ANNEX
Response of the Competent Authorities of the United Arab Emirates to the recommendations of Mission Report ref. DG(SANCO)/2011-6205MR carried out from 25 January to 02 February 2011 in order to evaluate the animal health controls in place on camel milk based products intended for export to the European Union N°.
Recommendation
Action Proposed by the Competent Authority
1
The CCA should consider to adopt the necessary missing legislation regarding animal health without delay. In particular, they should consider the accelerated adoption of the animal health law and the adoption of specific and detailed rules for disease controls, applicable in the whole territory, in line with the requirements of Article 8, Paragraph 1, 1, a) of Directive 2002/99/EC.
1. Federal Law of Animal Health under review by the Ministry of Justice and the MOEW will coordinate with the Ministry of Justice to speed the issuance of the law 2. the ministry will adopt specific rules ( at federal level ) for control epidemic diseases in coordination with the concerned competent authorities (CA) especially against FMD , brucella ,T.B , in line with the requirements of Article 8, Paragraph 1, 1, a) of Directive 2002/99/EC. Completion/closing date: 31- December 2011
2
The CCA should consider to improve the organization and functioning of their services at different levels, in line with Article 8, Paragraph 1, 1, b) of Directive 2002/99/EC. This should in particular cover an improvement of the coordination between the different levels of the CA and increased transparency.
1. Formulation of a team in ministry of environment and water (CCA) to carry out the following; • distribute the responsibilities between ministry of environment and water( CCA) and local authorities (CA) concerning animal health issues • coordination of activities between ministry of environment and water( CCA) and local authorities (CA) concerning animal health issues • set up a comprehensive maps to show the location of federal and local veterinary clinics completion date for formulation the team: completed completion date for carrying out the tasks of the team: April - 2012
Action plan – received on 16 May 2011
Page: 1