MSD - DF Labs Winter 2021

Page 1

DF_Lab: Designing Making / Week 4 Final

ABPL90378 DF_Lab: Designing Making Assessment 2 ASCEND

Darcy Zelenko Winter intensive, 2021 Duke Wang Enoch Fung Fred Huang Christine Jorge

Assessment 2: Ascend

1

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

Introducing...

WHALE WALKER Final design configuration for a Timber Long-span bridge

Assessment 2: Ascend

2

(project) (method) (brief)

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final Presented through...

SCOPE OF WORK

MAP

1 RESEARCH

2 DESIGN

1.1 Design for Configuration: Constant radius 1.2 Proposed Site

2.1 Design iterations / Resolution 2.2 Structural analysis / Karamba 3D 2.3 Workflow description / Grasshopper 2.4 Detail drawings 1:5

3 TEST

4

3.1 Research through making, prototypes & failures

4.1 User Manual for 1:10 Assembly

BUILD

5

Assessment 2: Ascend

APPENDIX 5.1 Precendent references 5.2 Detail references

3

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

SCOPE OF WORK

MAP

1 RESEARCH

2 DESIGN

1.1 Design for Configuration: Constant radius 1.2 Proposed Site

2.1 Design iterations / Resolution 2.2 Structural analysis / Karamba 3D 2.3 Workflow description / Grasshopper 2.4 Detail drawings 1:5

3 TEST

4

3.1 Research through making, prototypes & failures

4.1 User Manual for 1:10 Assembly

BUILD

5

Assessment 2: Ascend

APPENDIX 5.1 Precendent references 5.2 Detail references

4

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

1 RESEARCH 1.1 Design for Configuration: Constant radius

RESEARCH THEME 1 CONSTANT RADIUS

STUDY 1. Sketch design A (referencing Boats + Meydan bridge, UAE: https://www.aurecongroup.com/ projects/transport/meydan-racecourse-development) see appendix pg

Assessment 2: Ascend

5

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making

Structure Study

Traditional Chinese Wooden Bridge

1 RESEARCH 1.1 Design for Configuration: Constant radius

RESEARCH THEME 2 STRUCTURAL LOGIC

Design Review - Research

1

Group Enoch Fung, Fred Huang, Duke Wang, Christine Jorge

STUDY 2. Sketch design B (referencing Da Vinci Bridge & Reciprocal structure: (https://news.mit. edu/2019/leonardo-da-vinci-bridge-test-1010) see appendix pg

Assessment 2: Ascend

6

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

1 RESEARCH 1.1 Design for Configuration: Constant radius

RESEARCH THEME 3 BRIDGE FEASIBILITY PRECEDENTS

STUDY 3. Sketch design C (referencing pedestrian bridge precedent) see appendix pg

Assessment 2: Ascend

7

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

1 RESEARCH 1.1 Design for Configuration: Constant radius

RESEARCH THEME 4 CONFIGURATIONS

STUDY 4. Sketch design D (referencing repetition of forms)

Assessment 2: Ascend

8

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

FROM THE SHIPBUILDER 1 RESEARCH 1.1 Design for Configuration: Constant radius

Assessment 2: Ascend

TO THE WHALE

9

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

1 RESEARCH 1.1 Design for Configuration: Constant radius

Diagram 1. Timber Kayak Boat (referencing bridge construction) see appendix pg

Assessment 2: Ascend

10

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

1 RESEARCH 1.1 Design for Configuration: Constant radius

Diagram 2. Humpback Whale Skeleton (referencing whale anatomy) see appendix pg

Assessment 2: Ascend

11

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

1 RESEARCH 1.2 Proposed Site

Assessment 2: Ascend

12

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

OVERALL BRIDGE SPAN 50m

Lookout point

Lookout point

1 RESEARCH 1.2 Proposed Site

Walkway

Lookout point

PROPOSED BRIDGE 42m

North access from Flinders Street Station underpass

Underbridge restaurant

South access to Southbank

Assessment 2: Ascend

13

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

OVERALL BRIDGE SPAN 50m

Lookout point

Lookout point

1 RESEARCH 1.2 Proposed Site

Walkway

Lookout point

PROPOSED BRIDGE 42m

North access from Flinders Street Station underpass

Underbridge restaurant

South access to Southbank

Assessment 2: Ascend

14

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

SCOPE OF WORK

MAP

1 RESEARCH

2 DESIGN

1.1 Design for Configuration: Constant radius 1.2 Proposed Site

2.1 Design iterations / Resolution 2.2 Structural analysis / Karamba 3D 2.3 Workflow description / Grasshopper 2.4 Detail drawings 1:5

3 TEST

4

3.1 Research through making, prototypes & failures

4.1 User Manual for 1:10 Assembly

BUILD

5

Assessment 2: Ascend

APPENDIX 5.1 Precendent references 5.2 Detail references

15

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.1 Design iterations / Resolution

Iteration A

Assessment 2: Ascend

Iteration B

Iteration C

16

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

Diagram 3.

Mid-Semester design proposition

Assessment 2: Ascend

17

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

Diagram 4.

Final design configuration

Assessment 2: Ascend

18

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.1 Design iterations / Resolution

1 Varied radius

Diagram 5.

Mid-Semester design proposition

2 Constant radius

Diagram 6.

Final design configuration

Assessment 2: Ascend

19

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.2 Structural Analysis / Karamba 3D

Assessment 2: Ascend

20

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.2 Structural Analysis / Karamba 3D

Diagram 2.2a Structural analysis of final bridge configuration After mid-sem review our group went through the structural analysis and approached a more realistic and optimized result.

Assessment 2: Ascend

21

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.2 Structural Analysis / Karamba 3D

DESIGN DETERMINATION

Q=4

Q=7

R=16

Segment Quantity

S=40x80

Assessment 2: Ascend

Cross Section Dimension

R=6

Constant Radius

S=20x40

22

Similar to the mid-sem workflow, we are optimizing the model in three ways. Segment quantity, constant radius and cross section can each influence the model becoming very different ways.

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.2 Structural Analysis / Karamba 3D

SEGMENT QUANTITY ANALYSIS

6

9

12

15

Genome[0], Fitness=3.90, Genes [71%] Segment Quantity : 15

Manual recording of displacement distance

Assessment 2: Ascend

S=6

S=9

S=12

Galapagos result of displacement

S=15

23

The result from Galapagos is less successful because the lack of convergence but best quantity result 15 proved Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge manual data is correct.


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.2 Structural Analysis / Karamba 3D

CONSTANT RADIUS ANALYSIS

6

9

SR=6

Assessment 2: Ascend

38

30

SR=9

24 Individual optimization to each radius.

PR=30

PR=38

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.2 Structural Analysis / Karamba 3D

1

2

PR: 39m SR: 14m Displacement: 2.76

4

3

5

PR: 38m SR: 12m Displacement: 2.83

PR: 38m SR: 11m Displacement: 2.79

PR: 38m SR: 13m Displacement: 2.78

6

PR: 36m SR: 13m Displacement: 2.94

PR: 35m SR: 9m Displacement: 3.08

Representational samples from Galapagos in term of Displacement

Assessment 2: Ascend

25

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.2 Structural Analysis / Karamba 3D

CROSS SECTION ANALYSIS

10 20

Model

30 ... 100

Optimize Cross Section

Cross section: 2

Analysis

The OptiCroSec component has a series of options to select instantaneously, base on our previous optimization result, and considering our fabrication procedure, the final cross section is set to 20x40.

Assessment 2: Ascend

26

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

Assessment 2: Ascend

27

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

000:

Ref. Crv Notes: Human defined length (~42m) and width (7m) to create reference elements.

Assessment 2: Ascend

28

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

001:

S Arch Generation Notes: The curves are shattered into segments to generate variations, dependent on the desired results.

Assessment 2: Ascend

29

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

002:

R30 Application Notes: 30m Radius arcs were used in our proposal for primary structure elements.

Assessment 2: Ascend

30

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

003:

Prim. Arches defined from End Pts Notes: The Primary Arches are designed to be the strongest element to support the entire structure.

Assessment 2: Ascend

31

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

004:

R30 Application Notes: 30m Radius arches are generated in the Z direction (Against gravity) using the endpoints.

Assessment 2: Ascend

32

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

005:

Secondary Arches defined by Segment Quantity Notes: The segment quantity is defined by the structural optimisation and can be increased or decreased depending on the desired aesthetic outcome/ fabrication cost.

Assessment 2: Ascend

33

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

006:

Outer Ribs Generation Notes: Using the same segment quantity figure from the Secondary Arches the Outer Ribs are generated towards the outside to support the loads from above.

Assessment 2: Ascend

34

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

007:

R6 Application Notes: 6m Radius is used on secondary elements to exaggerate the curvature while being able to provide structural support, and they form the ribcage of the Whale.

Assessment 2: Ascend

35

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

008:

Mid Bracing Notes: Bracing elements are used to maintain the form of the Primary Arches, sharing the same nodes as the Secondary Arches and the Outer Ribs.

Assessment 2: Ascend

36

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

009:

Additional Mid Bracing Notes: Additional bracing elements are introduced using the mid points of the Outer Ribs, it aims to maintain the form of the Outer Ribs when compression force is applied from above.

Assessment 2: Ascend

37

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

010:

Surface Defined by S Crv Projection Notes: Using the projection of the initial S curve, the Walkway Surface is defined for pedestrian use.

Assessment 2: Ascend

38

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

011:

Surface Support Beams Generation Notes: Load bearing Beams are generated also using the projection of the initial S curve, an additional mid beam is introduced, connected to the Secondary Arches to provide an even walking surface.

Assessment 2: Ascend

39

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

012:

Outer Rib Bracing Generation Notes: To evenly distribute the load, an extra load path is introduced with the Outer Rib Bracing, it uses segments of the 30m radius members between the mid points of the Outer Rib Bracing.

Assessment 2: Ascend

40

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

013:

Structural Elements Complete

Assessment 2: Ascend

41

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

014:

Railing Generation Notes: The railing elements use the same 6m radius as the secondary members but with a separate segment quantity definition, it is formed like a Whale’s rib cage, mirroring the underside supporting structure.

Assessment 2: Ascend

42

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.3 Workflow Description / Grasshopper

015:

Railing Bracing Generation Notes: Non structural bracing elements are added at the thirds of the railing elements to secure the form.

Assessment 2: Ascend

43

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

Assessment 2: Ascend

44

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.4 Detail Drawings 1:5

Assessment 2: Ascend

45

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

TOP FOOTING DETAIL AXO EXPLODED 1:5

TOP FOOTING DETAIL AXO 1:5

1. 2. 3. 4. 5. 6.

1. 10MM Stainless Steel Plate Sitting 2. Refilled Concrete Base 3. Heavy Duty Angle Plate 4. Stainless Threaded Bolts 5. Caste-In Anchor Blots 6. 200*400MM Timber Glulamed from 100*100MM pieces

SCALE BAR 1:5

Assessment 2: Ascend

46

0

100 200 300 400 500

1000MM

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


BOT FOOTING TOPAXO FOOTING DETAIL AXO DETAIL EXPLODED 1:5 EXPLODED 1:5

DF_Lab: Designing Making / Week 4 Final

BOT FOOTING DETAIL AXO 1:5

TOP FOOTING DETAIL AXO 1:5

1.

7.

2. 3. 4.

4.

5.

6. 5.

6.

3. 2

Assessment 2: Ascend

47

1.

1. 10MM Stainless Steel Plate Sitting 1. 10MM Stainless Steel Plate Sitting 2. Refilled Concrete Base 2. Refilled Concrete Base 3. Heavy Duty Angle Plate 3. Heavy Duty Angle Plate 4. Stainless Threaded Bolts 4. Stainless Threaded 5. Caste-In Anchor Blots Bolts 5. Caste-In Anchor 6. 200*400MM Timber Blots 6. 200*400MM Timber Glulamed from 100*100MM pieces

Glulamed from 100*100MM pieces 7. Slotted Hole for Timber Shrinkage SCALE BAR 1:5 0

100 200 300 400 500

1000MM

Group Front: Enoch Fung, SCALE BARFred 1:5 Huang, Duke Wang, Christine Jorge

0

100 200 300 400 500

1000MM


DF_Lab: Designing Making / Week 4 Final

2 DESIGN 2.4 Detail Drawings 1:5

Assessment 2: Ascend

48

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

TOP FOOTING DETAIL AXO EXPLODED 1:5

FLEXIBLE JOINT DETAIL AXO EXPLODED 1:5

TOP FOOTING DETAIL AXO 1:5

FLEXIBLE JOINT DETAIL AXO 1:5

1. 2. 3. 4. 5.

6.

7. 8. 9. 10.

1. 1. Stainless Threaded Bolts 2. 10MM Stainless Steel Plate Wraping With 3. 2. 3. Precasted Metal Connector 3. 4. Ruber Refill For Damping And Timber Shrinkage & Swollen 1. 10MM Stainless Steel Plate Sitting 5. Plate 4. Heavy Duty Angle 2. Refilled Concrete Base 6. Bolts For Rotation Securing 3. Heavy Duty Angle Plate Stainless Threaded Bolts 5. Rounded Head 4.Rotatable 7. Connector 5. Caste-In Anchor Blots 8. Pin To Be Wield6.During Instalation 200*400MM Timber 6. Precasted One Piece 9. Connector Glulamed from 100*100MM pieces 10. 200*400MM Timber Glulamed from 100*100MM pieces SCALE BAR 1:5

Assessment 2: Ascend

49

0

100 200 300 400 500

1000MM

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

Assessment 2: Ascend

50

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

Assessment 2: Ascend

51

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

SCOPE OF WORK

MAP

1 RESEARCH

2 DESIGN

1.1 Design for Configuration: Constant radius 1.2 Proposed Site

2.1 Design iterations / Resolution 2.2 Structural analysis / Karamba 3D 2.3 Workflow description / Grasshopper 2.4 Detail drawings 1:5

3 TEST

4

3.1 Research through making, prototypes & failures

4.1 User Manual for 1:10 Assembly

BUILD

5

Assessment 2: Ascend

APPENDIX 5.1 Precendent references 5.2 Detail references

52

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

1 JIG DESIGN

(Week 1)

Assessment 2: Ascend

(Week 2) 53

(Week 3)

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

2 TEMPERATURE MONITORING

(Week 3)

Assessment 2: Ascend

(Week 3) 54

(Week 3)

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

3 BEND TECHNIQUE

(Week 1)

Assessment 2: Ascend

(Week 2) 55

(Week 3)

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

4 CROSS SECTION & LAMINATION

(Week 3)

Assessment 2: Ascend

(Week 3) 56

(Week 3)

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

SCOPE OF WORK

MAP

1 RESEARCH

2 DESIGN

1.1 Design for Configuration: Constant radius 1.2 Proposed Site

2.1 Design iterations / Resolution 2.2 Structural analysis / Karamba 3D 2.3 Workflow description / Grasshopper 2.4 Detail drawings 1:5

3 TEST

4

3.1 Research through making, prototypes & failures

4.1 User Manual for 1:10 Assembly

BUILD

5

Assessment 2: Ascend

APPENDIX 5.1 Precendent references 5.2 Detail references

57

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

WHALE WALKER DFLAB DFLAB Design and Quality FRONT of Group

Assessment 2: Ascend

58

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21

CODE: TL1

10x

2x

1x

1x

U2 - Plate fixings

Heavy duty gloves

1x

U1 - Footings bottom plate

Urn

For 1:10 bridge construction

Steambox V2

For steam bending & lamination

Pinnacle M4 x 25mm Zinc Plated Hex Head

Power Drill

9x

Pinnacle M4 x 30mm Zinc Plated Hex Head

F-Clamps

Category: Timber steam bending

Rough Sawn Timber

2

TOOLS

2 Assessment 2: Ascend

59

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: TT1

Category: Bridge Construction

Rough Sawn Timber

3

TOOLS & TASK

9x

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

60

CONSTRUCTION

3

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: TT2

Assessment 2: Ascend

Urn

Heavy duty gloves

F-Clamps

Category: Bridge Construction

Steambox V2

4

TOOLS & TASK

1x

1x

1x

10x

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

61

CONSTRUCTION

4

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: OM

OVERVIEW MAP

5

Category: Bridge Construction (NOTE: DRAWING TO BE CHANGED TO EXPLODED ISO?)

8

Railing Bracing See page 00

7

(RB)

Railing

(R) See page 00

SCHEDULE OF BRIDGE PARTS

Outer Rib Bracing

(ORB) See page 00

Walkway support beam

(WSB) See page 00

Outer Rib

(OR) See page 00

Secondary Arch

2

(SA) See page 00

Mid-Bracing See page 00

1

Assessment 2: Ascend

5

4

3

(MB)

Primary Arch

See page 00

6

Part

Code

1

Primary Arch

PA

2

Mid-Bracing

MB

3

Secondary Arch

SA

4

Outer Rib

OR

5

Walkway support Beam

WSB

6

Outer Rib Bracing

ORB

7

Railing

R

8

Railing Bracing

RB

(PA-L)

62

5 Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21

CODE & ASSIGN PROCESS 6.5

6

Primary Arch (PA) CODE: TIMBER PIECES COMPONENTS

PA-L3

1 2 3 4

PA-R1 PA-R2 PA-R3 PA-R4

1117mm

5 6 7 8

PA-L1 PA-L2 PA-L3 PA-L4

1208mm

TOTAL (PA) SEGMENTS: 8

PA-L4 PA-L2 U-3 U-2 PA-R3

PA-R4

U-1 PA-R2

PA-L1

PA-R1

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

63

CONSTRUCTION

6

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21

CODE & ASSIGN PROCESS 6.5

Outer-rib Bracing (ORB)

7

ORB-L6 ORB-L5 ORB-L4 ORB-L3

9 10 11 12 13 14

ORB-R1 ORB-R2 ORB-R3 ORB-R4 ORB-R5 ORB-R6

654 mm 690 713 713 722 830

15 16 17 18 19 20

ORB-L1 ORB-L2 ORB-L3 ORB-L4 ORB-L5 ORB-L6

875mm 760 755 755 740 685

TOTAL (ORB) SEGMENTS: 12

ORB-L2 ORB-R5 ORB-R4 ORB-L1

ORB-R6

ORB-R3 ORB-R2

ORB-R1

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

64

CONSTRUCTION

7

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21

CODE & ASSIGN PROCESS 6.5

Walkway support beam (WSB)

8 WSB-3.4 WSB-2.4

WSB-3.3

21 22 23 24

WSB-1.1 WSB-1.2 WSB-1.3 WSB-1.4

1031mm

25 26 27 28

WSB-2.1 WSB-2.2 WSB-2.3 WSB-2.4

1066mm

WSB-2.3 L-R21 L-R20

WSB-3.2 WSB-2.2 WSB-3.1

L-R19

WSB-1.4

L-R18

WSB-2.1

WSB-1.3 L-R17 L-R16 WSB-1.2

L-R15

29 30 31 32

WSB-3.1 WSB-3.2 WSB-3.3 WSB-3.4

1101mm

TOTAL (WSB) SEGMENTS: 12

WSB-1.1

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

65

CONSTRUCTION

8

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21

CODE & ASSIGN PROCESS 6.5

Additional Bracing (AB)

9

33 34 35 36 37 38 39

AB-1 AB-2 AB-3 AB-4 AB-5 AB-6 AB-7

1635mm 975 810 767 804 951 1582

TOTAL (AB) SEGMENTS: 7

AB-7

AB-6 AB-5 L-R6

AB-4

L-R3

AB-2 L-R2

AB-1

Assessment 2: Ascend

CUT

STEAM

PROCESS 1

PROCESS 2

PROCESS 3

PREPARATION & FABRICATION

L-R7

L-R4

AB-3

DRESS

L-R5

BEND L-R1 PROCESS 4

66

DRY

GLUE

ASSEMBLE

PROCESS 5

PROCESS 6

PROCESS 7 CONSTRUCTION

9

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21

CODE & ASSIGN PROCESS 6.5

Mid-Bracing (MB)

10

40 41 42 43 44 45 46

MB-1 MB-2 MB-3 MB-4 MB-5 MB-6 MB-7

846mm 838 825 809 792 779 773

TOTAL (MB) SEGMENTS: 7

MB-6 MB-5 MB-4

L-A9 L-A7 L-A8

MB-3

MB-7 L-A10

L-A11 L-A12

L-A13 L-A14

L-A5 L-A6 MB-2

Assessment 2: Ascend

DRESS

CUT

PROCESS 1

PROCESS 2

PREPARATION & FABRICATION

MB-1

STEAM PROCESS 3

L-A3 L-A4

L-A1 L-A2BEND PROCESS 4

67

DRY

GLUE

ASSEMBLE

PROCESS 5

PROCESS 6

PROCESS 7 CONSTRUCTION

10

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21

CODE & ASSIGN PROCESS 6.5

Outer Rib (OR)

11

47 48 49 50 51 52 53

OR-L7 OR-L6 OR-L5

OR-R1 OR-R2 OR-R3 OR-R4 OR-R5 OR-R6 OR-R7

1588mm 827 483 383 517 827 1486

TOTAL (OR) SEGMENTS: 14

OR-L4

L-R14 L-R13

OR-L3

L-R12

OR-L2 L-R11

OR-L1

OR-R5

OR-R7

OR-R4

L-R10 L-R9

OR-R6

OR-R3

54 55 56 57 58 59 60

L-R8 OR-R2

OR-L1 OR-L2 OR-L3 OR-L4 OR-L5 OR-L6 OR-L7

1486mm 704 390 248 417 754 1588

TOTAL (OR) SEGMENTS: 14

OR-R1

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

68

CONSTRUCTION

11

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21

CODE & ASSIGN PROCESS 6.5

L-21

12

Railing (R) R-21

61 R-R1-21 85 R-L1-21

641mm

TOTAL (R) SEGMENTS: 24

L-1 R-1

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

69

CONSTRUCTION

12

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21

CODE & ASSIGN PROCESS 6.5

Railing Bracing (RB)

13 RB-R8 RB-R7

RB-R1 RB-R2 RB-R3 RB-R4 RB-R5 RB-R6 RB-R7 RB-R8

550mm

94 RB-L1 95 RB-L2 96 RB-L3 97 RB-L4 98 RB-L5 99 RB-L6 100 RB-L7 101 RB-L8

550mm

RB-R3

RB-R6

RB-R5

RB-R4

86 87 88 89 90 91 92 93

RB-R2

RB-R1

TOTAL (RB) SEGMENTS: 16

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

70

CONSTRUCTION

13

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: TL5

TOOLS: FRIENDLY TIPS 14 Category: Bridge Assembly

DARCY

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

71

CONSTRUCTION

14

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: F1

15

STEP 1

STRINGLINE DIMENSIONS

Category: Bridge Assembly footings & reference points

1

2

3

Batter board (Add diagonal bracing if needed)

String lines

Dimension lines

Boundary markers

Temporary support NOTE: Site set out plan subject to change depending on the specified location of the bridge construction in campus. True as of: 20-Jul-2021

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

72

CONSTRUCTION

15

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 2 16 Category: Step-by-step assembly

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

73

CONSTRUCTION

16

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

17

STEP 2

Category: Step-by-step assembly

Detail Assembly 1 Footing plate connection (4x plates) Primary Arch & Mid-bracing

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

74

CONSTRUCTION

17

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

18

STEP 3

Category: Step-by-step assembly

F2

F2

F2

F2 F2

F2

Detail Assembly 2 Primary arch plate connection (6x plates)

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

Assessment 2: Ascend

18

CONSTRUCTION

75

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 4 19 Category: Step-by-step assembly

Detail Assembly 3 Mid-bracing connection (10x)

F3

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

76

CONSTRUCTION

19

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 5 20 Category: Step-by-step assembly

Detail Assembly - L-plate connection for Frame (4x 7 Frames)

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

77

CONSTRUCTION

20

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

21

STEP 6

Category: Step-by-step assembly

Detail Assembly - L-plate connection Footings to Frames 1&7

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

78

CONSTRUCTION

21

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 7 22 Category: Step-by-step assembly

Detail Assembly - L-plate connection: Frame to Primary Arch

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

79

CONSTRUCTION

22

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 8 23 Category: Step-by-step assembly

Detail Assembly - Cross halving joint: Walkway to frames

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

80

CONSTRUCTION

23

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 9 24 Category: Step-by-step assembly

Detail Assembly - L plate connection Outer rib bracing

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

81

CONSTRUCTION

24

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 10 25 Category: Step-by-step assembly

Detail Assembly - plate connection Walkway segments

Detail Assembly - Repeat steps

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

82

CONSTRUCTION

25

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 11 26 Category: Step-by-step assembly

Detail Assembly - Repeat steps

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

83

CONSTRUCTION

26

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 12 27 Category: Step-by-step assembly

Detail Assembly - Repeat steps

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

84

CONSTRUCTION

27

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 13 28 Category: Step-by-step assembly

Detail Assembly - Timber decking

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

85

CONSTRUCTION

28

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 14 29 Category: Step-by-step assembly

Detail Assembly 5 - Cross lap joint for nonstructural vertical railing components with horizontal bracing

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

86

CONSTRUCTION

29

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 15 30 Category: Step-by-step assembly

Detail Assembly - Repeat cross lap joints assembly

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

87

CONSTRUCTION

30

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

31

STEP 16

Category: Step-by-step assembly

Detail Assembly - Repeat cross lap joints assembly

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

88

CONSTRUCTION

31

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 16 32 Category: Step-by-step assembly

Detail Assembly - Repeat cross lap joints assembly

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

89

CONSTRUCTION

32

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21 CODE: AS

STEP 17 33 Category: Step-by-step assembly

Detail Assembly - Repeat cross lap joints assembly

Assessment 2: Ascend

DRESS

CUT

STEAM

BEND

DRY

GLUE

ASSEMBLE

PROCESS 1

PROCESS 2

PROCESS 3

PROCESS 4

PROCESS 5

PROCESS 6

PROCESS 7

PREPARATION & FABRICATION

90

CONSTRUCTION

33

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

DF_Lab: Designing Making / User manual v21

34

Assessment 2: Ascend

91

34 Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

Assessment 2: Ascend

92

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

SCOPE OF WORK

MAP

1 RESEARCH

2 DESIGN

1.1 Design for Configuration: Constant radius 1.2 Proposed Site

2.1 Design iterations / Resolution 2.2 Structural analysis / Karamba 3D 2.3 Workflow description / Grasshopper 2.4 Detail drawings 1:5

WEEK 4 (SEMI) CONCLUSION 3 TEST

4

Assessment 2: Ascend, winter 2021

4.1 User Manual for 1:10 Assembly

BUILD

5

Assessment 2: Ascend

APPENDIX 5.1 Precendent references 5.2 Detail references

93

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

5 APPENDIX 5.1 Precedent references 5.2 Detail references

Assessment 2: Ascend

94

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

5 APPENDIX 5.1 Precedent references 5.2 Detail references

Bamboo Pavilion for the Expo Shanghai 10/2010 By Markus Heinsdorff Source: https://inspiration.detail.de/bamboo-pavilion-for-the-expo-shanghai-103526.html?lang=en

Assessment 2: Ascend

95

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

Vance Tsing Tao Pearl Hill Visitor Center 2012 By Bohlin Cywinski Jackson Source: https://www.archdaily.com/876934/vance-tsing-taopearl-hill-visitor-center-bohlin-cywinski-jackson

Assessment 2: Ascend

96

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

Connections Source: http://staff.fit.ac.cy/eng.ma/BATECH08/ Connections.pdf

Assessment 2: Ascend

97

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


DF_Lab: Designing Making / Week 4 Final

Connection Options for Wood-Frame and Heavy Timber Buildings Source: https://continuingeducation.bnpmedia.com/courses/think-wood/ connection-options-for-woodframe-and-heavy-timber-buildings/1/

Assessment 2: Ascend

98

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


Assessment 2: Ascend 99

Source: https://www.stainlesstimberconnectors.co.uk/

Source: https://vicbeam.com.au/

Source: https://www.forconstructionpros.com/concrete/equipment-products/article/12281002/anchor-bolt-tolerances

Anchor Bolt Tolerances

BESPOKE STAINLESS STEEL TIMBER CONNECTORS

VICBEAM-LAMINATED TIMBER SPECIALISTS

DF_Lab: Designing Making / Week 4 Final

Group Front: Enoch Fung, Fred Huang, Duke Wang, Christine Jorge


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.