Holbrook Estates Property Information

Holbrook Estates CCRs

Holbrook Estates

Well Log

MONTANAWELLLOG REPORT

This well log reports the activities of a licensed Montana well driller, serves as the official record of work done within the borehole and casing, and describes the amount of water encountered.This report is compiled electronically from the contents of the Ground Water Information Center (GWIC) database for this site.Acquiring water rights is the well owner's responsibility and is NOTaccomplished by the filing of this report.

Site Name: HOLBROOK ESTATES EAST GWIC Id: 316799

Section 1: Well Owner(s)

1)HOLBROOK ESTATES EAST(MAIL) 175 SOMERS STAGE ROAD KALISPELLMT59901 [08/13/2021]

Section 2: Location

Township Range Section Quarter Sections 28N 21W 1 SE¼ SE¼ County Geocode FLATHEAD

Addition Block Lot

Section 3: Proposed Use of Water PUBLIC WATER SUPPLY(1)

Section 4: Type of Work

Drilling Method: DUALROTARY Status: NEW WELL

Section 5: Well Completion Date

Date well completed: Friday,August 13, 2021

Section 6: Well Construction Details

Other Options

Return to menu Plot this site in State Library DigitalAtlas Plot this site in Google Maps

Section 7: Well Test Data

Total Depth: 290

Static Water Level: -2

Closed-in Pressure: 0 psi

WaterTemperature:

Air Test *

100 gpm with drill stem set at 290 feet for 8 hours. Time of recovery 1 hours. Recovery water level 10 feet. Pumping water level feet.

* During the well test the discharge rate shall be as uniform as possible. This rate may or may not be the sustainable yield of the well. Sustainable yield does not include the reservoir of the well casing.

Section 8: Remarks

20-50LBS BAGS BENTONITE 3/8" CHIPS WERE INSTALLED WHILE PULLING 12" CASING OUTPULLING POORINGTAGGING. WELLWAS MAKING WAYMORETHAN 100GPMAND WILLBETESTPUMPEDTO PROVE

Section 9: Well Log

Geologic Source Unassigned

From To Description 0 30 BROWN SANDYSOIL

30 130 GRAYSANDYCLAY

130 150 TAN STICKYCLAY

150 170 TAN CLAYSOME GRAVEL

170 190 GRAVELWATER

190 235 CEMENTED GRAVELWITH WATER

235 250 LARGE GRAVELWATER

250 255 CLAYEYGRAVEL

255 290 LARGE GRAVELS LOTS OF WATER

Driller Certification

All work performed and reported in this well log is in compliance with the Montana well construction standards.This report is true to the best of my knowledge.

Name:MARTIN WILSON

Company:COLDWATER DRILLINGAND PUMPS

License No:WWC-624

Date Completed:8/13/2021

Holbrook Estates Subdivision Plat

Holbrook Estates

Arch Review Checklist

APPLICANT CHECKLIST

Holbrook Estates: Architectural Review Committee

PLEASE COMPLETE AND RETURN IN CONJUNCTION WITH YOUR REQUEST TO BE INCLUDED ON THE MEETING AGENDA

PROJECT NAME:

LOT NUMBER:

ADDRESS:

PROPERTY OWNER:

PHONE:

SUBMITTED BY:

SUBMITTED DATE:

REQUESTED MEETING DATE:

DOCUMENTS TO SUBMIT: 1

EMAIL:

☐ Site Plan (including location of house, outbuilding(s), septic field, driveway, or other structure(s) proposed to be built or revised. Must show finished grade elevations).

☐ Building Plans (including floor plans for all floors, cross sections, and elevations showing all dimensions and square footage).

☐ Examples of exterior colors, materials, and finishes, and outdoor lighting.

THE ARCHITECTURAL REVIEW COMMITTEE

SHALL COMPLETE THE FOLLOWING AS PART OF ITS REVIEW OF YOUR PROJECT:

DEPOSIT FOR COMMON AREAS RECEIVED? YES NO Amount:

1 Architectural Review Committee may require further documentation and a review fee of $300.00

Any antennas, poles, cellular telephone towers, communication towers, or other structures shall be erected without Architectural Review Committee approval. Any satellite dish receiver must be 24 inches or less in

Any and all signs, billboards, banners, or advertising devices of any nature must be authorized by the Architectural Review Committee, and are otherwise not permitted, except for (a) “For Sale” sign if Lot is for sale, or (b) a builder’s sign placed on the lot during the course of construction of a dwelling. 7.20

30

Reasonable precautions to address drainage in place during and after construction to prevent erosion and other drainage problems.

31 Drainage Control:

Disturbed soils to be revegetated within reasonable time and fashion to minimize erosion.

Driveways constructed as to no interfere with drainage and shall include culverts of appropriate size.

Draft measures to deal with drainage control must be approved by Architectural Review Committee

32 Basic landscaping, including finish grading, seeding, or sodding, must be completed within ninety (90) days after date of occupancy (weather permitting).

33 All landscaping or modifications to Landscaping must be approved by Architectural Review Committee

34 No fuel tanks permitted below ground on any occupied lot, however propane tanks must be buried. Above ground fuel tanks permitted subject to prior approval of Architectural Review Committee

Holbrook Estates COSA/Septic