selected WORKS

Page 1

selectedW O

RKS

francisco martinez 2

3


CONTENTS professional work F11 MIXED-USE NoHo MIXED USE DUARTE MIXED-USE WALNUT CREEK RESIDENCES NIGHTINGALE BIG BLOCK FENCHEL RESIDENCE SUNSET RESTAURANT CMC AQUATICS PORSHCE TOWER KEELUNG PORT TERMINAL

07 11 15 19 23 27 31 35 39 43 49

academic work BROAD MUSEUM REDUX CHICAGO APARTMENTS

55 61

visual studies IMPLIED CONTINUITIES DIGITAL SIGNATURE 99 SECTIONS DIGITAL PHOTOS

2

69 75 78 83

3


professional WORK

4

5


back OF HOUSE VERSE DESIGN 2919 BOH was the acounting and support services for a large luxory ressort. Worked on the massing and layout of the building having full desing freedom. Also worked on producing concept and pricing packages.


OFFICE/COMMERCIAL


f11 MIXED USE DESIGNARC

SAN DIEGO, CA 191, 476 sf 2016 F11 was a 5-story type IIIA building that houses 127 units. It sits on 2-story, above grade type IA retail. Lobby, leasing, and 2 levels of type IA subterranean parking. I worked in the Design Development phase of the project, producing drawing sets, in particular sections and elevations, and going over reclines.

6


MIXED-USED 9 8


noho MIX-USED DESIGNARC

NORTH HOLLYWOOD, CA 250,000 sf 2017 - 2018 NoHo was a 5-story, type IIIA building that houses 127 units. It included a 2-story, above grade type IA retail. lobby, leasing, and 2 levels of type IA subterranean parking. I worked in the Design Development phase of the project, producing drawing sets, in particular sections and elevations, and going over redlines.

10

11


MIXED-USED 13 12


duarte MIX-USED DESIGNARC DUARTE, CA 300,000 sf 2018

DUARTE was a 4-story, type V building that houses 161 units and retail wrapping around a multi-level parking garage. I worked very closely with the project manager on every phase of this project. Projects included but, not limited to, creating unit plans, facade studies, sections, and elevations, and producing drawing sets for every phase, and going through plan-check comments and redlines.

14

15


MIXED-USED 17 16


walnut CREEK DESIGNARC

WALNUT CREEK, CA 111, 672 sf 2016 - 2017 WALNUT CREEK was a 4-story, type IIIA building that houses 52 units. It sits on 2-story, above grade type IA lobby, leasing, and 2 levels of type IA subterranean parking. I worked in the Design Developement phase of the project, producing drawing sets, in particular sections and elevations, interior elevations, and going over redlines.

18

19


M U LT I - F A M I LY 21 20


nightingale CLUB DESIGNARC

WEST HOLLYWOOD, CA 8,665 sf 2016 NIGHTINGALE was renovation of an existing restaurant and dance club with no added area. I worked in creating egress plans, floor plans, and RCPs, and preparing the set for plan check submittal.

22

23


TENANT IMPROVEMENT 25 24


big BLOCK AUX ARCHITECTURE EL SEGUNDO, CA 11,000 sf 2015

BIG BLOCK was an office space project (interior only) that consisted of executive offices, a theater, screening rooms, and a large, open working space. I worked on both, Schematic and Design Development phases. Task included, 3D modeling, drawing plans, sections and elevations and preparing presentation packages and drawing sets for permits.

26

27


TENANT IMPROVEMENT

Floor Plans

LEGEND

1 HALLWAY 212 412 SF OPEN TO DECK F 001

STAIRWELL 216 412 SF OPEN TO DECK

R=26@7" T=25@11"

1 HALLWAY 121 412 SF OPEN TO DECK

F 001

DOWN

R=26@7" T=25@11"

F 001

101

201

STAIRWELL 122 412 SF OPEN TO DECK

OFFICE 201 412 SF OPEN TO DECK

F 001

103

104

UP

F 001

102

201 202

NOTES

COPY/STORAGE 209 412 SF CLG. 10'-0"

BREAK AREA 213 412 SF OPEN TO DECK

F 001

NOTES

FLAME 101 412 SF CLG. 10'-0"

KEY NOTES

F 001

CLOSET 123 412 SF

EDIT 01 102 412 SF CLG. 10'-0"

F 001

F 001

LOUNGE 103 412 SF CLG. 10'-0"

F 001

F 001

KEY NOTES

203

MECHANICAL CHASE 210 412 SF

OFFICE 202 412 SF OPEN TO DECK F 001

ROOF ACCESS 211 412 SF

202

MATERIALS SITE MATERIALS

210

209

MATERIALS SITE MATERIALS

FLOORS FLOORS

101

SEMI-PRIVATE OFFICE 214 412 SF OPEN TO DECK

INTERIOR FINISHES

F 001

HALLWAY 120 412 SF OPEN TO DECK

SERVER/PROJECTOR 104 412 SF OPEN TO DECK

THEATER 105 412 SF CLG. 10'-0"

F 001

F 001

F 003

KITCHEN 106 412 SF CLG. 10'-0"

INTERIOR FINISHES

F 001

203

R=4@6" T=3@30"

209

OFFICE 203 412 SF OPEN TO DECK

2

UP

105

F 001

204

2

SEMI-PRIVATE OFFICE 215 412 SF OPEN TO DECK

OPEN SEATING 208 412 SF OPEN TO DECK

CEILINGS

111

FIXTURES

205

106

LARGE CONFERENCE 107 412 SF CLG. 10'-0"

ENGINEERS OFFICE 108 412 SF CLG. 10'-0"

F 001

F 001

HALL 110 412 SF CLG. 10'-0"

208

110

F 001

107

DOWN

108

APPLIANCES & EQUIPMENT

113

114

R=19@6-3/4" T=18@12"

UP 207

WALL/PARTITION TYPE

208

205

206

119

WOMENS RESTROOM 114 412 SF CLG. 10'-0"

MENS RESTROOM 115 412 SF CLG. 10'-0"

F 002

F 002

115

R=26@7" T=25@12"

123

JANITOR 116 412 SF CLG. 10'-0"

CLOSET 117 412 SF CLG. 10'-0"

F 001

F 001

UP 124

WALL/PARTITION TYPE

120

ENTRY/GALLERY 118 412 SF CLG. 10'-0"

OPEN TO BELOW OFFICE 205 412 SF OPEN TO DECK F 001

OFFICE 113 412 SF OPEN TO DECK

OFFICE 206 412 SF OPEN TO DECK

OFFICE 207 412 SF OPEN TO DECK

F 001

F 001

FIXTURES

F 001

HALLWAY F 001 119 412 SF OPEN TO DECK

APPLIANCES & EQUIPMENT

206

RECEPTION 112 412 SF CLG. 10'-0"

CLOSET 109 412 SF CLG. 10'-0"

109

R=26@7" T=25@12"

204

CEILINGS 112

F 001

F 003

OFFICE 204 412 SF OPEN TO DECK F 001

CLOSET 111 412 SF CLG. 10'-0"

F 001

F 001

116 121

F 001

207

F 001

117 118

(E) ELEC ROOM N.I.S.

122

(E) FR N.I.S.

3

3

C

B

A.1

A E S

N W

28

01

C

2ND LEVEL FLOOR PLAN

B

A.1

A E S

N

SCALE 1/4" = 1'-0"

01

1ST LEVEL FLOOR PLAN SCALE 1/4" = 1'-0"

W

29


fenchel RESIDENCE AUX ARCHITECTURE CALABASAS, CA 4,000 sf 2015

FENCHEL RESIDENCE was a renovation for single family residence in the Calabasas mountains. Work included a complete material, and formal renovation that kept the original footprint and square footage. I assisted on both, Schematic and Design Development phases, on tasks including 3D modeling, drawing plans, sections and elevations and preparing presentation packages and drawing sets for permits.

30


XXX

GARAGE 109 113 SF 7'-11" CLG

PROJECT ADDRESS:

MASTER BATH 209 174 SF

SAFE

8'-2" CLG

MASTER CLOSET 207 172 SF 8'-2" CLG

TOILET / BIDET SHOWER

SAFE

WATER HEATER

CLOSET

CLOSET

AV CLOSET

LAUNDRY 108 113 SF 8'-2" CLG

BEDROOM #2 204 125 SF

8'-2" CLG

BATH 1 106 47 SF 8'-2" CLG

TV

HALLWAY 107 26 SF 8'-2" CLG

CLOSET

CLOSET HALLWAY 201 109 SF

BATHROOM #2 206 49 SF 8'-2" CLG

CLOSET

BATHROOM #1 203 71SF 8'-2" CLG

BEDROOM #3 205 178 SF

FAMILY ROOM 102 292 SF 8'-2" CLG

CABINET

S I N G L E F A M I LY

AUXOFFICE 2404 WILSHIRE BLVD. STE. 12D LOS ANGELES, CA 90057 TEL: 1.213.568.3578 CONTACT: JEREMY FLETCHER

BALCONY

MASTER BEDROOM 208 433 SF

XXX

PROJECT ADDRESS:

DINING ROOM 105 216 SF 8'-1" CLG

UP

FOYER 101 275 SF OPEN TO ABOVE

BEDROOM #1 202 125 SF

DN

OPEN TO BELOW

UP

UP

BANQUETTE

CABINET

LIVING ROOM 103 515 SF

KITCHEN 104 197 SF

FIRE

STORAGE

COVERED PATIO

FIRE

01

01

SCALE 1/8" = 1'-0"

FLOOR PLAN

SCALE 1/8" = 1'-0"

FLOOR PLAN

33 32

AUXOFFICE 2404 WILSHIRE BLVD. STE. 12D LOS ANGELES, CA 90057 TEL: 1.213.568.3578 CONTACT: JEREMY FLETCHER

Floor Plans


s u n s e t R E S TAU R A N T AUX ARCHITECTURE HOLLYWOOD, CA 2015

SUNSET STRIP was renovation of restaurant on the sunset strip that combined two tenant spaces into one. I worked on both, schematic and design development phases. Task included 3d modeling, drawing plans, sections and elevations and preparing presentation packages and drawing sets for permits.

34

35


TENANT IMPROVEMENT

Floor Plans

HS

HS

F

F

DN

WALK IN FREEZER WALK IN FREEZER

R

HOST

HOST

01

AUXOFFICE AUXOFFICE

PROJECT ADDRESS: PROJECT ADDRESS:

2404 WILSHIRE STE. 12D 2404BLVD. WILSHIRE BLVD. STE. 12D LOS ANGELES, 90057 CA 90057 LOSCA ANGELES, TEL: 1.213.568.3578 TEL: 1.213.568.3578 CONTACT: JEREMY FLETCHER CONTACT: JEREMY FLETCHER

36

FIRST FLOOR OUTLINE

FIRST FLOOR OUTLINE

POS

FIRST FLOOR OUTLINE

POS

FIRST FLOOR OUTLINE

R

CRAVINGS COURTYARD

R

R

COOK LINE

COOK LINE

DN

EXPEDITE COUNTER

DW

R

R

R

R

EXPEDITE COUNTER R

R

PREP/DRY STORAGE PREP/DRY STORAGE

R

WARE WASHING

DW

LAV

MEN'S RESTROOM

PREP

WALK IN COOLER WALK IN COOLER

R

MEN'S RESTROOM

WARE WASHING

LAV

HS

HS

PREP REFRIGERATOR POT WASHING POT WASHINGSTORAGEREFRIGERATOR STORAGE

MOP SINK

CRAVINGS COURTYARD

MOP SINK

WOMEN'S RESTROOM WOMEN'S RESTROOM

8653 SUNSET BOULEVARD 8653 SUNSET BOULEVARD

1ST LEVEL 1STFLOOR LEVELPLAN FLOOR PLAN 01

SCALE 1/8" = 1'-0" SCALE 1/8" = 1'-0"

02

2ND LEVEL PLAN PLAN 2ND FLOOR LEVEL FLOOR 02 SCALE 1/8" = 1'-0" SCALE 1/8" = 1'-0"

FLOORFLOOR PLAN PLAN

10/21/2015 10/21/2015

A01 A01

37


c m c A Q U AT I C S JOHN FRIEDMAN ALICE KIM ARCHITECTS CLAREMOUNT, CA 14,000 SF 2014

CMC AQUATICS was a proposal for a new aquatics center at Claremont Mckanna college. This building would serve as an addition/extension of the newly designed Robert’s Pavillion. CMC Aquatics would house looker rooms, showers and storage to the water polo and swimming teams, as well as executive offices and meeting rooms for the coaches

38

39


41 40

S P O R T S FA C I L I T Y

Floor Plans


porsche TOWER NEIL DENARI ARCHITECTS FRANKFURT, GERMANY 425,000 SF 2015

PORSCHE TOWER was a competition entry for a tower in Frankfurt Germany that would house design suits for Porsche employees and luxury apartments.

42

43


DACHGARTEN

LICHTDURCHLÄSSIGER INNENHOF / TAGESLICHT VERBINDUNGEN FUSSGÄNGERZUGANG ZUR PARKANLAGE

DACHTERRASSE

FUSSGÄNGERZUGANG ZUR PARKANLAGE

GEBÄUDE ALS EINGANG ZUR PARKANLAGE

05

Massing Studies and Site Plan

EINHEIT A PARKFLÄCHE IST EINE ERWEITERUNG DES GEBÄUDES

06

ANSCHLUSSWEGE SIND ERFAHRUNGSSTARKE VERBINDUNGEN

BGF GESAMT BGF 39,449 m2

ANSCHLUSSWEGE SIND ERFAHRUNGSSTARKE VERBINDUNGEN

03

PLAZAZONE ZUR AKTIVIERUNG DES WASSERTURMES

10 11

1

PARKANLAGE ALS ZIELPUNKT

2

100M BEBAUUNGSLIMIT

12

PLAZAZONE ZUR AKTIVIERUNG DES WASSERTURMES

3

BENÖTIGT m2

LEGENDE: 01. DROP-OFF UND PARKGARAGENEINFAHRT 02. EINGANGSPORTAL 03. LICHTGARTEN 04. SKULPTURENGARTEN 05. STEINGARTEN 06. TURMPLATZ 07. WASSERTURM 08. WASSERGARTEN 09. VARIIERTE BEPFLANZUNGSMUSTER (GENEIGT) 10. WESTEINGANG 11. OBSTGARTEN 12. OSTEINGANG 13. VARIIERTE BEPFLANZUNGSMUSTER 14. SANDGARTEN 15. SÜDLICHES EINGANGSPORTAL

RPLAN KONZEPT M1:500

LAGEPLAN M 1:500

Ordnung

L26- L27 GRUNDRISSTYPUS D

TH.

L21- L23 GRUNDRISSTYPUS B

4-ZIMMER

FORMALE ANALYSE

Drei in Einem

60

o

Parallelogramm

piegelte Parallelogramm wird ebenfalls zur Erzeugung des Fendas sich über die Nord- und Südfassade erstreckt.

Farbpalette

05

06

Schwarz C0, M0, Y0, K100

raßenniveau tragen große V-Stützen die Basis. Eine Art Arkade se Formen ein Feld aus 3D-Parallelogrammen, durch welche der g zur Lobby des südlich gelegenen Parkes - geführt wird. Diese uck der strukturellen Kräfte. beeinhaltet formale, strukturelle und graphische Aspekte - drei er architektonischen Antwort auf diese zwei Identitäten, die das

STRUKTURELLE BALKONVERBINDUNG

= 5X

Der neue öffentliche Park formt sich aus der vorhandenen Topographie, indem er die vorhandene Böschung als Potenzial für den neuen Entwurf aufgreift. Eine neue Modellierung wird nach dem dig and fill ( Graben und Füllen) Prinzip geschaffen. Der bestehende Hang wird punktuell aufgefüllt um einen durchgängigen sanften Hügel zu erhalten, während einige Teile herausgestanzt werden um leicht abgesengte “Räume” in den Hang zu setzen. Verschiedene Nutzungen wie ein Skulpturengarten, ein Teich, eine Lichtinstallation und ein Sandstrand usw. prägen die “Räume”. Diese sind künstliche Landschaften, welche mit ihrem unverwechselbaren Programm und eigener Atmosphäre von der natürlicheren Landschaft der umgebenden Topographie gerahmt werden. Ein Fußweg erstreckt sich durch den Park welcher die verschiedenen „Räume“ mit einander und dem Gebäude verbindet. Ein neu geschaffener, gepflasterter Platz umfängt den vorhandenen Wasserturm und integriert so dieses historische Denkmal in den neuen Park. Wasserfontänen auf dem Platz schaffen ein weiteres Element, während grüne Stufen die Grenze zwischen dem befestigten Bereich und dem grünen Hang als angenehmen Sitzplatz um den Wasserturm definieren. Der Platz erstreckt sich zum Gebäude und integriert dort den Eingangsbereich des neuen Turms und stärkt dadurch die Beziehung zwischen dem Park und dem Gebäude. Die überdachte Bereich umfasst eine grüne Topographie, ein kleiner Hügel aus Kunstrasen auf dem Sitzen und Liegen möglich ist.

03

Südende des Turmes ergeben sich, durch große, dreieckige Aussrmigen Ausgangsform, welche - wenn aus der Schräge aus ekursiven, diagonalen Profil führen. In Verbindung mit den schräst - und Nordfassade (welche sich an die Bebauungsgrenze halten) ionen eine präzise, aber ausgefallene prismatische Form.

VORGEFERTIGTER BALKON ZUSAMMENBAU

3-ZIMMER

LICHTSCHACHT / MECHANISCHE VENTILATION

Porsche Design Tower / Parkanlage

Spiegelung 1

Ausgangsform

4-ZIMMER

MASTERPLAN KONZEPT M1:500 CONCEPT 3

CHARAKTERISTIK

Spiegelung 2

Spiegelung 1

BALKON/AUSBLICKS-MANIPULATION

02

LEGENDE: Rot 01. EINGANGSPORTAL C0, M100, Y100, K0 02. STEINGARTEN 03. TURMPLATZ (BRUNNEN) Orange 04. FEUERWEHR-WENDEFLÄCHE C0, M85, Y100, K0 05. WASSERTURM 06. WASSERGARTEN

Durchgehend vom Erdgeschoss bis zum Dach der Vergnügungsebene, wird dieser Schacht für jegliche erforderliche mechanische Ventilation genützt. Durch die Nähe zum vorgesehenen Mechanikraum, können alle klar sichtbaren Fassaden von Lüftungsschlitzen und Ventilationsvorrichtungen frei bleiben.

L7 - L19 GRUNDRISSTYPUS_A

Das Vordach dient zum Wetterschutz um die Nutzung des Dachgartens zusätzlich attraktiv zu machen.

4-ZIMMER 3-ZIMMER

L8 DACHGARTEN / VERGNÜGUNGSEBENE

= 5X

KENNZAHL 936333 / 02

L1 - L8 PARKGARAGENEBENE

02

PENTHAUS-PARKPLÄTZE: WOHNUNGS-PARKPLÄTZE: DESIGN SUITE - PARKPLÄTZE: ANGESTELLTEN-PARKPLÄTZE:

2

Elevations and Sections

3

1

2

100M BEBAUUNGSLIMIT

80% MAX GRUNDSTÜCKSBEBAUUNG

4F +14.80m

3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.10m 3.10m

01B -3.10m

01B -3.10m

01B -3.10m

44

THW - TOWNHOUSE 3.30m

2.60m

THW - TOWNHOUSE

THW - TOWNHOUSE 8.30m

2.50m

7.70m

4.20m

3.30m

2.60m

5.50m

4.90m

4.90m

4.90m

8.10m

1.30m

5.30m

9.40m

PHW - PENTHAUS 2.50m

8.70m

ANSICHT, WESTEN M 1:200

ANSICHT, NORDEN M 1:200

THW - TOWNHOUSE 8.30m

ZI5 - FÜNF-RAUM-WOHNUNG

184 DEN WOHUNGEN ZUGETEILTE LAGERRÄUME MECH. / HEIZUNGSANLAGEN / LUFTTECHNISCHE ANLAGEN / TECHNISCHE ANLAGEN

LÄNGSSCHNITT M 1:200

QUERSCHNITT M 1:200 ANSICHT, WESTEN M 1:200

ANSICHT, NORDEN M 1:200

5.60m

0F +0.00m

0F +0.00m

0F +0.00m

4.20m

3.50m

5.30m

6.50m

BESCHREIBUNG DER TRAGKONSTRUKTION

9.80m

3.60m

5.30m

6.50m

2.50m 0.60m

11.00m

ZI5 - FÜNF-RAUM-WOHNUNG 6.10m

3.90m

4.50m

15

0.90m

3.10m

ZI5 - FÜNF-RAUM-WOHNUNG 7.60m

5.50m

ZI5 - FÜNF-RAUM-WOHNUNG 7.90m

4.00m

5.60m

4.90m

4.90m

4.90m

8.10m

5.30m

4.00m

14

AUM-WOHNUNG

05

2.60m

03

1.50m

03 DECKENÖFFNUNG

THW - TOWNHOUSE

03

0m 0.90m

DECKENÖFFNUNG

03

3.80m

2.50m

1.90m

1.90m 4.00m

2.50m 3.80m

THW - TOWNHOUSE

0m 0.90m

F-RAUM-WOHNUNG

03

1.30m

9.40m

03

03

03

03

03

05

45

FASSADEN - / THERMISC

TRAGWERKSBESCHREIBUNG ZI5 - FÜNF-RAUM-WOHNUNG

6.10m

3.90m

4.50m

0.90m

3.10m

Der Rohbau des Porsche Towers wird in massiver Stahlbetonbauweise konzipiert. Durch geschickte Anordnung der Tragglieder entstehen weitgehend stützenfreie flexibel aufteilbare Geschossflächen. Der vorgeschlagene Skelettbau nimmt sich zurück und fügt sich harmonisch in den Gesamtentwurf ein.

Porsche Design Einheiten: Lokalisiert auf Ebe Einheiten flankieren den Eingangsbereich un 1-2. Der Innenraum der Design Einheiten sin auf eine erfahrungsstarke Präsentation für di Einbau- Oberflächen und Fassadengeometrie Porsche-Marke zu kreieren. ENERGIE/ NACHHALTIGKEIT

NUTZUNGS-AUFTEILUNGS-DIAGRAMM

PHW - PENTHAUS 4.20m

ZI5 - FÜNF-RAUM-WOHNUNG

0.90m

13

STÄDTEBAULICHE VERBINDUNGEN Angehoben und offen, bietet jener Nutzungsblock, der die Porsche Design Einheiten beeinhaltet visuelle Beziehungen zu und von dem urbanen Raum. Zugleich behält dieser physische Verbindungen zu Fußgänger- und Park-Bereichen des Grundstückes bei. Dies soll zur Steigerung des urbanen Characters der Europa Allee beitragen.

KELLERABTEILE / MECH. / TECHNISCHE AUSSTATTUNG -3.10m

ZI5 - FÜNF-RAUM-WOHNUNG

3.10m

5.50m

EINGANGSBEREICH LOBBY +0.00m

01B -3.10m

4.00m

KENNZAHL 936333 / 02

2F +8.60m

1F +5.50m

1F +5.50m

FAHRRADLAGER

0F +0.00m

3.40m

3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m

3.10m

3.10m

PARKGARAGENEINFAHRT

1F +5.50m

PORSCHE-DESIGN- SUITES

B1 KELLER / LAGER

3F +11.70m

2F +8.60m

2F +8.60m

PARKGARAGE

+5.50m

3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m

3.10m

3.10m

+8.60m

3.10m

3.40m

KENNZAHL 936333 / 02BEZIEHUNGEN PORSCHE DESIGN TOWER / FRANKFURT am MAIN / LAGEPLAN / STÄDTEBAULICHE

1F +5.50m

60

EINGANG UND DROP-OFF

Angenehm erreichbar, entweder durch den Aufzug oder eine separierte, offene Treppe, gibt es 184 Lagerräume, die je nach Wohnungstypus ihre Größe verändern. In diesem Bereich sind ebenfalls mechanische Ausstattungen, wie auch sonstige technische Ausstattungen untergebracht.

4F +14.80m

3F +11.70m

3F +11.70m

3.10m

2F +8.60m

3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m 3.40m

OFFEN

5F +17.90m

4F +14.80m

4F +14.80m

+11.70m

7F +24.10m

Orange C0, M85, Y100, K0

5F +17.90m

4-Zimmer-Wohnungseinheiten: Lokalisiert an diese mittelgroßen Wohnungseinheiten gleic Lichteinfall-beeinflusste, nach Westen orient ma-Ausblicke. Südseitige Wohnungen sind f nach Wunsch, zusammen gelegt zu werden.

Der Haupteingang wird durch einen überdachten Drop-Off Bereich und Kreisverkehr unter den Porsche Design Suites erhalten. Eine Reihe von großen, strukturell tragenden Formen bilden ein Eingangsportal und hochwertig artikulierte Ausblicke zu allen Bereichen des Projektes, darauf ausgelegt, die Erfahrung/das Erlebnis des Areals einzuleiten.

6F +21.00m

6F +21.00m

6F +21.00m

3.10m

EN

8F +27.20m

Rot C0, M100, Y100, K0

7F +24.10m

7F +24.10m

3.10m

3F +11.70m

9F +30.60m

8F +27.20m

5F +17.90m

3.10m

3.10m

+14.80m

10F +35.00m

Schwarz C0, M0, Y0, K100

8F +27.20m

3.10m

3.10m

3.10m

+17.90m

Farbpalette

Parallelogramm

9F +30.60m

9F +30.60m

3.10m

3.10m

3.10m

+21.00m

10F +35.00m

10F +35.00m

und integriert dort den Eingangsbereich des neuen Turms und stärkt dadurch die Aufund Straßenniveau tragen V-Stützen die Basis. Eine Art Arkade BeziehungTragkonstruktion: zwischen dem Park dem Gebäude. Diegroße überdachte Bereich erzeugend, kreieren diese ein Feld 3D-Parallelogrammen, durch welche der umfasst eine grüne Topographie, ein Formen kleiner Hügel ausaus Kunstrasen auf dem - auf dem Sitzen undBesucher Liegen möglich ist. Weg zur Lobby des südlich gelegenen Parkes - geführt wird. Diese sind ein robuster Ausdruck der strukturellen Kräfte. Dieser Entwurfprozess beeinhaltet formale, strukturelle und graphische Aspekte - drei starke Charaktere unserer architektonischen Antwort auf diese zwei Identitäten, die das Projekt umgeben.

3.10m

6F +21.00m

11F +38.40m

auf dem Platz schaffen ein weiteres Element, während grüne Stufen die Grenze Fenstermuster: gespiegelte Parallelogramm wirdangenehmen ebenfalls zur Erzeugung des Fenzwischen dem befestigtenDas Bereich und dem grünen Hang als stersystems verwendet, das sich über dieerstreckt Nord- und erstreckt. Sitzplatz um den Wasserturm definieren. Der Platz sichSüdfassade zum Gebäude

11F +38.40m

60o

11F +38.40m

Separiert vom Drop Off, ist die private Parkgarage durch die gegenspurige Rampe von der Einfahrt erreichbar. Private und halbprivate Bewohnernutzung unbeeinflusst, sind Drop-Off, Valet und Wartebereich beim verlassen der Rampenstruktur schnell zu erreichen.

PORTIER SECURITY BÜROS BRIEFKÄSTEN FAHRRADLAGER GALLERIE LOGGIA LOBBY

12F +41.80m

12F +41.80m

12F +41.80m

3.10m

3.10m

3.10m

+24.10m

13F +45.20m

3.10m

3.10m

3.10m

+27.20m

7F +24.10m

13F +45.20m

13F +45.20m

3.10m

3.40m

3.40m

+30.60m

8F +27.20m

14F +48.60m

14F +48.60m

3.10m

3.40m

3.40m

+35.00m

9F +30.60m

15F +52.00m

15F +52.00m

14F +48.60m

3.10m

10F +35.00m

16F +55.40m

15F +52.00m

3.40m

3.40m

3.40m

+38.40m

17F +58.80m

16F +55.40m

3.40m

3.40m

3.40m

+41.80m

11F +38.40m

Spiegelung 1

PARKEBENEN / EINFAHRT

Ein zwei Stockwerke hoher Eingangsbereich sorgt für ein offenes und tageslicht-beleuchtetes Eintreten in das Gebäude, und legt somit den Schwerpunkt auf den Erfahrungswert. Eine zentral lokalisierte Loggia dient zur Verbindung öffentlicher, privater und halbprivater Ansprüche der Bewohner, und bietet zugleich eine sichtbare Sicherheitskontrolle und Services für die Bewohner.

19F +65.60m

Der neue öffentliche Park formt sich aus der vorhandenen Topographie, indem er die vorhandene Böschung als Potenzial für den neuen Entwurf aufgreift. Eine neue Modellierung wird nach dem dig and fill ( Graben und Füllen) Prinzip geschaffen. Der bestehende Hang wird punktuell aufgefüllt um einen durchgängigen sanften Hügel zu erhalten, während einige Teile herausgestanzt werden um leicht abgesengte “Räume” in den Hang zu setzen. Verschiedene Nutzungen wie ein Skulpturengarten, ein Teich, eine Lichtinstallation und ein Sandstrand usw. prägen die “Räume”. Diese sind künstliche Landschaften, welche mit ihrem unverwechselbaren Programm und eigener Atmosphäre von der natürlicheren Landschaft der umgebenden Topographie gerahmt werden. Ein Fußweg erstreckt sich durch den Park welcher die verschiedenen „Räume“ mit einander und dem Gebäude verbindet. Ein neu geschaffener, gepflasterter Platz umfängt den vorhandenen Wasserturm und integriert so dieses historische Denkmal in den neuen Park. Wasserfontänen auf dem Platz schaffen ein weiteres Element, während grüne Stufen die Grenze zwischen dem befestigten Bereich und dem grünen Hang als angenehmen Sitzplatz um den Wasserturm definieren. Der Platz erstreckt sich zum Gebäude und integriert dort den Eingangsbereich des neuen Turms und stärkt dadurch die Beziehung zwischen dem Park und dem Gebäude. Die überdachte Bereich umfasst eine grüne Topographie, ein kleiner Hügel aus Kunstrasen auf dem Sitzen und Liegen möglich ist.

16F +55.40m

baren Programm und eigener Atmosphäre von der natürlicheren Landschaft der Masse: Das Nordgerahmt - und Südende umgebenden Topographie werden.des Ein Turmes Fußwegergeben erstrecktsich, sichdurch durch große, den dreieckige Aussparungen der quaderförmigen welche wenn ausverbinder Schräge aus Park welcher die verschiedenen „Räume“ Ausgangsform, mit einander und dem -Gebäude betrachtet - zu einem rekursiven, diagonalen Profil führen. In Verbindung mit den schrädet. gen Oberflächen der Ost -Platz undumfängt Nordfassade (welche sich an die Bebauungsgrenze halten) Ein neu geschaffener, gepflasterter den vorhandenen Wasserturm ergeben diesehistorische Subtraktionen eine präzise, aber ausgefallene prismatische Form. und integriert so dieses Denkmal in den neuen Park. Wasserfontänen

L0 ERDGESCHOSS / EINGANG

20F +69.00m

Porsche Design Tower / Parkanlage

17F +58.80m

3.40m

12F +41.80m

Drei in Einem

Spiegelung 2

17F +58.80m

3.10m

3.40m

3.40m

+45.20m

Ausgangsform

3.10m

13F +45.20m

CONCEPT 3

18F +62.20m

18F +62.20m

3.10m

3.40m

3.40m

+48.60m

Rolle dessen Eingangsportals übernimmt, zwei Identitäten betrachtet und einbezogen werden. Seit dessen Gründung 1972, ist Porsche Design ein Unternehmen, das für einige der beständigsten Produktdesigns verantwortlich ist. Angetrieben durch Prinzipien der Schlichten Eleganz, Funktion und formalen Präzision, hat das Studio, durch das Einflösen von einzigartigen, unsere zeitgenösischen Welt ansprechenden Designqualitäten, den Modernismus zu neuen Ebenen geführt. Für den neuen Porsche Design Tower strebten wir danach ein Gebäude zu entwerfen, das von ähnlichem Temperament und Präzision inspiriert ist; ein Gebäude, das der Zukunft entgegen blickt, sich aber gleichzeitig durch eine zeitlose Geometrie und Farbpalette auszeichnet. Damit ein Gebäude dem Namen eines jenen Unternehmens gerecht wird, das eine solche Vorreiterrolle in Bezug auf Ideen 60o und Technologie übernimmt, muss es als Produkt ebenfalls ein gewisses Präzisionslevel Parallelogramm erreichen und zugleich dem räumlichen MediumFarbpalette der Architektur treu bleiben. Frankfurt ist eine Stadt, die nicht nur für seine Rolle als Finanzzentrum der Welt bekannt ist, Schwarz sondern auch als Stadt, die seit jeher das Hochhaus wertschätzt. Dieser Wettbewerb fragt C0, M0, Y0, K100 Die nach einem 100 Meter hohen Turm, mit einer “exceptionally unique appearance”. Fragen, die sich dabei stellen sind folgende: Wie entwirft man ein Gebäude, das Frankfurts Rot Skyline eine neue Form hinzufügt, ohne dabei exzessiv expressionistisch zu sein. Wie C0, M100, Y100, K0 erreicht man die Einzigartikeit im Rahmen dieser Thematik unter Einbezug der spezifischen Bedingungen, Nutzung und Grundstück? Wie lässt sich unsereOrange Vision einer Architektur der Vitalität mit den Ordnungen des Modernen Designs verbinden?C0, M85, Y100, K0

Spiegelung 1

3.10m

3.40m

3.40m

+52.00m

14F +48.60m

Ausgangsform

18F +62.20m

3.10m

15F +52.00m

5F +17.90m

3.40m 3.40m 3.40m

Von diesen Überlegungen inspiriert, daran aufgreift. interessiert, auf diese zwei Idendie vorhandene Böschung als Potenzial für denwaren neuenwir Entwurf Eine titäten - Porsche Design undand Frankfurt - zu reagieren. neue Modellierung wird nach dem dig fill ( Graben und Füllen) Prinzip geschaffen. Der bestehende Hang wird punktuell aufgefüllt um einen durchgängigen Das Porsche Design Logoeinige - eine Teile gespiegelte und rotierte Glyphe - präsentiert eine, durch sanften Hügel zu erhalten, während herausgestanzt werden um leicht die“Räume” Ökonomie undHang Ordnung der Widerholung erzeugte, formale Schönheit. Gleichzeitig abgesengte in den zu setzen. Verschiedene Nutzungen wie ein dazu, haben wir miteine dem gleichen Operationsablauf eine Form Das ParalleloSkulpturengarten, ein Teich, Lichtinstallation und ein Sandstrand usw.geschaffen. prägen gramm, ist ein Element, welches dasunverwechselgesamte Projekt verbindet. die “Räume”. Dieseoder sind geneigte künstlicheLinie, Landschaften, welche mit ihrem

LICHTSCHACHT / VENTTILATION

3.40m

3.40m

3.40m

3.40m 3.40m

3.40m

+55.40m

21F +72.40m

19F +65.60m

Spiegelung 2

EINGANGSPORTAL Die Eingangsrampen-Struktur bietet ein fußgängerfreundliches Eingangsportal zu den öffentlichen Parkanlagen. Eine Reihe von großen, strukturell tragenden Formen artikuliert die sensorische Verbindung von einem zum anderen Ort.

22F +75.80m

CHARAKTERISTIK

20F +69.00m

19F +65.60m

+62.20m

+58.80m

BALKON/AUSBLICKS-MANIPULATION

21F +72.40m

FORMALE ANALYSE

Porsche Design Tower / Parkanlage Geometrische Ordnung Der neue öffentliche Park formt sich aus der vorhandenen Topographie, indem er

Spiegelung 1 neuem Europaviertel gerecht zu werden, müssen für ein Gebäude, das die AusgangsformUm Frankfurts

16F +55.40m

GRÜNFLÄCHE/ ERREICHT BENÖTIGTE M

22F +75.80m

GRAPHIK DNA

20F +69.00m

Drei in Einem Unternehmen & Standort: Zwei Identitäten Spiegelung 2

18F +62.20m

17F +58.80m

23F +79.20m

21F +72.40m

KONZEPT 2

3.40m

3.40m

3.40m

Spiegelung 1

3.40m

3.40m

+65.60m

BEBAUUNGSGRENZE

3.40m

CONCEPT 3

3.40m

CHARAKTERISTIK

+69.00m

19F +65.60m

24F +82.60m

2

3.10m

KONZEPT 1

3.40m

3.40m

3.40m

LAGEPLAN DETAIL M 1:200

25F +86.00m

22F +75.80m

3.40m

3.40m

+75.80m

26F +89.40m

23F +79.20m

23F +79.20m

184 Abstellplätze befinden sich im Erdgeschoss und sind für die Bewohner direkt und leicht erreichbar. Dies ermöglicht schnelles und einfaches Abstellen der Fahrräder beim nützen des Ausganges durch den Fußgängerpark von der Südfassade.

27F +92.80m

24F +82.60m

BALKON/AUSBLICKS-MANIPULATION

3.40m

3.40m

ERREICHT BENÖTIGTE M2

22F +75.80m

+72.40m

VIER-ZIMMER-WOHNUNGEN

28F +96.20m

26M BEBAUUNGSGRENZE

24F +82.60m 3.40m

3.40m

3.40m

+82.60m

orm

3.40m

3.40m

3.40m

3.40m

3.40m

3.40m

3.40m

3.40m

3.40m

25F +86.00m

24F +82.60m

20F +69.00m

25F +86.00m

26F +89.40m

+86.00m

Spiegelung 2

26F +89.40m

27F +92.80m

ZWEISTÖCKIGER RAUM

+89.40m

25F +86.00m

21F +72.40m

27F +92.80m

28F +96.20m

26F +89.40m

FORMALE ANALYSE

28F +96.20m

3.40m

3.40m

3.40m

29R +99.60m

DACHTERRASSE

+92.80m

PHIK DNA

37

Lokalisiert zur maximalen Ausnutzung der urbanen und landschaftlichen Ausblicke, sind die Porsche Design Suites als “Schmuckkästchen im Himmel” entworfen. Von öffentlichen Bereichen aus sichtbar, jedoch nicht erschließbar, vermarktet diese Positionierung ideal die Nutzungsabsicht, ohne dabei die Privatsphäre der Gäste zu stören.

L0 FAHRRADLAGER

29R +99.60m

29R +99.60m +99.60m

+96.20m

27F +92.80m

+79.20m

20 m2 50 m2

Townhouse: In den oberen Stockwerken geleg degeometrie zu nutzen, und erhalten somit zw

80% MAX GRUNDSTÜCKSBEBAUUNG

29R +99.60m

LEGENDE: 26M BEBAUUNGSGRENZE 01. WESTEINGANG 02. OBSTGARTEN 03. SITZPLÄTZE 04. OSTEINGANG BEBAUUNGSGRENZE GRÜNFLÄCHE/ 05. SANDGARTEN 06. VARIIERTE BEPFLANZUNGSMUSTER

WOHNUNGSEINHEIT PD1 WOHNUNGSEINHEIT PD2

Die Reduktion der mechanischen Ausstattungen ermöglicht es, diese zu verbergen und sorgt für einen kleineren Umfang der erforderlichen Fläche. Lokalisiert nahe zum Kern, kann der verborgene Lichtschacht für Zu- und Abluft verwendet werden.

3

BENÖTIGT m2

-

L1 - L7 DESIGN SUITE EBENE

B1, L1 - L8 MECHANISCHE EBENEN

03

50 m2 200 m2 10 m2

Mit bepflanztem Dachgarten, Golf “Fairway”, Parkanlage und Bewohner-Erholungsbereichen, ist die Vergnügungsebene die Privat-Park-Komponente zu der “Idea Section”. Trotz freiluft, ist die Anlage geschützt durch Elemente in der Dachstruktur. Bepflanzungen reichen von großen Bäumen über Wild-Grass und -Blumen, zu manikürten Rasenflächen.

01

BENÖTIGT m2

TOWNHOUSES

5-ZIMMER

GYM. INDOOR GOLF EINRICHTUGEN

AN / STÄDTEBAULICHE BEZIEHUNGEN

8

SONNENSCHUTZ / WINSCHUTZ/ REGENSCHUTZ

LAGEPLAN DETAIL M 1:200

23F +79.20m

GLASGELÄNDER

5-ZIMMER GRÜNFLÄCHE/ ERREICHT BENÖTIGTE M2

Spiegelung 2

28F +96.20m

STEIN, AUSSENVERTÄFELUNG

26M BEBAUUNGSGRENZE

BEBAUUNGSGRENZE

04

1

FASSADENPANEL ZUSAMMENBAU

L21- L23 GRUNDRISSTYPUS C

FASSADENZUSAMMENSETZUNG

Ausgangsform

100M BEBAUUNGSLIMIT

PASSIVER SONNENSCHUTZ REDUKTION DER SOLAREN AUFHEIZUNG

PH.

Auf den Dächern des Wohnungsturmes ist (ausgenommen von Aufzugsmaschinenräumen) keine mechanische Ausstattung vorgesehen. Die Qualität der Wohnumgebung ist Priorität.

MIKRO PARKS ERZEUGEN AUSSICHTEN AUF DAS GEBÄUDE

15

01

go - eine gespiegelte und rotierte Glyphe - präsentiert eine, durch ung der Widerholung erzeugte, formale Schönheit. Gleichzeitig m gleichen Operationsablauf eine Form geschaffen. Das Paralleloinie, ist ein Element, welches das gesamte Projekt verbindet.

Nicht zentralisierte Frischluft / Abluft erlaubt eine Reduktion des Kernschaft-Umfanges und ergibt somit zusätzliche Mietfläche, ohne die erlaubte Bebauungsbeschränkung zu überschreiten.

5-ZIMMER

GRAPHIK DNA

en inspiriert, waren wir daran interessiert, auf diese zwei Idenn und Frankfurt - zu reagieren.

SCHMALER SCHAFT / KERNENTWURF

Den zwei Penthäusern sind private Dachterrassen zugewiesen. Ähnlich wie die Vergnügungsebene, sind diese durch Wetterschutzvorrichtungen temperaturreguliert und tragen somit zum komfortablen Genießen der uneingeschränkten Ausblicke bei.

80% MAX GRUNDSTÜCKSBEBAUUNG

MIKRO PARKS ERZEUGEN AUSSICHTEN AUF DAS GEBÄUDE

STAPELUNG

L28 DACHTERRASSEN-EBENE [PENTHAUS]

PARKANLAGE ALS ZIELPUNKT

13

14

SPIEGELUNG

GEBÄUDE ALS EINGANG ZUR PARKANLAGE

07

08

09

DACHTERRASSE

COMPETITION

PARKFLÄCHE IST EINE ERWEITERUNG 04 DES GEBÄUDES

03

DACHGARTEN

LICHTDURCHLÄSSIGER INNENHOF / TAGESLICHT VERBINDUNGEN

02

Durch die geschickte Anordnung der Tragglieder müssen keine Elemente beim Nutzungswechsel von Wohngeschossen zum Parkgeschoss durch kostenintensive Strukturen abgefangen werden. Als bewusst gewähltes Gestaltungselement wird der Sockelbau durch eine

07

Nachhaltigkeit Es gibt zahlreiche Definitionen zum Thema nachhaltige Entwicklung als “eine Entwickl ohne die Bedürfnisse zukünftiger Generat


COMPETITION

46

MAIN / ENTWURFSKONZEPT

KENNZAHL 936333 / 01

47


keelung TERMINAL NEIL DENARI ARCHITECTS KEELUNG, TAIWAN 1,259,377 SF 2012

KEELUNG TERMINAL was the winning entry for the Keelung Port competition.

48

49


Parking Plans / Elev -6.0

Phase 1

Phase 2

COMPETITION

Parking Plans / Elev -10.0 (Elev -14.0 m)

1F Plan / Elev +0.0 m

\\\2F Mezzanine Plan / Elev +13.0 m / Office Level 04 / Elev +16.8

50

2F Plan / Elev +7.0

3F Plan / Elev +19.0 m /Office Level 05/ +21.0\\\

51


academic WORK

52

53


broad REDUX SCI-ARC TOM WISCOMBE 5TH SEMESTER 2012

BROAD REDUX was a project that consisted of the re-imagination of the Broad Museum by Diller Scofidio Renfro. My approach to this project was to use the idea of “the box in the box” and flip it inside out. First I came up with an aggregation of 3 objects that went arranged together “inside a box” would create a cavernous space. I then took these objects out of the box and have them press on it from the outside to replicate their original interior spaces.

54

55


Perspective

ACADEMIC

Massing Diagrams

Plan`

Plan

Objects in the box

Objects come out of the box

Objects press back on the box

Final massing

Section

56

57


ACADEMIC 59 58


chicago HOUSING SCI-ARC ERICK CARCAMO 4TH SEMESTER 2012

CHICAGO HOUSING is an apartment complex that would house 200 apartments plus retail and restaurants. The main driver for this project was the idea of being able to use the entire footprint of the site to maximize the number of apartment required and still have a large open space. Through a series of studies, it was determined that the Perimeter Block model was the best way to achieved this. The perimeter block changes in elevations and breaks into different parts to create public conditions within the site.

60

61


Serial Plans

Perimeter

Change in elevation determined by surrounding buildings

Arms start interacting with each other

Final form

Arms start to peel and connect to each other.

Block gets divided into 2 sets of “arms”

The peels become bridges that serve as circulation between the arms.

Arms get thinner to create larger plaza space

The peels also dictate the openings on the facades.

Typical Plans

5

ACADEMIC

Massing Diagrams

Level 2

Level 3

Level 4

Level 6

Level 7

Level 8

Level 9

Level 10

Level 11

Level 12

Sections

9

2

9

1 2

7 7

4 8

7 7

7

7

10

7

7

7

6

10

11

7

7

7

3

7

8

7

7

2

3

3 2

8

6

1 10

9

8 9

8

62

63


ACADEMIC 65 64


visual STUDIES

66

67


implied CONTINUITIES SCI-ARC DWAYNE OYLER 7TH SEMESTER 2013

IMPLIED CONTINUITIES explored the idea of something that seemed continuous in space and form but, was physically disconnected. What I was trying to do as to explore an organizational coherence that had some level of autonomy but was not so hierarchical. Through this technique, separation may occur and smaller volumetric space may be created in between the larger volumes. I started with a series of studies of solids that dissolved into a dense field of lines that had a gestalt relationship between them but never touch. 4 Techniques came out of these studies which I then decided to develop further. I then started moving from 2D drawings into more 3D. I was interested in the effect created by viewing several layers of lines. This was also an opportunity to slowly move away from 2d, to prevent these studies from becoming a ground, or landscape idea and towards a more spatial volumetric one. Although in some instances the idea were just the landscape, in other areas, the vertical layers started to create implied volumetric space, and potentially some type of massing. I started to add more information so that it wouldn’t become a direct translation from the first studies like the moire effect, which it itself can add a level of 3-dimentionality. Also the patterns created from it made it seem like the larger volumes were composed of several disjointed shapes. There was also the idea of the fuzzy edges, which gave the drawing a level of miss registration, blurring the boundaries of what was solid and what was line, which dissolved any idea of hierarchy. I finally started to move into a building project, which was the Taichung Cultural Center. The program for the project consisted of a museum and a library. The key challenge was the necessary separation of the two programs and while creating one single coherent project. My intention was never to provide, in a focused way, aesthetic and visual ambitions for the development of the project. I was more interested in seeing how the techniques I’ve been using could potentially be used at a building level, and create a continuity, between the different elements of the program, making these elements stand on their own while reading as coherent unified whole.

68

69


VISUAL STUDIES

Rules A higher density of lines creates a more clear unity of fragments. Density

Line Interaction Corner to corner Edge to edge Point to point

Corner to corner Edge to edge

Edge to edge

Point to point

70

71


VISUAL STUDIES 73 72


d i g i t a l S I G N AT U R E SCI-ARC EMILY WHITE

2ND SEMESTER 2011 DIGITAL SIGNATURE was a study on 3D forms created by the interaction of 2 different objects. Using the model of a whale and a fortune cookie, an encyclopedia of forms was created depicting several different ways to make these 2 objects interact and the different forms these interactions created. Then one of these forms was physically fabricated using a CNC machine. Finally, color was used to emphasize some of the most dynamic characteristics on the form. In my case, a gradient of reds was used to emphasize the contrast between the sharp edges of the form and its smooth curves.

74

75


Boolean 3.1 Whales minus cookie # of Meshes: # of Control Points : 5 3811

Boolean 1.2 Difference between Cookie and Whale # of Surfaces: 17 # of Control Points : 1254

Boolean 4.1 Cookie Minus Whale # of Meshes: # of Control Points : 1 13236

Boolean 2.1 Difference between Cookie and Whale # of Surfaces: 58 # of Control Points : 360

Boolean 4.2 Difference between whale and cookie # of Meshes: 1 # of Control Points : 8467

Boolean 2.2 Cookie minus whale # of Surfaces: # of Control Points :

Action

142 696

Addition

77 76

Least Subtraction

Mesh Original

Most Boolean 3.2 Difference between cookie and whale # of Meshes: 4 # of Control Points : 1057

Least

VISUAL STUDIES

Encyclopedia

Most

Difference

Surfaces

Color Experimentations


99 SECTIONS SCI-ARC ALEXIS ROCHAS 1ST SEMESTER 2010

99 SECTIONS was a study on the sectional qualities of 3 hypothetical sites using several techniques like, an object on a site, form determined by the site, form interacting with the site, form respecting the site boundaries, to changing the those boundaries, etc...

78

79


VISUAL STUDIES 81 80


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.