5 minute read

OUTDOOR ATHLETIC FACILITIES LIST

Next Article
DESIGN APPROACH

DESIGN APPROACH

Additional Projects

Fanning Howey’s experience with outdoor athletic facilities for school districts spans more than six decades. See the following pages for a list of additional projects.

Advertisement

Outdoor Athletic Facilities List

Warren High School

Warren Local Schools, Vincent, OH • $27,751,357 – Completed in 2021 • New High School with and upgrade to an existing stadium. Provided planning for artifi cial turf, bleacher relocation, and other site related issues.

Southmont Sports Complex Upgrade

Southmont Schools, New Market, IN • $1,187,679 – Completed in 2017 • Upgrade of facilities include a new turf fi eld that supports football, soccer, band practice, youth football and youth soccer. A paved area off ers room for tailgating during games, and a miniature turf fi eld gives younger children a place to play during sporting events. Other improvements to the sports complex include new practice fi elds, new lighting and a new central support/locker building.

Kenston Football Stadium Upgrade

Kenston Local Schools, Kenston, OH • $4,433,581 – Completed in 2016 • New grandstand with 2,946 seats and refurbishment of 1,179 visitor seats.

Replaced all lighting, resurfaced track, and improved walkway. Project also included a new concession stand and renovations to the transportation center building.

Green Level High School

Wake County Public School System, Cary, NC • $62,000,000 – Completed in 2017 • New natural grass football stadium with grandstand seating for 2500.

Also includes tennis courts, softball and baseball fi elds, and soccer fi elds.

Belleville High School

Van Buren Public Schools, Belleville, MI • $46,875,883 – Completed in 2012 • Project included a renovation of the football fi eld with a new 2,000-seat grandstand including a pressbox and locker rooms. Track was resurfaced with polyurethane and fi eld event areas were replaced. Also included new varsity and JV baseball and softball fi elds with combined pressbox/concession building, 8 new tennis courts, and a practice soccer fi eld.

South Gallia High School and River Valley High School Stadiums

Gallia County Local Schools, Gallipolis, OH • $2,650,156 – Completed in 2012 • New natural-turf football fi eld with 8-lane track, stadium seating for 2000 with pressbox, and baseball and softball fi elds.

Allen East Sports Complex

Allen East Local Schools, Harrod, OH • $2,067,411 – Completed in 2007 • The 1,966-seat stadium features a natural grass fi eld with a full irrigation and underdrain system and an 8-lane all-weather track. Other amenities include sports lighting systems, a sound system, an athletic building housing team locker rooms, public toilets, concessions and storage.

Project also included a small bus garage.

Green High School Stadium

Green Local Schools, Green, OH • $2,305,035 – Completed in 2004 • This new stadium includes a football fi eld with an 8-lane synthetic track and track events, a 10,000 SF fi eld house including home and visitor locker rooms, public toilets, concession, and a ticket window.

Also included are new aluminum home bleachers for 3,400 seats with a 700 SF pressbox and new visitor bleachers for 1,600. In addition, 2 new 1,000 SF storage buildings for equipment storage and new paved

ADA handicap parking/access.

Baseball diamond irrigation, fencing and dugouts.

Hilliard Third High School

Hilliard City Schools, Columbus, OH • $42,224,000 Project - Completed In 2012 • New HS with complete site development including stadium with locker rooms in a 11,200 SF facility, as well as 2 additional outbuildings totaling 1,800 SF.

Carterville High School

Carterville Community USD #5, Carterville, IL • $35,072,665 Project - Seating

Capacity of 2,475 - Completed In 2011 • New latex surfaced track and synthetic turf fi eld, new 475-seat grandstand expandable to 2,000 seats

Riverside Intermediate School

Hamilton Southeastern Schools, Fishers, IN • $20,539,141 Project -

Completed In 2009 • New latex-surfaced running track; new practice football fi eld; 1 varsity softball fi eld with 1 JV softball fi eld; 1 new varsity baseball fi eld; 6 new tennis courts

Outdoor Activity Field Development

Eaton Community Schools, Eaton, OH • $1,000,000 Project - Completed In 2008 • The scope of work includes developing an overall master plan showing all the fi elds and associated developments including bleachers, concession stands, and restroom facilities.

Carmel Middle School

Carmel Clay Schools, Carmel, IN • $22,000,000 Project -

Completed In 2007 • Renovated football bleachers and new concession building, new 300-seat baseball grandstands and renovated fi eld, new 100-seat softball grandstand and 2 fi elds, numerous portable bleachers for all sports venues

Murray Field Sports Lighting

Carmel Clay Schools, Carmel, IN • $195,000 Project - Completed In 2007 • New sports lighting at soccer stadium

Tennis Center Support Building

Carmel Clay Schools, Carmel, IN • $632,047 Project - Completed In 2007 • New support building with a 430-square- foot locker room, three restrooms, a 540 -square-foot team room, an offi ce and a 370-square-foot mechanical/storage room

Zionsville West Middle School

Zionsville Community Schools, Zionsville, IN • $35,184,252 Project -

Completed In 2007 • 12 new tennis courts; baseball and softball fi elds with grandstand seating and combined seating of approximately 500; two new practice football/soccer fi elds and practice baseball and softball fi elds; cross country course

Fishers High School

Hamilton Southeastern Schools, Fishers, IN • $66,521,944 Project -

Completed In 2006 • 12 new tennis courts and portable bleachers; new latex surfaced running track; four practice football fi elds; varsity soccer fi eld with grandstand seating capacity of 300+; three practice soccer fi elds; varsity and

JV baseball fi elds with grandstand seating for 350 and 200 respectively; varsity and JV softball fi elds with grandstand seating for 300 and 200 respectively

Holder Field Improvements

Perry Township, MSD of, Indianapolis, IN • $165,403 Project - Completed In 2005 • New varsity soccer fi eld and grandstand with seating capacity of 350

Creekside Middle School

Carmel Clay Schools, Carmel, IN • $29,186,080 Project -

Completed In 2004 • 8 new tennis courts, 9 soccer fi elds, practice football fi eld, new baseball fi eld and 300-seat grandstand, new softball fi eld and 1500-seat grandstand, numerous portable bleachers for all sports venues

Lakeland High School

Huron Valley Schools, Highland, MI • $10,864,071 Project - Completed In 2004 • New baseball fi eld, three new softball fi elds and four new tennis courts

St. Vincent’s Field

Marian University, Indianapolis, IN • $1,400,000 Project - Completed In 2008 • Latex surfaced running track; 8 tennis courts, softball fi eld and baseball fi eld with concessions and locker rooms

St. Theodore Guerin Catholic High School Track

Diocese of Lafayette-In-Indiana, Lafayette, IN • $502,883 Project - Completed In 2008 • New latex-surfaced running track; 1 practice football fi eld; 1 varsity soccer fi eld with grandstand seating capacity of 450+; 1 practice soccer fi eld

Clay Middle School

Carmel Clay Schools, Carmel, IN • $27,759,520 Project -

Completed In 2007 • 8 new tennis courts, renovated football bleachers and new concession bldg, new 300-seat baseball grandstand, new 1500seat softball grandstand, numerous portable bleachers for all sports venues

OHIO 128 West Market St Celina, OH 45822 419.586.7771

4930 Bradenton Ave Suite 200 Dublin, Ohio 43017 614.764.4661

INDIANA 350 East New York St Suite 300 Indianapolis, IN 46204 317.848.0966

fh ai.com

This article is from: