOSPITAL WITHOUT WALLS•VIBRANT•BE PART OF•SUSTAINABILITY• GREEN•RELATIONSHIP•WISH•VISIONS•CONNECTED•HUMAN SCALE• TRANSITIONS II HOSPITAL WITHOUT WALLS AS A PARK•NETWORK HEALTHY•SAFE•NATURE•HOSPITAL ENERGY
FORNANCE STREET
existing hospital
DEKALB STEET
POWELL STEET
LOCUST STEET
PARKING
A HOSPITAL FOR THE CITY DESIGN PROPOSAL
PT DROP-OFF
PATIENT BED TOWER
ADMIN
RETAIL
COURTYARD COURTYARD
CIRCULATION SPINE
IMAGING + SURGERY
WOOD STREET
EMERGENCY DEPARTMENT
OUTPATIENT SERVICES
EMS DROP-OFF
PT ER DROP-OFF
PARKING BASIN STREET
HOSPITAL, SCHEMATIC DESIGN
HOSPITAL BIRD‘S VIEW (PHASE 1)
FALL 2009
RISTOWN
AIN MAIN ENTRY ENTRANCE
RETAIL
A HOSPITAL FOR THE CITY
FALL 2009
SHE OBSERVES THE LIFE ON THE STR
DESIGN PROPOSAL
PATIENT TOWE
SHADING PANELS ON SOUTH FACADE INPATIENT TOWER
wi
STUDIES OF INTERIOR DESIGN/ ARCHITECTURE/ ENGINEERING UNIVERSITY OF WISMAR| GERMANY UNIVERSITY OF APPLIED SCIENCE, TECHNOLOGY, BUSINESS AND DESIGN
SPRING 2009
THESIS: A New Children’s Psychiatry University Hospital Marburg | Germany DIPLOMA THESIS SPRING 2009 Prof. Dipl. Ing. Michael Rudnik Prof. Dipl. Des. Rainer Hock TOPIC AND CHALLENGE
The Child and Adolescent Psychiatry in Marburg, Germany is the oldest facility of its kind in the country and is located in several buildings across the University hospital campus. Built in 1946 and earlier, the clinic’s reconstruction and reorganization includes historic preservation and the need to incoporate new buildings on the existing site to create an environment that allows treatment by today’s and future standards.
Schwachpunkte und Mängel auf den Stationen gibt.
STATIONEN/ SCHULE/ THERAPIE
GARTEN
nes Entwurfes genaueDie in einen dem Begleitbuch abgebildeten Fotos wurden von he Situation vor Ort machen den Mitarbeitern, Kindern/ Jugendlichen und der Direktion der Klinik um ihre Mitarbeit, der Klinik im Februar/März 2009 fotografiert. ieren.
innen
innen innen
innen
Derüber Außenbereich sollte sowohl Platz für sportlich Jede Station soll ihren eigenen Freibereich verfügen. tivitäten als auch RuheDer Außenbereich sollte sowohl Platzund für Entspannungsmöglich sportliche Akbieten. tivitäten als auch Ruhe- und Entspannungsmöglichkeiten bieten.
GARTEN
außen außen
innen Abb. 67 Bestandssituation Struktur Abb. 67 BestandssituationAußenraumbezüge Struktur
THESIS:
SPRING 2009
innen MASTER PLANNING: BUILDING AS außen außen A SMALL VILLAGE
s unterschiedlichen SichtweiAußenraumbezüge orstellungen und Wünschen gebenheiten zu bekommen. führen zu einer großen Verschattung auf der Nor 59 Abb. 60 b es aus Abb. persönlicher Sicht des großen Gebäudes. Deshalb wird vorgeschlagen, führen zu einer Verschattung auf der Nordseite den A STATIONEN/ Abb. 61 STATIONEN/ 59-61built Fotoaktion Case study: of staff GARTEN and children Abb. ofJede their environment GARTENperception Station soll über ihren eigenen Freibereich verfügen. SCHULE/ THERAPIE 6.1.2 Einbindung des SCHULE/ THERAPIE desPATIENT Gebäudes. Deshalb wird Außenraumes vorgeschlagen, den Anbau ANALYSE 51 auf den Stationen gibt. STATIONEN/ TOWER +GARTEN Der Außenbereich sollte sowohl Platz für sportliche AkSCHULE/ THERAPIE 6.1.2 Einbindung des Außenraumes ersetzen. Diese Maßnahme ermöglicht die Realisi +GARTEN tivitäten als auch Ruhe- und Entspannungsmöglichkeiten STATIONEN/ GARTEN bieten. STATIONEN/SCHULE/ THERAPIE
ebildeten Fotos wurden von gendlichen und der Direktion 009 fotografiert.
GARTEN
innen
innen
fließende
außen
innen
Abb. 60
Abb. 67 Bestandssituation Struktur Außenraumbezüge
Abb. 59-61 Fotoaktion
GARTEN SCHOOL
SCHULE/ THERAPIE
außen
Abb. 61
ANALYSE
51
fließende Übergäng
Übergäng
e
e
g nach Bewegung außen sraum Öffnun g nach Bewegung innen außen innen außen sraum außen innen außen Abb. innen 65 Umstrukturierung Funktionsbereiche Abb. 68 der Zielplanung innen außen Einbindung der Topographie Abb. 65 Umstrukturierung Funktionsbereiche Abb. 68 der Zielplanung außen innen Einbindung der Topographie Abb. 67 Bestandssituation Struktur außen Abb. 67 BestandssituationAußenraumbezüge Struktur
6.1.3 Abriss des Anbaus des NEUBAU VERBINDUNGSGEBÄUDE/ building 6.1.3 Abriss desBettenhauses Anbaus des new und Neubau AKUTSTATION NEUBAU VERBINDUNGSGEBÄUDE/ Bettenhauses und Neubau organization AKUTSTATION
GARDEN
Außenraumbezüge
führen zu einer großen Verschattung auf der Nordseite Abb. 66 Neue Bereichsgliederung des Gebäudes. Deshalb wird vorgeschlagen, den Anbau NEUE BEREICHSGLIEDERUNG
STATIONEN/ SCHULE/ THERAPIE +GARTEN
1 Fotoaktion
Abb. 61
STATIONEN/ SCHULE/ THERAPIE
GARTEN
fließende
ANALYSE GARTEN
6.1.2 Einbindung des Außenraumes GARTEN
51
Übergän
ge
STATIONEN/
THERAPIE ersetzen. Diese Maßnahme ermöglicht SCHULE/ die Realisierung einer im Erdgeschoss liegenden Station mit eigenem gesiJede Station soll über ihren eigenen Freibereich verfügen. cherten sonnigen Freibereich. Der Außenbereich sollte sowohl Platz für sportliche Aktivitäten als auch und Entspannungsmöglichkeiten Die RuheAkutstation sollte über einen Schleusenzugang und bieten. ein Beobachtungs- und Überwachungszimmer mit direkter Anbindung an das Stationszimmer verfügen.
GARTEN
Öffnung nach au gsraum ßen
Bewegun
innen
RESEARCH einer im Erdgeschoss liegenden Station mit eigenem ersetzen. Diese Maßnahme ermöglicht die Realisierung Jede soll über ihren eigenen Freibereich verfügen. cherten sonnigen Freibereich. einerStation im Erdgeschoss liegenden Station mit eigenem gesiDer Außenbereich sollte sowohl Platz für sportliche AkJede Station soll über ihren eigenen Freibereich verfügen. cherten sonnigen Freibereich. TREATMENT tivitäten als auch Der Außenbereich sollte sowohl Platzund für Entspannungsmöglichkeiten sportliche Die RuheAkutstation sollte überAk-einen Schleusenzugan bieten. tivitäten als auch undein Entspannungsmöglichkeiten BeobachtungsundSchleusenzugang Überwachungszimmer Die RuheAkutstation sollte über einen und mit d bieten. Anbindung an das Stationszimmermit verfügen. ein Beobachtungsund Überwachungszimmer direkter GARDEN Anbindung an dasGARDEN Stationszimmer verfügen. Öffnun
GARTEN
SCHULE
Die geringe Gebäudetiefe und die enge bauliche Subgang zu vermeiden stanz lassen eine Nutzung nur schwer zu und Die geringe Gebäudetiefe und zeitgemäße die enge bauliche Subführen zu einer Nutzung großen Verschattung stanz lassen eine zeitgemäße nur schwer zuauf undder Nordseite vom stationären Bereich zu erhöhen des Gebäudes. Deshalb wird vorgeschlagen, den Anbau führen zu einer großen Verschattung aufUMSETZUNG der Nordseite 55 STATIONEN Jede Station soll über ihren eigenen Freibereich verfügen. IM BETTENHAUS tenhaus transportiert werden müssen desDeshalb Bettenhauses abzureißen und durch einen Neubau zu des Gebäudes. wird vorgeschlagen, den Anbau STATIONEN IMDiese BETTENHAUS ersetzen. Maßnahme ermöglicht des Bettenhauses abzureißen und durch einen Neubaudie zu Realisierung einer im Erdgeschoss liegenden Station mit eigenem gesiersetzen. Diese Maßnahme ermöglicht die Realisierung THERAPIE cherten sonnigen SCHULE einer im Erdgeschoss liegendenFreibereich. Station mit eigenem gesiErgotherapie THERAPIE cherten sonnigen Freibereich. Musiktherapie Ergotherapie Die Akutstation sollte über einen Schleusenzugang und Musiktherapie Krankengymnastik ein BeobachtungsundSchleusenzugang Überwachungszimmer Die Akutstation sollte über einen und mit direkter Krankengymnastik Gärten Anbindung an das Stationszimmermit verfügen. Gärten ein Beobachtungsund Überwachungszimmer direkter Gärtenan das Stationszimmer verfügen. Anbindung Gärten
6.1.3 Abriss des Anbaus des Schulhof Abb. 68 Zielplanung NEUBAU VERBINDUNGSGEBÄUDE/ Bettenhauses und Neubau REORGANIZATION OF THE UNIVERSITY HOSPITAL Schulhof Einbindung der Topographie Abb. 68 Zielplanung AKUTSTATION integrated garden in site the
innen außen
außen Abb. 65 Umstrukturierung Funktionsbereiche Abb. 68 der Zielplanung innen Einbindung der Topographie Abb. 67 Bestandssituation Struktur Außenraumbezüge
außen
Einbindung der Topographie
facility: strong connection to nature Abb. 69 Bestandssituation Lageplan: Außenraumbezüge Abb. 70 Zielplanung Lageplan: and smooth transitions die gesamte Fläche wird zum Aktionsraum der Klinik Abb. 70 Zielplanung Lageplan:
Abb. Bereichsgliederung Abb.6669Neue Bestandssituation Lageplan: Außenraumbezüge Die geringe Gebäudetiefe und die enge bauliche Substanz lassen eine zeitgemäße Nutzung nur schwer zu Abb. und66 Neue Bereichsgliederung führen zu einer großen Verschattung auf der Nordseite
die gesamte Fläche wird zum Aktionsraum der Klinik
THESIS: THE EXTERIOR
SPRING 2009
THESIS:
+0,80
SPRING 2009
THE INDIVIDUAL SPACE
+0,60
+0,45 +0,30
24
3,76
24
24
3,76
1,76
BAD
+0,15
15
FB: MOSAIKFLIESEN BF: 3,84 m2
1,76
24
1,16
60
15
1,85
1,03
22
1,76
30
+0,00
1,76
24
1,06
70
24
ZIMMER
FB: MOSAIKFLIESEN BF: 3,71 m 2
FB: LINOLEUM BF: 20,48 m2
3,61
2,01
BAD
+0,15
15
BAD
365
365
FB: LINOLEUM BF: 19,54 m2
ZIMMER
+0,00 -0,00
365
3,04
FB: LINOLEUM BF: 16,93 m2
1,58
ZIMMER
-0,15
-0,15
365
6,31
745
+0,00
FB: MOSAIKFLIESEN BF: 3,71 m 2
floorplan groundfloor
515
Planungsaufgabe: Untersuchung zur möglichen Nutzung als Fitnessstudio Eigene Konzeption: Gesundheitszentrum im alten Speicher
Die Idee meines Entwurfes ist den ehemaligen Thormann-Speicher zukünftig als Gesundheitszentrums zu nutzen. Gesundheitsthemen werden in Zukunft immer mehr an Bedeutung in Fitnessstudios zunehmen.
FALL 2008
Das Konzept des Gesundheitsspeichers ist es Gesundheit zu erhalten oder wieder zu erlangen. Ein gesunder Körper und das Wohlbefinden hängt neben der Fitness auch stark mit der Entspannung und guter Ernährung zusammen. Dies sind Themen, die im Gesundheitspeicher an erster Stelle stehen - für Einheimische und für Touristen.
spa
HEALTH CENTER IN HISTORIC ENVIRONMENT Vormodell
The design studio includes an utilization concept and the conversion of a heritage listed granary into a health center. The goal of the restructuring is to stimulate the historical area in Wismar and to increase the attractiveness of the port.
es ist den ehemaligen Thormann-Speicher szentrums zu nutzen. Gesundheitsthemen werden n Bedeutung in Fitnessstudios zunehmen.
dheitsspeichers ist es Gesundheit zu erhalten oder
das Wohlbefinden hängt neben der Fitness auch g und guter Ernährung zusammen. Dies sind Ideenskizzen heitspeicher an erster Stelle stehen r Touristen.
Main design topics are contrasts between inside and outside, light and dark, and waterEBENENSCHNITT and fire. M 1: 50 Vormodell
Gesundhe Entwurf: E 7.Semester Inn
Betreuung: Pr
Das Gebäude
FALL 2008
Der alte denkmalgeschütze Thormannspe deren Speichergebäuden, Silos und Lager Hafen von Wismar. Ursprünglich wurde de Plan der Hansestadt Wismar ist es auf de „Holzstadt“ zu errichten. Dies beinhaltet staltungszentrum und Hotel. Ziel dieser U beleben und die Attraktivität des Hafens steigern.
HEALTH CENTER IN HISTORIC ENVIRONMENT CONCEPT
WELLNESS: SAUNA, WHIRLPOOL, MASSAGE, YOGA NUTRITION: COOKING SCHOOL
GYM: FITNESS Schwe AND EXERCISE im En
Fitnes
Kraft, Au
Ernäh
Kochsch
Health Center in historic storehouse Old town of Wismar (World heritage)
Entsp HEALING: Sauna, W PHYSIO- Training THERAPY, Heile MEDICAL Physioth OFFICE Ernährun unterschiedliche Themenbereiche im Gesundheitsspeicher
FUNCTIONS
FALL 2008
1
2
3
HEALTH CENTER IN HISTORIC 6 5 ENVIRONMENT
4
ER +14,725
fen
Kochschule im Gesundheitsspeicher
peicher
Massage
+8,945
Schulungsraum
Fitness im Gesundheitspeicher
92
Physiotherapie +6,585
+6,515
+4,095
+4,095
+3,115
+3,81 515
61
145
mit anischen enutzt. ne Verannde zu ern zu
Entspannung: SPA und Wellness +11,395
B
C
D
E
F
EBENENSCHNITT
A
G
KOCHSCHULE
A
B
C
D
E
FLOATING
Schwimmen Sauna Sole Whirlpool
TECHNIK BF: 18,31 m2
G
FALL 2008
HEALTH CENTER IN HISTORIC ENVIRONMENT FLUCHTTREPPE
EBENENSCHNITT
EBENE 0 M 1: 100
F
EBENE 03 M 1: 100 Physiotherapie Gesundheits-/ Ernährungsberatung Kneipp Stretching Geräte 1
1 BERATUNG BF: 24,47 m2
WARTEN BF: 15,47 m2
SOLE GLAS
SPIEGEL
BF: 10,94 m2
PFBAD
9,52 m2
EINGANG
STRETCHING
+7,36
FB: KAUTSCHUK BF: 3,18 m2
LINOLEUM BF: 29,33 m2
2
UNTERSUCHUNG BF:
14,90 m2
+7,36
GERÄTE 1
EMPFANG/ BÜRO
BF: 17,42 m2
BF:
20,22
m2
GEBÄUDESCHNITT +8,36
3 ENTSPANNEN BF:
29,07 m2
GEBÄUDESCHNITT
GEBÄUDESCHNITT 4
+8,07
WHIRLPOOL
0 GRAD
BF:
8,51 m2
6,65 m2
KNEIPP FB: SCHIEFER BF: 33,08 m2 +8,22
0 GRAD 9,86 m2
model of the health center
EMPFANG/ TRESEN
LAGER
FB: BF:
BF: 6,90 m2
KAUTSCHUK 9,06 m2
PHYSIOTHERAPIE 1 BF:
23,68 m2
-0,35
5 +8,36
GRÜNFLÄCHE
ABKÜHLEN SAUNA BF:
BF:
25,50 m2
19,63 m2
WARTEBEREICH BF:
17,14 m2
PHYSIOTHERAPIE 3 BF:
15,92 m2
PHYSIOTHERAPIE 2 BF:
25,41 m2
6
floorplan groundfloor ENSCHNITT
-1,40
Gesundheitsspeicher Entwurf: Eva Behringer 7.Semester Innenarchitektur
LIGHT OBJECTS simple system-complex capacities
CAN BEAUTY CAN BE BEAUTY BE Pattern Rundvorlage M 1:500 1200 x 800 mm
CUTTING MODEL OBJECT 1 1200MM x 800MM
CUTTING MODEL OBJECT 2 1000MM x 700MM Pattern Fl채chenvorlage M 1:500 1000 x 700 mm
SPRING 2008
OBJECT 1
OBJECT 1
OBJECT 2
SWAROVSKI CHAIR
SPRING 2008
Student Design Competition for Swarovski AG 1st prize
+ pea
template
= base: chrome-plated steel tubing
seat: formed veneer
IZM-FRAUNHOFERINSTITUTFÜR ZUVERLÄSSIGKEITUNDMIKROINTEGRATION A
B
C
D
2007-2008 INTERN AT NICKL ARCHITECTS
09126CHEMNITZ REICHENHAINERSTRASSE88 TEL.0371/53133130
F
E
PLANINHALT
LVÜBERSICHTSPLAN
facade construction design frauenhofer research center chemnitz | germany
DG Technik
3.OG Wiss. Hilfskr.
SCHNITTAA
3.OG Prozeß -test
2.OG optische Meßtech.
BAUHERR:
FRAUNHOFERGESELLSCHAFT 80686MÜNCHEN HANSASTRASSE27c TEL.089/1205-0FAX-7549
1.OG Grad. Pers.DZ
2.OG Oase
PLANVERFASSER:
EG Trafo1
EG Putzraum
NICKL&PARTNERARCHITEKTENAG LINDBERGHSTRASSE19 80939MÜNCHEN TEL.089/360514-0 FAX.-1442
EG Bespr.
Innenhof
1:175
31.08.2007
MASSSTAB
PLANDATUM
FREIGEGEBENNURFÜR: UG Kältezentrale
Verbau, Verfüllungmitvorh.Aushub entsprechendden geologischenSchichtenaufbau
UG DI-Wasser
-
i.A.-
DATUM INDEX
1 RB Stb
A3.131 PLANNUMMER
E
F
10 F1 dampfdichteFolie
+8.415 OKFFB
+8.415
ACHSERIEGEL
A
B
C
D
E
-
A
-
TEIL
STATUS
INDEX
F
10
1 RB Stb
1
10 F1 dampfdichteFolie
1
11 F1 L-Winkelprofil,Stahl, n.stat.Erfordernis
2
11 F1 L-Winkelprofil,Stahl, n.stat.Erfordernis
3
12 F1 Pfosten-Riegel-Fassade,200/56, Aluminiumeloxiert/pulverbeschichtetn.RAL/NCS, Farben.WahlAG
26
+8.345 OKSTBDECKE
12
4
6
11 OKFFEG+/-0,00=320,10mNN
14 F1 Blockfenster,Klappflügel, motorischbetrieben, Isolierverglasung,Aluminiumeloxiert/ pulverbeschichtetn.RAL/NCS,Farben.WahlAG
1
IZM-FRAUNHOFERINSTITUTFÜR +2.50 UKSTü.FFB ZUVERLÄSSIGKEITUNDMIKROINTEGRATION 09126CHEMNITZ REICHENHAINERSTRASSE88 TEL.0371/53133130
17 F1 DeckleisteP-R-K,50/10,Aluminium eloxiert/pulverbeschichtetn.RAL/NCS,Farben.WahlAG
25
OASE,
+8.04 UKSTBDECKE
RB MBA 1 DD 2 SP 3 ST 4
-
PLANNUMMER
A
ROHBAU METALLBAU C D E F DACHDECKER SPENGLER STAHLBAU TEIL
B
STATUS
27 13 +7.425
ACHSERIEGEL
PLANINHALT
STANDARDFASSADE TAPETENTÜRVERTIKAL ACHSE4/F
56 F3 Kalzium-Silicat-Platted=20mm
VORABZUG
VORABZUG
BAUHERR:
FRAUNHOFERGESELLSCHAFT 80686MÜNCHEN HANSASTRASSE27c TEL.089/1205-0FAX-7549
66 TB Abhangdecke
17
BAUHERR:
FRAUNHOFERGESELLSCHAFT 80686MÜNCHEN HANSASTRASSE27c TEL.089/1205-0FAX-7549
PLANVERFASSER:
NICKL&PARTNERARCHITEKTENAG LINDBERGHSTRASSE19 80939MÜNCHEN TEL.089/360514-0 FAX.-1442
14
1:5
20.10.2007
MASSSTAB
PLANDATUM
PLANVERFASSER:
55 26
±0.00 OKFFB FREIGEGEBENNURFÜR:
-
29
i.A.-
DATUM INDEX
27
NICKL&PARTNERARCHITEKTENAG LINDBERGHSTRASSE19 80939MÜNCHEN TEL.089/360514-0 FAX.-1442
1:5
20.10.2007
MASSSTAB
PLANDATUM
FREIGEGEBENNURFÜR:
PLANVERFASSER DATUM
ÄNDERUNG
-
i.A.-
DATUM INDEX
5
+7.05 UKAHD 66 20 +6.93 ACHSERIEGEL
13
LEGENDE:
RB MB DD SP ST
ROHBAU METALLBAU DACHDECKER SPENGLER STAHLBAU
EST ESTRICH TB TROCKENBAU AA AUßENANL. SCHR SCHREINER ELT ELEKTRO
EST TB AA SCHR ELT
OKFFEG+/-0,00=320,10mNN
09126CHEMNITZ REICHENHAINERSTRASSE88 TEL.0371/53133130
52 F3 Polysterol-DämmplattePSSEWLG03510cm
29 12
INDEX
6
IZM-FRAUNHOFERINSTITUTFÜR ZUVERLÄSSIGKEITUNDMIKROINTEGRATION
29 F1 TürschwelleEdelstahl
51 F3 Klebeschichtd=10mm
53 F3 ArmierungmitGewebeeinlage mitorganischemKlebe-undArmierungsmasse, Egalisationsspachtelungmitorganischen Oberputz(Kornstärke1,5mm),Schlußbeschichtung mitorganischenOberputz(Kornstärke1,0mm)
-
5
26 F1 Winkelprofil,Aluminium,eloxiert/ pulverbeschichtetn.RAL/NCS,Farben.WahlAG 27 F1 Schlitzrinne
53 F3 ArmierungmitGewebeeinlage undorganischerKlebe-undArmierungsmasse, Egalisationsspachtelungmitorganischen Oberputz(Kornstärke1,5mm),Schlußbeschichtung mitorganischenOberputz(Kornstärke1,0mm) 55 F3 dauerelastischesKompriband
GESCHOSSDECKENANSCHLUSS, VER
29 F1 P-R-K,T-Profil,200/56, PfostenbeidseitigmitBrandschutzplattebeplankt, Aluminiumblechkaschierungbeidseitig, pulverbeschichtetn.RAL/NCS,Farben.WahlAG
+2,475ACHSERIEGEL
53
FASSSADEP-R-K,
27 F1 vollflächigeEmaillierungaufPos.13
A3.176 LEGENDE:
ÄNDERUNG
+2,50OKRIEGEL
56
PLANINHALT
26 F1 Hohlprofil,Stahl,n.stat.Erfordernis
5
25 F1 WärmegedämmteStahlblechtür, verwindungssteif, pulverbeschichtetnachRAL/NCS mitsenkbarerBodendichtung
5
13 F1 Isolierverglasung
11
bündig
17
PLANVERFASSER DATUM
LEGENDE:
PLANVERFASSER DATUM
ÄNDERUNG
ESTRICH TROCKENBAU AUßENANL. SCHREINER ELEKTRO
2007-2008 INTERN AT NICKL ARCHITECTS construction drawings:pet research center and radioactive control areas juelich | germany Zeichnungsnummer:
Index:
Stand:
15.16_ A2.240-SCHNITT EE1
A
B
C
D
E
+ 0,00= 92,05m
F Projekt:
FORSCHUNGSZENTRUM JÜLICH NEUBAU PETGEBÄUDE 15.16 und LABORGEBÄUDE 15.9
ProjektNr.: Bauherr:
Freigabe:
Projektsteuerung: Planungskoordination:
Freigabe:
Architekt:
Überwachung
Konsole
Scanner 365
Freigabe:
JMP-INGENIEURBÜRO JAEGER, MORNHINGWEG+PARTNER
Freigabe:
VOR DEM LAUCH 4 70567 STUTTGART
TGA2: Fachplaner:
15
Freigabe:
LEONHARD, ANDRÄ & PARTNER
LENZHALDE 16 70192 STUTTGART
TGA1: Fachplaner: Scanner
NICKL & PARTNER ARCHITEKTEN AG
LINDBERGHSTRASSE 19 80939 MÜNCHEN
Tragwerksplanung:
5
30 29 11
+8.17
Freigabe:
25
WD15/15
Tiervorbereitung
Scanner
1.15
20
50
40
1.05
40
90
Planungsphase:
15 50
61
1.50
WDL50/50
Planverfasser:
30
WD100/100
20
Flur Radiopharmakaherstellung
Vorläufersynthese
Bearbeitung: 2LagenPE-Folie
1.53
Vorbereitung
2LagenPE-Folie
Qualitätskontrolle -3.83
30
-4.33
BetonC16/20
SCHNITT E-E
1:100 15.16
15
50
1.50
AchseMRT
40 1.00
77
-1.55
50
Maßstab:
GebäudeNr.:
Planart:
ARCHITEKTUR
ABSCHIRMTÜR
ABSCHIRMTÜR
Freigabe:
ENTWURFSPLANUNG
Gewerk:
AchseMRT
±0.00
-0.08
40
Generalunternehmer:
WDL50/50
90
Scanner
11.28
11.22
Autoradiographie
SteuerleitungenMRT
SteuerleitungenMRT
2.20
Dekontamination
WD40/50 50
8.60
SteuerleitungenMRT
7cmWDVS
Metaboliten
WD40/50
20 30 20
50
WD20/50
WD40/50 1.57
30
30
+3.62
AN Geprüft:
Dateinahme:
NICKL & PARTNER ARCHITEKTEN AG
LINDBERGHSTRASSE 19 80939 MÜNCHEN
Abteilung:
N+P Abteilung:
Datum:
PlanbasisGewerk
Index:
Ersatzfür:
Index:
PlanbasisBautechnik
Index:
0
08.02.08 Datum:
FürdieseZeichnungbeanspruchenwiralleUrheberrechte.VervielfältigungoderWeitergabe anDrittenurnachunserervorherigenZustimmung.SchutzvermerkISO16016beachten!
-5.88
15.16
15.14
FALL/SPRING 2007-2008 INTERN AT NICKL ARCHITECTS
construction drawings:pet research center and radioactive control areas juelich | germany
Kopierer
1
1020 Dokumentation,Archiv 20 18.5m²
FensteralsFluchtweg
1021 Büro 18 20.2m²
2
1022 Büro 18 20.2m²
3 1023 Büro(Leitung) 20 20.2m²
1000d Flur 28.72m2
1024 Besprechung,Aufenthalt 20 17.2m²
4
1025 ELT-Verteiler 6,5 2.65m² 1V07 Schacht 0.67m²
T30/RS
1026b WC 4.7m²
1A01 Aufzug 5.44m² 2,00x2,90mLichte
5
1027b WC 4.6m²
1027a WC 1.6m²
1026a WC 1.5m²
Einbringung Technik -4,33
6
7
T30/RS
15Stg17,3/27cm
1T01 Treppenraum 45.27m²
1.60
RR100/100
WD20/20 10cmUKD
10Stg17,2/27cm
1019 NSHV-NOTSTROM 20 16.54m²
1018 NSHV-AV 32 19.78m²
A
1.60
1017 Lüftung/Sanitär/AnschlussFernwärmeKälte/DI-Wasser/Drucklu 159.7m²
Zeichnungsnummer:
112
111
BÜRO
BÜRO
18.14qm
2.135
1V01 Schacht 6 8.44m²
F90
F90 1014 Personenschleuse 30 29.4m²
F90
1013 Wareneingang 10 11.6m²
1V05
1V02 Schacht 1.10m²
F90
1015 SV 6 5.12m²
T30/RS
Projekt:
FORSCHUNGSZENTRUM JÜLICH NEUBAU PETGEBÄUDE 15.16 und LABORGEBÄUDE 15.9
ProjektNr.: Bauherr:
Freigabe:
Projektsteuerung: Planungskoordination:
1002 Putzraum 4.56m²
110
Freigabe:
MR-Technik/Lüftung 58.98qm DD15/15
RRDN100
Architekt:
Lüftung
Tragwerksplanung:
fürMRT
Kontrollbereich
TGA1: Fachplaner:
1003a Pers.SchleuseReinraum 10 19.12m²
1004a Radiopharmakaherstellung 80 90.5m²
16Stg17,3/27cm
1007b Zyklotron 45 44.7m²
1006 Qualtitäskontr. 30 31.9m² 1003b Vorläufersynthese 30 34.3m²
1004c Wägekab. 5 7.4m²
1T02 Treppenraum 17.47m²
Freigabe:
JMP-INGENIEURBÜRO JAEGER, MORNHINGWEG+PARTNER
Freigabe:
VOR DEM LAUCH 4 70567 STUTTGART
TGA2: Fachplaner:
Planungsphase:
Freigabe:
ENTWURFSPLANUNG
Gewerk:
1007b Zyklotron
Planart:
ARCHITEKTUR
Durchreiche 1004b Vorbereitung 5 11.33m²
-5,88
Planverfasser: -1,55
Spülmaschinemit Durchreiche
Einbringöffnung wirdnachGeräteaufstellunggeschlossen Schwelle-1,00
10
Bearbeitung:
AN Geprüft:
2.Fluchtweg
B
C
GRUNDRISS EBENE 1 UNTERGESCHOSS
Maßstab:
1:100
GebäudeNr.:
15.16
NICKL & PARTNER ARCHITEKTEN AG
LINDBERGHSTRASSE 19 80939 MÜNCHEN
Abteilung:
N+P Abteilung:
Datum:
PlanbasisGewerk
Index:
Ersatzfür:
Index:
PlanbasisBautechnik
Index:
0
08.02.08 Datum:
-4,33
"Lichtgraben"
D
D1
E
E1
A
A
EinbringungBleizellen
Freigabe:
Generalunternehmer: 9Stg17,2/27cm
1005 Verpackung 10 10.42m²
Freigabe:
LEONHARD, ANDRÄ & PARTNER
LENZHALDE 16 70192 STUTTGART
Obergeschoss
-4,33
NICKL & PARTNER ARCHITEKTEN AG
LINDBERGHSTRASSE 19 80939 MÜNCHEN
T30/RS T30/RS
1000b Flur 103.03m2
9
WD20/20 UKD
T30
F90
F90
F90
WD1,30/40 12cmUKD
1001 Putzraum 4.56m²
1V04 Schacht 0.79m²
F90
F90 F90
1V01 Schacht 1.10m²
DD50/20
T30 T30
1012 Spektroskopie 20 9.6m²
+ 0,00= 92,05m
WD1,70/40 12cmUKD
1016 AV 6 5.83m²
1V06 AHD F90
AHD F90
2.50
T90 3Stg16,6/27cm
-3,83
F90
1011 Materiallager 20 18.63m²
F90
1010 Materiallager 20 13.0m²
F90
1009 Strahlen10 14.9m²
Blindtür spätereVerbindungzuGeb.15.16
1000c Flur 8.47m2
T30
8 1008 WarmeWerkstatt 20 21.6m²
WD40/40 UKD
WD1,30/30 12cmUKD
T30
1000a Flur 32.54m2
Stand:
15.16_ A2.090-UG_EBENE 1
19.87qm
T30
Index:
WD40/40 UKD
F
Dateinahme:
4.00
FürdieseZeichnungbeanspruchenwiralleUrheberrechte.VervielfältigungoderWeitergabe anDrittenurnachunserervorherigenZustimmung.SchutzvermerkISO16016beachten!
-1,55
SPRING 2007 COURTYARD HOUSE A NEW HOME IN AN OLD VILLAGE
Das Hofhaus
KICKER FB: PARKETT BF: 7,19 m2
-0,3
±0,00 ABSTELLRAUM FB: BF:
PARKETT 2,78 m2
WOHNZIMMER FB:
Schiefer
BF:
24,75 m2
FB: BF:
BÜRO
TREPPE
Projektbeschreibung
KÜCHE/ ESSBEREICH
FB: PARKETT BF: 14,88 m2
FB: PARKETT BF: 6,80 m2
PARKETT 37,15 m2
Projektbeschreibung
Das Konzept und die Idee
Das Konzept und die Idee
Aufgabenstellung: Entwurf eines Gebäudes für eine Person 18 Stg 17,5 / 28 cm
Das gewählte Grundstück für das Hofhausprojekt liegt im Zentrum des Dorfes Forst mit circa 7000 Aufgabenstellung: Einwohnern in der Nähe von Bruchsal in Süddeutschland. Entwurf eines Gebäudes für eine Person
TERRASSE
Adresse: Schwanenstraße 41 Forst, Kreis Karlsruhe, Baden Württemberg
FB: EICHE BF: 54,44 m2
Der Besitzer dieses Grundstückes ist Geschäftsinhaber eines Floristengroßhandels. Ziel war es Adresse: Grundstücksgröße: ein nutzerorientiertes Haus zu entwerfen, daß Schwanenstraße 41 die Länge des Grundstückes für sich nutzt, den 1000 m² Länge 85 m, Breite 13,5 m Das Grundstück wird durch eine alte Steinmauer in vorhandenen Baum und die alte Steinmauer erForst, Kreis Karlsruhe, Baden Württemberg zwei Teile geteilt: die vordere Bebauungsfläche und hält, sich zur Straßenseite abschirmt und zuder offene Garten. Auf dem vorderen Teil steht ein alter sätzlich neben dem offen gehaltenen hinteren Walnußbaum der nicht gefällt werden sollte. Gartenbereich umschlossene Freifläche bietet. Grundstücksgröße: FLUR
FB: PARKETT BF: 20,01 m2
Das gewählte Grundstück für das Hofhausprojekt liegt im Zentrum des Dorfes Forst mit circa 7000 Einwohnern in der Nähe von Bruchsal in Süddeutschland.
WC
FB: SCHIEFER BF: 1,61 m2
FB: SCHIEFER BF: 3,04 m2
TROPENGEWÄCHS BF:
2,84 m2
GARAGE
FB: PARKETT BF: 2,07 m2
SCHLAFZIMMER
BF: 29,93 m2
QUERSCHNITT
ANKLEIDE
FB: BF:
VORRAUM
GÄSTE WC
FB: SCHIEFER BF: 2,18 m2
N
1000 m² Länge 85 m, Breite 13,5 m Das Grundstück wird durch eine alte Steinmauer in zwei Teile geteilt: die vordere Bebauungsfläche und der offene Garten. Auf dem vorderen Teil steht ein alter Der Schwerpunkt des Entwurfes liegt in der Bildung Walnußbaum der nicht werden von gefällt Höfen. Diese variierensollte. in ihrer Größe und sind
PARKETT 16,66 m2
HWR
FB: SCHIEFER BF: 6,32 m2
BAD
N
FB: SCHIEFER BF: 9,40 m2
BF: 14,05 m2
Der Besitzer dieses Grundstückes ist Geschäftsinhaber eines Floristengroßhandels. Ziel war es Straßenansicht M 1: 100 ein nutzerorientiertes Haus zu entwerfen, daß 1. Obergeschoss 1: 50 Grundstückes für sich nutzt, den die Länge Mdes BF 1.OG 110 m² vorhandenen Baum und die alte Steinmauer erhält, sich zur Straßenseite abschirmt und zusätzlich neben dem offen gehaltenen hinteren Gartenbereich umschlossene Freifläche bietet.
VIEW FROM THE STREET
+7,50
Straßenansicht M 1: 100
in ihrer Lage auf dem Grundstück unterschiedlich gestaffelt. Je nach Position und Nutzung ist die Einsicht halboffen, wie zur Strasse hin, oder nur intern erschließund einsehbar (Bad/ Schlafhof).
HOF
3
HOBBY
GALERIE FB: PARKETT
1
BF: 18,32 m2
Das Hofhaus FB: PARKETT BF: 5,52 m2
3
Erschließung/ Büro Wohnen
Der Schwerpunkt des Entwurfes liegt in der Bildung von Höfen. Diese variieren in ihrer Größe und sind in ihrer Lage auf dem Grundstück unterschiedlich gestaffelt. Je nach Position und Nutzung ist die Einsicht halbofModellfotos fen, wie zur Strasse hin, oder nur intern erschließund einsehbar (Bad/ Schlafhof). ±0,00
Projektbeschreibung
BAD FB: SCHIEFER BF: 10,81 m2
Aufgabenstellung: Entwurf eines Gebäudes für eine Person LÄNGSSCHNITT
GAST Adresse: Schwanenstraße 41 Forst, Kreis Karlsruhe, Baden Württemberg FB: PARKETT
Das Konzept und die Idee
2,085
Das gewählte Grundstück für das Hofhausprojekt liegt im Zentrum des Dorfes Forst mit circa 7000 Einwohnern in der Nähe von Bruchsal in Süddeutschland.
BF: 26,01 m2
N
Grundstücksgröße: 1000 m² Länge 85 m, Breite 13,5 m Das Grundstück wird durch eine alte Steinmauer in zwei Teile geteilt: die vordere Bebauungsfläche und der offene Garten. Auf dem vorderen Teil steht ein alter Walnußbaum der nicht gefällt werden sollte. UERSCHNITT
Schlafen
+3,15 30
2
FB: PARKETT BF: 21,78 m2
Höfe Hof 1 halboffen Hof 2 Nutzung vom Schlafzimmer/ Bad / Tropengarten und HWR möglich Hof 3 VerbindungFLUR zwischen dem Garten- und Wohnbereich, große Holzdeckterrasse und Walnußbaum.
2,85
Sichtachsen und Sichtbezüge
er
er
Das Hofhaus
Der Besitzer dieses Grundstückes ist Geschäftsinhaber 2 eines Floristengroßhandels. Ziel war es ein nutzerorientiertes Haus zu entwerfen, daß 1 die Länge des Grundstückes für sich nutzt, den vorhandenen Baum und die alte Steinmauer erhält, sich zur Straßenseite abschirmt und zusätzlich neben dem offen gehaltenen hinteren Gartenbereich umschlossene Freifläche bietet.
3,115
1,28
125
7,805
1,20
30 30
1,195
2,84
58
4,615
13,63
Sichtachsen und Sichtbezüge
SECTION 1
LÄNGSSCHNITT
Höfe Querschnitt M 1: 50 Hof 1 halboffen Hof 2 Nutzung vom Schlafzimmer/ Bad / Tropengarten und HWR möglich Hof 3 Verbindung zwischen dem Garten- und Wohnbe-
Straßenansicht M 1: 100
Das Hofhaus
MODEL
+7,50
+6,35
+6,20
+3,15
±0,00
3,18
1,45
3,18 5,21
1,45 6,97
98
2 2,01
1,01 4,245 4,245
1,89
20
5,89 8,40
SECTION 2 Längsschnitt M 1: 50
Das Hofhaus Fach Gebäudeentwurf Eva Behringer Innenarchitektur 7. Semester WS 08/09 Betreuung: Prof. Gerd Baron
hof
30 ° 40 °
5
50 °
6
60 ° 7
70 ° 8
6
15
Sonnenstandsverlauf 21.06.2009 Am 21. Juni steigt die Sonne gegen 4.20 Uhr im Nordosten auf und steht um 12.23 Uhr ca. 65 Grad hoch am Himmel. Um 20.30 geht sie im Nordwesten unter. Die mögliche Sonnenscheindauer an diesem längsten Tag des Jahres beträgt 16 Stunden und 10 Minuten.
9 15
7
10 14
13
12
11
14
d) 12.27 h
51°20’ ng 308°40’
13
13
12
12
DAYLIGHT STUDIES
8 9
14
EAST 90°
11
11
Sonnenstandsverlauf 23.03.2009/ 23.09.2009
10
10
9
Sonnenlichtdiagramm für das
Baugrundstückhouse in Forst, during Landkreis winter Model courtyard
Sonnenstandsverlauf 21.12.2009 Am 21. Dezember geht die Sonne erst um 8.14 Uhr am südöstlichen Horizont auf und versinkt nach 16.30 Uhr wieder im Südwesten. Die Sonnenscheindauer beträgt 8 Stunden und 15 Minuten. Die Sonne steigt an diesem kürzesten Tag des Jahres auf nur ca. 18 Grad über dem Horizont.
Karlsruhe, Baden Württemberg Geographische Lage: E/O 8° 35’, N 49° 9’
Sonnenstandsverlauf 21.06.2009 Am 21. Juni steigt die Sonne gegen 4.20 Uhr im Nordosten auf und steht um 12.23 Uhr ca. 65 Grad hoch am Himmel. Um 20.30 geht sie im Nordwesten unter. Die mögliche Sonnenscheindauer an diesem längsten Tag des Jahres beträgt 16 Stunden und 10 Minuten.
SOUTH 180°
Sonnenstandsverlauf 23.03.2009/ 23.09.2009
Sonnenstandsverlauf 23.03.2009/ 23.09.2009 Sonnenaufgang 6.22 Wahre Mittagszeit (Sonnenhöchststand) 12.32 Sonnenuntergang 18.43 Sonnenscheindauer (Tageslänge) [hh.mm] 12.21 Sonnenhöchststand 40° Himmelsrichtung bei Sonnenaufgang 87°15’ Himmelsrichtung bei Sonnenuntergang 272°45’
Model courtyard house during spring and fall
Sonnenstandsverlauf 21.12.2009 Am 21. Dezember geht die Sonne erst um 8.14 Uhr am südöstlichen Horizont auf und versinkt nach 16.30 Uhr wieder im Südwesten. Die Sonnenscheindauer beträgt 8 Stunden und 15 Minuten. Die Sonne steigt an diesem kürzesten Tag des Jahres auf nur ca. 18 Grad über dem Horizont.
Sonnenstandsverlauf 21.06.2009 Am 21. Juni steigt die Sonne gegen 4.20 Uhr im Nordosten auf und steht um 12.23 Uhr ca. 65 Grad hoch am Himmel. Um 20.30 geht sie im Nordwesten unter. Die mögliche Sonnenscheindauer an diesem längsten Tag des Jahres beträgt 16 Stunden und 10 Minuten.
Model courtyard house during summer
FREIRAUM
FALL 2006
the tree-house project
FR Ein
. construction
. basement
. floor
. roof
TREEHOUSE
excerpt of the project book: Freiraum- a treehouse made of bamboo
STRUCTURES II
FALL 2008
studying the aesthetic of structural systems
strc
CAN BEAUTY BE A CALCULATEABLE STRUCTURE? A STEP-BY-STEP SELF-EXPERIMENT
EOG F G O GURES N I EAD AL FI TIONS R P S RIC FUNC T E H M WIT
A A A A A
x x x x
3 3 x 3 3 x 32 3 x 33
strc
A A A A A
x x x x
4 4 x 4 4 x 42 4 x 43
A A A A A
x x x x
5 5 x 5 5 x 52 5 x 53
A A A A A
x x x x
6 6 x 6 6 2x 6 6 3x 6
A A A A A
x x x x
7 7 x 7 7 x 72 7 x 73
A A A A A
x x x x
8 8 x 8 8 x 82 8 x 83
O TERN T T A P USING DIMEN3 A BUILD BJECT O L A N SIO
The project studies the spreading of geometrical shapes. To compare perfomance, the same function is used for every study. By discarding polygon and using offcut as building material different shapes could be designed.
Material
zusammenbauen
Variante 3 Hohlkรถrperbildung Variante 2 Ringbildung
BUILDING A BALL
Hohlkรถrperbildung
BUILDING A BRIDGE
BUILDING A RING
strc USING LEFTOVER
WOODWORKING
2002-2005
as professional cabinet maker Carpentry Sieg, Buxtehude | Germany During the work as professional cabinet maker different tasks of interior woodworking were performed including the handcrafting of furniture, or the making of built-ins, stairs, doors or windows. The German woodworking trade requires a 3-year applied education in traditional woodworking as well as modern applications including CNC. Built examples:
Š Eva Behringer 2011