313e_3 Calculation Figures for O2-Transfer

Page 1

A Q U A

SAUERSTOFFEINTRAG OXYGEN TRANSFER

C O N S U L T

Calculation Figures for O2-Transfer WWT Plant: Control of the plant:

_________________________________ Screen Grit Trap Primary Settling Tank Aeration Tank Intermediate Settling Tank Aeration Tank 2 Secondary Settling Tank

Term: ______________

Date: ______________ Editor:______________

Step 1 Number of equal Tanks: Type of Tanks:

Step 2

[pcs] Rectangular Ring Circle Special Race Track

Length / Outside Diameter

[m]

Width / Inside Diameter

[m]

Depth of Water

[m]

Mixing during Aeration:

Location above Sea Level

[m]

BOD-Load/Day

[BOD5/d]

BOD-Load/Hour

[BOD5/h]

OC/Load

[kgO2/BOD5]

Duration of Aeration/Day

[h/d]

Oxygen Demand in Waste Water

[kgO2/h]

yes

Rectangular Ring Circle Special Race Track

no

yes

no

α-Value (0,7 for ACPB) Oxygen Demand in Clean Water

[kgO2/h] none ±

Minus Tolerances

Number of Blowers in Operation

%

none ±

%

[pcs/step]

Max. Speed of Air

No Data

<

m/s

Air Pipe Material

No Data

Synthetics

Stainl. Steel

Ball Valve Material

No Data

Brass

Stainless Steel

Panel fixing

flat floor

sloped floor

on a frame

Maintenance of Aerators

excavatable solitary excavatable

Stainl. Steel / Synth.

Remarks:

Calculation Figures for O2-Transfer Code M 1.0.2

Vert.:IEJ

Bull 313e

Rev.3

03/03

Seite 1/1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.