fakhira hanis
‘‘
A firm believer that anything can be achieved with a little more focus on the detail and a spark of creative magic. I am an ambitious and hardworking individual . I would welcome the oppurtunity to expand my credibility in more details.
Fakhira Hanis
Part 1 Architectural Graduate
+60143426563 fakhirahns.wip@gmail.com
selected works 00. the kosmo-sis semester 6
01. the proem semester 5
05. working drawing semester 5
06. freelance works 07. personal works photography
02. paradox
semester 4
03. the brandalism semester 3
04. platonic
semester 2
semester 4
semester 3
semester 2
working drawing semester 05
NURFAKHIRA HANIS BINTI AHMAD NORI (A169627)
RESEARCH LOCATION PLAN
BATU CAVES
A
KEPONG SENTUL
WANGSA MAJU
SETIAWANGSA MONT KIARA
TAMAN TUN DR ISMAIL
KUALA LUMPUR
BRICKFIELDS
PANDAN INDAH
1. PROF MADYA. AR. DR. MOHD FARID BIN MOHAMED (PENSYARAH) LL
FA
CHERAS
TAMAN DESA
B LL
FA
TAMAN CONNAUGHT SRI PETALING
30°
FALL
LL
FA
30°
30°
LL
BUKIT JALIL
FA
R.C
FLAT
30°
ROOF R.C
1
KEY PLAN
FLAT
ROOF
B
N
30°
LL
FA
N.T.S
33°
33°
LL
FA
LUKISAN KERJA SENI BINA LL
FA
55°
LL
FA
RUMAH MELAKA FRIM KEPONG, 52109 KUALA LUMPUR, MALAYSIA.
33°
LL
KKSB 3123 : LUKISAN KERJA SENI BINA (SEMESTER 5, SESI 2020/2021)
55°
LL
FA
BOU
NDA
RY
LL
FA
LIN
E
FA 30°
30°
FRIM MUSEUM FALL
SARJANA MUDA SAINS SENIBINA DENGAN KEPUJIAN
°
18.5
MASJID JAMEK FRIM
A
E LIN RY NDA
AN
BOU
RESEARCH SITE PLAN
N
2
LOCATION PLAN N.T.S
T
OR
W OX
L JA
N
HY
F
3
LOCATION PLAN N.T.S
PROGRAM SENI BINA, FAKULTI KEJURUTERAAN DAN ALAM BINA, UNIVERSITI KEBANGSAAN MALAYSIA (UKM)
B
C
D
E
NURFAKHIRA HANIS BINTI AHMAD NORI (A169627)
A
A
A
F
G
A
1
B
C
1
D
E
F
G
SEPTIC TANK
MANHOLE TO ENGR'S DETAIL
2
2
W3
115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES
W4
W2
W1
FALL 30° D3
D3
FALL 30° W1
W1
M.S FRAME SOLID TIMBER DOOR
FALL 30°
D2
D2
3
3
R.C. COLUMN TO ENGR'S DETAIL POWDER COATED ALUMN. FRAMED FIX GLASS WINDOW TO MANUF'S DETAIL
W2
B
B
B
UP
1. PROF MADYA. AR. DR. MOHD FARID BIN MOHAMED (PENSYARAH)
B
SD1
FALL 30°
R.C FLAT ROOF
POWDER COATED ALUMN. FRAME GLASS SLIDING DOOR TO MANUF'S DETAIL
W1
4
D1
4
W1
W2
washing machine
R.C. STAIRCASE TO ENGR'S DETAIL R=150, T=400, N=3
R.C FLAT ROOF
UP
5
5
6
STAIRCASE TO ARCH'S DETAIL 500mm x 500mm CONC. STUMP TO ARCH DETAILS
6
FALL 33°
FALL 55°
FALL 33°
7
150mm x 20mm H.W TIMBER PANEL
7
FALL 30°
840 mm x 1415 mm H.W WINDOW TO MANUF'S DETAIL
FALL 55°
FALL 30°
8
150mm x 150mm H.W TIMBER COLUMN
KKSB 3123 : LUKISAN KERJA SENI BINA (SEMESTER 5, SESI 2020/2021)
FALL 18.5°
4
SCALE 1 : 100
BOUNDARY LINE
GROUND FLOOR PLAN
SARJANA MUDA SAINS SENIBINA DENGAN KEPUJIAN
A
ROOF PLAN
10
A
3
BOUNDARY LINE
BOUNDARY LINE
9 BOUNDARY LINE
10
SCALE 1 : 100
PROGRAM SENI BINA, FAKULTI KEJURUTERAAN DAN ALAM BINA, UNIVERSITI KEBANGSAAN MALAYSIA (UKM)
SCHEDULE OF OUTDOOR AND INDOOR FINISHES WALL FINISHES
115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES DRY WALL (GYPSUM BOARD PARTATION) TO MANUF'S DETAIL. GLAZED CERAMIC WALL TILES AT 2100mm HIGH ALL AROUND INTERNALLY TO ARCH'S APPROVAL.
FLOOR FINISHES
COLUMN CONSTRUCTION R.C COLUMN FINISH WITH PLASTERING TO ENGR'S DETAIL 100mm x 100mm H.W TIMBER COLUMN
B
C
D
E
F
R.C STEP R.C. STEP TO ENGR'S DETAIL WITH HOMOG. TILES FINISH C/W HOMOG. STEP NOISING TO ARCHITECT'S SELECTION. (T=400mm, R=150mm)
2
DRAINAGE & SEWER SPECIFICATION PC. CONC. DRAIN TO ENGR'S DETAIL.
3
NON-SLIP HOMOGENEOUS TILES CERAMIC TILES
PC. CONC. & R.C. SPECIFICATION
INTERLOCKING PAVER
PC. CONC. KERB TO ENGR'S DETAIL.
CARPET
R.C. COUNTER TOP TO ENGR'S DETAIL WITH HOMO. TILES FINISH AND TIMBER CABINET BELOW TO DETAIL.
CONCRETE WITH BROOM FINISH
ROOF CONSTRUCTION SELECTED UNGLAZED CLAY ROOFING TILES AT 30 PITCH TO ARCH'S APPROVAL R.C. FLAT ROOF WITH A LAYER WATERPROOFING MEMBRANCE TO ENGR'S DETAIL.
R.C. STUMP TO ENGR'S DETAIL.
LEGENDS CEILING 'UAC SUPERFLEX' TO MANUF'S DETAIL
4
R.C. BEAM TO ENGR'S DETAIL. R.C. SLAB TO ENGR'S DETAIL. R.C. SLAB WITH 1 LAYER WATER PROFING TO ENGR'S DETAIL.
RUMAH MELAKA FRIM KEPONG, 52109 KUALA LUMPUR, MALAYSIA.
D1
8
9
LUKISAN KERJA SENI BINA
5
REFLECTED CEILING PLAN SCALE 1 : 100
SWITCH
POWER POINT
WALL MOUNTED LIGHT
CEILING FAN
LIGHTING
LED LIGHTING
1
2
4
3
5
6
7
8
9
NURFAKHIRA HANIS BINTI AHMAD NORI (A169627)
10
BOUNDARY LINE
BOUNDARY LINE
SCHEDULE OF DOORS AND IRONMEGERIES DOOR TYPE
ALUMN. FRAME CASEMENT / SLIDING WINDOW C/W 6mm THK. TINTED GLASS TO MANUF'S DETAIL.
UPPER ROOF LEVEL
D1
SD1
R.C. FLAT ROOF TO ENGR'S DETAIL SELECTED UNGLAZED CLAY ROOFING TILES
D2
D3
ELEVATION
LOWER ROOF LEVEL PLAN
SD1
SELECTED DECORATIVE TO MANUF DETAIL W1
GROUND FLOOR LEVEL
1. PROF MADYA. AR. DR. MOHD FARID BIN MOHAMED (PENSYARAH)
SPECIFICATION
GROUND LEVEL
IRON MONGERY
POWDER COATED ALUMN. FRAME CASEMENT WINDOW TO MANUF'S DETAIL
6
FRONT ELEVATION SCALE 1 : 100
SCHEDULE OF WINDOW AND IRONMEGERIES DOOR TYPE
10
9
8
6
5
4
2
W2
W1
W3
W4
1
BOUNDARY LINE
UPPER ROOF LEVEL
BOUNDARY LINE
ROOF CONSTRUCTION SELECTED UNGLAZED CLAY ROOFING TILES AT 30° PITCH TO ARCH'S APPROVAL 150 X 50 H.W. RAFTER 150 X 50 H.W. TIE BEAM 50 X 25 H.W. BATTEN AT 300 C/C 50MM THK FIBREGLASS INSULATION (32KG/M) SUPPORT ON CHICKEN WIRE MESH DOUBLE SIDE ALUM. FOIL (DUOFOIL NER2)
ELEVATION
LUKISAN KERJA SENI BINA RUMAH MELAKA FRIM KEPONG, 52109 KUALA LUMPUR, MALAYSIA.
PLAN LOWER ROOF LEVEL
SPECIFICATION
W3
200 X 25 THK. THREATED H.W. FASCIA BOARD R.C. COPING TO ENGR'S DETAIL
KKSB 3123 : LUKISAN KERJA SENI BINA (SEMESTER 5, SESI 2020/2021)
IRON MONGERY
POWDER COATED ALUMN. FRAME CASEMENT WINDOW TO MANUF'S DETAIL
GROUND FLOOR LEVEL W2
W1
W1
SARJANA MUDA SAINS SENIBINA DENGAN KEPUJIAN
115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES
GROUND LEVEL
7
REAR ELEVATION
PROGRAM SENI BINA, FAKULTI KEJURUTERAAN DAN ALAM BINA, UNIVERSITI KEBANGSAAN MALAYSIA (UKM)
SCALE 1 : 100
SCHEDULE OF NATURAL LIGHTING AND VENTILATION G
F
C
B
REQUIRED
A
BOUNDARY LINE
BOUNDARY LINE
ENCLOSED SPACES
UPPER ROOF LEVEL
LOWER ROOF LEVEL
AREA (SQM)
GROUND LEVEL
8
LEFT ELEVATION SCALE 1 : 100
CERTIFICATE OF COMPLIANCE BY PSP 10 % LIGHTING & NATURAL VENTILATION (SQM)
5% AIR ROUTES WITHOUT BARRIERS (SQM)
NOTE
22.20
2.22
1.11
3.56/1.11
SUFFICIENT
KITCHEN
12.20
1.22
0.61
3.18
3.18
3.18/1.22
3.18/0.61
SUFFICIENT
1.78
1.78/1.08
1.78/0.54
SUFFICIENT
3.56
3.56/1.13
3.56/0.56
SUFFICIENT
3.56/1.05
3.56/0.53
W4
W1
5% AIR ROUTES WITHOUT BARRIERS (SQM)
LIVING ROOM
115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES
W1
PROVIDED 10 % LIGHTING & NATURAL VENTILATION (SQM)
SELECTED UNGLAZED CLAY ROOFING TILES AT 30° PITCH TO ARCH'S APPROVAL 150 X 50 H.W. RAFTER 150 X 50 H.W. TIE BEAM 50 X 25 H.W. BATTEN AT 300 C/C 50MM THK FIBREGLASS INSULATION (32KG/M) SUPPORT ON CHICKEN WIRE MESH DOUBLE SIDE ALUM. FOIL (DUOFOIL NER2)
POWDER COATED ALUMN. FRAME CASEMENT WINDOW TO MANUF'S DETAIL GROUND FLOOR LEVEL
5% AIR ROUTES WITHOUT BARRIERS (SQM)
ROOF CONSTRUCTION
DINING AREA BEDROOM 1 BEDROOM 2
3.56
10.80
1.08
0.54
1.78
11.25
1.13
0.56
3.56
10.50
1.05
0.53
3.56
3.56
3.56
3.56/2.22
SUFFICIENT
BATHROOM 1
4.80
0.48
0.24
0.9
0.9
0.9/0.48
0.9/0.24
SUFFICIENT
BATHROOM 2
2.60
0.26
0.13
0.3
0.3
0.3/0.26
0.3/0.13
SUFFICIENT
SUB-TOTAL
74.35 SQM
R.C. FLAT ROOF TO ENGR'S DETAIL SELECTED UNGLAZED CLAY ROOFING TILES
W3
10 % LIGHTING & NATURAL VENTILATION (SQM)
SEMI-CLOSED SPACES CORRIDOR ENTRANCE LAUNDRY
19.40 9.80 8.5
SUB-TOTAL
37.70
TOTAL GROUND FLOOR AREA
112.05 SQM
D
E
F
G
G
F
C
B
NURFAKHIRA HANIS BINTI AHMAD NORI (A169627)
A
BOUNDARY LINE
BOUNDARY LINE
C
BOUNDARY LINE
UPPER ROOF LEVEL
B
BOUNDARY LINE
A
ALUMN. FRAME SLIDING WINDOW TO MANUF'S DETAIL (5MM THK. 7% GREEN TINTED GLASS)
UPPER ROOF LEVEL THATCH ROOFING AT ENGINEER'S DETAIL LOWER ROOF LEVEL
STEEL TRUSSES TO ENGR'S DETAIL LOWER ROOF LEVEL W1
ALUMN. FRAME CASEMENT / SLIDING WINDOW C/W 6mm THK. TINTED GLASS TO MANUF'S DETAIL.
W1 D1
SELECTED DECORATIVE TO MANUF DETAIL VENTILATION AIRWAY
GROUND FLOOR LEVEL
TIMBER LATTICE FRAME TO MANUF'S DETAILS
150mm x 150mm H.W TIMBER COLUMN 250mm x 250mm CONC. COLUMN STUMP
GROUND LEVEL
9
M.S FRAME SOLID TIMBER DOOR
GROUND FLOOR LEVEL GROUND LEVEL
RIGHT ELEVATION
10
9
R.C. COUNTER TOP TO ENGR'S DETAIL
SECTION B-B'
SCALE 1 : 100
10
1. PROF MADYA. AR. DR. MOHD FARID BIN MOHAMED (PENSYARAH)
SCALE 1 : 100
8
6
5
4
2
ALUMN FRAME HIGHT LEVEL TOP HUNG TO DETAIL
1
BOUNDARY LINE
UPPER ROOF LEVEL
BOUNDARY LINE
125X125MM FLOOR TILES FINISHES
LUKISAN KERJA SENI BINA
115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES
ROOF CONSTRUCTION SELECTED UNGLAZED CLAY ROOFING TILES AT 30° PITCH TO ARCH'S APPROVAL 150 X 50 H.W. RAFTER 150 X 50 H.W. TIE BEAM 50 X 25 H.W. BATTEN AT 300 C/C 50MM THK FIBREGLASS INSULATION (32KG/M) SUPPORT ON CHICKEN WIRE MESH DOUBLE SIDE ALUM. FOIL (DUOFOIL NER2)
RUMAH MELAKA FRIM KEPONG, 52109 KUALA LUMPUR, MALAYSIA.
WASH HAND BASIN TO MANUF'S DETAIL
P.V.C DOOR TO MANUF'S DETAIL
SECTION A-A
SECTION A-A
CEILING LEVEL
ALUMN. FRAME CASEMENT / SLIDING WINDOW C/W 6mm THK. TINTED GLASS TO MANUF'S DETAIL.
KKSB 3123 : LUKISAN KERJA SENI BINA (SEMESTER 5, SESI 2020/2021)
R.C BEAM TO ENGR'S DETAIL
LOWER ROOF LEVEL STEEL TRUSSES TO ENGR'S DETAIL
ALUMN FRAME HIGHT LEVEL TOP HUNG TO DETAIL
SARJANA MUDA SAINS SENIBINA DENGAN KEPUJIAN
200 X 25 THK. THREATED H.W. FASCIA BOARD R.C. ROOF BEAM TO ENGR'S DETAIL SD1 D2
GROUND FLOOR LEVEL
200 X 250MM GLAZED WALL TILES AT 1500MM HIGH AT ALL AROUND
ALUMN. FRAME CASEMENT / SLIDING WINDOW C/W 6mm THK. TINTED GLASS TO MANUF'S DETAIL. 114 THK BRICKWALL TO BE PLASTERED ON BOTHSIDES
GROUND LEVEL
GROUND LEVEL FLOOR CONSTRUCTION
11
-
SECTION A-A'
115 THK BRICKWALL WITH 20mm THK. CEMENT PLASTER & PAINTED ON BOTHSIDES
GROUND FLOOR LEVEL
M.S FRAME SOLID TIMBER DOOR
R.C. FOOTING, RC GROUND BEAM SLAB TO ENGR'S DETAIL. 50MM THICK SAND SCREED. 150MM THICK HARDCORE. FLOOR FINISH (FOLLOW TO MATERIAL SPEC)
SCALE 1 : 100
12
SECTION B-B
SECTION B-B
BATHROOM 2
BATHROOM 1
PROGRAM SENI BINA, FAKULTI KEJURUTERAAN DAN ALAM BINA, UNIVERSITI KEBANGSAAN MALAYSIA (UKM)
BATROOM DETAILS SCALE 1 : 25
1 NO 1892 LITER (500 GAL.)HDPE WATER STORAGE TANK ON 20 MM THK WATERPROOF PLYWOOD BOARD
32 MM DIA UPVC PIPE
25 MM DIA UPVC PIPE
100 MM DIA UPVC VENT PIPE 25 MM HDPE PN 10 BEAM LEVEL
BEAM LEVEL
15 MM DIA UPVC PIPE
25 MM HDPE PN 10 BASIN
BASIN
BASIN
WC
WC
TAP
BASIN
GROUND FLOOR LEVEL
GROUND FLOOR LEVEL
TAP
GT
GROUND LEVEL
GROUND LEVEL STOPCOCK & WATER METER 20 MM DIA LOCKABLE VALVE 32 MM DIA HDPE PN 10 FROM JBA MAIN PIPE
SANITARY SERVICE DIAGRAMATIC LAYOUT SCALE : NTS
14
WATER SUPPLY DIAGRAMMATIC LAYOUT SCALE : NTS
BASIN
SHOWER TAP
WC GT
13
BASIN
SHOWER
FT
FT
FT
TAP
WC
freelance works
renovation drawing taman lagenda, cheras
NO FAIL / CAP PENDAFTARAN JABATAN :
17
92
21
8
17
94
3
CAP KELULUSAN / TANDATANGAN JABATAN KAWALAN BANGUNAN :
17
96
94
1
6
32
18
09
43
2
3 18
09
324 54
324
46
4
48
325
JAL
2
05
48
32
AN
55
325
3
7
46'
325
61
325 45
325
325 36
325 59 325 58 60
32
TAPAK BERKENAAN
324 71
32
00
324 62
KAWASAN TAPAK
LEB
LAG
AR
2
56
31
32
24
1 31
END
JAL
AN
A2
2
24
2 881
2
QIBL
AT
292°
1
KEY PLAN
QIBL
AT
LOCATION PLAN
2
292°
N.T.S
N.T.S
325
325
15
A
18
325
14
TAJUK CADANGAN :
84
325
19
B
26°
16
FALL
24.3
PEMILIK / PEMOHON :
325
" Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan lot/jiran bersebelahan akibat dari kerja-kerja pembinaan yang dijalankan. "
26°
325
20
25° 00' 10"
B
ARKITEK :
325 22
25°
26° FALL
00'
FALL
325
10"
21
24.3
84
FALL
26° FALL 26°
Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan bersebelahan akibat dari kerja-kerja pembinaan. Saya memperakui bahawa butir-butir di dalam lukisan ini adalah menurut Undang-Undang Kecil Bangunan Seragam Selangor 1986 dan saya bersetuju menerima tanggungjawab penuh yang sewajarnya.
A
7
LAG
AR
END
JAL
AN
A2
4
TAJUK LUKISAN :
KEY PLAN LOCATION PLAN SITE PLAN
325
28
325 2
LEB
24
325
05
AN
40'
325
JAL
325
23
31-2 Jalan Danau Lumayan, Bandar Tasik Permaisuri, Cheras, 56000 Kuala Lumpur Tel : 03-91723992/3993 Fax : 03-91723994 Email: arkitekadamhalim@gmail.com
QIBL
AT
292°
3
SITE PLAN SCALE 1 : 150
SKALA : AS SHOWN
TARIKH : 27/12/2021
DILUKIS : KYR
FAIL CAD : TAMAN LAGENDA MAS/BP-reno
DISEMAK : AH
NO. HELAIAN :
TAJUK LUKISAN :
AAH
2021
3.TLM
MPKj
Reno
1/3
SP - 01
Rev-1
NO FAIL / CAP PENDAFTARAN JABATAN :
A
B
A
F
E
D
C
B
A
F
E
C
F
E
C
1
EXIST. DOOR TO BE DEMOLISHED
2
2
NEW DOOR REFER TO SCHEDULE
3
1 NEW WINDOW REFER TO SCHEDULE
EXIST. WINDOW TO BE DEMOLISHED
2
26° FALL
1
A
A
A
CAP KELULUSAN / TANDATANGAN JABATAN KAWALAN BANGUNAN :
EXIST. ROOF TO BE DEMOLISHED
3
NEW EXTENDED ROOF
3
NEW 150MM BRICKWALL
4 B
B
EXIST. WALL TO BE DEMOLISHED
4 B
5
B
NEW 150MM BRICKWALL
NEW DOOR REFER TO SCHEDULE
6 7
NEW DOOR REFER TO SCHEDULE
6
EXIST. WALL TO BE DEMOLISHED
EXIST. DOOR TO BE DEMOLISHED
7
EXIST. DOOR TO BE DEMOLISHED
B
5
B
6 7
EXIST. WINDOW TO BE DEMOLISHED
EXIST. WINDOW TO BE DEMOLISHED
NEW WINDOW REFER TO SCHEDULE
EXIST. WALL TO BE DEMOLISHED
8
26° FALL
4 5
8
8 NEW 150MM BRICKWALL
NEW DOOR REFER TO SCHEDULE
9
EXIST. WINDOW TO BE DEMOLISHED
10
26° FALL
EXIST. WALL TO BE DEMOLISHED EXIST. DOOR TO BE DEMOLISHED
10
EXIST. WALL TO BE DEMOLISHED EXIST. ROOF TO BE DEMOLISHED
26° FALL
NEW DOOR REFER TO SCHEDULE
11
26° FALL
EXIST. WINDOW TO BE DEMOLISHED
13
NEW DOOR REFER TO SCHEDULE
NEW FLAT ROOF
26° FALL
26° FALL
12
EXIST. SLIDING DOOR TO BE DEMOLISHED
EXIST. R.C COLUMN TO BE DEMOLISED
13
TAJUK CADANGAN :
26° FALL
EXIST. WALL TO BE DEMOLISHED
NEW 150MM BRICKWALL
12
26° FALL
NEW DOOR REFER TO SCHEDULE
NEW DOOR REFER TO SCHEDULE
NEW 150MM BRICKWALL
NEW 685 x 2265 MM ELEC. BOX AND REFUSE CHAMBER
14
14
14
2
FIRST FLOOR PLAN
3
SCALE 1 : 100
12
10
8
7
3
1
F
BOUNDARY LINE
BOUNDARY LINE
14
SECOND FLOOR PLAN SCALE 1 : 100
BOUNDARY LINE
SCALE 1 : 100
E
C
B
A
BOUNDARY LINE
GROUND FLOOR PLAN
1
A
A
A
PEMILIK / PEMOHON : " Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan lot/jiran bersebelahan akibat dari kerja-kerja pembinaan yang dijalankan. "
ARKITEK : Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan bersebelahan akibat dari kerja-kerja pembinaan. Saya memperakui bahawa butir-butir di dalam lukisan ini adalah menurut Undang-Undang Kecil Bangunan Seragam Selangor 1986 dan saya bersetuju menerima tanggungjawab penuh yang sewajarnya.
26°
EXIST. 230MM PARTYWALL 26°
EXIST. 230MM PARTYWALL 26°
31-2 Jalan Danau Lumayan, Bandar Tasik Permaisuri, Cheras, 56000 Kuala Lumpur Tel : 03-91723992/3993 Fax : 03-91723994 Email: arkitekadamhalim@gmail.com
NEW 230MM PARTYWALL NEW EXTENDED ROOF
NEW R.C BEAM NEW 150MM BRICKWALL EXIST. WINDOW TO BE DEMOLISHED NEW DOOR REFER TO SCHEDULE NEW BALCONY SLAB NEW 150MM BRICKWALL
NEW ROOF GUTTER NEW 150MM BRICKWALL
NEW 150MM BRICKWALL NEW WINDOW REFER TO SCHEDULE
NEW 150MM BRICKWALL
EXIST. WINDOW TO BE DEMOLISHED
EXIST. DOOR TO BE DEMOLISHED
EXIST. WALL TO BE DEMOLISHED EXIST. ROOF TO BE DEMOLISHED
NEW R.C BEAM NEW R.C FLOOR SLAB
NEW R.C BEAM
TAJUK LUKISAN :
EXIST. R.C COLUMN TO BE DEMOLISHED
EXIST. DOOR TO BE DEMOLISHED
NEW 150MM BRICKWALL NEW DOOR REFER TO SCHEDULE
EXIST. WALL TO BE DEMOLISHED
EXIST. DOOR TO BE DEMOLISHED
COLOUR LEGEND NEW FOUNDATION TO ENGR'S DETAIL
1
SECTION A-A SCALE 1 : 100
GROUND FLOOR PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN SECTION A-A SECTION B-B
EXISTING COMPONENTS
2
SECTION B-B SCALE 1 : 100
NEW COMPONENTS DEMOLISHED COMPONENTS
SKALA : AS SHOWN
TARIKH : 27/12/2021
DILUKIS : KYR
FAIL CAD : TAMAN LAGENDA MAS/BP-reno
DISEMAK : AH
NO. HELAIAN :
TAJUK LUKISAN :
AAH
2021
3.TLM
MPKj
Reno
2/3
FP - 02
Rev-1
NO FAIL / CAP PENDAFTARAN JABATAN :
A
14
F
12
10
8
7
3
1
BOUNDARY LINE
A
BOUNDARY LINE
CAP KELULUSAN / TANDATANGAN JABATAN KAWALAN BANGUNAN :
26°
1
26°
EXIST. 230MM PARTYWALL 26°
NEW 230MM PARTYWALL
NEW EXTENDED ROOF NEW ROOF GUTTER
B
NEW 150MM BRICKWALL
EXIST. ROOF TO BE DEMOLISHED
NEW WINDOW REFER TO SCHEDULE NEW WINDOW REFER TO SCHEDULE
26° FALL
NEW 1200MM HEIGHT GLASS RAILING
EXIST. ROOF TO BE DEMOLISHED
NEW BALCONY SLAB
NEW WINDOW REFER TO SCHEDULE
EXIST. WALL TO BE DEMOLISHED EXIST. WINDOW TO BE DEMOLISHED
NEW 150MM BRICKWALL
NEW DOOR REFER TO SCHEDULE
EXIST. R.C COLUMN TO BE DEMOLISHED
26° FALL
3
SCALE 1 : 100 F
F
E
D
A
BOUNDARY LINE
E
BOUNDARY LINE
26° FALL
BOUNDARY LINE
A
26° FALL
SIDE ELEVATION
BOUNDARY LINE
B
NEW 150MM BRICKWALL
TAJUK CADANGAN :
NEW FLAT ROOF
EXIST. 230MM PARTYWALL
26° FALL NEW 230MM PARTYWALL
NEW EXTENDED ROOF
NEW ROOF GUTTER
NEW 150MM BRICKWALL NEW SLIDING DOOR REFER TO SCHEDULE NEW 1200MM HEIGHT GLASS RAILING
14
NEW TOP HUNG WINDOW REFER TO SCHEDULE
NEW TOP HUNG WINDOW REFER TO SCHEDULE
NEW 150MM BRICKWALL
NEW 150MM SLAB
EXIST. ROOF TO BE DEMOLISHED
NEW BALCONY SLAB
A
NEW 150MM BRICKWALL
4
NEW FOLDING DOOR REFER TO SCHEDULE
ROOF PLAN
NEW WINDOW REFER TO SCHEDULE
EXIST. ROOF TO BE DEMOLISHED
NEW 150MM BRICKWALL
PEMILIK / PEMOHON :
EXIST. WINDOW TO BE DEMOLISHED
EXIST. DOOR TO BE DEMOLISHED
NEW 150MM BRICKWALL
NEW DOOR REFER TO SCHEDULE
NEW STAIRCASE NEW DOOR REFER TO SCHEDULE
SCALE 1 : 100
" Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan lot/jiran bersebelahan akibat dari kerja-kerja pembinaan yang dijalankan. "
EXIST. DOOR TO BE DEMOLISHED
EXIST. STAIRCASE TO BE DEMOLISHED
4
FRONT ELEVATION SCALE 1 : 100
5
REAR ELEVATION SCALE 1 : 100
ARKITEK : Saya mengaku untuk bertanggungjawab terhadap sebarang kerosakkan bangunan bersebelahan akibat dari kerja-kerja pembinaan. Saya memperakui bahawa butir-butir di dalam lukisan ini adalah menurut Undang-Undang Kecil Bangunan Seragam Selangor 1986 dan saya bersetuju menerima tanggungjawab penuh yang sewajarnya.
31-2 Jalan Danau Lumayan, Bandar Tasik Permaisuri, Cheras, 56000 Kuala Lumpur Tel : 03-91723992/3993 Fax : 03-91723994 Email: arkitekadamhalim@gmail.com
1
DOOR SCHEDULE SCALE : NTS
TAJUK LUKISAN :
COLOUR LEGEND
ROOF PLAN SIDE ELEVATION FRONT ELEVATION REAR ELEVATION DOOR & WINDOW SCHEDULE DIAGRAMMATIC OF SANITARY LAYOUT (EXIST.)
EXISTING COMPONENTS
1
DIAGRAMMATIC OF SANITARY LAYOUT SCALE : NTS
NEW COMPONENTS
2
WINDOW SCHEDULE SCALE : NTS
DEMOLISHED COMPONENTS
SKALA : AS SHOWN
TARIKH : 27/12/2021
DILUKIS : KYR
FAIL CAD : TAMAN LAGENDA MAS/BP-reno
DISEMAK : AH
NO. HELAIAN :
TAJUK LUKISAN :
AAH
2021
3.TLM
MPKj
Reno
3/3
FP - 03
Rev-1
personal works