ARCHITECTURAL PORTFOLIO 1

Page 1

fakhira hanis


‘‘

A firm believer that anything can be achieved with a little more focus on the detail and a spark of creative magic. I am an ambitious and hardworking individual . I would welcome the oppurtunity to expand my credibility in more details.

Fakhira Hanis

Part 1 Architectural Graduate

+60143426563 fakhirahns.wip@gmail.com


selected works 00. the kosmo-sis semester 6

01. the proem semester 5

05. working drawing semester 5

06. freelance works 07. personal works photography

02. paradox

semester 4

03. the brandalism semester 3

04. platonic

semester 2


















semester 4





semester 3




semester 2



working drawing semester 05


NURFAKHIRA HANIS BINTI AHMAD NORI (A169627)

RESEARCH LOCATION PLAN

BATU CAVES

A

KEPONG SENTUL

WANGSA MAJU

SETIAWANGSA MONT KIARA

TAMAN TUN DR ISMAIL

KUALA LUMPUR

BRICKFIELDS

PANDAN INDAH

1. PROF MADYA. AR. DR. MOHD FARID BIN MOHAMED (PENSYARAH) LL

FA

CHERAS

TAMAN DESA

B LL

FA

TAMAN CONNAUGHT SRI PETALING

30°

FALL

LL

FA

30°

30°

LL

BUKIT JALIL

FA

R.C

FLAT

30°

ROOF R.C

1

KEY PLAN

FLAT

ROOF

B

N

30°

LL

FA

N.T.S

33°

33°

LL

FA

LUKISAN KERJA SENI BINA LL

FA

55°

LL

FA

RUMAH MELAKA FRIM KEPONG, 52109 KUALA LUMPUR, MALAYSIA.

33°

LL

KKSB 3123 : LUKISAN KERJA SENI BINA (SEMESTER 5, SESI 2020/2021)

55°

LL

FA

BOU

NDA

RY

LL

FA

LIN

E

FA 30°

30°

FRIM MUSEUM FALL

SARJANA MUDA SAINS SENIBINA DENGAN KEPUJIAN

°

18.5

MASJID JAMEK FRIM

A

E LIN RY NDA

AN

BOU

RESEARCH SITE PLAN

N

2

LOCATION PLAN N.T.S

T

OR

W OX

L JA

N

HY

F

3

LOCATION PLAN N.T.S

PROGRAM SENI BINA, FAKULTI KEJURUTERAAN DAN ALAM BINA, UNIVERSITI KEBANGSAAN MALAYSIA (UKM)


B

C

D

E

NURFAKHIRA HANIS BINTI AHMAD NORI (A169627)

A

A

A

F

G

A

1

B

C

1

D

E

F

G

SEPTIC TANK

MANHOLE TO ENGR'S DETAIL

2

2

W3

115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES

W4

W2

W1

FALL 30° D3

D3

FALL 30° W1

W1

M.S FRAME SOLID TIMBER DOOR

FALL 30°

D2

D2

3

3

R.C. COLUMN TO ENGR'S DETAIL POWDER COATED ALUMN. FRAMED FIX GLASS WINDOW TO MANUF'S DETAIL

W2

B

B

B

UP

1. PROF MADYA. AR. DR. MOHD FARID BIN MOHAMED (PENSYARAH)

B

SD1

FALL 30°

R.C FLAT ROOF

POWDER COATED ALUMN. FRAME GLASS SLIDING DOOR TO MANUF'S DETAIL

W1

4

D1

4

W1

W2

washing machine

R.C. STAIRCASE TO ENGR'S DETAIL R=150, T=400, N=3

R.C FLAT ROOF

UP

5

5

6

STAIRCASE TO ARCH'S DETAIL 500mm x 500mm CONC. STUMP TO ARCH DETAILS

6

FALL 33°

FALL 55°

FALL 33°

7

150mm x 20mm H.W TIMBER PANEL

7

FALL 30°

840 mm x 1415 mm H.W WINDOW TO MANUF'S DETAIL

FALL 55°

FALL 30°

8

150mm x 150mm H.W TIMBER COLUMN

KKSB 3123 : LUKISAN KERJA SENI BINA (SEMESTER 5, SESI 2020/2021)

FALL 18.5°

4

SCALE 1 : 100

BOUNDARY LINE

GROUND FLOOR PLAN

SARJANA MUDA SAINS SENIBINA DENGAN KEPUJIAN

A

ROOF PLAN

10

A

3

BOUNDARY LINE

BOUNDARY LINE

9 BOUNDARY LINE

10

SCALE 1 : 100

PROGRAM SENI BINA, FAKULTI KEJURUTERAAN DAN ALAM BINA, UNIVERSITI KEBANGSAAN MALAYSIA (UKM)

SCHEDULE OF OUTDOOR AND INDOOR FINISHES WALL FINISHES

115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES DRY WALL (GYPSUM BOARD PARTATION) TO MANUF'S DETAIL. GLAZED CERAMIC WALL TILES AT 2100mm HIGH ALL AROUND INTERNALLY TO ARCH'S APPROVAL.

FLOOR FINISHES

COLUMN CONSTRUCTION R.C COLUMN FINISH WITH PLASTERING TO ENGR'S DETAIL 100mm x 100mm H.W TIMBER COLUMN

B

C

D

E

F

R.C STEP R.C. STEP TO ENGR'S DETAIL WITH HOMOG. TILES FINISH C/W HOMOG. STEP NOISING TO ARCHITECT'S SELECTION. (T=400mm, R=150mm)

2

DRAINAGE & SEWER SPECIFICATION PC. CONC. DRAIN TO ENGR'S DETAIL.

3

NON-SLIP HOMOGENEOUS TILES CERAMIC TILES

PC. CONC. & R.C. SPECIFICATION

INTERLOCKING PAVER

PC. CONC. KERB TO ENGR'S DETAIL.

CARPET

R.C. COUNTER TOP TO ENGR'S DETAIL WITH HOMO. TILES FINISH AND TIMBER CABINET BELOW TO DETAIL.

CONCRETE WITH BROOM FINISH

ROOF CONSTRUCTION SELECTED UNGLAZED CLAY ROOFING TILES AT 30 PITCH TO ARCH'S APPROVAL R.C. FLAT ROOF WITH A LAYER WATERPROOFING MEMBRANCE TO ENGR'S DETAIL.

R.C. STUMP TO ENGR'S DETAIL.

LEGENDS CEILING 'UAC SUPERFLEX' TO MANUF'S DETAIL

4

R.C. BEAM TO ENGR'S DETAIL. R.C. SLAB TO ENGR'S DETAIL. R.C. SLAB WITH 1 LAYER WATER PROFING TO ENGR'S DETAIL.

RUMAH MELAKA FRIM KEPONG, 52109 KUALA LUMPUR, MALAYSIA.

D1

8

9

LUKISAN KERJA SENI BINA

5

REFLECTED CEILING PLAN SCALE 1 : 100

SWITCH

POWER POINT

WALL MOUNTED LIGHT

CEILING FAN

LIGHTING

LED LIGHTING


1

2

4

3

5

6

7

8

9

NURFAKHIRA HANIS BINTI AHMAD NORI (A169627)

10

BOUNDARY LINE

BOUNDARY LINE

SCHEDULE OF DOORS AND IRONMEGERIES DOOR TYPE

ALUMN. FRAME CASEMENT / SLIDING WINDOW C/W 6mm THK. TINTED GLASS TO MANUF'S DETAIL.

UPPER ROOF LEVEL

D1

SD1

R.C. FLAT ROOF TO ENGR'S DETAIL SELECTED UNGLAZED CLAY ROOFING TILES

D2

D3

ELEVATION

LOWER ROOF LEVEL PLAN

SD1

SELECTED DECORATIVE TO MANUF DETAIL W1

GROUND FLOOR LEVEL

1. PROF MADYA. AR. DR. MOHD FARID BIN MOHAMED (PENSYARAH)

SPECIFICATION

GROUND LEVEL

IRON MONGERY

POWDER COATED ALUMN. FRAME CASEMENT WINDOW TO MANUF'S DETAIL

6

FRONT ELEVATION SCALE 1 : 100

SCHEDULE OF WINDOW AND IRONMEGERIES DOOR TYPE

10

9

8

6

5

4

2

W2

W1

W3

W4

1

BOUNDARY LINE

UPPER ROOF LEVEL

BOUNDARY LINE

ROOF CONSTRUCTION SELECTED UNGLAZED CLAY ROOFING TILES AT 30° PITCH TO ARCH'S APPROVAL 150 X 50 H.W. RAFTER 150 X 50 H.W. TIE BEAM 50 X 25 H.W. BATTEN AT 300 C/C 50MM THK FIBREGLASS INSULATION (32KG/M) SUPPORT ON CHICKEN WIRE MESH DOUBLE SIDE ALUM. FOIL (DUOFOIL NER2)

ELEVATION

LUKISAN KERJA SENI BINA RUMAH MELAKA FRIM KEPONG, 52109 KUALA LUMPUR, MALAYSIA.

PLAN LOWER ROOF LEVEL

SPECIFICATION

W3

200 X 25 THK. THREATED H.W. FASCIA BOARD R.C. COPING TO ENGR'S DETAIL

KKSB 3123 : LUKISAN KERJA SENI BINA (SEMESTER 5, SESI 2020/2021)

IRON MONGERY

POWDER COATED ALUMN. FRAME CASEMENT WINDOW TO MANUF'S DETAIL

GROUND FLOOR LEVEL W2

W1

W1

SARJANA MUDA SAINS SENIBINA DENGAN KEPUJIAN

115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES

GROUND LEVEL

7

REAR ELEVATION

PROGRAM SENI BINA, FAKULTI KEJURUTERAAN DAN ALAM BINA, UNIVERSITI KEBANGSAAN MALAYSIA (UKM)

SCALE 1 : 100

SCHEDULE OF NATURAL LIGHTING AND VENTILATION G

F

C

B

REQUIRED

A

BOUNDARY LINE

BOUNDARY LINE

ENCLOSED SPACES

UPPER ROOF LEVEL

LOWER ROOF LEVEL

AREA (SQM)

GROUND LEVEL

8

LEFT ELEVATION SCALE 1 : 100

CERTIFICATE OF COMPLIANCE BY PSP 10 % LIGHTING & NATURAL VENTILATION (SQM)

5% AIR ROUTES WITHOUT BARRIERS (SQM)

NOTE

22.20

2.22

1.11

3.56/1.11

SUFFICIENT

KITCHEN

12.20

1.22

0.61

3.18

3.18

3.18/1.22

3.18/0.61

SUFFICIENT

1.78

1.78/1.08

1.78/0.54

SUFFICIENT

3.56

3.56/1.13

3.56/0.56

SUFFICIENT

3.56/1.05

3.56/0.53

W4

W1

5% AIR ROUTES WITHOUT BARRIERS (SQM)

LIVING ROOM

115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES

W1

PROVIDED 10 % LIGHTING & NATURAL VENTILATION (SQM)

SELECTED UNGLAZED CLAY ROOFING TILES AT 30° PITCH TO ARCH'S APPROVAL 150 X 50 H.W. RAFTER 150 X 50 H.W. TIE BEAM 50 X 25 H.W. BATTEN AT 300 C/C 50MM THK FIBREGLASS INSULATION (32KG/M) SUPPORT ON CHICKEN WIRE MESH DOUBLE SIDE ALUM. FOIL (DUOFOIL NER2)

POWDER COATED ALUMN. FRAME CASEMENT WINDOW TO MANUF'S DETAIL GROUND FLOOR LEVEL

5% AIR ROUTES WITHOUT BARRIERS (SQM)

ROOF CONSTRUCTION

DINING AREA BEDROOM 1 BEDROOM 2

3.56

10.80

1.08

0.54

1.78

11.25

1.13

0.56

3.56

10.50

1.05

0.53

3.56

3.56

3.56

3.56/2.22

SUFFICIENT

BATHROOM 1

4.80

0.48

0.24

0.9

0.9

0.9/0.48

0.9/0.24

SUFFICIENT

BATHROOM 2

2.60

0.26

0.13

0.3

0.3

0.3/0.26

0.3/0.13

SUFFICIENT

SUB-TOTAL

74.35 SQM

R.C. FLAT ROOF TO ENGR'S DETAIL SELECTED UNGLAZED CLAY ROOFING TILES

W3

10 % LIGHTING & NATURAL VENTILATION (SQM)

SEMI-CLOSED SPACES CORRIDOR ENTRANCE LAUNDRY

19.40 9.80 8.5

SUB-TOTAL

37.70

TOTAL GROUND FLOOR AREA

112.05 SQM


D

E

F

G

G

F

C

B

NURFAKHIRA HANIS BINTI AHMAD NORI (A169627)

A

BOUNDARY LINE

BOUNDARY LINE

C

BOUNDARY LINE

UPPER ROOF LEVEL

B

BOUNDARY LINE

A

ALUMN. FRAME SLIDING WINDOW TO MANUF'S DETAIL (5MM THK. 7% GREEN TINTED GLASS)

UPPER ROOF LEVEL THATCH ROOFING AT ENGINEER'S DETAIL LOWER ROOF LEVEL

STEEL TRUSSES TO ENGR'S DETAIL LOWER ROOF LEVEL W1

ALUMN. FRAME CASEMENT / SLIDING WINDOW C/W 6mm THK. TINTED GLASS TO MANUF'S DETAIL.

W1 D1

SELECTED DECORATIVE TO MANUF DETAIL VENTILATION AIRWAY

GROUND FLOOR LEVEL

TIMBER LATTICE FRAME TO MANUF'S DETAILS

150mm x 150mm H.W TIMBER COLUMN 250mm x 250mm CONC. COLUMN STUMP

GROUND LEVEL

9

M.S FRAME SOLID TIMBER DOOR

GROUND FLOOR LEVEL GROUND LEVEL

RIGHT ELEVATION

10

9

R.C. COUNTER TOP TO ENGR'S DETAIL

SECTION B-B'

SCALE 1 : 100

10

1. PROF MADYA. AR. DR. MOHD FARID BIN MOHAMED (PENSYARAH)

SCALE 1 : 100

8

6

5

4

2

ALUMN FRAME HIGHT LEVEL TOP HUNG TO DETAIL

1

BOUNDARY LINE

UPPER ROOF LEVEL

BOUNDARY LINE

125X125MM FLOOR TILES FINISHES

LUKISAN KERJA SENI BINA

115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES

ROOF CONSTRUCTION SELECTED UNGLAZED CLAY ROOFING TILES AT 30° PITCH TO ARCH'S APPROVAL 150 X 50 H.W. RAFTER 150 X 50 H.W. TIE BEAM 50 X 25 H.W. BATTEN AT 300 C/C 50MM THK FIBREGLASS INSULATION (32KG/M) SUPPORT ON CHICKEN WIRE MESH DOUBLE SIDE ALUM. FOIL (DUOFOIL NER2)

RUMAH MELAKA FRIM KEPONG, 52109 KUALA LUMPUR, MALAYSIA.

WASH HAND BASIN TO MANUF'S DETAIL

P.V.C DOOR TO MANUF'S DETAIL

SECTION A-A

SECTION A-A

CEILING LEVEL

ALUMN. FRAME CASEMENT / SLIDING WINDOW C/W 6mm THK. TINTED GLASS TO MANUF'S DETAIL.

KKSB 3123 : LUKISAN KERJA SENI BINA (SEMESTER 5, SESI 2020/2021)

R.C BEAM TO ENGR'S DETAIL

LOWER ROOF LEVEL STEEL TRUSSES TO ENGR'S DETAIL

ALUMN FRAME HIGHT LEVEL TOP HUNG TO DETAIL

SARJANA MUDA SAINS SENIBINA DENGAN KEPUJIAN

200 X 25 THK. THREATED H.W. FASCIA BOARD R.C. ROOF BEAM TO ENGR'S DETAIL SD1 D2

GROUND FLOOR LEVEL

200 X 250MM GLAZED WALL TILES AT 1500MM HIGH AT ALL AROUND

ALUMN. FRAME CASEMENT / SLIDING WINDOW C/W 6mm THK. TINTED GLASS TO MANUF'S DETAIL. 114 THK BRICKWALL TO BE PLASTERED ON BOTHSIDES

GROUND LEVEL

GROUND LEVEL FLOOR CONSTRUCTION

11

-

SECTION A-A'

115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES

GROUND FLOOR LEVEL

M.S FRAME SOLID TIMBER DOOR

R.C. FOOTING, RC GROUND BEAM SLAB TO ENGR'S DETAIL. 50MM THICK SAND SCREED. 150MM THICK HARDCORE. FLOOR FINISH (FOLLOW TO MATERIAL SPEC)

SCALE 1 : 100

12

SECTION B-B

SECTION B-B

BATHROOM 2

BATHROOM 1

PROGRAM SENI BINA, FAKULTI KEJURUTERAAN DAN ALAM BINA, UNIVERSITI KEBANGSAAN MALAYSIA (UKM)

BATROOM DETAILS SCALE 1 : 25

1 NO 1892 LITER (500 GAL.)HDPE WATER STORAGE TANK ON 20 MM THK WATERPROOF PLYWOOD BOARD

32 MM DIA UPVC PIPE

25 MM DIA UPVC PIPE

100 MM DIA UPVC VENT PIPE 25 MM HDPE PN 10 BEAM LEVEL

BEAM LEVEL

15 MM DIA UPVC PIPE

25 MM HDPE PN 10 BASIN

BASIN

BASIN

WC

WC

TAP

BASIN

GROUND FLOOR LEVEL

GROUND FLOOR LEVEL

TAP

GT

GROUND LEVEL

GROUND LEVEL STOPCOCK & WATER METER 20 MM DIA LOCKABLE VALVE 32 MM DIA HDPE PN 10 FROM JBA MAIN PIPE

SANITARY SERVICE DIAGRAMATIC LAYOUT SCALE : NTS

14

WATER SUPPLY DIAGRAMMATIC LAYOUT SCALE : NTS

BASIN

SHOWER TAP

WC GT

13

BASIN

SHOWER

FT

FT

FT

TAP

WC


freelance works


renovation drawing taman lagenda, cheras


NO FAIL / CAP PENDAFTARAN JABATAN :

17

92

21

8

17

94

3

CAP KELULUSAN / TANDATANGAN JABATAN KAWALAN BANGUNAN :

17

96

94

1

6

32

18

09

43

2

3 18

09

324 54

324

46

4

48

325

JAL

2

05

48

32

AN

55

325

3

7

46'

325

61

325 45

325

325 36

325 59 325 58 60

32

TAPAK BERKENAAN

324 71

32

00

324 62

KAWASAN TAPAK

LEB

LAG

AR

2

56

31

32

24

1 31

END

JAL

AN

A2

2

24

2 881

2

QIBL

AT

292°

1

KEY PLAN

QIBL

AT

LOCATION PLAN

2

292°

N.T.S

N.T.S

325

325

15

A

18

325

14

TAJUK CADANGAN :

84

325

19

B

26°

16

FALL

24.3

PEMILIK / PEMOHON :

325

" Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan lot/jiran bersebelahan akibat dari kerja-kerja pembinaan yang dijalankan. "

26°

325

20

25° 00' 10"

B

ARKITEK :

325 22

25°

26° FALL

00'

FALL

325

10"

21

24.3

84

FALL

26° FALL 26°

Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan bersebelahan akibat dari kerja-kerja pembinaan. Saya memperakui bahawa butir-butir di dalam lukisan ini adalah menurut Undang-Undang Kecil Bangunan Seragam Selangor 1986 dan saya bersetuju menerima tanggungjawab penuh yang sewajarnya.

A

7

LAG

AR

END

JAL

AN

A2

4

TAJUK LUKISAN :

KEY PLAN LOCATION PLAN SITE PLAN

325

28

325 2

LEB

24

325

05

AN

40'

325

JAL

325

23

31-2 Jalan Danau Lumayan, Bandar Tasik Permaisuri, Cheras, 56000 Kuala Lumpur Tel : 03-91723992/3993 Fax : 03-91723994 Email: arkitekadamhalim@gmail.com

QIBL

AT

292°

3

SITE PLAN SCALE 1 : 150

SKALA : AS SHOWN

TARIKH : 27/12/2021

DILUKIS : KYR

FAIL CAD : TAMAN LAGENDA MAS/BP-reno

DISEMAK : AH

NO. HELAIAN :

TAJUK LUKISAN :

AAH

2021

3.TLM

MPKj

Reno

1/3

SP - 01

Rev-1


NO FAIL / CAP PENDAFTARAN JABATAN :

A

B

A

F

E

D

C

B

A

F

E

C

F

E

C

1

EXIST. DOOR TO BE DEMOLISHED

2

2

NEW DOOR REFER TO SCHEDULE

3

1 NEW WINDOW REFER TO SCHEDULE

EXIST. WINDOW TO BE DEMOLISHED

2

26° FALL

1

A

A

A

CAP KELULUSAN / TANDATANGAN JABATAN KAWALAN BANGUNAN :

EXIST. ROOF TO BE DEMOLISHED

3

NEW EXTENDED ROOF

3

NEW 150MM BRICKWALL

4 B

B

EXIST. WALL TO BE DEMOLISHED

4 B

5

B

NEW 150MM BRICKWALL

NEW DOOR REFER TO SCHEDULE

6 7

NEW DOOR REFER TO SCHEDULE

6

EXIST. WALL TO BE DEMOLISHED

EXIST. DOOR TO BE DEMOLISHED

7

EXIST. DOOR TO BE DEMOLISHED

B

5

B

6 7

EXIST. WINDOW TO BE DEMOLISHED

EXIST. WINDOW TO BE DEMOLISHED

NEW WINDOW REFER TO SCHEDULE

EXIST. WALL TO BE DEMOLISHED

8

26° FALL

4 5

8

8 NEW 150MM BRICKWALL

NEW DOOR REFER TO SCHEDULE

9

EXIST. WINDOW TO BE DEMOLISHED

10

26° FALL

EXIST. WALL TO BE DEMOLISHED EXIST. DOOR TO BE DEMOLISHED

10

EXIST. WALL TO BE DEMOLISHED EXIST. ROOF TO BE DEMOLISHED

26° FALL

NEW DOOR REFER TO SCHEDULE

11

26° FALL

EXIST. WINDOW TO BE DEMOLISHED

13

NEW DOOR REFER TO SCHEDULE

NEW FLAT ROOF

26° FALL

26° FALL

12

EXIST. SLIDING DOOR TO BE DEMOLISHED

EXIST. R.C COLUMN TO BE DEMOLISED

13

TAJUK CADANGAN :

26° FALL

EXIST. WALL TO BE DEMOLISHED

NEW 150MM BRICKWALL

12

26° FALL

NEW DOOR REFER TO SCHEDULE

NEW DOOR REFER TO SCHEDULE

NEW 150MM BRICKWALL

NEW 685 x 2265 MM ELEC. BOX AND REFUSE CHAMBER

14

14

14

2

FIRST FLOOR PLAN

3

SCALE 1 : 100

12

10

8

7

3

1

F

BOUNDARY LINE

BOUNDARY LINE

14

SECOND FLOOR PLAN SCALE 1 : 100

BOUNDARY LINE

SCALE 1 : 100

E

C

B

A

BOUNDARY LINE

GROUND FLOOR PLAN

1

A

A

A

PEMILIK / PEMOHON : " Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan lot/jiran bersebelahan akibat dari kerja-kerja pembinaan yang dijalankan. "

ARKITEK : Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan bersebelahan akibat dari kerja-kerja pembinaan. Saya memperakui bahawa butir-butir di dalam lukisan ini adalah menurut Undang-Undang Kecil Bangunan Seragam Selangor 1986 dan saya bersetuju menerima tanggungjawab penuh yang sewajarnya.

26°

EXIST. 230MM PARTYWALL 26°

EXIST. 230MM PARTYWALL 26°

31-2 Jalan Danau Lumayan, Bandar Tasik Permaisuri, Cheras, 56000 Kuala Lumpur Tel : 03-91723992/3993 Fax : 03-91723994 Email: arkitekadamhalim@gmail.com

NEW 230MM PARTYWALL NEW EXTENDED ROOF

NEW R.C BEAM NEW 150MM BRICKWALL EXIST. WINDOW TO BE DEMOLISHED NEW DOOR REFER TO SCHEDULE NEW BALCONY SLAB NEW 150MM BRICKWALL

NEW ROOF GUTTER NEW 150MM BRICKWALL

NEW 150MM BRICKWALL NEW WINDOW REFER TO SCHEDULE

NEW 150MM BRICKWALL

EXIST. WINDOW TO BE DEMOLISHED

EXIST. DOOR TO BE DEMOLISHED

EXIST. WALL TO BE DEMOLISHED EXIST. ROOF TO BE DEMOLISHED

NEW R.C BEAM NEW R.C FLOOR SLAB

NEW R.C BEAM

TAJUK LUKISAN :

EXIST. R.C COLUMN TO BE DEMOLISHED

EXIST. DOOR TO BE DEMOLISHED

NEW 150MM BRICKWALL NEW DOOR REFER TO SCHEDULE

EXIST. WALL TO BE DEMOLISHED

EXIST. DOOR TO BE DEMOLISHED

COLOUR LEGEND NEW FOUNDATION TO ENGR'S DETAIL

1

SECTION A-A SCALE 1 : 100

GROUND FLOOR PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN SECTION A-A SECTION B-B

EXISTING COMPONENTS

2

SECTION B-B SCALE 1 : 100

NEW COMPONENTS DEMOLISHED COMPONENTS

SKALA : AS SHOWN

TARIKH : 27/12/2021

DILUKIS : KYR

FAIL CAD : TAMAN LAGENDA MAS/BP-reno

DISEMAK : AH

NO. HELAIAN :

TAJUK LUKISAN :

AAH

2021

3.TLM

MPKj

Reno

2/3

FP - 02

Rev-1


NO FAIL / CAP PENDAFTARAN JABATAN :

A

14

F

12

10

8

7

3

1

BOUNDARY LINE

A

BOUNDARY LINE

CAP KELULUSAN / TANDATANGAN JABATAN KAWALAN BANGUNAN :

26°

1

26°

EXIST. 230MM PARTYWALL 26°

NEW 230MM PARTYWALL

NEW EXTENDED ROOF NEW ROOF GUTTER

B

NEW 150MM BRICKWALL

EXIST. ROOF TO BE DEMOLISHED

NEW WINDOW REFER TO SCHEDULE NEW WINDOW REFER TO SCHEDULE

26° FALL

NEW 1200MM HEIGHT GLASS RAILING

EXIST. ROOF TO BE DEMOLISHED

NEW BALCONY SLAB

NEW WINDOW REFER TO SCHEDULE

EXIST. WALL TO BE DEMOLISHED EXIST. WINDOW TO BE DEMOLISHED

NEW 150MM BRICKWALL

NEW DOOR REFER TO SCHEDULE

EXIST. R.C COLUMN TO BE DEMOLISHED

26° FALL

3

SCALE 1 : 100 F

F

E

D

A

BOUNDARY LINE

E

BOUNDARY LINE

26° FALL

BOUNDARY LINE

A

26° FALL

SIDE ELEVATION

BOUNDARY LINE

B

NEW 150MM BRICKWALL

TAJUK CADANGAN :

NEW FLAT ROOF

EXIST. 230MM PARTYWALL

26° FALL NEW 230MM PARTYWALL

NEW EXTENDED ROOF

NEW ROOF GUTTER

NEW 150MM BRICKWALL NEW SLIDING DOOR REFER TO SCHEDULE NEW 1200MM HEIGHT GLASS RAILING

14

NEW TOP HUNG WINDOW REFER TO SCHEDULE

NEW TOP HUNG WINDOW REFER TO SCHEDULE

NEW 150MM BRICKWALL

NEW 150MM SLAB

EXIST. ROOF TO BE DEMOLISHED

NEW BALCONY SLAB

A

NEW 150MM BRICKWALL

4

NEW FOLDING DOOR REFER TO SCHEDULE

ROOF PLAN

NEW WINDOW REFER TO SCHEDULE

EXIST. ROOF TO BE DEMOLISHED

NEW 150MM BRICKWALL

PEMILIK / PEMOHON :

EXIST. WINDOW TO BE DEMOLISHED

EXIST. DOOR TO BE DEMOLISHED

NEW 150MM BRICKWALL

NEW DOOR REFER TO SCHEDULE

NEW STAIRCASE NEW DOOR REFER TO SCHEDULE

SCALE 1 : 100

" Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan lot/jiran bersebelahan akibat dari kerja-kerja pembinaan yang dijalankan. "

EXIST. DOOR TO BE DEMOLISHED

EXIST. STAIRCASE TO BE DEMOLISHED

4

FRONT ELEVATION SCALE 1 : 100

5

REAR ELEVATION SCALE 1 : 100

ARKITEK : Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan bersebelahan akibat dari kerja-kerja pembinaan. Saya memperakui bahawa butir-butir di dalam lukisan ini adalah menurut Undang-Undang Kecil Bangunan Seragam Selangor 1986 dan saya bersetuju menerima tanggungjawab penuh yang sewajarnya.

31-2 Jalan Danau Lumayan, Bandar Tasik Permaisuri, Cheras, 56000 Kuala Lumpur Tel : 03-91723992/3993 Fax : 03-91723994 Email: arkitekadamhalim@gmail.com

1

DOOR SCHEDULE SCALE : NTS

TAJUK LUKISAN :

COLOUR LEGEND

ROOF PLAN SIDE ELEVATION FRONT ELEVATION REAR ELEVATION DOOR & WINDOW SCHEDULE DIAGRAMMATIC OF SANITARY LAYOUT (EXIST.)

EXISTING COMPONENTS

1

DIAGRAMMATIC OF SANITARY LAYOUT SCALE : NTS

NEW COMPONENTS

2

WINDOW SCHEDULE SCALE : NTS

DEMOLISHED COMPONENTS

SKALA : AS SHOWN

TARIKH : 27/12/2021

DILUKIS : KYR

FAIL CAD : TAMAN LAGENDA MAS/BP-reno

DISEMAK : AH

NO. HELAIAN :

TAJUK LUKISAN :

AAH

2021

3.TLM

MPKj

Reno

3/3

FP - 03

Rev-1






personal works






Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.