PORTFOLIO Eva Papageorgiou Marigli March A.A. Design&Make, Architectural Association March/BSc Architectural Engineering, University of Thessaly
Eva Papageorgiou Marigli 1
2
PART 1
POST - GRADUATE STUDIES................................p.02 #01 A.A. Student Lodge 1&2 #02 Raping Bands PART 2
PROFESSIONAL WORK........................................p.14 #03 High school in Saint Martin #04 Mediateque in Chelle PART 3
COMPETITIONS...................................................p.22
3
#05 Disaster Prevention and Education Center
PART 4
GRADUATE STUDIES...........................................p.28 #06 Post-Camping Farm
Eva Papageorgiou Marigli March A.A. Design&Make [Architectural Association School of Architecture] March/BSc Architectural Engineering [University of Thessaly, Greece]
portfolio 2013
#07 Highway-stop public Bath
4
PART 1
POST-GRADUATE STUDIES
A.A. March Design & Make 2011-13 Architectural Association School of Architecture
5
02.2013
STUDENT LODGE 1&2 LOCATION: Architectural Association Hooke Park, Dorset, UK SURFACE: 80 m2 PROJECT TEAM: (designers and construction): Bojana Grebenar, Thiago Jose Barros, Karjvit Rirermvanich,
Natalia Iliadi, Abdullah Omar Ashkar Khan, Hugo
Garcia Urrutia, Elizabeth Cunningham, Eva Papageorgiou-Marigli / Supervisors: Martin Self, Piers Taylor, Charlie Corry-Wright, Charley Brentnall, (timber framers): Dominique Taylor, Janes Blabla, Jack Blabla CONSTRUCTION BUDGET: £80.000
The project of A.A. March Design & Make 2012 is a housing unit which accomodates four residential students. It is the first of a series of buildings that will form the “Student Zone” of the approved master plan for the campus of AA in Hooke Park*. The project is aiming towards a
6
prototypical and experimental architecture where
design is generated
reactively through the processes of fabrication and construction. As a non-ordinary housing unit, the project intents to provoke alternative modes of domesticity and sociological conceptions merging together traditional and contemporary building techniques, using timber from Hooke Park as well as other resources. *Hooke Park is a 350-acre working forest in Dorset, that has been owned and operated by Architectural Association since 2002. A.A. aims to develop Hooke Park as a site for exploring architecture, the craft of construction and sustainable timber technologies. The existing buildings at Hooke Park, designed by collaborations between ABK, Frei Otto, Burro Happold and Edward Cullinan, are remarkable demostrations of an intelligent approach to maximizing the resources provided by the forest.
#01
Post-Gradute Studies
7
The
Lodge was divided in two separate
parts, the west and east bedroom wings and the central communal area. The west bedroom wing was oriented to face the south viewsand sunsets whereas the east bedroom wing faces the forest to the north.
8 Preliminary designs: southwest view and ground floor plan of the forest penetration
The building’s boundaries are allowing and at the same time prevent the interaction between the building and forest life. We perceive the Lodge as a prism of a forest, and the openings as the prism’s edges where the forest picture is deconstructed to trees and foliage occupy the house the same way people do.
#01 Post-Graduate Studies
Student
Lodge 1&2 building consists
of a post-and-beam structural system with additional diagonal bracing
on both
end walls. Alongside physical prototyping activities,
the
structure
was
digitally
modeled to analyse its structural behavior and to provide accurate information for the prefabrication of the two main structural components, the longitudinal frames and the cross-frames. All structural elements were made of spruce.
Structural prototyping principle in the Big Shed Prefabrication of a longitundinal frame
9
Examples of working drawings and constrction details
810
#01 Post-Graduate Studies
Through a process of building and desinging at the same time, the evolution and the transformation of the project emerges through the layering of material.
working on site: the installation of prefabricated primary frames and making the structure of the central part
11
12 Working on the roof membrane
Northeast view, before applying the cladding, January 2013
Interior view, central area, December 2012
#01 Post-Graduate Studies
OUT
IN
section : cladding in front of window
11 13
IN OUT plan : cladding in front of window
screw
nail
Part of the cladding prefabrication process
10.2011
RAPPING BANDS PROJECT DESIGNER: Eva Papageorgiou Marigli COURSE: Induction Studio, March Design&Make TUTORS: Martin Self, Kostas Grigoriadis
Using parametric digital tools, such as grasshopper and rhinoscript, design and fabrication of aggregated components, formed space. The main notion of the project is to create surfaces throught positioning of circularly formed stripes. Simplifying the whole construction procedure, the strips where deployed on a rectangular grid where each component is acting as a construction element and a joint. Parametres such as the distance between the strips are differentiating the curvature and the structural behaviour of the resulting surface.
14
#02
Post-Gradute Studies
A component
B component
Multiply 4 times the A component and locked in the final position: B component
After designing the surface, the loops has been unrolled and labeled, ready to be cut in the cnc (1-2-3-4)
U direction
1 V direction unroll loops u direction
2
3 loopwidth
row spacing
overlap
13 15 4
Fabricating the wooden rapping band: using a cnc machine to cut the pieces, water soaking technique to make them flexible
16
PART 2
PROFESSIONAL WORK
17
12.2008
SAINT MITRE HIGHT SCHOOL aRCHi 5 prod Invited competition entry LOCATION: Marceille, France SURFACE :14 494 m² SHON CLIENT: Région Provence Alpes Côte d’Azur PROJECT TEAM: Architects: aRCHi 5 prod and Stéphane Ribeiro de Abreu / Landscape designers : Michel Desvigne / Enviromental engineer :Oasiis COST : 27 956 000 €
18
#03
Professional Work
19
A bioclimatically designed building which is fostering a harmonic coexistence and coherence of open and closed spaces. The functions are divided in three main central areas, one intersecting the other with small green areas. The three central areas are located in oblong energetically designed buildings, with their longer side facing the south. The alternation of the buildings protects and shades the school yard.
Longitudinal Section
20
West Elevation
Mater Plan
#03 Professional Works
21
North-West View
03.2009
MEDIATEQUE aRCHi 5 prod Invited competition entry LOCATION: Chelles, France SURFACE : 3 253 m² CLIENT: Communauté de communes Marne et Chantereine PROJECT TEAM: Architects: aRCHi 5 prod and Tecnova / Landscape designers : A ciel ouvert / Enviromental engineer :Oasiis COST : 8 336 180 €
22
According to the brief the design of the mediateque complex in Chelles had to reflect a strong personality and be recognizable for both its unique use and landmark location, right next to the area’s municipal theatre. The building was designed to leave the majority of the plot unbuilt and to concentrate all of the main massing near the central crossing.The austere right-angle geometry in combination with the semi transparent materials used in the facade produces a varied result opening a continuous dialogue among its materials. The extensive use of glass panels offers a quality light, which is necessary for this particular type of building, a mediateque.
#04
Professional Work
Cross Section
East Elevation
21 23
Master Plan
24
PART 3
ARCHITECTURAL COMPETITIONS
25
08.2011
DISASTER PREVENTION AND EDUCATION CENTER International Architectural and Town Planning Competition (by ThyssenKrupp Architecture Award and UIA ) CLIENT: Istanbul Metropolitan Municipality LOCATION: Istambul, Turkey PLOT AREA: 9.450 m2 PROJECT TEAM: Xrisoula Helidonaki, Giorgos Mademohoritis, Eva Papageorgiou-Marigli
Our proposal approach is based on the principle of reversal balance during a natural disaster. The Building consept is governed by the maxim: “Energy is not lost, it changes form”. We believe that it is possible to recycle energy not only with proper planning (orientation, materials, microclimate) but also with the reuse of the energy escaping the building with appropriate
26
management so as to change its form and use it again within the same building. On the basis of the above, a natural disaster building is designed by negotiating these notions of alternating forms of energy, flows, materials which are in harmony through their movement and recycling. The initial impetus of the design results by exerting pressure on the surface land. These pressures stem from the direction, density and intensity of visitors’ traffic in the plot we are studying, the surrounding areas, the city and the rest of the world. The location of the subway station, the new main roads, the university, the airport, all play an important role in the creation of the network of the building’s visitors movement, that are subjects of study. The artificial insicions planned are elevated in the space “overthrowing” the new system that tends to equilibrate. This leads to “walls - pathways” that offer a rhythm and flow to the movement of visitors but also act as energy capacitors.
#05
Competitions
27
28 26
A
A
#05 Competitions
North Elevation
South Elevation
27 29 North- East Elevation
Main Entrance View
Section A-A
30
PART 4
UNDERGRADUATE STUDIES
31
March / BSc Architectural Engineering University of Thessaly (Greece), Polytecnical School, Departement of Architecture
11.2009
EC[h]O: A POST-CAMPING FARM LOCATION: Halkidiki, Greece PROJECT TEAM: Natalia Iliadi, Eva Papageorgiou-Marigli COURSE: Thesis Project / professors: G.Tzirtzilakis, K.Panigiris
Ec(h)o is a community of temporary housing and research.
The ec(ho) new housing is realised through a series of different
The community by cultivating and studying plants is producing
modules that can be plugged-in in the various network sockets.
research in the fields of health, food, and energy, with the
The user, depending on the way she chooses to work, dwell
common denominator sustainability and autonomy. The
or socialize, chooses the number, variety and placement of her
community’s inhabitants are all staying in Ec(h)o temporarily,
modules. These modules can be hauled inside and outside of
from a few hours as summer vacationists to a few months
the site. On the site all spaces are isotropic and equivalent,
as researchers. Ec(h)o was designed over the old facilities
although centres of congestion can be created through the
network of a camping of the GTO(Greek Tourist Organisation)
choise of placement the users make. These centres are of
that was located beforehand at the site. The design was based
course temporary and depend on the whim and choise of
on a global idea: that of discovery, emergence and reuse
the users.
of the already existing networks, as an “artifact” of a former housing situation.
32
#06
Undergraduate Studies
unstable
energy
modules
circulation
plantation
33
farmings
plug in points
networks stable
A
camping, in architectural terms, is not typologically defined,
electricity,telecommunications,transportation)
to
the
immaterial
therefore it has organizational patterns. Thus, transforming a camping
networks that can be determined depending on each individual’s
means maintaining and upgrading its infrastructure. With the term
choices (such as a PC users network or the communication/
infrastructure we mean the networks – from the material ones (water,
relationships network, that can be formed among “neighbours”).
34
The combination of low cost technology and traditional farming techniques will give a new understanding of ecological issues, urban dispersal and landscape picturesque.
#06 Undergraduate Studies
Living Modules The residence and working space has been splited in roomsmodules, based on the activities it includes. We design the maximum dimensions (3x3x12) that the module can occupy, given the fact that it can be towed.
washing room
sleeping & dressing room
research , experimentation and play room
small animals room (e.g. chickens)
cooking, eating and resting room
big animals room (e.g. pigs)
conference room
energy storage
products storage
35 Example of modules sequence in ec[h]o Farm
Energy Production and Management drinking water hot water
pluvian water collection
et elec hernet c tricit able y cab le
air
r ate nw
o ati
g irri
g erin filt d ter ree wa ough n thr ntatio pla
hea ted
Using the AVL’ s Bio Pig programme 2001
Creating the Network sockets - plug-in, in ec[h]o Farm
ate He
r ate dw
m
fro
ar
sol
ls
ne
pa
02.2008
HIGHWAY-STOP PUBLIC BATH LOCATION: Thermopylae, Greece SURFACE : 400 m² PROJECT TEAM: Dimitris Poulios, Dimitris Zontanos, Eva Papageorgiou COURSE: DESIGN STUDIO 7 PROFESSOR: Kostis Panigiris
36
The project persued the design of a building wich provides bathing services for travellers at the Thermopylae intersection on the Athens-Larissa national highway (Greece). Inspired by the natural springs in the area we decided to create a “fast relaxation centre”. The Public Bath has been designed as a visible and easily accessed building, using water as its basic element. The building’s morphological elements are based on water flows, whereas the functional elements refer to the “motel” design, given the fact that the building is on the highway. The 7 indipended entrances, opted for the visitor to be able to enter the building facilities directly and have easy access to its interior.
#07
Undergraduate Studies
Interior view: Pools and Sauna
Interior view: Coridor and Pools
The lane along the highway forms the water element spaces: various water pools (mud baths, swimming pools, aromatherapy).
Longitudinal section, to the pools
37
1St floor plan
Parking view
Highway view
38
PORTFOLIO 2013
Eva Papageorgiou Marigli March A.A. Design&Make [Architectural Association School of Architecture] March/BSc Architectural Engineering [University of Thessaly, Greece]
39
PORTFOLIO Eva Papageorgiou Marigli March A.A. Design&Make, Architectural Association March/BSc Architectural Engineering, University of Thessaly
Eva Papageorgiou Marigli 40