D
A
684.188
G"
P
N
Q
W 684.955 10 .00
.00
2.5
0
U
0
V
3.5
0
W
2.7
0
X
4.3
0
10
7.0
0
13
ers t e m
14
0
Y
2.5
.40
0 3.5
12 .10
0 36.0
E WID
T 2.5
3.61
S
D ROA
S
2.8
0
2.4
E
R
0 2.5 0
8.00
7. 0
0
14
684.458
JA
14
.00
R
B 24 DD
EN DO
OR
DD
JA
1
20 .00
HI
HI
R
.00
EN
2.11
OR
9.8
1
0.5 0
6.0
0
DEPTH WELL
9
0
23 .0
2.9
4 .0
0
DO
SEPTIC TANK R
R
JA
6.0
'S
8. 0 0
0 0.5
SO N
SOAKAWAY
JA
A
3.0 0
VI LL
ACCESS IF REQUIRED BY MEP
TU RE
5
0
1.4
SC UP
7.2
26 .0
0
0
686.640
24
G
.00
LDIN
UI NB
R
0
REC
20 .0
C
IO EAT
15
19
35
.45
2
8.95
AT ER
TW
DI W
8.0 0
0
MI LY
.00
.00
15.00 meters WIDE ROAD
FA
20
AT ER
AT W
20 .00 20
B 19 .00
.00
N
5
0 10
21
7
8.0
0
13
6
.00
.00
0
GU
.00
ES
T
6.0
5.0
DI
0
P0 5
W
2.5
AN
P0 5
IY
A
P05
MA I
P0 5
10.06
8.0 0
VI
LL A
9.5 0
28
13 .00
4
FL
18
SO N'
AN
S
IY
VI
A
LL A
PL
AN TE R
26 .0
0
PL
AN
TE
R
TA BL
E
CO NS OL
E
21
.00
20 .00
FL A
17
3
14 .5
36.00 meters WIDE ROAD
VI SO
9.5
N' S
0
5.47
LL
SO N' S
21 .00
8.0 0
22 .95
16
A
VI
LL
A
10 .00
.00
5.0
0
.00
2.5
33
.00
FOUNTAIN
6.00
12.00
0
19
G
9
26.24
.00
8
5.0 0
0
13
15 .6
2.5
A
0 DN
7.2 5
LEGEND :
20.56
4.0
9
- TOP OF ROOF FLOOR BUILDING LINE
0
0 SLOPE DOWN TO BASEMENT PARKING
D
7.0
0
C
10
- GROUND FLOOR BUILDING LINE
6.89
8.8
P0 2
0
9.5
B
13 .0
13 .00
687.570
1.0 01.5 0
12 .0
0
4.0
E
6.0
2.7 4.3
0
0
F
G'
H
I
06.11. 2016
For Co-ordination.
DATE
DESCRIPTION
Stage : DESIGN DEVELOPMENT
3.5
0
J
K
L
686.775 0
0
2.8
0
M
N
MKAN ARCHT IECTS www.mkan.sa
686.527
686.652
685.722
2.5
O
11
C A
36.00 meters WIDE ROAD
PROJECT:
Checked By:
REV.
For Co-ordination.
Revised By:
A
23.11. 2016
0
D
CONSULTANTS R1
2.5 0
AL BLEHED PRIVATE COMPOUND RIYADH - KSA
12 DATE
DRAWN
23.11.2016
F.T
DRAWING TITLE
MASTER PLAN
CHECKED
A.K.
APPROVED
A.S.
DWG. NO.
A-101
SCALE
1:125 -
REV.
R1