ARCHITECTURE PORTFOLIO EVIE YUEMING YANG Selected Works 2019-2023
yangyueming29@gmail.com 0498271578
1
EVIE YUEMING YANG Phone: Email: LinkedIn:
+61 498271578 yangyueming29@gmail.com www.linkedin.com/in/yuemingyang
OBJECTIVE A Master of Architecture graduate with a professional background in collaborative, clientengaging roles. Known for adaptability, enthusiasm for challenges, and rapid acquisition of new skills. Currently seeking a full-time employment opportunity.
EVIE EVIE YUEMING YUEMING YANG YANG EVIELANGUAGE YUEMING YANG
Phone: English +61 498271578 Phone: +61 498271578 Email: Mandarin yangyueming29@gmail.com Phone: +61 498271578 Email: yangyueming29@gmail.com LinkedIn: www.linkedin.com/in/yuemingyang Email: yangyueming29@gmail.com LinkedIn: www.linkedin.com/in/yuemingyang LinkedIn: www.linkedin.com/in/yuemingyang SKILLS
EDUCATION The University of Melbourne Master of Architecture Jan 2021 - Dec 2023 Relevant course work: Research on traditional building renovation projects in old Beijing hutongs in China; energy conservation, environmental protection and sustainable development of green buildings University of Melbourne Bachelor of Design (Major in Architecture) Jan 2017 - Dec 2020 •Relevant course work: Public space deign and small to medium sized residential project design
EMPLOYMENT
EDUCATION EDUCATION Peddle Thorp Architects(Beijing Office) EDUCATION
Software Skills Rhino Revit Lumion Render
The UniversityGraduate of Melbourne of Architecture (Full Time) The University of Melbourne Master of Architecture Mar 2021 - Mar 2022 The University of Melbourne Master of Architecture Jan 2021 - Dec 2023 OBJECTIVE Master of Architecture Developed on design of 8 public architecture/residential projects, Jan 2021 - Dec2023 OBJECTIVE 2021 Relevant work: Research on traditional building renovation Jan - Deccourse 2023 Relevant course work: Research on traditional buildingdetailed renovation performed site visits, and produced architectural drawings and OBJECTIVE •Strong interpersonal and communication skills projects in old Beijing hutongs in China; energy conservation, A Master of Architecture graduate with a Relevant course work: Research on traditional building renovation projects in old Beijing hutongs in China; energy conservation, A Master of Architecture graduate with a environmentalrenders protection and sustainable development of green developed through teamwork-oriented professional background in collaborative, clientprojects in old Beijing hutongs in China; energy conservation, environmental protection and sustainable development green to be supervised by A Master of Architecture graduate with a clientprofessional background in collaborative, Completed design proposals within 1-3ofweeks buildings engagingarchitectural roles. Knownprojects for adaptability, environmental protection and sustainable development of green buildings professional background collaborative, clientengaging roles. Known forinadaptability, director to become part of final design proposal •Excellent problem solving abilities gained enthusiasm for challenges, and rapid acquisition buildings engaging roles. Known for adaptability, enthusiasm for challenges, and rapid acquisition University of Melbourne Undertook design team discussions on strategic design weekly and of new skills. through coordinating projects, collaborating with University of Melbourne enthusiasm of new skills.for challenges, and rapid acquisition Bachelor of Design (Major in Architecture) contributed creative concepts Currently seeking a full-time University Melbourne team members, andemployment meeting client's expectations Bachelor ofofDesign (Major in Architecture) of new skills. Currently seeking a full-time employment Jan 2017 Dec 2020 opportunity. 2020Coordinated communication between different engineers, architects and Bachelor Design (Major in Architecture) Janskills 2017 -ofDec •Implemented bothemployment creativity and analytical Currently seeking a full-time opportunity. •Relevant course work: Public space deign and small to medium sized Jan 2017 Dec 2020 clients, follow updeign and solve questions arise, and finally collected •Relevant course work: Public space and small to medium sized in navigating architectural designs, managing opportunity. residential project design Public space deignand andpresented small to medium sized residentialcourse projectwork: design everyone's opinions to team, making up 20% of total budget, achieving and exceeding clients' •Relevant LANGUAGE residential project design project LANGUAGE
Enscape Render
Peddle Thorp Architects(Beijing Office) Peddle Thorp Architects(Beijing Office)reports on progress of projects and presented results Conducted weekly Graduate of Architecture (Full Time) Peddle Thorp Architects(Beijing Office) Graduate of Architecture (Full Time) to director Mar 2021 - Mar 2022 SKILLSTECHNICAL SKILLS Graduate of Architecture (Full Time) Mar 2021 Mar 2022 SKILLS Developed design of 8 public architecture/residential projects, Mar 2021 - Mar on 2022 Developed on design of 8 public architecture/residential projects, SKILLS performed site visits, and produced detailed architectural drawings and PARTICIPATION •StrongMicrosoft interpersonal and communication skills Developed on 8 public architecture/residential performed sitedesign visits, of and produced detailed architecturalprojects, drawings and Office Word, Excel, •Strong interpersonal and Suite: communication skills PowerPoint renders developed through teamwork-oriented performed site visits, and produced detailed architectural drawings and renders Adobe Suite: Photoshop, Illustrator, Indesign, •Strong interpersonal and communication skills developed through teamwork-oriented Completed design proposals within 1-3 weeks to be supervised by architectural projects renders AAdesign Completed proposals within 1-3 weeks to beEveryday supervisedArtistry by Visiting School Bangkok: Curating developed through teamwork-oriented Premiere. architectural projects director to become part of final design proposal •Excellent problem solving abilities gained Completed design proposals within 1-3 weeks to be supervised by director to become part of final design proposal Student architectural projects •Excellent problem solving abilities gained Render Softwares: Enscape, Lumion Undertook design team discussions on strategic design weekly and through coordinating projects, collaborating with director to become part of final design proposal Undertook design discussions on strategic design weekly and •Excellent problem solving abilities gained with Dec 2022team - concepts Dec 2022 through coordinating projects, collaborating contributed creative team members, and meeting client's expectations Undertook design team discussions on strategic design weekly and contributed creative concepts through coordinating projects, collaborating with team members, and meeting client's expectations communication Partnered with architecture students from more than Coordinated between different engineers, architects and six different •Implemented both creativity and analytical skills contributed creative concepts Coordinated communication between different engineers, architects and team members,both and creativity meeting client's expectations •Implemented and analytical skills together to arise, accomplish tasks clients, follow countries up and solve questions and finally collected in navigating architectural designs, managing Coordinated communication between different engineers, architects and clients, follow up and solve questions arise, and finally collected •Implemented both creativity and analytical in navigating architectural designs, managingskills everyone's opinions and presented to team, making up 20% of total budget, achieving and exceeding clients' clients, follow up and solve questions arise, and finally collected everyone's opinions and presented to team, making up 20% of total in navigating architectural designs, managing budget, achieving and exceeding clients' project Melbourne School of Design Exhibition expectations everyone's opinions and presented to team, making up 20% of total project budget, achieving and exceeding clients' expectations Managed projects'Volunteer progress from 3-4 multidisciplinary teams to ensure •Highly skilled in design/ presentation and office project ManagedStudent projects' progress from 3-4 multidisciplinary teams to ensure expectations •Highly skilled in design/ presentation and office all drawings are finished time according to schedule softwares: Adobe suite, excel. word. ppt, and etc. Nov 2017 - Novon Managed projects' progress fromaccording 3-4 multidisciplinary all drawings are finished on2022 time to scheduleteams to ensure •Highly skilled in design/ presentation andand office softwares: Adobe suite, excel. word. ppt, etc. Conducted weekly reports on progress of projects and presented results all drawings are finished on time according to schedule Volunteered with studio leader designing and planning Conducted weekly reports on progress of projects and presented results of set and softwares: Adobe suite, excel. word. ppt, and etc. to director TECHNICAL SKILLS Conducted reports on progress of projects and presented results Exhibition to director weekly TECHNICAL SKILLS to director TECHNICAL SKILLS PARTICIPATION Microsoft Office Suite: Word, Excel, PowerPoint PARTICIPATION Microsoft Office Suite: Word, Excel, PowerPoint Adobe Suite: Photoshop, Illustrator, Indesign, PARTICIPATION Microsoft Office Suite: Word, Excel, Indesign, PowerPoint Adobe Suite: Photoshop, Illustrator, AA Visiting School Bangkok: Curating Everyday Artistry Premiere. AA Visiting School Bangkok: Curating Everyday Artistry Adobe Suite: Photoshop, Illustrator, Indesign,
3D Printing
expectations EMPLOYMENT LANGUAGE EMPLOYMENT Managed projects' progress from 3-4 multidisciplinary teams to ensure •Highly skilled in design/ presentation and office English EMPLOYMENT English softwares: Adobe suite, excel. word. ppt, and etc. all drawings are finished on time according to schedule Mandarin English Mandarin Mandarin
AutoCAD SketchUp Adobe Photoshop Adobe Illustrator Adobe Indesign Adope Premiere Laser Cut
I value people’s experience and believe architecture is not about designing a certain building but designing an experience & lifestyle. I am proficient in applying architectural design related software, outgoing and have good communication skills and teamwork skills. I am also a quick learner and enjoy good challenges.
2
TABLE OF CONTENT
Academic Works :
Professional Works :
2019-2023
Peddle Thorp Architects (Beijing Office 2021-2022
01 The Gateway
Melbourne School of Design APPLIED ARCHITECTURAL TECHNOLOGY Subject Coordinator: Dr Giorgio Marfella
Author
Student ID
Yueming Yang
929212
4-7
05 COMMUNITY KINDERGARTEN
18 - 19
The proposed extension plans for the Melbourne Immigration Museum.
A community kindergarten proposal as an integral element within a comprehensive large-scale development master plan.
02 HUTONG DESTINATION 8 - 10
06 RESIDENTIAL SALES CENTRE
A community Hub within a Beijing Hutong Laneway.
A sales center dedicated to marketing and showcasing high-end vacation residences within a newly developed neighborhood emphasizing tourism and leisure.
03 LIVING PALETTE
20-21
11 - 13
CoHousing project in the inner suburb of Melbourne, specifically Northcote.
Sky Lounge Sky Rise Hotel High Rise Office Goods Lift
Low Rise Office
Elevator for Sky Rise
Podium
Elevator for High Rise
Underground Car Park
Elevator for Low Rise
Crown
Elevator for Car Park
Vertical Circulation
Underground Car parking spaces and Crown are added. Lift Projection Diagram
Floor Plate & Circulation Diagram
04 SYMBIOTIC PLAZA
14 - 17
A vertical mixed-use tower featuring a hotel component atop an office building structure.
3
01 THE GATEWAY
New Expansion of Melbourne Immigration Museum Master of Architecture Year 2- 2023 Design Studio E Site Location:400 Flinders St, Melbourne VIC 3000
Tutor:
Softwares Used in Project Rhino + Sub Revit
Ariani Anwar dewi.anwar@unimelb.edu.au Ariani.Anwar@wardle.studio
Enscape Render
Tom Proctor thomas.proctor@wardle.studio
Adobe Photoshop
Michelle Gan michelle.gan@wardle.studio
AutoCAD
The project entailed an expansion of the existing Melbourne Immigration Museum, it is a heritage building that formerly served as the Custom House for new immigrants in 19th Century. The design brief mandated the incorporation of a new gallery space spanning a minimum of 1,500 square meters. Additionally, the project called for the integration of a new program aimed at attracting visitors to the museum.
Adobe Illustrator Adobe Indesign
4
Expansion of Melbourne Immigration Museum Here is a skill learning and jobs Centre at immigration museum for newly coming immigrants while expanding the existing exhibition space to maintain the museum's education role for the public. the original site of the Melbourne Immigration Museum is the old customs building in Melbourne.
The intervention is the gateway to jobs and the gateway to opportunities.
Based on the Characteristics of Recent Migrants Survey (CoRMS) conducted across Australia in November 2019,A third (33%) reported experiencing some difficulty finding their first job. Also the primary difficulties faced by new immigrants pertain to language and communication, given that English is the official language in Australia. Many immigrants who do not speak English as their first language face significant obstacles in integrating into society.
In this way, the new immigration museum is not only a repository of old immigration history, but also writes a new immigration history for the future through active participation and helping new immigrants.
Existing Immigration Museum
New Gallery
It also serves a connection between the old and new, and between history and future.
Education Hub
Design Principle 4,288 sqm
500 sqm
1500 sqm 5x 300sqm
1. social networking opportunities
2. Connection
3. Space Flexibility
5
Multi-use of material (Weathering steel) Weathering steel as the most important material at the staircase and to guide the circulation. By employing Weather steel and its colour reminiscent of gold, the material propose a concept that pays tribute to the building’s "Gold Rush" history. The Shinny yellow orange colour culturally connect the past with the present, and the structure physically connect the existing structure with the expansion. As the material ages gracefully, the vibrant orange hue transforms into a more subtle copper shade, symbolizing the immigration on this land is an ongoing process and happening every day.
Except from the ground connection, there is a tunnel connect to the new structure and goes directly into the long room. Also, the glazing exterior of expansion reflect the shadow of heritage façade, making new building part of the extension of the history and heritage language.
The section between existing and expansion. The weathering steel elements are derived from the gold colour of sculpture from the main doorway and it continues to wrap around the building just like a gold ribbon to tell the story and lead the circulation.
The material also be used at different scales, for example, it also be used in the exhibition to display artifacts , it can also be bend down become a seat, or the decoration on the ground and doorway to tell the story and direct the visitors journey of experience.
Tunnel Walkway stretches into the Existing Heritage Long Room as a retrofit addition, while preserving the heritage architecture features.
6
n pe O an pl dy tu S
C om ro
a re A
ss la
s R p fto oo n de ar G
d oi V C om
m
iu
ry ra s po ion m bit Te hi x E
n
itio
hib
Ex
ry ra ns po io m bit Te hi x E
ry ora
ry ra ns po io m bit Te hi x E
It's a very light-filled space. The heritage façade of the existing become a very significant window view, reminding people of history.
tr
A
ro
dy
ss
tu
la
S
The interior render from the study atrium.
p
ing
H
g an
dio
Stu
ro
ss
Cla
om
h ug
ro
Th
to
m Te
UP
y
ar
br
Li
Gallery lo C m
oo
r ak
Education Space
n
ry
le
io at
al
m
r fo In
UP
G
k
es D
m eu p us o M Sh
Public Amenities
s e id r K ca ay D
n
om ro
ak
io at rm
lo
C
fo In
BOH: Office + Storage
k es
D e
af C
Through to Existing Museum
Gallery
Education Space
Public Amenities
BOH: Office + Storage
7
02 HUTONG DESTINATION
(Community Hub in Beijing Hutong Laneway) Master of Architecture Year 1- 2021 Design Studio C
Site Location: Shique Hutong, Beijing, China Tutor: Gumji Kang - gumji.kang@unimelb.edu.au
Softwares Used in Project Rhino Grasshoper Lumion Render AutoCAD Adobe Photoshop Adobe Illustrator Adobe Indesign
8
Program Diagram
SITE ENTRANCE
BANQUETTE SEATS
CAFE
SKYLIGHT
COURTYARD
VIEWS
SUNSHINE
ESSENTIAL MEETING AREA
GREENERY
SITE ENTRANCE
CIRCULATE &STAY
LEISURE
CENTRAL COURTYARD
CASUAL BEAMBAGS SEATS
SLOPE
9
3
MOVEABLE FURNITURES
DOORWAY
24/7 ACCESS
SITE ENTRANCE
TRANSITION ZONE
CONSULTATION
a
8
COURTYARD STAIRCASE TO ROOTTOP
WAITING AREA
ADMINISTRATION
1
SLOPE
A
SERVICE COUNTER
5
TRANSITION ZONE
PRIVATE CONVERSATION
2
24/7 ACCESS
DOORWAY
GREENERY
COMFORT
QUIET
RAMP SITTING
BACK YARD
TRANSITION ZONE
FOOD&DRINKS
LIBRARY
CALM
SLOPE
CHILL
COMMUNAL KITCHEN BAKERY STUDIO
CASUAL BEAMBAGS SEATS
HOT DESKING
B
BOOKSHELVES
CIRCULATE &STAY
SOCIALISING
VIBRANT
SUNSHINE
TOILET
ADULTS&CHILDREN
DOORWAY
MEETING ROOMS
RESTRICTED AREA
COURTYARD
PLANT ROOM
SOCIALISING
LEARNING
HOBBY WORKSHOPS
Massing Diagram
4
13
8
14
15
12
b
9
10
9
11
8
6
6
6 7
0
5
10
20 1:250@A3
1. Cafe 2. Communal Kitchen 3. Toilet 4. Outdoor Staircase 5. Library 6. After School Club 7. Pottery Workshop 8. Courtyard 9. Indoor Staircase 10. Beambags Sitting 11. Meeting Room 12. Administration 13. Private 14. Service Counter 15. Waiting area
Start From Chinese Traditional courtyard house form
Take out west side structure to form the main entry to central courtyard space
MID SEM DESIGN: Adjust the building height and create a continous pathway to rooftop
Allocate small courtyards to introduce natural lights and staircase to the rooftop play ground
Lift up the surface to create multiple entry to the site
Turn to curvilinear form to further pursue the idea of continouity
DESIGN BRIEF: It is easy to think of hutongs as extensions of home space, even if they are actually public Spaces. People attach various meanings to hutong, such as relaxing in the sun, drying clothes, playing cards and mahjong, and even hosting banquets and entertaining guests. The concept of home is expanded. Even though the living space of people's physical home is very small, People's Daily life is not at home, but in the public area. The activity area of domestic living extends to the city limits. This kind of special way of life produced under the restriction of times and economy is the rudiment of co-living. With the development of economy, people can buy their own real estate, and the life of the big family is divided into small families. However, the relationship between neighbors is gradually becoming indifferent, which is due to the disappearance of public shared space. Destination is a place you would go and stay. Concerned with the lack of facilities and the absence of quality communal space, original residents decide to sell and move out to bigger apartments outside of the city center. The project will give back the public gathering space back to the residents and keep the tradition of “sharing “in hutong. Let the residents have no burden to come directly from the home doort ot the place to rest, as they used to rest in the hutongs. It also aim to integrate greenery and create a “pocket park” for surrounding residents to challenge the growing disinterest of the hutong tenants.
9
Casual beambags Sitting
Cafe banquette seats
Private Conversation Area
Back Yard
10
03 LIVING PALETTE
(CoHousing in Melbourne Inner Suburb) Third Year Individual Work - 2020, Semester 2
DESIGN BRIEF:
ARCH30002 Design Studio Epsilon
The topic of Studio Epsilon is collective housing and the design of multiresidential buildings in the present context of middle-ring suburbs in Melbourne, characterised by demographic changes, economic pressures and diversified ways of living. We will be seeking new housing solutions which are better suited to contemporary societal needs, and we will be pursuing housing models which provide communal amenities and integrate other uses. We will focus on how people may live closer together, and how design can provide innovative and lasting solutions to support communal living.
Site Location: 11 High St, Northcote VIC 3070 Tutor: Alice Choi - alice.choi@unimelb.edu.au
Rhino Vray Render Adobe Photoshop Adobe Illustrator Adobe Indesign
11
The Living Palette focusing upon the mix dwelling types within a standardised and fixed outshape frame. And with the help of modular cosntruction to offer a more affoardable and sustanable living style. A category of different unit types is ready for residents to choose. You can customise your space with movable walls and bi-folding doors, in a way create your own colour in our community palette. This is not only a last resort for people who can not afford, but interested in offering a shift of lifestyle to break apathetic neighborhood relationship in modern society. We do value your privacy but we still want you to give your neighbour a chance greet you in a doorstep every day.
Dwelling type Options
North Side
South Side
65 m²
65 m²
65 m²
65 m²
68 m²
68 m²
68 m²
68 m²
68 m²
2x65 m²
68 m²
2x65 m²
68 m²
2x65 m²
65 m²
65 m²
68 m²
68 m²
65 m²
65 m²
68 m²
68 m²
2x65 m²
2x65 m²
2x65 m²
68 m²
Beyond Housing Studio EPSILON ARCH30002
2x65 m²
130 m²
116 m²
165 m²
138 m²
Bi-folding doors are adopted to create a flex space outside each private unit, to activate corridor shared living space and allow for more possibililites. It avoid forced social interacction for introvers but also give them chances to share their little space and join our community events.
165 m²
150 m²
115 m²
1 Bed 2 Beds 3 or 4 Beds 3 or 4 Beds (Standard flat) The reders shows a birthday party at shared kitchen. Someone is opening his bi-folding doors to share his space with others.
12
The building is separated by a middle spiral staircase into two parts for better ventilation and sunlight access. The first render shows how the middle area is used as a meeting point for people from both sides. Shared facilities like laundry, cafe, yoga space are placed in the middle. Planters are also available for those who want to participate in our community urban farming project and create a more sustainable lifestyle.
Beyond Housing Studio EPSILON ARCH30002
13
04 SYMBIOTIC PLAZA Master of Architecture Year 1- 2020 APPLIED ARCHITECTURAL TECHNOLOGY
Site Location: 185-227 Spring Street, Melbourne Tutor: Yohan Abhayaratne - yabhayaratne@unimelb.edu.au
AutoCAD RHINO Adobe Photoshop Adobe Illustrator Adobe Indesign
The project ‘SYMBIOTIC PLAZA’ is a mixed-use tower with a hotel stacking on the top of an office building and the main concept is to provide different living conditions, achieving a harmony ‘symbiosis’of the programs. The site is located on 185-227 Spring Street, on the northeast side of Melbourne CBD, Facing an area of big greenery of Parliament Garden on the east side. This high-rise project aims to respond to the surrounding commercial context with its incorporation of both office and hotel functions.
The 240m tall structure is consist of four parts: - Low-rise levels: Podium, 20 meters tall, 3 levels. -Medium rise levels: 12 offices floors and 2 mechanical levels with an efficiency 82%. -High rise levels: 15 offices floors and 1 mechanical level with an efficiency 86%. -Sky levels: 17 hotel floors (including 1 sky lobby) and 1 mechanical level with an efficiency 89%. And there are four lift groups service each of these levels to minimize the waiting time. The perimeter of podium is 3m back away from the site boundary from eastside, and 9900mm back away from North Lonsdale Street. And the tower above is 5m setback from the edge of podium. The designed tower has 49 floors and sits at 240m in height. The overall design ensures the maximum amount of area on each floor, achieving 86% in efficiency and 1:15 in FAR. The tower volume above 32nd floors on the sky levels (hotel part) are reduced based on a 3mx3m grid to prevent the wind load on the highrise building. In addition, the edge corners on all four sides are chamfered to correspon
14
1 A2.3
3D STRUCTURE SOUTHEAST ISOMETRIC
2 A2.3
SOUTHEAST EXPLODED ISOMETRIC DIAGRAM SCALE 1:500
The overall structure of the designed tower utilizes the outrigger and belt truss system in order to effectively control the excessive drift due to the lateral load coming from the natural winds in Melbourne.
The core is located centrally in the floor plan, and the shape of the core is a square form to resist torsion. The core wall has been designed to withstand most of the lateral loads and has been connected to the perimeter concrete mega-columns at the corners through the outriggers and the belt trusses. A 1500mm building module has been selected to provide a basis for the interior and exterior design.
15
HERO SHOT VIEW FROM NORTH EAST
To control solar gain, an intelligent blind system is applied to the fully glazed facade as one of the passive design strategies. As regards the double facade, the system is called Closed Cavity Façade (CCF). There is a cavity between the outer skin and inner skin of glass, which is permanently conditioned with clean and dry air. The shading device is impacted in the cavity.
NORTH DOUBLE FACADE - CCF SYSTEM
MOVEABLE PHOTOVOLTATIC SOLAR SHADING LOUVRE SYSTEM AT MECHNICAL FLOOR
16
17
05 COMMUNITY KINDERGARTEN 石家庄辛集 澳森观澜壹号四期 社区幼儿园
Responsible for: - Overall design of kindergarten - Collaborating with the construction team to create initial construction drawings for the kindergarten - Modifying residential drawings as needed - Assisting in the detailed planning and graphics of general drawings - Producing Presentation Slides and other related tasks 幼儿园用地选址
b a
c
d e
幼儿园用地位于项目南侧,面向文体街
PROFESSIONAL WORKS 18
The project is located in Shijiazhuang, China. As supporting facilities of the community, the kindergarten needs to fit in with the modern style of the community as a whole. Due to the surrounding high-rise blocks, the minimum daylight standard requires that the children's class activity units can only be located in the south. Therefore the stairwell and logistics area was placed on the north side of the building to ensure maximum daylight in the children's area. The design inspiration of the sloping roof is derived from children's paintings, and its shape also conforms to the ideal house shape in children's minds. The design's main goal is to offer a sunny and cheerful environment where children can enjoy a happy and well-illuminated childhood.
Kindergarten Requirements: Total number of classes: 4 Total construction area: 1330.24m² (Required planned building area: 1300m²) Total land area: 2024.67m² (Required planned land area: 1900m²) Parking spaces: 6 cars
1-1 班级活动单元 Classroom 办公后勤 Boh Office+ 交通走道 Hallway
班级活动单元 Classroom 办公后勤 Boh Office+ 交通走道 Hallway
首层平面图 Ground Floor
二层平面图
First Floor
Floor Area: 666.77 m² Gross Floor Area : 1330.24 m² 建筑总面积:1330.24m² 本层面积:665.77 m²
本层面积:664.47 m²
Floor Area: 664.47 m²
屋顶平面图
Project Status: Under Construction
1-1剖面图 1-1 Section
19
06 RESIDENTIAL SALES CENTRE
示范区场地平面 Site Area : 5500 m² Sales Center Area : 1000 m² Sample Room Area : 170 + 200 m² Parking Space: 20 cars 10
The project is located in the area of Tai moutain Bixia Lake tourism resort, which is thecore of the Taishan Tourism development plan. The overall strategy of Bixia Lake's slow leisure area planning takes Bixia Lake as the main feature, highlights the characteristics of vacation station, and plans an urban style tourism resort area, integrating vacation, leisure, sports, fitness, entertainment, and tourism.
示范区面积:5000m²
14 12
售楼处面积:1000m²
7
My primary responsibility involves the overall planning of the sales office, which includes accommodating two sets of model houses. Additionally, the design should create open areas that are accessible to the public, thereby establishing a distinctive mixed-use space that serves as both a commercial sales office and a leisure area for the surrounding residents.
样板间面积:170+200㎡
10
13
停车位:20辆
11
1. Pedestrian Entry 8 小桥流水 示范区人行入口 1 2. Vehicle Entry 3. 2Parking Lot 示范区车行入口 9 静谧竹园 4. Park (Front Side) 5. 3Waiting Zone 停车场 10 样板间 6. Scupture Garden 7. 4Lake 11 东麓书院 前场公园
9 8
Project Status: Tender
7 5
6
4
3
2
8. Bridge 9. 5Bamboo 对景照壁Garden 12 观景亭 10. Sample Room 11.6 Library 假山叠石 13 湖心小岛 12. Observing Pavilion 镜面水景 14 后场庭院 13.7 Stage 14. Theatre
1
Site Plan
Sample Room ︵ ︶ 200sqm 3F
Observing Pavilion
Back Yard
Sample Room ︵ ︶ 170sqm 3F
观景亭
Bamboo Garden
︵ ︶ Sales Centre 2F
Lake
Entry
Front Park
样板间
后场庭院
流线分析 场地剖面
• 强烈的仪式感流线
• 景观植被巧妙结合水系打造,移 步换景的感官体验
样板间
• 都市内闹中取静的一处心灵归所 售楼处
静谧竹园
前场公园
入口照壁
停车场
200.60
车行流线 196.60
人行流线 人行入口
顺应地势,示范区前后场形成4米高差,观湖视野不断提升;售楼处二层大面积退台处理,做到观景视野最大化 车行入口 Site Section 山东泰安·碧霞湖 5 号 6 号地块规划建筑概念方案设计
189
20
Sales Centre Technical Drawings
2F Terrace
Terrace
Back Yard
1F
1
Front Park Entry
1 1
Ground
1
Section Diagram
售楼处剖面示意
2F
售楼处
露台 前场景观
露台
1F
楼 梯
南立面图
South Elevation
后场景观
Ground Floor 首层平面图 首层平面图
Floor Area : 1035 m² Gross Floor Area : 1379 m²
二层平面图 First Floor 二层平面图
Floor Area : 344 m²
覆土 西立面图
West Elevation
售楼处剖面示意
东立面图 East Elevation
北立面图
North Elevation
1-1剖面图
1-1 Section
21
THANK YOU FOR READING
EVIE YUEMING YANG
22