Portfolio Eva Behringer 2011

Page 1

PORTFOLIO.


EVA BEHRINGER DIPL.-ING. INTERIOR ARCHITECT

eb

Archicad /G Allplan/ N raphisoft emetsche k Autocad Cinema 4 d/ Maxon & Artlanti Adobe C reative Su s ite: Photosho p, InDesig n, Illustra Premiere tor Pro/ Ado be

SOFTWARE

Date of birth: July 17, 1980 in Stade (Germany) cell 864-328-7213 evabehringer@gmx.de


cv

PROFESSIONAL EXPERIENCE

STUDIES/EDUCATION Since 08/2009

as a Fulbright Scholar: Graduate Studies in Architecture & Health, pursuing Master of Architecture degree, School of Architecture/ Clemson University, SC

07/2009-08/2009

Fulbright Pre-Academic Program, Monterey Institute of International Studies, Monterey, CA

07/2009

Diplom (Dipl.-Ing. (FH)) ( Master of Interior Design/ Architecture/ Engineering equivalent) graduated with honors: GPA: 4,0 University of Applied Science Wismar| Germany

02/2007

Preliminary Diploma University of Applied Science Wismar| Germany

01/2005

Gesellenbrief (Bachelor of Furniture Design equivalent) Jobelmannschule Stade| Germany

01/1998-04/1998

Exchange student of AFS at Pioneer High School, Queensland, Australia

CURRICULUM VITAE

Since 08/2009

Assistantship for Professor David Allison Director of the Architecture + Health Concentration, School of Architecture| Clemson University

05/2010-08/2010

Research Assistant Development of Daylight Guidelines for the Department of Defense Clemson University | School of Architecture

09/2007-03/2008

Internship at Nickl & Partner Architects in Munich, Germany

08/2002-08/2005

Cabinet Maker carpentry of Matthias Sieg, Buxtehude|Germany

11/2001-05/2002

Social Work Carpentry at Community Hospital Stade, Germany


AWARDS 2011

Henry Adams Medal 2011 Clemson University | School of Architecture

2010

2010-2011 AIA Arthur N. Tuttle, Jr. Graduate Fellow in Health Facility Planning and Design Award for the thesis “The Daylight Imperative�

2009

Fulbright Fellowship Grant from the U.S. Department of State and German government to conduct graduate research and study in the United States.


sc

GRADUATE STUDIES IN ARCHITECTURE AND HEALTH SCHOOL OF ARCHITECTURE CLEMSON UNIVERSITY, SOUTH CAROLINA


ASSISTED LIVING

FALL 2010

new identity for a historic neighborhood



site plan




COMPLETING A NETWORK OF SERVICES

FALL 2010 STUDENT DESIGN CHARRETTE

a new emergency and primary care centre for downtown las vegas healthcare design conference 2010 CONTEXT/ CONCEPT SITE: Las Vegas Boulevard BUILDING, current use: Casino and Hotel

KEY SERVICES: PROVIDE EMERGENCY AND URGENT CARE PROVIDE PRIMARY AND PREVENTATIVE CARE PROVIDE WELLNESS AND PHYSICAL THERAPY DESIGN TEAM: Eva Behringer Ryan Remsey Derrick Simpson Sarah Wade Patrick Willke

REVENUE GENERATING/ INTEGRATING IN ITS CONTEXT ENVIRONMENTAL AWARENESS/ RETREAT

REUSE/ADAPT the current spatial program and building infrastructure to accomodate new service typology (health + commercial). REVIVE the existng structural system to create a new pedestrian pathway. REPLACE the existing skin with a new skin system, addressing local climate condition.




SPRING 2010 INCREMENTAL URBANISM a community-based approach The primary driver of the project is the addition of overall value to the community. This is accomplished by concentrating the efforts on people, profits, and the planet.


SPRING 2010 INCREMENTAL URBANISM an interactive tool for community visioning

Local participation and investment are crucial elements to adding community value. For this project a game was developed to get residents involved in the process of planning. Designed symbols and cards giving them the tools they may not otherwise have to express themselves architecturally.


SPRING 2010 INCREMENTAL URBANISM design proposal


SPRING 2010 INCREMENTAL URBANISM design proposal


A HOSPITAL FOR THE CITY

FALL 2009

Topic and challenge

Urban analysis: greater Philadelphia area

The analogy between the design of buildings and cities is one that architects have recognized throughout centuries of architectural history. The project includes an urban analysis including large health facilities and their interaction with the environment and communities. A redevelopment of a community hospital in Norristown, PA follows the analysis.

BUILDING: ...IN THE CITY ...A CITY ...AS A CITY ...FOR THE CITY: A NEW COMMUNITY HOSPITAL FOR NORRISTOWN


ORGIGRAM functions

she wants to go out for lunch during her break

they are waiting for their treatment

A HOSPITAL FOR THE CITY

CONCEPT DIAGRAMS: needs and characteristics of a healthy environment

she just arrived with the bus and wish to have a place to rest

HEALTHY ENVIRONMENT

CENTER FOR HEALTH

HEALTH CENTER

NATURE

he wants to buy some food

GREEN ENVIRONMENT

EDUCATION

HEALTHY LIVING

LIVING SCHOOLS LIBRARY

PARKS

WORKING

FARMERS MARKET

IA

PH

EL AD IL PH

TRAINSTATION

TO

INFRASTRUCTURE

he wants to play

it wishes there is a water place

FALL 2009

she wants to spent time in a park

0' they want to save a life

HE IS LOOKING FOR A FREE PARKING LOT


A HOSPITAL FOR THE CITY

ITAL FOR NORRISTOWN

OASIS

WINTER SUN _ABSORB

PATIENT UNIT 3

PATIENT UNIT 2

OASIS

WOOD ST.

PATIENT UNIT 4

EMERGENCY

PATIENT UNIT 1

MAIN STREET

ON THE STREET

CONCEPT DIAGRAMS

SUMMER SUN _REFLECT

AND INSIDE

FALL 2009

IT RESTS AT THE WATERPLACE

EMERGENCY

THEY SAVE A LIFE

THE SURGEON CAN WALK OUTSIDE AND RELAX

CONCEPT MODELS INFRASTRUCTURE

PUBLIC PARK

TAKE A BREAK

HEALTHY LIVING

RETAIL/SERVICE

COURTYARD_ ACCESS TROUGH THE CAFETERIAS

HEALTH CENTER

MAIN CONNECTION BETWEEN PUBLIC/OUTPATIENT AND INPATIENT/SURGERY

THEY SAVE A LIFE

DEKALB ST.

PUBLIC STREET

GREEN ENVIRONMENT

DAYLIGHT

HOSPITAL WITHOUT WALLS•VIBRANT•BE PART OF•SUSTAINABILITY• GREEN•RELATIONSHIP•WISH•VISIONS•CONNECTED•HUMAN SCALE• TRANSITIONS II HOSPITAL WITHOUT WALLS AS A PARK•NETWORK HEALTHY•SAFE•NATURE•HOSPITAL ENERGY


FORNANCE STREET

existing hospital

DEKALB STEET

POWELL STEET

LOCUST STEET

PARKING

A HOSPITAL FOR THE CITY DESIGN PROPOSAL

PT DROP-OFF

PATIENT BED TOWER

ADMIN

RETAIL

COURTYARD COURTYARD

CIRCULATION SPINE

IMAGING + SURGERY

WOOD STREET

EMERGENCY DEPARTMENT

OUTPATIENT SERVICES

EMS DROP-OFF

PT ER DROP-OFF

PARKING BASIN STREET

HOSPITAL, SCHEMATIC DESIGN

HOSPITAL BIRD‘S VIEW (PHASE 1)

FALL 2009


RISTOWN

AIN MAIN ENTRY ENTRANCE

RETAIL

A HOSPITAL FOR THE CITY

FALL 2009

SHE OBSERVES THE LIFE ON THE STR

DESIGN PROPOSAL

PATIENT TOWE

SHADING PANELS ON SOUTH FACADE INPATIENT TOWER


wi

STUDIES OF INTERIOR DESIGN/ ARCHITECTURE/ ENGINEERING UNIVERSITY OF WISMAR| GERMANY UNIVERSITY OF APPLIED SCIENCE, TECHNOLOGY, BUSINESS AND DESIGN


SPRING 2009

THESIS: A New Children’s Psychiatry University Hospital Marburg | Germany DIPLOMA THESIS SPRING 2009 Prof. Dipl. Ing. Michael Rudnik Prof. Dipl. Des. Rainer Hock TOPIC AND CHALLENGE

The Child and Adolescent Psychiatry in Marburg, Germany is the oldest facility of its kind in the country and is located in several buildings across the University hospital campus. Built in 1946 and earlier, the clinic’s reconstruction and reorganization includes historic preservation and the need to incoporate new buildings on the existing site to create an environment that allows treatment by today’s and future standards.


Schwachpunkte und Mängel auf den Stationen gibt.

STATIONEN/ SCHULE/ THERAPIE

GARTEN

nes Entwurfes genaueDie in einen dem Begleitbuch abgebildeten Fotos wurden von he Situation vor Ort machen den Mitarbeitern, Kindern/ Jugendlichen und der Direktion der Klinik um ihre Mitarbeit, der Klinik im Februar/März 2009 fotografiert. ieren.

innen

innen innen

innen

Derüber Außenbereich sollte sowohl Platz für sportlich Jede Station soll ihren eigenen Freibereich verfügen. tivitäten als auch RuheDer Außenbereich sollte sowohl Platzund für Entspannungsmöglich sportliche Akbieten. tivitäten als auch Ruhe- und Entspannungsmöglichkeiten bieten.

GARTEN

außen außen

innen Abb. 67 Bestandssituation Struktur Abb. 67 BestandssituationAußenraumbezüge Struktur

THESIS:

SPRING 2009

innen MASTER PLANNING: BUILDING AS außen außen A SMALL VILLAGE

s unterschiedlichen SichtweiAußenraumbezüge orstellungen und Wünschen gebenheiten zu bekommen. führen zu einer großen Verschattung auf der Nor 59 Abb. 60 b es aus Abb. persönlicher Sicht des großen Gebäudes. Deshalb wird vorgeschlagen, führen zu einer Verschattung auf der Nordseite den A STATIONEN/ Abb. 61 STATIONEN/ 59-61built Fotoaktion Case study: of staff GARTEN and children Abb. ofJede their environment GARTENperception Station soll über ihren eigenen Freibereich verfügen. SCHULE/ THERAPIE 6.1.2 Einbindung des SCHULE/ THERAPIE desPATIENT Gebäudes. Deshalb wird Außenraumes vorgeschlagen, den Anbau ANALYSE 51 auf den Stationen gibt. STATIONEN/ TOWER +GARTEN Der Außenbereich sollte sowohl Platz für sportliche AkSCHULE/ THERAPIE 6.1.2 Einbindung des Außenraumes ersetzen. Diese Maßnahme ermöglicht die Realisi +GARTEN tivitäten als auch Ruhe- und Entspannungsmöglichkeiten STATIONEN/ GARTEN bieten. STATIONEN/SCHULE/ THERAPIE

ebildeten Fotos wurden von gendlichen und der Direktion 009 fotografiert.

GARTEN

innen

innen

fließende

außen

innen

Abb. 60

Abb. 67 Bestandssituation Struktur Außenraumbezüge

Abb. 59-61 Fotoaktion

GARTEN SCHOOL

SCHULE/ THERAPIE

außen

Abb. 61

ANALYSE

51

fließende Übergäng

Übergäng

e

e

g nach Bewegung außen sraum Öffnun g nach Bewegung innen außen innen außen sraum außen innen außen Abb. innen 65 Umstrukturierung Funktionsbereiche Abb. 68 der Zielplanung innen außen Einbindung der Topographie Abb. 65 Umstrukturierung Funktionsbereiche Abb. 68 der Zielplanung außen innen Einbindung der Topographie Abb. 67 Bestandssituation Struktur außen Abb. 67 BestandssituationAußenraumbezüge Struktur

6.1.3 Abriss des Anbaus des NEUBAU VERBINDUNGSGEBÄUDE/ building 6.1.3 Abriss desBettenhauses Anbaus des new und Neubau AKUTSTATION NEUBAU VERBINDUNGSGEBÄUDE/ Bettenhauses und Neubau organization AKUTSTATION

GARDEN

Außenraumbezüge

führen zu einer großen Verschattung auf der Nordseite Abb. 66 Neue Bereichsgliederung des Gebäudes. Deshalb wird vorgeschlagen, den Anbau NEUE BEREICHSGLIEDERUNG

STATIONEN/ SCHULE/ THERAPIE +GARTEN

1 Fotoaktion

Abb. 61

STATIONEN/ SCHULE/ THERAPIE

GARTEN

fließende

ANALYSE GARTEN

6.1.2 Einbindung des Außenraumes GARTEN

51

Übergän

ge

STATIONEN/

THERAPIE ersetzen. Diese Maßnahme ermöglicht SCHULE/ die Realisierung einer im Erdgeschoss liegenden Station mit eigenem gesiJede Station soll über ihren eigenen Freibereich verfügen. cherten sonnigen Freibereich. Der Außenbereich sollte sowohl Platz für sportliche Aktivitäten als auch und Entspannungsmöglichkeiten Die RuheAkutstation sollte über einen Schleusenzugang und bieten. ein Beobachtungs- und Überwachungszimmer mit direkter Anbindung an das Stationszimmer verfügen.

GARTEN

Öffnung nach au gsraum ßen

Bewegun

innen

RESEARCH einer im Erdgeschoss liegenden Station mit eigenem ersetzen. Diese Maßnahme ermöglicht die Realisierung Jede soll über ihren eigenen Freibereich verfügen. cherten sonnigen Freibereich. einerStation im Erdgeschoss liegenden Station mit eigenem gesiDer Außenbereich sollte sowohl Platz für sportliche AkJede Station soll über ihren eigenen Freibereich verfügen. cherten sonnigen Freibereich. TREATMENT tivitäten als auch Der Außenbereich sollte sowohl Platzund für Entspannungsmöglichkeiten sportliche Die RuheAkutstation sollte überAk-einen Schleusenzugan bieten. tivitäten als auch undein Entspannungsmöglichkeiten BeobachtungsundSchleusenzugang Überwachungszimmer Die RuheAkutstation sollte über einen und mit d bieten. Anbindung an das Stationszimmermit verfügen. ein Beobachtungsund Überwachungszimmer direkter GARDEN Anbindung an dasGARDEN Stationszimmer verfügen. Öffnun

GARTEN

SCHULE

Die geringe Gebäudetiefe und die enge bauliche Subgang zu vermeiden stanz lassen eine Nutzung nur schwer zu und Die geringe Gebäudetiefe und zeitgemäße die enge bauliche Subführen zu einer Nutzung großen Verschattung stanz lassen eine zeitgemäße nur schwer zuauf undder Nordseite vom stationären Bereich zu erhöhen des Gebäudes. Deshalb wird vorgeschlagen, den Anbau führen zu einer großen Verschattung aufUMSETZUNG der Nordseite 55 STATIONEN Jede Station soll über ihren eigenen Freibereich verfügen. IM BETTENHAUS tenhaus transportiert werden müssen desDeshalb Bettenhauses abzureißen und durch einen Neubau zu des Gebäudes. wird vorgeschlagen, den Anbau STATIONEN IMDiese BETTENHAUS ersetzen. Maßnahme ermöglicht des Bettenhauses abzureißen und durch einen Neubaudie zu Realisierung einer im Erdgeschoss liegenden Station mit eigenem gesiersetzen. Diese Maßnahme ermöglicht die Realisierung THERAPIE cherten sonnigen SCHULE einer im Erdgeschoss liegendenFreibereich. Station mit eigenem gesiErgotherapie THERAPIE cherten sonnigen Freibereich. Musiktherapie Ergotherapie Die Akutstation sollte über einen Schleusenzugang und Musiktherapie Krankengymnastik ein BeobachtungsundSchleusenzugang Überwachungszimmer Die Akutstation sollte über einen und mit direkter Krankengymnastik Gärten Anbindung an das Stationszimmermit verfügen. Gärten ein Beobachtungsund Überwachungszimmer direkter Gärtenan das Stationszimmer verfügen. Anbindung Gärten

6.1.3 Abriss des Anbaus des Schulhof Abb. 68 Zielplanung NEUBAU VERBINDUNGSGEBÄUDE/ Bettenhauses und Neubau REORGANIZATION OF THE UNIVERSITY HOSPITAL Schulhof Einbindung der Topographie Abb. 68 Zielplanung AKUTSTATION integrated garden in site the

innen außen

außen Abb. 65 Umstrukturierung Funktionsbereiche Abb. 68 der Zielplanung innen Einbindung der Topographie Abb. 67 Bestandssituation Struktur Außenraumbezüge

außen

Einbindung der Topographie

facility: strong connection to nature Abb. 69 Bestandssituation Lageplan: Außenraumbezüge Abb. 70 Zielplanung Lageplan: and smooth transitions die gesamte Fläche wird zum Aktionsraum der Klinik Abb. 70 Zielplanung Lageplan:

Abb. Bereichsgliederung Abb.6669Neue Bestandssituation Lageplan: Außenraumbezüge Die geringe Gebäudetiefe und die enge bauliche Substanz lassen eine zeitgemäße Nutzung nur schwer zu Abb. und66 Neue Bereichsgliederung führen zu einer großen Verschattung auf der Nordseite

die gesamte Fläche wird zum Aktionsraum der Klinik


THESIS: THE EXTERIOR

SPRING 2009


THESIS:

+0,80

SPRING 2009

THE INDIVIDUAL SPACE

+0,60

+0,45 +0,30

24

3,76

24

24

3,76

1,76

BAD

+0,15

15

FB: MOSAIKFLIESEN BF: 3,84 m2

1,76

24

1,16

60

15

1,85

1,03

22

1,76

30

+0,00

1,76

24

1,06

70

24

ZIMMER

FB: MOSAIKFLIESEN BF: 3,71 m 2

FB: LINOLEUM BF: 20,48 m2

3,61

2,01

BAD

+0,15

15

BAD

365

365

FB: LINOLEUM BF: 19,54 m2

ZIMMER

+0,00 -0,00

365

3,04

FB: LINOLEUM BF: 16,93 m2

1,58

ZIMMER

-0,15

-0,15

365

6,31

745

+0,00

FB: MOSAIKFLIESEN BF: 3,71 m 2

floorplan groundfloor


515

Planungsaufgabe: Untersuchung zur möglichen Nutzung als Fitnessstudio Eigene Konzeption: Gesundheitszentrum im alten Speicher

Die Idee meines Entwurfes ist den ehemaligen Thormann-Speicher zukünftig als Gesundheitszentrums zu nutzen. Gesundheitsthemen werden in Zukunft immer mehr an Bedeutung in Fitnessstudios zunehmen.

FALL 2008

Das Konzept des Gesundheitsspeichers ist es Gesundheit zu erhalten oder wieder zu erlangen. Ein gesunder Körper und das Wohlbefinden hängt neben der Fitness auch stark mit der Entspannung und guter Ernährung zusammen. Dies sind Themen, die im Gesundheitspeicher an erster Stelle stehen - für Einheimische und für Touristen.

spa

HEALTH CENTER IN HISTORIC ENVIRONMENT Vormodell

The design studio includes an utilization concept and the conversion of a heritage listed granary into a health center. The goal of the restructuring is to stimulate the historical area in Wismar and to increase the attractiveness of the port.

es ist den ehemaligen Thormann-Speicher szentrums zu nutzen. Gesundheitsthemen werden n Bedeutung in Fitnessstudios zunehmen.

dheitsspeichers ist es Gesundheit zu erhalten oder

das Wohlbefinden hängt neben der Fitness auch g und guter Ernährung zusammen. Dies sind Ideenskizzen heitspeicher an erster Stelle stehen r Touristen.

Main design topics are contrasts between inside and outside, light and dark, and waterEBENENSCHNITT and fire. M 1: 50 Vormodell

Gesundhe Entwurf: E 7.Semester Inn

Betreuung: Pr


Das Gebäude

FALL 2008

Der alte denkmalgeschütze Thormannspe deren Speichergebäuden, Silos und Lager Hafen von Wismar. Ursprünglich wurde de Plan der Hansestadt Wismar ist es auf de „Holzstadt“ zu errichten. Dies beinhaltet staltungszentrum und Hotel. Ziel dieser U beleben und die Attraktivität des Hafens steigern.

HEALTH CENTER IN HISTORIC ENVIRONMENT CONCEPT

WELLNESS: SAUNA, WHIRLPOOL, MASSAGE, YOGA NUTRITION: COOKING SCHOOL

GYM: FITNESS Schwe AND EXERCISE im En

Fitnes

Kraft, Au

Ernäh

Kochsch

Health Center in historic storehouse Old town of Wismar (World heritage)

Entsp HEALING: Sauna, W PHYSIO- Training THERAPY, Heile MEDICAL Physioth OFFICE Ernährun unterschiedliche Themenbereiche im Gesundheitsspeicher

FUNCTIONS


FALL 2008

1

2

3

HEALTH CENTER IN HISTORIC 6 5 ENVIRONMENT

4

ER +14,725

fen

Kochschule im Gesundheitsspeicher

peicher

Massage

+8,945

Schulungsraum

Fitness im Gesundheitspeicher

92

Physiotherapie +6,585

+6,515

+4,095

+4,095

+3,115

+3,81 515

61

145

mit anischen enutzt. ne Verannde zu ern zu

Entspannung: SPA und Wellness +11,395


B

C

D

E

F

EBENENSCHNITT

A

G

KOCHSCHULE

A

B

C

D

E

FLOATING

Schwimmen Sauna Sole Whirlpool

TECHNIK BF: 18,31 m2

G

FALL 2008

HEALTH CENTER IN HISTORIC ENVIRONMENT FLUCHTTREPPE

EBENENSCHNITT

EBENE 0 M 1: 100

F

EBENE 03 M 1: 100 Physiotherapie Gesundheits-/ Ernährungsberatung Kneipp Stretching Geräte 1

1 BERATUNG BF: 24,47 m2

WARTEN BF: 15,47 m2

SOLE GLAS

SPIEGEL

BF: 10,94 m2

PFBAD

9,52 m2

EINGANG

STRETCHING

+7,36

FB: KAUTSCHUK BF: 3,18 m2

LINOLEUM BF: 29,33 m2

2

UNTERSUCHUNG BF:

14,90 m2

+7,36

GERÄTE 1

EMPFANG/ BÜRO

BF: 17,42 m2

BF:

20,22

m2

GEBÄUDESCHNITT +8,36

3 ENTSPANNEN BF:

29,07 m2

GEBÄUDESCHNITT

GEBÄUDESCHNITT 4

+8,07

WHIRLPOOL

0 GRAD

BF:

8,51 m2

6,65 m2

KNEIPP FB: SCHIEFER BF: 33,08 m2 +8,22

0 GRAD 9,86 m2

model of the health center

EMPFANG/ TRESEN

LAGER

FB: BF:

BF: 6,90 m2

KAUTSCHUK 9,06 m2

PHYSIOTHERAPIE 1 BF:

23,68 m2

-0,35

5 +8,36

GRÜNFLÄCHE

ABKÜHLEN SAUNA BF:

BF:

25,50 m2

19,63 m2

WARTEBEREICH BF:

17,14 m2

PHYSIOTHERAPIE 3 BF:

15,92 m2

PHYSIOTHERAPIE 2 BF:

25,41 m2

6

floorplan groundfloor ENSCHNITT

-1,40

Gesundheitsspeicher Entwurf: Eva Behringer 7.Semester Innenarchitektur


LIGHT OBJECTS simple system-complex capacities

CAN BEAUTY CAN BE BEAUTY BE Pattern Rundvorlage M 1:500 1200 x 800 mm

CUTTING MODEL OBJECT 1 1200MM x 800MM

CUTTING MODEL OBJECT 2 1000MM x 700MM Pattern Fl채chenvorlage M 1:500 1000 x 700 mm

SPRING 2008


OBJECT 1

OBJECT 1

OBJECT 2


SWAROVSKI CHAIR

SPRING 2008

Student Design Competition for Swarovski AG 1st prize


+ pea

template

= base: chrome-plated steel tubing

seat: formed veneer


IZM-FRAUNHOFERINSTITUTFÜR ZUVERLÄSSIGKEITUNDMIKROINTEGRATION A

B

C

D

2007-2008 INTERN AT NICKL ARCHITECTS

09126CHEMNITZ REICHENHAINERSTRASSE88 TEL.0371/53133130

F

E

PLANINHALT

LVÜBERSICHTSPLAN

facade construction design frauenhofer research center chemnitz | germany

DG Technik

3.OG Wiss. Hilfskr.

SCHNITTAA

3.OG Prozeß -test

2.OG optische Meßtech.

BAUHERR:

FRAUNHOFERGESELLSCHAFT 80686MÜNCHEN HANSASTRASSE27c TEL.089/1205-0FAX-7549

1.OG Grad. Pers.DZ

2.OG Oase

PLANVERFASSER:

EG Trafo1

EG Putzraum

NICKL&PARTNERARCHITEKTENAG LINDBERGHSTRASSE19 80939MÜNCHEN TEL.089/360514-0 FAX.-1442

EG Bespr.

Innenhof

1:175

31.08.2007

MASSSTAB

PLANDATUM

FREIGEGEBENNURFÜR: UG Kältezentrale

Verbau, Verfüllungmitvorh.Aushub entsprechendden geologischenSchichtenaufbau

UG DI-Wasser

-

i.A.-

DATUM INDEX

1  RB Stb

A3.131 PLANNUMMER

E

F

10  F1 dampfdichteFolie

+8.415 OKFFB

+8.415

ACHSERIEGEL

A

B

C

D

E

-

A

-

TEIL

STATUS

INDEX

F

10

1  RB Stb

1

10  F1 dampfdichteFolie

1

11  F1 L-Winkelprofil,Stahl, n.stat.Erfordernis

2

11  F1 L-Winkelprofil,Stahl, n.stat.Erfordernis

3

12  F1 Pfosten-Riegel-Fassade,200/56, Aluminiumeloxiert/pulverbeschichtetn.RAL/NCS, Farben.WahlAG

26

+8.345 OKSTBDECKE

12

4

6

11 OKFFEG+/-0,00=320,10mNN

14  F1 Blockfenster,Klappflügel, motorischbetrieben, Isolierverglasung,Aluminiumeloxiert/ pulverbeschichtetn.RAL/NCS,Farben.WahlAG

1

IZM-FRAUNHOFERINSTITUTFÜR +2.50 UKSTü.FFB ZUVERLÄSSIGKEITUNDMIKROINTEGRATION 09126CHEMNITZ REICHENHAINERSTRASSE88 TEL.0371/53133130

17  F1 DeckleisteP-R-K,50/10,Aluminium eloxiert/pulverbeschichtetn.RAL/NCS,Farben.WahlAG

25

OASE,

+8.04 UKSTBDECKE

RB MBA 1 DD 2 SP 3 ST 4

-

PLANNUMMER

A

ROHBAU METALLBAU C D E F DACHDECKER SPENGLER STAHLBAU TEIL

B

STATUS

27  13 +7.425

ACHSERIEGEL

PLANINHALT

STANDARDFASSADE TAPETENTÜRVERTIKAL ACHSE4/F

56  F3 Kalzium-Silicat-Platted=20mm

VORABZUG

VORABZUG

BAUHERR:

FRAUNHOFERGESELLSCHAFT 80686MÜNCHEN HANSASTRASSE27c TEL.089/1205-0FAX-7549

66  TB Abhangdecke

17

 BAUHERR:

FRAUNHOFERGESELLSCHAFT 80686MÜNCHEN HANSASTRASSE27c TEL.089/1205-0FAX-7549

PLANVERFASSER:

NICKL&PARTNERARCHITEKTENAG LINDBERGHSTRASSE19 80939MÜNCHEN TEL.089/360514-0 FAX.-1442

14

1:5

20.10.2007

MASSSTAB

PLANDATUM

PLANVERFASSER:

55 26

±0.00 OKFFB FREIGEGEBENNURFÜR:

-

29

i.A.-

DATUM INDEX

27

NICKL&PARTNERARCHITEKTENAG LINDBERGHSTRASSE19 80939MÜNCHEN TEL.089/360514-0 FAX.-1442

1:5

20.10.2007

MASSSTAB

PLANDATUM

FREIGEGEBENNURFÜR:

PLANVERFASSER DATUM

ÄNDERUNG

-

i.A.-

DATUM INDEX

5

+7.05 UKAHD 66 20 +6.93 ACHSERIEGEL

13

LEGENDE:

RB MB DD SP ST

ROHBAU METALLBAU DACHDECKER SPENGLER STAHLBAU

EST ESTRICH TB TROCKENBAU AA AUßENANL. SCHR SCHREINER ELT ELEKTRO

EST TB AA SCHR ELT

OKFFEG+/-0,00=320,10mNN

09126CHEMNITZ REICHENHAINERSTRASSE88 TEL.0371/53133130

52  F3 Polysterol-DämmplattePSSEWLG03510cm

29 12

INDEX

6

IZM-FRAUNHOFERINSTITUTFÜR ZUVERLÄSSIGKEITUNDMIKROINTEGRATION

29  F1 TürschwelleEdelstahl

51  F3 Klebeschichtd=10mm

53  F3 ArmierungmitGewebeeinlage mitorganischemKlebe-undArmierungsmasse, Egalisationsspachtelungmitorganischen Oberputz(Kornstärke1,5mm),Schlußbeschichtung mitorganischenOberputz(Kornstärke1,0mm)

-

5

26  F1 Winkelprofil,Aluminium,eloxiert/ pulverbeschichtetn.RAL/NCS,Farben.WahlAG  27  F1 Schlitzrinne

53  F3 ArmierungmitGewebeeinlage undorganischerKlebe-undArmierungsmasse, Egalisationsspachtelungmitorganischen Oberputz(Kornstärke1,5mm),Schlußbeschichtung mitorganischenOberputz(Kornstärke1,0mm)  55  F3 dauerelastischesKompriband

GESCHOSSDECKENANSCHLUSS, VER

29  F1 P-R-K,T-Profil,200/56, PfostenbeidseitigmitBrandschutzplattebeplankt, Aluminiumblechkaschierungbeidseitig, pulverbeschichtetn.RAL/NCS,Farben.WahlAG

+2,475ACHSERIEGEL

53

FASSSADEP-R-K,

27  F1 vollflächigeEmaillierungaufPos.13

A3.176 LEGENDE:

ÄNDERUNG

+2,50OKRIEGEL

56

PLANINHALT

26  F1 Hohlprofil,Stahl,n.stat.Erfordernis 

5

25  F1 WärmegedämmteStahlblechtür, verwindungssteif, pulverbeschichtetnachRAL/NCS mitsenkbarerBodendichtung

5

13  F1 Isolierverglasung

11

bündig

17

PLANVERFASSER DATUM

LEGENDE:

PLANVERFASSER DATUM

ÄNDERUNG

ESTRICH TROCKENBAU AUßENANL. SCHREINER ELEKTRO


2007-2008 INTERN AT NICKL ARCHITECTS construction drawings:pet research center and radioactive control areas juelich | germany Zeichnungsnummer:

Index:

Stand:

15.16_ A2.240-SCHNITT EE1

A

B

C

D

E

+ 0,00= 92,05m

F Projekt:

FORSCHUNGSZENTRUM JÜLICH NEUBAU PETGEBÄUDE 15.16 und LABORGEBÄUDE 15.9

ProjektNr.: Bauherr:

Freigabe:

Projektsteuerung: Planungskoordination:

Freigabe:

Architekt:

Überwachung

Konsole

Scanner 365

Freigabe:

JMP-INGENIEURBÜRO JAEGER, MORNHINGWEG+PARTNER

Freigabe:

VOR DEM LAUCH 4 70567 STUTTGART

TGA2: Fachplaner:

15

Freigabe:

LEONHARD, ANDRÄ & PARTNER

LENZHALDE 16 70192 STUTTGART

TGA1: Fachplaner: Scanner

NICKL & PARTNER ARCHITEKTEN AG

LINDBERGHSTRASSE 19 80939 MÜNCHEN

Tragwerksplanung:

5

30 29 11

+8.17

Freigabe:

25

WD15/15

Tiervorbereitung

Scanner

1.15

20

50

40

1.05

40

90

Planungsphase:

15 50

61

1.50

WDL50/50

Planverfasser:

30

WD100/100

20

Flur Radiopharmakaherstellung

Vorläufersynthese

Bearbeitung: 2LagenPE-Folie

1.53

Vorbereitung

2LagenPE-Folie

Qualitätskontrolle -3.83

30

-4.33

BetonC16/20

SCHNITT E-E

1:100 15.16

15

50

1.50

AchseMRT

40 1.00

77

-1.55

50

Maßstab:

GebäudeNr.:

Planart:

ARCHITEKTUR

ABSCHIRMTÜR

ABSCHIRMTÜR

Freigabe:

ENTWURFSPLANUNG

Gewerk:

AchseMRT

±0.00

-0.08

40

Generalunternehmer:

WDL50/50

90

Scanner

11.28

11.22

Autoradiographie

SteuerleitungenMRT

SteuerleitungenMRT

2.20

Dekontamination

WD40/50 50

8.60

SteuerleitungenMRT

7cmWDVS

Metaboliten

WD40/50

20 30 20

50

WD20/50

WD40/50 1.57

30

30

+3.62

AN Geprüft:

Dateinahme:

NICKL & PARTNER ARCHITEKTEN AG

LINDBERGHSTRASSE 19 80939 MÜNCHEN

Abteilung:

N+P Abteilung:

Datum:

PlanbasisGewerk

Index:

Ersatzfür:

Index:

PlanbasisBautechnik

Index:

0

08.02.08 Datum:

FürdieseZeichnungbeanspruchenwiralleUrheberrechte.VervielfältigungoderWeitergabe anDrittenurnachunserervorherigenZustimmung.SchutzvermerkISO16016beachten!

-5.88

15.16

15.14








 





FALL/SPRING 2007-2008 INTERN AT NICKL ARCHITECTS



 

 

construction drawings:pet research center and radioactive control areas juelich | germany

Kopierer

1

1020 Dokumentation,Archiv 20 18.5m²

FensteralsFluchtweg

1021 Büro 18 20.2m²

2

1022 Büro 18 20.2m²

3 1023 Büro(Leitung) 20 20.2m²

1000d Flur 28.72m2

1024 Besprechung,Aufenthalt 20 17.2m²

4

1025 ELT-Verteiler 6,5 2.65m² 1V07 Schacht 0.67m²

T30/RS

1026b WC 4.7m²

1A01 Aufzug 5.44m² 2,00x2,90mLichte

5

1027b WC 4.6m²

1027a WC 1.6m²

1026a WC 1.5m²

Einbringung Technik -4,33

6

7

T30/RS

15Stg17,3/27cm

1T01 Treppenraum 45.27m²

1.60

RR100/100

WD20/20 10cmUKD

10Stg17,2/27cm

1019 NSHV-NOTSTROM 20 16.54m²

1018 NSHV-AV 32 19.78m²

A

1.60

1017 Lüftung/Sanitär/AnschlussFernwärmeKälte/DI-Wasser/Drucklu 159.7m²

Zeichnungsnummer:

112

111

BÜRO

BÜRO

18.14qm

2.135

1V01 Schacht 6 8.44m²

F90

F90 1014 Personenschleuse 30 29.4m²

F90

1013 Wareneingang 10 11.6m²

1V05

1V02 Schacht 1.10m²

F90

1015 SV 6 5.12m²

T30/RS

Projekt:

FORSCHUNGSZENTRUM JÜLICH NEUBAU PETGEBÄUDE 15.16 und LABORGEBÄUDE 15.9

ProjektNr.: Bauherr:

Freigabe:

Projektsteuerung: Planungskoordination:

1002 Putzraum 4.56m²

110

Freigabe:

MR-Technik/Lüftung 58.98qm DD15/15

RRDN100

Architekt:

Lüftung

Tragwerksplanung:

fürMRT

Kontrollbereich

TGA1: Fachplaner:

1003a Pers.SchleuseReinraum 10 19.12m²

1004a Radiopharmakaherstellung 80 90.5m²

16Stg17,3/27cm

1007b Zyklotron 45 44.7m²

1006 Qualtitäskontr. 30 31.9m² 1003b Vorläufersynthese 30 34.3m²

1004c Wägekab. 5 7.4m²

1T02 Treppenraum 17.47m²

Freigabe:

JMP-INGENIEURBÜRO JAEGER, MORNHINGWEG+PARTNER

Freigabe:

VOR DEM LAUCH 4 70567 STUTTGART

TGA2: Fachplaner:

Planungsphase:

Freigabe:

ENTWURFSPLANUNG

Gewerk:

1007b Zyklotron

Planart:

ARCHITEKTUR

Durchreiche 1004b Vorbereitung 5 11.33m²

-5,88

Planverfasser: -1,55

Spülmaschinemit Durchreiche

Einbringöffnung wirdnachGeräteaufstellunggeschlossen Schwelle-1,00

10

Bearbeitung:

AN Geprüft:

2.Fluchtweg

B

C

GRUNDRISS EBENE 1 UNTERGESCHOSS

Maßstab:

1:100

GebäudeNr.:

15.16

NICKL & PARTNER ARCHITEKTEN AG

LINDBERGHSTRASSE 19 80939 MÜNCHEN

Abteilung:

N+P Abteilung:

Datum:

PlanbasisGewerk

Index:

Ersatzfür:

Index:

PlanbasisBautechnik

Index:

0

08.02.08 Datum:

-4,33

"Lichtgraben"

D

D1

E

E1

A

A

EinbringungBleizellen

Freigabe:

Generalunternehmer: 9Stg17,2/27cm

1005 Verpackung 10 10.42m²

Freigabe:

LEONHARD, ANDRÄ & PARTNER

LENZHALDE 16 70192 STUTTGART

Obergeschoss

-4,33

NICKL & PARTNER ARCHITEKTEN AG

LINDBERGHSTRASSE 19 80939 MÜNCHEN

T30/RS T30/RS

1000b Flur 103.03m2

9

WD20/20 UKD

T30

F90

F90

F90

WD1,30/40 12cmUKD

1001 Putzraum 4.56m²

1V04 Schacht 0.79m²

F90

F90 F90

1V01 Schacht 1.10m²

DD50/20

T30 T30

1012 Spektroskopie 20 9.6m²

+ 0,00= 92,05m

WD1,70/40 12cmUKD

1016 AV 6 5.83m²

1V06 AHD F90

AHD F90

2.50

T90 3Stg16,6/27cm

-3,83

F90

1011 Materiallager 20 18.63m²

F90

1010 Materiallager 20 13.0m²

F90

1009 Strahlen10 14.9m²

Blindtür spätereVerbindungzuGeb.15.16

1000c Flur 8.47m2

T30

8 1008 WarmeWerkstatt 20 21.6m²

WD40/40 UKD

WD1,30/30 12cmUKD

T30

1000a Flur 32.54m2

Stand:

15.16_ A2.090-UG_EBENE 1

19.87qm

T30

Index:

WD40/40 UKD

F

Dateinahme:

4.00

FürdieseZeichnungbeanspruchenwiralleUrheberrechte.VervielfältigungoderWeitergabe anDrittenurnachunserervorherigenZustimmung.SchutzvermerkISO16016beachten!

-1,55


SPRING 2007 COURTYARD HOUSE A NEW HOME IN AN OLD VILLAGE

Das Hofhaus

KICKER FB: PARKETT BF: 7,19 m2

-0,3

±0,00 ABSTELLRAUM FB: BF:

PARKETT 2,78 m2

WOHNZIMMER FB:

Schiefer

BF:

24,75 m2

FB: BF:

BÜRO

TREPPE

Projektbeschreibung

KÜCHE/ ESSBEREICH

FB: PARKETT BF: 14,88 m2

FB: PARKETT BF: 6,80 m2

PARKETT 37,15 m2

Projektbeschreibung

Das Konzept und die Idee

Das Konzept und die Idee

Aufgabenstellung: Entwurf eines Gebäudes für eine Person 18 Stg 17,5 / 28 cm

Das gewählte Grundstück für das Hofhausprojekt liegt im Zentrum des Dorfes Forst mit circa 7000 Aufgabenstellung: Einwohnern in der Nähe von Bruchsal in Süddeutschland. Entwurf eines Gebäudes für eine Person

TERRASSE

Adresse: Schwanenstraße 41 Forst, Kreis Karlsruhe, Baden Württemberg

FB: EICHE BF: 54,44 m2

Der Besitzer dieses Grundstückes ist Geschäftsinhaber eines Floristengroßhandels. Ziel war es Adresse: Grundstücksgröße: ein nutzerorientiertes Haus zu entwerfen, daß Schwanenstraße 41 die Länge des Grundstückes für sich nutzt, den 1000 m² Länge 85 m, Breite 13,5 m Das Grundstück wird durch eine alte Steinmauer in vorhandenen Baum und die alte Steinmauer erForst, Kreis Karlsruhe, Baden Württemberg zwei Teile geteilt: die vordere Bebauungsfläche und hält, sich zur Straßenseite abschirmt und zuder offene Garten. Auf dem vorderen Teil steht ein alter sätzlich neben dem offen gehaltenen hinteren Walnußbaum der nicht gefällt werden sollte. Gartenbereich umschlossene Freifläche bietet. Grundstücksgröße: FLUR

FB: PARKETT BF: 20,01 m2

Das gewählte Grundstück für das Hofhausprojekt liegt im Zentrum des Dorfes Forst mit circa 7000 Einwohnern in der Nähe von Bruchsal in Süddeutschland.

WC

FB: SCHIEFER BF: 1,61 m2

FB: SCHIEFER BF: 3,04 m2

TROPENGEWÄCHS BF:

2,84 m2

GARAGE

FB: PARKETT BF: 2,07 m2

SCHLAFZIMMER

BF: 29,93 m2

QUERSCHNITT

ANKLEIDE

FB: BF:

VORRAUM

GÄSTE WC

FB: SCHIEFER BF: 2,18 m2

N

1000 m² Länge 85 m, Breite 13,5 m Das Grundstück wird durch eine alte Steinmauer in zwei Teile geteilt: die vordere Bebauungsfläche und der offene Garten. Auf dem vorderen Teil steht ein alter Der Schwerpunkt des Entwurfes liegt in der Bildung Walnußbaum der nicht werden von gefällt Höfen. Diese variierensollte. in ihrer Größe und sind

PARKETT 16,66 m2

HWR

FB: SCHIEFER BF: 6,32 m2

BAD

N

FB: SCHIEFER BF: 9,40 m2

BF: 14,05 m2

Der Besitzer dieses Grundstückes ist Geschäftsinhaber eines Floristengroßhandels. Ziel war es Straßenansicht M 1: 100 ein nutzerorientiertes Haus zu entwerfen, daß 1. Obergeschoss 1: 50 Grundstückes für sich nutzt, den die Länge Mdes BF 1.OG 110 m² vorhandenen Baum und die alte Steinmauer erhält, sich zur Straßenseite abschirmt und zusätzlich neben dem offen gehaltenen hinteren Gartenbereich umschlossene Freifläche bietet.

VIEW FROM THE STREET

+7,50

Straßenansicht M 1: 100

in ihrer Lage auf dem Grundstück unterschiedlich gestaffelt. Je nach Position und Nutzung ist die Einsicht halboffen, wie zur Strasse hin, oder nur intern erschließund einsehbar (Bad/ Schlafhof).

HOF

3

HOBBY

GALERIE FB: PARKETT

1

BF: 18,32 m2

Das Hofhaus FB: PARKETT BF: 5,52 m2

3

Erschließung/ Büro Wohnen

Der Schwerpunkt des Entwurfes liegt in der Bildung von Höfen. Diese variieren in ihrer Größe und sind in ihrer Lage auf dem Grundstück unterschiedlich gestaffelt. Je nach Position und Nutzung ist die Einsicht halbofModellfotos fen, wie zur Strasse hin, oder nur intern erschließund einsehbar (Bad/ Schlafhof). ±0,00

Projektbeschreibung

BAD FB: SCHIEFER BF: 10,81 m2

Aufgabenstellung: Entwurf eines Gebäudes für eine Person LÄNGSSCHNITT

GAST Adresse: Schwanenstraße 41 Forst, Kreis Karlsruhe, Baden Württemberg FB: PARKETT

Das Konzept und die Idee

2,085

Das gewählte Grundstück für das Hofhausprojekt liegt im Zentrum des Dorfes Forst mit circa 7000 Einwohnern in der Nähe von Bruchsal in Süddeutschland.

BF: 26,01 m2

N

Grundstücksgröße: 1000 m² Länge 85 m, Breite 13,5 m Das Grundstück wird durch eine alte Steinmauer in zwei Teile geteilt: die vordere Bebauungsfläche und der offene Garten. Auf dem vorderen Teil steht ein alter Walnußbaum der nicht gefällt werden sollte. UERSCHNITT

Schlafen

+3,15 30

2

FB: PARKETT BF: 21,78 m2

Höfe Hof 1 halboffen Hof 2 Nutzung vom Schlafzimmer/ Bad / Tropengarten und HWR möglich Hof 3 VerbindungFLUR zwischen dem Garten- und Wohnbereich, große Holzdeckterrasse und Walnußbaum.

2,85

Sichtachsen und Sichtbezüge

er

er

Das Hofhaus

Der Besitzer dieses Grundstückes ist Geschäftsinhaber 2 eines Floristengroßhandels. Ziel war es ein nutzerorientiertes Haus zu entwerfen, daß 1 die Länge des Grundstückes für sich nutzt, den vorhandenen Baum und die alte Steinmauer erhält, sich zur Straßenseite abschirmt und zusätzlich neben dem offen gehaltenen hinteren Gartenbereich umschlossene Freifläche bietet.

3,115

1,28

125

7,805

1,20

30 30

1,195

2,84

58

4,615

13,63

Sichtachsen und Sichtbezüge

SECTION 1

LÄNGSSCHNITT

Höfe Querschnitt M 1: 50 Hof 1 halboffen Hof 2 Nutzung vom Schlafzimmer/ Bad / Tropengarten und HWR möglich Hof 3 Verbindung zwischen dem Garten- und Wohnbe-

Straßenansicht M 1: 100

Das Hofhaus


MODEL

+7,50

+6,35

+6,20

+3,15

±0,00

3,18

1,45

3,18 5,21

1,45 6,97

98

2 2,01

1,01 4,245 4,245

1,89

20

5,89 8,40

SECTION 2 Längsschnitt M 1: 50

Das Hofhaus Fach Gebäudeentwurf Eva Behringer Innenarchitektur 7. Semester WS 08/09 Betreuung: Prof. Gerd Baron

hof


30 ° 40 °

5

50 °

6

60 ° 7

70 ° 8

6

15

Sonnenstandsverlauf 21.06.2009 Am 21. Juni steigt die Sonne gegen 4.20 Uhr im Nordosten auf und steht um 12.23 Uhr ca. 65 Grad hoch am Himmel. Um 20.30 geht sie im Nordwesten unter. Die mögliche Sonnenscheindauer an diesem längsten Tag des Jahres beträgt 16 Stunden und 10 Minuten.

9 15

7

10 14

13

12

11

14

d) 12.27 h

51°20’ ng 308°40’

13

13

12

12

DAYLIGHT STUDIES

8 9

14

EAST 90°

11

11

Sonnenstandsverlauf 23.03.2009/ 23.09.2009

10

10

9

Sonnenlichtdiagramm für das

Baugrundstückhouse in Forst, during Landkreis winter Model courtyard

Sonnenstandsverlauf 21.12.2009 Am 21. Dezember geht die Sonne erst um 8.14 Uhr am südöstlichen Horizont auf und versinkt nach 16.30 Uhr wieder im Südwesten. Die Sonnenscheindauer beträgt 8 Stunden und 15 Minuten. Die Sonne steigt an diesem kürzesten Tag des Jahres auf nur ca. 18 Grad über dem Horizont.

Karlsruhe, Baden Württemberg Geographische Lage: E/O 8° 35’, N 49° 9’

Sonnenstandsverlauf 21.06.2009 Am 21. Juni steigt die Sonne gegen 4.20 Uhr im Nordosten auf und steht um 12.23 Uhr ca. 65 Grad hoch am Himmel. Um 20.30 geht sie im Nordwesten unter. Die mögliche Sonnenscheindauer an diesem längsten Tag des Jahres beträgt 16 Stunden und 10 Minuten.

SOUTH 180°

Sonnenstandsverlauf 23.03.2009/ 23.09.2009

Sonnenstandsverlauf 23.03.2009/ 23.09.2009 Sonnenaufgang 6.22 Wahre Mittagszeit (Sonnenhöchststand) 12.32 Sonnenuntergang 18.43 Sonnenscheindauer (Tageslänge) [hh.mm] 12.21 Sonnenhöchststand 40° Himmelsrichtung bei Sonnenaufgang 87°15’ Himmelsrichtung bei Sonnenuntergang 272°45’

Model courtyard house during spring and fall

Sonnenstandsverlauf 21.12.2009 Am 21. Dezember geht die Sonne erst um 8.14 Uhr am südöstlichen Horizont auf und versinkt nach 16.30 Uhr wieder im Südwesten. Die Sonnenscheindauer beträgt 8 Stunden und 15 Minuten. Die Sonne steigt an diesem kürzesten Tag des Jahres auf nur ca. 18 Grad über dem Horizont.

Sonnenstandsverlauf 21.06.2009 Am 21. Juni steigt die Sonne gegen 4.20 Uhr im Nordosten auf und steht um 12.23 Uhr ca. 65 Grad hoch am Himmel. Um 20.30 geht sie im Nordwesten unter. Die mögliche Sonnenscheindauer an diesem längsten Tag des Jahres beträgt 16 Stunden und 10 Minuten.

Model courtyard house during summer


FREIRAUM

FALL 2006

the tree-house project

FR Ein


. construction

. basement

. floor

. roof

TREEHOUSE

excerpt of the project book: Freiraum- a treehouse made of bamboo


STRUCTURES II

FALL 2008

studying the aesthetic of structural systems

strc

CAN BEAUTY BE A CALCULATEABLE STRUCTURE? A STEP-BY-STEP SELF-EXPERIMENT


EOG F G O GURES N I EAD AL FI TIONS R P S RIC FUNC T E H M WIT

A A A A A

x x x x

3 3 x 3 3 x 32 3 x 33

strc

A A A A A

x x x x

4 4 x 4 4 x 42 4 x 43

A A A A A

x x x x

5 5 x 5 5 x 52 5 x 53

A A A A A

x x x x

6 6 x 6 6 2x 6 6 3x 6

A A A A A

x x x x

7 7 x 7 7 x 72 7 x 73

A A A A A

x x x x

8 8 x 8 8 x 82 8 x 83


O TERN T T A P USING DIMEN3 A BUILD BJECT O L A N SIO

The project studies the spreading of geometrical shapes. To compare perfomance, the same function is used for every study. By discarding polygon and using offcut as building material different shapes could be designed.

Material

zusammenbauen

Variante 3 Hohlkรถrperbildung Variante 2 Ringbildung

BUILDING A BALL

Hohlkรถrperbildung

BUILDING A BRIDGE

BUILDING A RING

strc USING LEFTOVER


WOODWORKING

2002-2005

as professional cabinet maker Carpentry Sieg, Buxtehude | Germany During the work as professional cabinet maker different tasks of interior woodworking were performed including the handcrafting of furniture, or the making of built-ins, stairs, doors or windows. The German woodworking trade requires a 3-year applied education in traditional woodworking as well as modern applications including CNC. Built examples:


Š Eva Behringer 2011


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.