Portfolio 2024 Arch Planning Interior

Page 1

PORTFOLIO LEXIE WEI FAN

MASTER OF ARCHITECTURE 2018-2020 ACADEMIC+PRACTICAL WORKS

UNIVERSITY OF MELBOURNE


Education 2019.3 - 2020.12

2013 - 2018

E: lexiefn94@gmail.com Ph: 0450934126

Master of Architecture University of Melbourne , First Class Honours Bachelor of Architecture Qingdao University of Technology , WAM 86.34

Reference List Graham Betts

Software Skills Documents in Revit, ArchiCAD and AutoCAD environment

Rene Ling

Design and modelling with Rhino and Sketchup Render and animation with Lumion, Enscape,Twinmotion and Vray

Lexie Wei Fan

Dorelia Glasgow

Directors, Registered Architect - Edmiston Jones, M:+61 0408 696 327, E: grahamb@aej.com.au Senior Designer - Edmiston Jones, M:+61 0400 717 700, E: renel@aej.com.au Practice Manager - Edmiston Jones, M:+61 0431 053 240, E: doreliag@aej.com.au

Other skills: Knowledge of Grasshopper, Plant3D, Naviswork and Animation

Relevant Experience 2021.4 - 2023.12 5 months

Architectural Graduate/Assistant Edmiston Jones, NSW • Exposed to both Architecture and Interior work • Assisted registered architect to accomplish drawings package • Produced DD1, DD2, DA, CD drawings package Project • Learning Center Development, Illawarra • Classrooms Development, Illawarra • Multipurpose Hall Renovation, Illawarra • Regional University Planning, Illawarra • Office fit-out, Illawarra/Adelaide • Preschool Alt & Adds, Illawarra • Health Facility fit-out, Illawarra

2017 - 2018 5 months

Designer WAY Studio,Beijing • A Creative office with MAD,UNStudio,BIG background • International work flows, Multi-cultural office culture • Quick and Pressure work envrionment Project • MS - II Restaurant (Completed). Phases:Schematic Design, Design Development and Construction Documents https://www.gooood.cn/ms-ii-restaurant-design-china-by-way-studio.htm • Langfang Silk Road International Cultural Exchanger Center (Completed) Phases: Schematic Design, Design Development • Xihai Siheyuan Private Residence Renovation Design Phases: Concept Design,Schematic design

2015 6 months

DAM Lab Assistant DAM Lab Digital Architecture • Managing Laser Cutting, CNC and 3D print machines. • Buiding digital models with Rhino and Grasshopper

Personal Attributes Adaptability

• can work under high pressure • can communicate and cooperate with teams from different backgrounds

Proactive

• strong time manage and self-control • can work independently without supervision • can achieve quality design package before ddl

Detailed

• have eyes on details • always double check files before being exchanged

Keen to learn

•Keen interest in the property design development as well as market process •A fast learner and ‘CAN DO‘ attitude

Awards 2018

• Honor Graduate

2016

• 15th Challenge Cup - Third class prize • DAIA(Design and Art International Awards) - Gold Medal

2015

• Outstanding Students scholarship • National University Innovation Training Project

2013

• Technological Innovation scholarships

Other Experience 2022 & 2023 2019 - 2020 2017

Sydney Open, Volunteer Graypuksand, BVN Architects, The university of Sydney Graphic Designer , Volunteer IOT Club, The university of Melbourne Beijing Design Week, Volunteer World Architecture Magazine


Index PART A: DRAFTING WORK SAMPLES

01

02

03

Architecture & Landscaping

Planning

Interior

• University Estate Strategy • School Master Plan

• Restaurant • Joinery Design • Women Recovery Centre • Health Consulting Facility • Office

• High-rise Building • Shellharbour Learning Centre • Nowra Classrooms Development • Preschool Alts&Adds • Heritage Courtyard Renovation

MASTER THESIS & OTHER ACADEMIC WORKS

04

Thesis: A manual for retrofitting the 'enacted space' 2020 MSD Thesis TOP 10 Heritage enovation

05

Zero Carbon Data Loop Design with client NEXT DC Engineering |Environmental Sustainable Design

06

Abstract Revolution NGV_Contemporary Contemporary Art | Form Iterations

07

Index: the partial figures and residual events always already home Housing Home and Contents Philosophy | Sense| Process


Drafting Work Samples 01 Architecture / Landscaping


High-rise Building 2018, Team wrok: Wei Fan, Xiaohan Qi, Haochuan Guo Software: Rhino / AutoCAD / ArchiCAD Applied Architecture Technology Course Work at The University of Melbourne

The building site on the corner of the La Trobe St and the Exhibition St. Two main entrances are designed on each side to achieve a easy accessibility. Podium volumn is cut inward at its ground floor level for a welcoming posture. People will in a sunlit atrium when entering through the either entrance, which is next to the core area and is surounded by floor plates of the podium, enabling people to have a feeling of openness and visual interaction with other floor levels. The site is overwhelmed by high-rise buildings on the south side, but have open perspective on the north side, which help us decide to put the main aesthetic feature, the “crack”, along the La Trobe Street to make it be more easily recognized. To maximize the Net Lettable Area and afficienby, the tower is made to be in a square plan. To obtain some senses of identity, two different kinds of glasses are used, creating a visual effect that corner of the tower is cut to be seperate from the main volumn.


B 6.000

B

B 6.000

B

B 6.000

B

B 6.000

B

B

B 6.000

4.800 S-02

S-02

4.800

13.500

4.800

9.100

B

S-02

S-02

B

4.800

19

18

20

17

21R x 0.179 20G x 0.250

21R x 0.179 20G x 0.250

16

16

19

21

15

15

18

20

14

14

6.000

6.350

DOWN

13

13

21R x 0.179 20G x 0.250

21.000

8

7

6

11

9

12

12

17

1

UP

16

21

2

15

DOWN

3

14

6.000

4

13

B

B 6.000

B

13.500

6.000

B

5 12

B

9

DOWN

B

8

21

20

19

18

17

B

UP

7

4 3 2 1

6

5

4 3 2 1

UP

11

5

B

10

9

8

7

6

11

10

10

4.800

6.000

B

4.800

5.050

S-02

West Elevation

East Elevation

B 6.000

4.800

S-02

B 6.000

B West Elevation

4.800

S-02

B 9.000

B

6.000

6.000

6.000

6.000

B 9.000

B

B

B

North Elevation

12.000 1

12.000 1

North Elevation

6.000 1

6.000 1

6.000

6.000

1

1

6.000

6.000

1

1

6.000 1

6.000 1

9.000 1

9.000 1

1

1

South Elevation

0.

1

1

1

1

South Elevation

Ground Floor

1:500

1.

Story

B 6.000

B

1

B 6.000

B

B 6.000

B

01

GROUND FLOOR

02

1:500

B 4.800

S-02

4.800

4.800

4.800

4.800

4.800

13.500

21.000 9.100

2.800

East Elevation

9.100

B

S-02

S-02

S-02

B 6.000 8

7

10

9

6

21R x 0.179 20G x 0.250

21R x 0.179 20G x 0.250

6.000

21R x 0.179 20G x 0.250

11

19

18

17

21

15

15

16

16

20

20

14

14

6.000

6.350

6.000

4.800

DOWN

13

13

21R x 0.179 20G x 0.250

21.000

8

7

6

11

10

12

12

19

16

18

15

16

17

14

15

21

13

14

DOWN

DOWN

UP

21

20

19

6.000

12

13

5 4 3 2 1 18

13.500

B

6.000

6.000

B

6.000

B 6.000

B

5 4 3 2 1

UP

17

B

9

DOWN

B

8

21

20

19

18

17

B

UP

7

4 3 2 1

6

5

4 3 2 1

UP

11

5

B

10

9

8

7

6

11

10

9

4.800

6.000

B

4.800

4.800

5.050

B

West Elevation

East Elevation

6.000

GSPublisherVersion 0.23.100.100

6.000

4.800

S-02

B

12

B 9.000

B

6.000

B

6.000

6.000

6.000

6.000

6.000

6.000

6.000

B 9.000

West Elevation

4.800

S-02

B

6.000

S-02

6.000

6.000

4.800 S-02

6.000

B

B

B 12.000 1

12.000 1

6.000 1

6.000 1

6.000 1

South Elevation

6.000 1

6.000 1

6.000 1

6.000 1

6.000 1

9.000 1

9.000 1

1

1

TYPICAL LOW-RISE STRUCTURAL FLOOR PLAN 1:500

B 6.000

B

1

1

1

1

South Elevation

1

1

1

1

1

1

1

1



Participate in drafting DA package including site analysis, site plan, floor plans, elevations, sections, 3D rendering

Learning Centre Development 2021, Team wrok (3) at Edmiston Jones, NSW 2320 sqm Software: Revit / AutoCAD / Enscape Phase: Development Approval


Participate in drafting CC package including floor plans, elevations, sections, detailed plans and elevations, window&door schedule, ramp details EXISTING TILED ROOF

A

A

BOX GUTTER

EX.RL 47.54

EQ GF-EXISTING ADMIN CEILING 44.88 m

750

750 520 750

750

1330

BOX GUTTER

RL 46.61

880

RL 46.61

ROOF PITCH 11°

EQ

1025

1025

1025

CFC-1 CFC-2

EQ

CFC-1

CFC-2

B

970

632

1500

740

1200

740

CFC-1 EX. FB-1

EX. FB-1

CFC-2

RWH-1 DP

EX. FB-1

1025

1025

2

1025

660

D

DP CFC-1

1025

EXISTING TILED ROOF BEYOND

C

CFC-2

CFC-1

GF-EXISTING ADMIN CEILING 44.88 m

RWH-1 DP

HANDRAIL BEYOND

E

C

EX FB-1

GF-ADMIN/AMENITIES FLOOR 42180

EXISTING GROUND LINE

PROPOSED GROUND LINE

PROPOSED GROUND LINE

2

LIBRARY & SENSORY WEST ELEVATION

EX. WINDOW

EX. WINDOW

3 08

LIBRARY & SENSORY EAST ELEVATION 1 : 100

1200

7630

STAIRS

A

600

300 300 300

300

1

3

2

6

5

STEEL STAIRS

RL 43.11

TGSI

UP

4

3

2

1

3

TGSI

TGSI

UP

HR - 1

HR - 1

50mm MIN CLEARANCE FROM FINISH OF EXTERNAL WALL AND HANDRAIL

staff room

store 02

1 04

GLA 6-7 STAIR - PLAN 1 : 50

EQ

EQ

EQ

RL 43.11

660

RL 42.18

BH-1

GF-EXISTING ADMIN CEILING 44.88 m

RWH-1

sensory

DP

EQ

3

BH-1

RWH-1

office 02

EQ

EQ

300

660 RL 42.18

88

4430

BH-1

50mm MIN CLEARANCE FROM FINISH OF EXTERNAL B A WALL AND HANDRAIL

EQ

2

EXISTING TILED ROOF BEYOND

TGSI

HR - 1

1660

TGSI

STEEL STAIRS

sensory

2700

2100

library

1828 EQ

11

D

600 600

C

store 01

access wc

1

HANDRAIL

600

TGSI

4

RL 42.46

50

GF-ADMIN/AMENITIES FLOOR 42180

meeting

2500

office 03

300

ROOF PITCH 11°

ROOF PITCH 11°

ROOF PITCH 2°

GF-EXISTING ADMIN CEILING 44.88 m

3

EXISTING TILED ROOF

HR - 1

300

11

RL 46.61

1660

RL 46.61

3 09

BOX GUTTER

HR - 1

50

1 09

EX.RL 47.54

600

600 TGSI

TGSI

BOX GUTTER

EXISTING TILED ROOF

8017 EQ

300 300

HANDRAIL

1 : 100

STAIRS

EQ EQ EQ EQ EQ EQ

EQ EQ EQ EQ

A

LIBRARY & SENSORY SOUTH ELEVATION

1800

50

1 : 100

EXISTING GROUND LINE PROPOSED GROUND LINE

GLAZED FILM SAFETY STRIP (GFSS)

NEW DOOR

NEW DOOR IN EX. FACE BRICKWORK. MAKE GOOD EX. BRICKWORK

50

1 08

NEW DOOR GLAZED FILM SAFETY STRIP (GFSS)

900

EXISTING GROUND LINE

CONTRACTOR TO COORDINATE EXISTING GROUND LINE WITH NEW DOOR OPENING

50

NEW DOOR

300

EX. WINDOW

930 STAIRS 900 HANDRAILS

GF-ADMIN/AMENITIES FLOOR 42180

Regional School Development

998

EQ

RWH-1 G

2100

A

2700

RWH-1 DP CFC-1

445

660

760

CFC-1

CFC-1

EX FB-1

1025

ROOF PITCH 11°

CFC-1 EX FB-1

1

EXISTING TILED ROOF

660

660 845

library

2

HANDRAIL BEYOND

DP

GLA 6-7 STAIR - ELEVATION 1 : 50

GF-ADMIN/AMENITIES FLOOR 42180

NEW CAVITY SLIDER DOOR

EXISTING GROUND LINE

GLAZED FILM SAFETY STRIP (GFSS)

EXISTING GROUND LINE

PROPOSED GROUND LINE

NEW DOOR

EX. WINDOW

EXISTING GROUND LINE

1828 EQ

PROPOSED GROUND LINE

EQ 300

300 300

HR - 1

3

HR - 1

4

6

5

4

3

2

EQ

EQ

EQ

EQ

EQ

300

1 : 100 RL 42.18

TGSI

EQ

HR - 1

HR - 1

EQ EQ EQ EQ EQ EQ

300

50mm MIN CLEARANCE FROM FINISH OF EXTERNAL WALL AND HANDRAIL

RL 43.11

1800 STAIRS

300

300

RL 42.18

RL 42.46

GF-GLA'S 43110

GLA 6-7 STAIR - SECTION 1 : 50

GF-ADMIN/AMENITIES FLOOR 42180

3

88

3 11

42460

RL 42.18

6 11

STEEL STAIRS

GLA 6-7 STAIR - PLAN

2

GLA 6-7 STAIR - ELEVATION 1 : 50

6738 EX. DP

EQ

LANDING

2170

50

900

50 50 1711 RAMP

TGSI

ABBREVIATION LEGEND

2345

6

EQ

11

EQ

EQ

6688 LANDING

600

USE FIGURED DIMENSIONS IN PREFERENCE TO SCALE. VERIFY ALL DIMENSIONS ON SITE BEFORE CONSTRUCTION COMMENCES.

2400 STAIRS

2345 EQ

PROJECT:

DRAWING TITLE:

4 Wilford Street, Corrimal

SCALE: @ A1

DRAWN:

1 : 50

LF

900

50

900

50

EQ EQ

ASPECT SCHOOL

WOLLONGONG T 02 4226 3600

NOWRA

BATEMANS BAY

T 02 4421 6822

T 02 4472 7388

W www.aej.com.au

E aej@aej.com.au

A

GF-ADMIN/AMENITIES FLOOR 42180

F

1025

A

A

A

4100

ABOVE 1 OFF

EQ

700

TL02

GR

TH

TH

TL02

100

700

TH

.

1 : 50

8 07

PD SD

1425

2100

1000 F E

CEILING HEIGHT 44280

900

1425

SD

1000

F.AMB - INTERIOR ELEVATION 1

350

350

SENSORY / LIBRARY

EQ

F 1 OFF

. D1

F

F

F

F

G 1 OFF

GLAZED FILM SAFETY STRIP (GFSS). 75MM WIDTH LOCATED BETWEEN 900-1000MM IN ACCORDANCE WITH AS 1428.1. TYPICAL

1 OFF

F

F

GF-ADMIN/AMENITIES FLOOR 42180

GLAZED FILM SAFETY STRIP (GFSS)

S 1 OFF

GLAZED FILM SAFETY STRIP (GFSS)

2100

GR

TL-02

240

GF-ADMIN/AMENITIES FLOOR 42180

STANDARD TH PROJECTION FOR WC

PROJECTION FOR WC

7 07

1 OFF

EQ

900 PD

50

GR

800 BASIN

50

100

GR

GR

240 . TH STANDARD

C

1 OFF

487 MIN

60 440 GR

50

GR

200 TH

GR TH

. D12

1 OFF

400 GR

700 TH

440 GR TL-02

700 TH

TL-02

445

60

2100 SB

1 : 50

B

1 OFF

2850

EQ

2100

3300 1500 1850

1500

1 : 50

PB-02

50

A

1025

1000

A

1500

1025

2100

A

ABOVE 1 OFF

1500

1025

M.AMB - INTERIOR ELEVATION 4

PB-02

GR

1924

800

OFFICE BATHROOMS

900 MIRROR

GR

ISSUE:

600

A

A D

775

600

775

3300

775

600

775

GR

DATE:

06.12.21

LQ DWG No:

11

4100

850

400 700 GR

100

1 : 50

200 TH

CHECKED:

PROJECT No:

21-0067

20/05/2022 10:39:00 AM

3100

TL-02

6 07

M.AMB - INTERIOR ELEVATION 3

400 GR

STAIR & RAMP DETAILS

Nominated Architect Mark Jones Reg. No. 4474

WINDOW CONTACTOR TO PRICE MANUAL OPERATOR FOR HIGH LEVEL AWNING WINDOWS D,F. WINDOW WINDER TO BE LOCATED ON SITE 1000mm ABOVE FLOOR LEVEL.

800

900 PD

100

800 BASIN

PB-02

ASPECT SCHOOL

9 07

F.AMB - INTERIOR ELEVATION 2 1 : 50

10 07

F.AMB - INTERIOR ELEVATION 3 1 : 50

F.AMB - INTERIOR ELEVATION 4

2200

1 : 50

EQ

3300 EQ

A

EQ A

4400

EQ A

EQ

EQ

A

A

EQ A

EQ A

EQ A

11 07

ACCESS WC - INTERIOR ELEVATION 1 1 : 50

12 07

13 07

ACCESS WC - INTERIOR ELEVATION 2 1 : 50

A

1 : 50

WW

1100

WW

. D2

14 07

GF-ADMIN/AMENITIES FLOOR 42180 I 1 OFF

. D3

1 OFF

600 NEW DOOR

F GLAZED FILM SAFETY STRIP (GFSS)

J 1 OFF

NEW DOOR

900

900 F

GLAZED FILM SAFETY STRIP (GFSS)

600

2700 2100

2100

2700

2400

2100

F

1 OFF

1000

WW

1000 1 OFF

900

1 OFF

1800

A

M

600

600

A

L 1 OFF

WINDOW CONTACTOR TO PRICE MANUAL OPERATOR FOR HIGH LEVEL AWNING WINDOWS K,L,M. WINDOW WINDER TO BE LOCATED ON SITE 1000mm ABOVE FLOOR LEVEL.

2700 TL-02

F

H

300 MAX TH

ACCESS WC - INTERIOR ELEVATION 3

R 1 OFF

GF-ADMIN/AMENITIES FLOOR 42180

GF-GLA'S 43110

P 1 OFF

Q MIRROR 1 OFF

ACCESS WC - INTERIOR ELEVATION 4 1 : 50

MULTI PURPOSE SPACE

800

PB-02

CEILING HEIGHT 44880

PB-02

800

PB-02

A

50

1000

900 PD

800 BASIN

GR

TL-02

450-460

GR

800 PB-02

PD

A

300 MIN. 50 MAX.

100

700 TH

TH

800

800 GR

800 BASIN

900 MIRROR

2400 100

GR

TL-02

A

° 45.00

SB

437

A

500 SD PD

EQ

44580

PB-02

A

. IN 0M 70 GR 150 TH

K 1 OFF

4100 EQ EQ CEILING HEIGHT

EQ

EQ

2700

PB-02

M

TL-02

EQ

100

PB-02

PB-02

EQ

600

4100 EQ

1500

600

A

2 04

1 : 50

440

15 07

MULTIPURPOSE BATHROOM - INTERIOR ELEVATION 1 1 : 50

1 : 50

450-460

17 07

30

2700 GF-BIN STORE 42600

O 1 OFF TL-02

300 MIN GR

100

800 GR

700 TH

N 1 OFF TL-02

100

700 TH

MULTIPURPOSE BATHROOM - INTERIOR ELEVATION 2

TH

800 BASIN

GR

300 MAX TH

16 07

1680

2700

GR

GR

800 GR

150 TH TH

100

TL-02

450-460

MULTIPURPOSE BATHROOM

50

GF-ADMIN/AMENITIES FLOOR 42180

STORE SPACE

MULTIPURPOSE BATHROOM - INTERIOR ELEVATION 3 1 : 50

18 07

MULTIPURPOSE BATHROOM - INTERIOR ELEVATION 4 1 : 50

LEGEND A SD F WW

CLIENT

COPYRIGHT OF EDMISTON JONES PTY LTD (ACN 003 163 451) © 2021. Nominated Architect Mark Jones Reg. No. 4474 THIS DRAWING ALWAYS REMAINS THE COPYRIGHT OF EDMISTON JONES AND SHALL NOT BE USED OTHER THAN FOR THE PROJECT INTENDED WITHOUT WRITTEN AUTHORITY. LEVELS SHOWN ON PLAN ARE APPROXIMATE ONLY AND SHALL BE

New England Constructions ION

50 300 MIN GR

45.00 ° EMERGENCY CALL BUTTON

TL-02

800 GR

800 BASIN

SB

100

800

PD

900 MIRROR

TH GR

GR

2700

SD

300 MAX TH

17

TL-01

M

16

IN 0M GR

07

2480

15 70

access wc 18 02 FW-1

WOLLONGONG T 02 4226 3600

NOWRA

W www.aej.com.au

E aej@aej.co

T 02 4421 68

Nominated Architect Mark Jones Reg.

220 GR

A PB-02

800 BASIN

300 MAX TH

5 07

1 : 50

M

PROJECT:

41800

CEILING HEIGHT 44280

2100

GR

TH

M.AMB - INTERIOR ELEVATION 2

PB-02

A

GF-ADMIN/AMENITIES FLOOR 42180

REVISION

2100

100 800 BASIN

100

900 MIRROR

400

50

GR

TL-02

100

14

100

500 MIN PD

1 : 50

4 07

ISSUE:

1 : 50

400 GR

37

1500

M.AMB - INTERIOR ELEVATION 1

04

New England Constructions

RECEPTION WALKWAY AND STAIR- SECTION

PB-02

GF-ADMIN/AMENITIES FLOOR 42180

GR

07 13 TH

PD SD

1 04

PB-02

50

FW-1

12

50

TL-02

21-0067

300

TGSI

1850

access wc TL-01 11

TH

50

GR

700

50

3 07

300 MIN

700

TH

50

06.12.21 DATE

PD

450-460

MIN. CLEARANCE

MIN. CLEARANCE MIN. CLEARANCE

TH

240

2811 850

50

9

425 TL-02

DATE:

06.12.21

LQ DWG No:

CLIENT

EQ

New England Constructions

STANDARD TH PROJECTION FOR WC

8

FW-1

SB

260

.

MIN. CLEARANCE

PD SD

800 GR

TH

700

f.amb

07

700 TH60

50

900 50

MIN. CLEARANCE

m.amb6

GR

TL-01

900 MIN. CLEARANCE

900

4

07

SD

7 10

MIN. CLEARANCE

FW-1 5

CHECKED:

LF

PROJECT No:

06.12.21 DATE

CLIENT

A ISSUE FOR CONSTRUCTION CERTIFICATE PB-02 REV. DESCRIPTION

M

T 02 4472 7388

1275

EQ

6

380

1 : 50

BIM 360://21-0067 Aspect School/21-0067 Aspect School.rvt

221 TH

TL-01

PD SD

487 MIN

900 MIN. CLEARANCE

400 GR

3

BATEMANS BAY

T 02 4421 6822 E aej@aej.com.au

BIM 360://21-0067 Aspect School/21-0067 Aspect School.rvt

RECEPTION WALKWAY AND STAIR- PLAN

900

PD SD

DRAWN:

As indicated

NOWRA

W www.aej.com.au

4 Wilford Street, Corrimal

COPYRIGHT OF EDMISTON JONES PTY LTD (ACN 003 163 451) © 2021. Nominated Architect Mark Jones Reg. No. 4474

PB-02

SCALE: @ A1

WOLLONGONG T 02 4226 3600 41800

20/05/2022 10:38:44 AM

A ISSUE FOR CONSTRUCTION CERTIFICATE REV. DESCRIPTION

6 11

USE FIGURED DIMENSIONS IN PREFERENCE TO SCALE.

GF-ADMIN/AMENITIES FLOOR 42180 42130

380 STAIRS

900

900 1 : 50

RL 41.80 TGSI

VERIFY ALL DIMENSIONS ON SITE BEFORE CONSTRUCTION COMMENCES.

1 : 50

4 Wilford Street, Corrimal

50 50

41800

RECEPTION WALKWAY AND STAIR- SECTION

RECEPTION WALKWAY AND STAIR - ELEVATION

RL 42.18

LEVELS SHOWN ON PLAN ARE APPROXIMATE ONLY AND SHALL BE VERIFIED ON SITE BEFORE CONSTRUCTION COMMENCES.

2200 TGSI 2400 STAIRS

GF-ADMIN/AMENITIES FLOOR 42180

LIBRARY & SENSORY ELEVATIONS

6 11

Nominated Architect Mark Jones Reg. No. 4474

5 11

11

THIS DRAWING ALWAYS REMAINS THE COPYRIGHT OF EDMISTON JONES AND SHALL NOT BE USED OTHER THAN FOR THE PROJECT INTENDED WITHOUT WRITTEN AUTHORITY.

DRAWING TITLE:

ASPECT SCHOOL

RL 41.80

THIS DRAWING ALWAYS REMAINS THE COPYRIGHT OF EDMISTON JONES AND SHALL NOT BE USED OTHER THAN FOR THE PROJECT INTENDED WITHOUT WRITTEN AUTHORITY.

50

PROJECT:

300

4 04

50

2200 TGSI

RL 41.80 TGSI

6688 LANDING

50

1690 RAMP

TH

TGSI

EQ

RL 42.18

1711 RAMP

LEVELS SHOWN ON PLAN ARE APPROXIMATE ONLY AND SHALL BE VERIFIED ON SITE BEFORE CONSTRUCTION COMMENCES.

50

EQ

New England Constructions

RL 42.13

COPYRIGHT OF EDMISTON JONES PTY LTD (ACN 003 163 451) © 2021. Nominated Architect Mark Jones Reg. No. 4474

TGSI

RL 41.80

50

EQ

CLIENT

50 50

300

06.12.21 DATE TGSI

11

EQ

EQEQ EQ

HR - 1

2

UP

5

EQ

50

300 3

1

A ISSUE FOR CONSTRUCTION CERTIFICATE REV. DESCRIPTION

EQ

EQ

BH-1 BULK HEAD TYPE 1 COMPRESSED FIBRE CEMENT TYPE 1 CFC-1 CFC-21275 COMPRESSED FIBRE CEMENT TYPE 2 DOWNPIPE DP FACE BRICKWORK TYPE 1 FB-1 FIBRE CEMENT FC 300 HEAD TYPE 1 RWH-1 RAINWATER EXISTING EX

REVISION

RL 42.18 HR - 1 CONCRETE STAIRS

BIM 360://21-0067 Aspect School/21-0067 Aspect School.rvt

LANDING

2170 TGSI

600 TGSI

CONCRETE KERB CONCRETE RAMP

150 MIN KERB

300

600

300

TGSI

600 TGSI

900

VERIFY ALL DIMENSIONS ON SITE BEFORE CONSTRUCTION COMMENCES.

HR - 1

EQ 300

STAIRS

50

USE FIGURED DIMENSIONS IN PREFERENCE TO SCALE.

REVISION

LEVELS SHOWN ON PLAN ARE APPROXIMATE ONLY AND SHALL BE VERIFIED ON SITE BEFORE CONSTRUCTION COMMENCES.

HR - 1

HR - 1

EQ EQ EQ

1480

1580

50

50

THIS DRAWING ALWAYS REMAINS THE COPYRIGHT OF EDMISTON JONES AND SHALL NOT BE USED OTHER THAN FOR THE PROJECT INTENDED WITHOUT WRITTEN AUTHORITY.

EQ

2012

CONCRETE LANDING

TGSI RL 42.18

900 HANDRAILS

RL 42.18

260

50

50 EX. DP

1:30 WALKWAY

UP

6688 LANDING

1 : 50

6738 DP

TGSI RL 42.13

EQ

50

300

RECEPTION WALKWAY AND STAIR - ELEVATION

RL 42.18

2 COPYRIGHT OF EDMISTON JONES PTY LTD (ACN 003 163 451) © 2021. Nominated Architect Mark Jones Reg. No. 4474

EQ

300

1 : 50

EQ

900 650

900 HANDRAIL

300

STAIRS

300

5 11

42460

GF-ADMIN/AMENITIES FLOOR 42180

RECEPTION WALKWAY AND STAIR- PLAN

6

EQ

1200 50 STAIRS

50

2200 TGSI

RL 42.13

2400 STAIRS

11

EQ

GF-GLA'S 43110

900

50 6688 LANDING

RL 42.46

TGSI

EQ EQ EQ EQ

1800 STAIRS

1 : 50

600

TGSI RL 41.80

11

EQ EQ EQ EQ EQ EQ

GLA 6-7 STAIR -RAMP SECTION

EQ

EQ

150 MIN KERB

5

TGSI

300

STAIRS

1

EQEQEQEQ

HR - 1

2

UP

4 04

EQ 300

TGSI

300

3 TGSI

CONCRETE STAIRS

1690

3 11

600

TGSI

RL 42.18 HR - 1

RL 43.11

TGSI

EQ EQ EQ 50 900

50

300

900 HANDRAILS

930

STAIRS EQEQEQEQEQEQ

600 TGSI

900

300

CONCRETE KERB CONCRETE RAMP

EQ

300

900

50

50

300

300

RL 42.18

HR - 1

300

600 TGSI

EQ

2012 HR1336 -1

EQ

TGSI

HR - 1

50

RL 42.18 EQ

300

1480

1580

RL 42.18 CONCRETE LANDING

TGSI

1828 EQ

EQ

DP 1:30 WALKWAY

UP

TGSI RL 42.13

EQ

2

380

1 : 50

EQ

1 04

50

50mm MIN CLEARANCE FROM FINISH OF EXTERNAL WALL AND HANDRAIL

MIN. CLEARANCE

RL 43.11

TGSI

50

LIBRARY & SENSORY SECTION 3

1336 EQ

3

TGSI

UP

930 STAIRS 900 HANDRAILS

TGSI

1660

RL 43.11

TGSI

UP

50

1660

EQ

EQ

STEEL STAIRS

1

11 RL 42.46

50

EQ

930

EQ 1828 EQ

11 TGSI

6 02

8017

1 : 100

300

LIBRARY & SENSORY SECTION 2

HANDRAIL

600 TGSI

300

2

300

650 STAIRS

50

HR - 1 1

3

300

900 HANDRAILS

600 TGSI

50

TGSI

600 TGSI

900

300

300

900

600

900 HANDRAILS

5 02

1800 STAIRS

EQ EQ EQ EQ EQ EQ

EQ EQ EQ EQ 300 300

HANDRAIL

STAIRS EQEQEQEQEQEQ

7630

STAIRS

50

1 : 100

50

2021, Team wrok (3) at Edmiston Jones, NSW 320 sqm Software: Revit Phase: Construction Certificate

LIBRARY & SENSORY 1200 SECTION 1

900

300

PROPOSED GROUND LINE

4 02

PROJECT:

DRAWING TITLE:

4 Wilford Street, Corrimal

SCALE: @ A1

ASPECT SCHOOL

AWNING WINDOW SLIDING DOOR/WINDOW FIXED WINDOW WINDOW WINDERS

WINDOW SCHEDULE DRAWN:

CHECKED:

DATE:


COPYRIGHT OF EDMISTON JONES PTY LTD (ACN 003 163 451) © 2021. Nominated Architect Mark Jones Reg. No. 4474

1 DA/06

USE WRITTEN DIMENSIONS ONLY - DO NOT SCALE OFF DRAWINGS

COPYRIGHT OF EDMISTON JONES PTY LTD (ACN 003 163 451) © 2021. Nominated Architect Mark Jones Reg. No. 4474

LEGEND NEW FOOTPATH

18065

RL 38.77 TGSI

COL

FT

TGSI

39.22

RSF

COL

RL 39.38

CONC

SHELVING

CPT

5 Store 14 m²

CPD

5.7 x 2.5m RSF

DESK

TGSI

DP

CPD

TGSI

COL

ROBEY ST

W S

JOB NO

0

1

2

4

3

5

22-0006

= 131 m2

UNENCLOSED COVER AREA

SCALES

7

6

BW

46500

No. IN SET

BW

BW

COL

COL

Level 1 42.79 m

DP

DOWNPIPE

SP

SPREADER

DATE 02.05.22

4

3

2

1

RL 39.38

WOLLONGONG

NOWRA

BATEMANS BAY

T 02 4226 3600

T 02 4421 6822

T 02 4472 7388

W www.aej.com.au E aej@aej.com.au PROJECT

YEAR 4 CLASSROOMS

NOWRA ANGLICAN COLLEGE Corner of Princes Hwy and West Bunberra St, Bomaderry NSW 2541

DRAWING

FIRST FLOOR PLAN TN MN

1 DA/06

E

COPYRIGHT OF EDMISTON JONES W PTY LTD (ACN 003 163 451) © 2021. JOB NO Nominated Architect Mark Jones Reg. 22-0006 No. 4474 SCALES

0

1

2

4

3

5

6

7

8

ROOF BEYOND

T

T

T

GB

LEGEND

BW

AWNING ROOF

T

1 : 100 @ A3

USE WRITTEN DIMENSIONS DATE 02.05.22 ONLY - DO NOT SCALE OFF DRAWN LQ DRAWINGS 9 CHECKED

S

SHEET NO

No. IN SET

BRICK WORK

COL COLUMN

T

T

T

T

T

MC

TRANSLUCENT ROOF SHEETING METAL CLADDING

MR-1 METAL ROOF

MC

DP

DP

BAG STORAGE

DP

DOWNPIPE

SP

SPREADER

BW Level 1 42.79 m

COL

5 Store 14 m²

Subfloor

BORAL BRICKS ESCURA

Ground Floor 39.38 m

COTTAGE GREEN DESCRIPTION REV. A DEVELOPMENT APPLICATION

DESCRIPTION REV. A DEVELOPMENT APPLICATION

DATE 02.05.22

DATE 02.05.22

South Elevation MR-1

T 02 4421 6822

T 02 4472 7388

MC

W www.aej.com.au E aej@aej.com.au

SITE

Corner of Princes Hwy and West Bunberra St, Bomaderry NSW 2541

BRICK BUILDING METAL ROOF

DRAWING

SITE PLAN

EX. BLOCK E

TN MN E

BRICK BUILDING METAL ROOF

W S

JOB NO

22-0006

0

5

10

15

20

25

30

35

40

45

SCALES

1 : 500 @ A3

DATE

02.05.22

DRAWN

LF

CHECKED

LQ

SHEET NO

NOWRA

BATEMANS BAY

T 02 4226 3600

T 02 4421 6822

T 02 4472 7388

BW Level 1 42.79 m

CLIENT

NOWRA ANGLICAN COLLEGE SITE

BW

Corner of Princes Hwy and West Bunberra St, Bomaderry NSW 2541

COL

DRAWING

ELEVATIONS

Ground Floor 39.38 m JOB NO

22-0006

North Elevation

1

0

1

2

3

4

5

6

7

8

9

SCALES

1 : 100 @ A3

DATE

02.05.22

DRAWN

LF

CHECKED

LQ

SHEET NO

EXISTING ROOF

REV.

DA/07 A No. IN SET

Collaborated with Landscaping team for carpark and ramp design

Preschool Alts&Adds Team wrok (2) at Edmiston Jones, NSW 531 sqm Software: Revit / AutoCAD / Enscape Phase: Development Approval

LYSAGHTS CUSTOM ORB COLORBOND - PALE EUCALYPT

DP/SP

PROJECT

YEAR 4 CLASSROOMS

REV.

DA/01 A No. IN SET

WOLLONGONG

W www.aej.com.au E aej@aej.com.au

8055

NOWRA ANGLICAN COLLEGE

MR-1

MC

26/05/2022 1:49:08 PM

EX. BLOCK K

BIM 360://22-0006 NAC Year 4 Classrooms/22-0006 NAC Year 4 Classrooms _DD2_detached.rvt

CLIENT

ROOFING

EXISTING ROOF

PROJECT

YEAR 4 CLASSROOMS

BRICK BUILDING METAL ROOF

BAG STORAGE

METAL CLADDING

EXISTING POST STRUCTURE

BW

NOWRA

BATEMANS BAY

T 02 4226 3600

T 02 4421 6822

T 02 4472 7388

PROJECT

EXISTING BRICK BALUSTRADE Level 1 42.79 m

BW

WOLLONGONG

W www.aej.com.au E aej@aej.com.au

YEAR 4 CLASSROOMS

LYSAGHTS CUSTOM ORB COLORBOND - PAPERBARK

CLIENT

NOWRA ANGLICAN COLLEGE

BRICK WORK

SITE

Corner of Princes Hwy and West Bunberra St, Bomaderry NSW 2541

BORAL BRICKS ESCURA

EX. Block F 42.68 m

DRAWING

ELEVATIONS

ALUMINIUM FRAME, POWDER COATED COTTAGE GREEN JOB NO

22-0006

West Elevation 1

0

1

2

3

4

5

6

7

8

9

SCALES

1 : 100 @ A3

DATE

02.05.22

DRAWN

LF

CHECKED

LQ

SHEET NO

REV.

DA/08 A No. IN SET

BIM 360://22-0006 NAC Year 4 Classrooms/22-0006 NAC Year 4 Classrooms _DD2_detached.rvt

T 02 4226 3600

PROPOSED AWNING BEYOND

26/05/2022 1:49:59 PM

BATEMANS BAY

BIM 360://22-0006 NAC Year 4 Classrooms/22-0006 NAC Year 4 Classrooms _DD2_detached.rvt

NOWRA

26/05/2022 1:49:24 PM

WOLLONGONG

REV.

DA/03 A

EXISTING BUILDING BEYOND

EXISTING FENCE

5

5

ALUMINIUM FRAME, POWDER COATED

Ground Floor 39.38 m

TACTILE GROUND SURFACE INDICATOR

SITE

BRICK WORK

TRANSLUCENT ROOF SHEETING METAL CLADDING

REDUCED LEVEL

TGSI

CLIENT

BRICK WORK

COL

PROPOSED STAIR

PEDESTRIAN WALKWAY

6

PROPOSED BRICK BALUSTRADE TO MATCH EXISTING

1

East Elevation

EX. LIBRARY

27490

LYSAGHTS CUSTOM ORB COLORBOND - PAPERBARK

DATE 02.05.22

BRICK BUILDING METAL ROOF

7

HR TRENCH DRAIN

REV.

DA/02 A

HANDRAILS

RL

DRAINAGE 8

existing terrace

MR-1 METAL ROOF

METAL CLADDING

BW

EX. TAS

BRICK & W/B HOUSE TILE ROOF

MC

LYSAGHTS CUSTOM ORB COLORBOND - PALE EUCALYPT

MC

EXISTING BRICK WALL

BW COL

DESCRIPTION REV. A DEVELOPMENT APPLICATION

T

ROOFING

SHRUB

EX. CAR PARK

SHEET NO

FLOOR TILE TYPE 1

HR

ROOF LINE OVER

HR 18 17 16 15 14 13 12 11 10 9

COL COLUMN

MR-1

EXISTING ROOF

REMOVED TREES

EX. PRE SCHOOL

1 : 100 @ A3

COPYRIGHT OF EDMISTON JONES DATE 02.05.22 PTY LTD (ACN 003 163 451) DRAWN LQ © 2021. 8 9 Nominated Architect Mark Jones Reg. CHECKED GB No. 4474

DOWNPIPE

FT

FULL HEIGHT CUPBOARD

RL 42.68

EXISTING BUILDING BEYOND

DP/SP

RETAINED EXISTING TREES

NEW GATE

EX. BLOCK F

E

PROPOSED GROSS = 501m2 FLOOR AREA

PROPOSED AWNING

EXISTING PUBLIC BUS STOP

35000

0 00 36

35500

0 3650

0 50 37

0 00 37

EXISTING GATE

STAIR

FALL OF LAND

EX. BRICK BUILDING METAL ROOF

GROUND FLOOR PLAN

CARPET TILE

DP

CPT

CONC

LEGEND

EXISTING POWER POLE

DRIVEWAY

DRIVEWAY

PROPOSED COVERED OUTDOOR AREA EX. FOOTPATH

= N/A

CPT

RL 42.79

USE WRITTEN DIMENSIONS ONLY - DO NOT SCALE OFF DRAWINGS

EXISTING FENCE

8185

EX. BLOCK J BRICK BUILDING METAL ROOF

DRAWING

= 50910m2

FSR

DEMOLISH

EXISTING ENTRY

38000

3950 0

4000 0

4050 0

41500

6430

SITE AREA TOTAL SITE AREA

EXISTING STORMWATER

2010

44000

PROPOSED BUILDING

45000

45500

46000

41000

42000

43500

0 4300

2490

42500

EXTEND EXISTING SHRUB SCREENING

Corner of Princes Hwy and West Bunberra St, Bomaderry NSW 2541

TN MN

BOUNDARY

EXISTING PIT PROPOSED ENTRY

T 02 4472 7388

SITE

EXISTING WALL

1

NEW FENCE

NEW FOOTPATH AND GATE

T 02 4421 6822

NOWRA ANGLICAN COLLEGE

RL 39.38

EXISTING

PEDESTRIAN CROSSING

T 02 4226 3600

CUPBOARD

8.0 x 10.5m

9 OUTDOOR 123 m²

PROJECT

CLIENT

8060

BUNBERRA ST EX. FOOTPATH

BATEMANS BAY

YEAR 4 CLASSROOMS

LEGEND EX.

NOWRA

CONCRETE

CPD

DESCRIPTION REV. A DEVELOPMENT APPLICATION

W www.aej.com.au E aej@aej.com.au

NEW GATE

1 DA/06

USE WRITTEN DIMENSIONS ONLY - DO NOT SCALE OFF DRAWINGS

WOLLONGONG

CONC

DP

FALL

EXISTING FENCE

Stair 1

EXISTING BLOCK F

WHITEBOARD/ SCREEN

BAG STORAGE (TYPICAL)

39.81 COPYRIGHT OF EDMISTON JONES PTY LTD (ACN 003 163 451) © 2021. Nominated Architect Mark Jones Reg. No. 4474

CPT RL 42.79

FULL HEIGHT CUPBOARD

existing carparking

RL 39.38

SHELVES

COMMERCIAL

RL 42.79

FULL HEIGHT CUPBOARD CPD

NEW GATE

ENTRY

CPT RL 39.38

CPD

8 GLA 83 m²

8.0 x 10.5m

39.48 COL

7 GLA 83 m²

2 DA/06

DP

TGSI

5.1 x 3.1m

RSF RL 39.38

RESIDENTIAL

DATE 02.05.22

1:20

10.6 x 4.4m

1.0 x 1.5m CPT

WHITEBOARD/ SCREEN

BIM 360://22-0006 NAC Year 4 Classrooms/22-0006 NAC Year 4 Classrooms _DD2_detached.rvt

DESK

LOW CUPBOARD UNDER BENCH

26/05/2022 1:49:08 PM

CPD CHANGE ROOMS

SHELVING

15395

REF

4 Uniform 43 m²

6 GLA 83 m² CPT

DESCRIPTION REV. A DEVELOPMENT APPLICATION

BUILDING LINE OVER

CPD

Subfloor

RESIDENTIAL

WHITEBOARD/ SCREEN

TGSI

2 Kitchenette 6.6 x 2.4m FT 16 m²

LOW CUPBOARD UNDER BENCH

8.0 x 10.5m

39.48

3 Store CHANGE ROOM 16 m² 1.0 x 1.5m

RESIDENTIAL

2 DA/06

ENTRY

17.5 x 7.4m

CPD

LARGE SLIDING DOORS

2 DA/06

RL 39.38

CPD

TGSI

2 DA/06

LOW CUPBOARD UNDER BENCH

TGSI

RL 39.38

CPD

TGSI

1 Multipurpose 130 m²

CPD

ROOF LINE OVER

NEW FENCE EXISTING FENCE DEMOLISH BOUNDARY LINE

BAL

CPD

CPD

2022, Team wrok (3) at Edmiston Jones, NSW 510 sqm Software: Revit / AutoCAD / Enscape Phase: Development Approval

TGSI

BUILDING LINE OVER

USE WRITTEN DIMENSIONS ONLY - DO NOT SCALE OFF DRAWINGS

LEGEND CPD

1:14 RAMP

Learning Centre Development

BALUSTRADE CARPET TILE CUPBOARD COLUMN CONCRETE REFRIGERATOR REDUCED LEVEL RESILIENT SHEET FLOORING TACTILE GROUND SURFACE INDICATOR FLOOR TILE

BAL CPT CPD COL CONC REF RL RSF

RL 38.77

CPD

NEW GATE

24960

BIM 360://22-0006 NAC Year 4 Classrooms/22-0006 NAC Year 4 Classrooms _DD2_detached.rvt

EXISTING FOOTPATH

26/05/2022 1:49:09 PM

1 DA/06


Heritage Courtyard Renovation 2018, Intern, Team wrok (2) at WAYStudio, China 400 sqm Software: Rhino Phase: Concpet Deisgn, Physical Model Making


Drafting Work Samples 02 Planning


University Master Plan 2022, Individual wrok at Edmiston Jones, NSW 527320 sqm Software: Revit Supported Planning Officer at University to produce Master Plan Package, refering to guideline including Estate Strategy Guilding Principle, Design with Country, First Nation Deisgn

School Master Plan 2021, Team wrok (2) at Edmiston Jones, NSW 89620 sqm Software: Revit / Photoshop Supported Regional School to plan new Junior and Senior school


Drafting Work Samples 03 Interior


MS-II Restaurant 2018, Intern Work Facade and Interior Design Location: Beijing China Phase: Design Development / Construction Documents Software: Rhino / AutoCAD Materials: Red Brick / Bronze Panels / Velvet / Jade Link:https://www.gooood.cn/ms-ii-restaurant-design-china-by-way-studio.htm

Use tracing paper to assist construction


'Acrylic corridor' Modeling and rendering test, involved in construction process, communicated with external suppliers and workers

'Bar and Counter'

BAR ground metal inlay method 1:10 @A3

Marble Counter 18 mm Steel 5*30mm Stone 5*30mm Bonding layer 10mm Cement mortar 20mm Screed (radiant floor heating) Building slab

Bar and Counter 1:30 @A2

Translate draft into CAD drawings communicate with external and internal materials selection


Joinery Design 2022, Individual wrok at at Edmiston Jones, NSW Regional Child Care Center Software: Revit

'Children Kit' A series of kits includes trackor, boat, bus, car to enhance interactive environment.


Women's Trauma Recovery Centre 2023, Group wrok(3) at at Edmiston Jones, NSW 482 sqm Software: Revit/Photoshop/Indesign Phase: Co-design workshop, DD1, DD2, Tender Building and Joinery Modeling, Fly-through Animation, RCP, Floor Plans The Women’s Trauma Recovery Centre is a co-designed solution to the critical gap in services supporting a woman’s long-term recovery from the traumatic impact of violence and abuse. Design Approach: Conducted through a series of four co-design workshops, the project brought together professionals well-versed in trauma and violence alongside participants with personal experiences. This inclusive approach aimed to WS2 PAINT COLOUR PALETTE enrich discussions MATERIALS on creating safe spaces, considering physical, emotional, and WALL EASY MAINTENANCE PATTERN FEATURE cultural dimensions of safety. The collaborative process sought to enhance service integration and cultivate meaningful partnerships.

MOODBOARD MOODBOARD

MOODBOARD

WS2 PAINT COLOUR PALETTE MOODBOARD WS2 PAINT COLOUR PALETTE

ART

MOODBOARDWALL WALL PALETTE WS2 PAINT COLOUR

ART

ART

WALL

SHEAR

FEATURE

ART

ART

INSPIRATION IMAGES FEATURE

ART MATERIALS

EASY MAINTENANCE

SHEAR

WALL

ART

Co-Workshop - Data Collection

WALL

SHEAR

ART

TEXTURE

INSPIRATION IMAGES

FEATURE

SOFT

MATERIALS EASY MAINTENANCE

EASY MAINTENANCE

PATTERN

ARTART ART

FEATURE MATERIALS

PATTERN

TEXTURE

EASY MAINTENANCE

ART

ART

WALL

WALL

EASY MAINTENANCE

SOFT

MATERIALS

WALL

ART

FEATURE

TEXTURE

WS2 PAINT COLOUR PALETTE

MOODBOARD WALL WS2 PAINT COLOUR PALETTE

WALL

WALL

MATERIALS

WALL

WALL

SHEAR

TEXTURE

SOFT

Concept Design and Mood Board

Workshop on site - Test Materials

INSPIRATION IMAGES

ART

ART

ART

WALL

ART

WALL

WALL

INSPIRATION IMAGES Entry and Reception

Kitchen and Dining

Waiting Area

SHEAR

WALL

SHEAR

TEXTURE

TEXTURE


GP Room Joinery

Kitchen / Dining Joinery

'Details Design' To achieve Acoustic Rating Rw50 for consulting room, details needed to be custimized designed for CSR acoustic walls and double glazed system.


Health Consulting Facility

Office

2023, Group wrok(2) at at Edmiston Jones, NSW Software: Revit Phase: DD2, Tender Building and Joinery Modeling, RCP, Floor Plans, Internal Elevations

2022, Group wrok(2) at at Edmiston Jones, NSW Software: Revit Phase: CDC Package including floor plans, RCP, internal detailed plans & elevations, window&door schedule

2400 1100 300

900mm MIN

800

COPYRIGHT OF EDMISTON JONES PTY LTD (ACN 003 163 451) © 2021 Nominated Architect Mark Jones Reg. No. 4474

CUPBOARDS RECESSED BACK 150mm FROM FRONT EDGE TO ALLOW FOR 600mm DEEP CUPBOARD

THIS DRAWING ALW AYS REMAINS THE COPYRIGHT OF EDMISTON JONES AND SHALL NOT BE USED OTHER THAN FOR THE PROJECT INTENDED WITHOUT WRITTEN AUTHORITY.

600

LEVELS SHOW N ON PLAN ARE APPROXIMATE ONLY AND SHALL BE VERIFIED ON SITE BEFORE CONSTRUCTION COMMENCES.

746

800

60

2

3

JF-1/1 ELEVATION 1 1 : 50

4

JF-1/1&JF-1/2 ELEVATION 2 1 : 50

21

JF-1/2 ELEVATION 3 1 : 50

680

JF-1/1 ELEVATION 4 1 : 50

27

350 50 60

725 25 10 100 710 30 850 AS1428.1 COMPLIANT

1100

50

200 100

TABLE 200

LM-3

VERIFY ALL DIMENSIONS ON SITE BEFORE CONSTRUCTION COMMENCES.

LEGEND JF-13/1 WAITING HS JOINERY FITMENT TYPE 1 JF-32/1 KITCHEN/DINING JOINERY FITMENT TYPE 1 JF-32/2 KITCHEN/DINING JOINERY FITMENT TYPE 2 LM-1 LAMINATE TYPE 1 LM-3 LAMINATE TYPE 3 SNK-1 SINK TYPE 1 SS SOLID SURFACE T-1 TAP TYPE 1 TB TIMBER BENCH UH-3 UPHOLSTERY TYPE 3 UH-4 UPHOLSTERY TYPE 4

450

100

0 30

LM-1

TWP-1

50 350

50 R 17

SS

45 0

R

R

421 2 waiting H2H / GPH

10 0

330

330

750

1200

450

2950

BANQUETTE SEAT/PLANTER 900 1300

R

R

850

1100 32 13

0 80

SS

27

300

500

10 0

450

R

USE FIGURED DIMENSION IN PREFERENCE TO SCALE.

SS

800 TABLE

1

1031

330

3999 BANQUETTE SEAT & PLANTER

5

H2H RECEPTION/WAIT AREA PLAN 1 : 50

6

JF-2/1 FRONT ELEVATION 1 1 : 50

7

JF-2/1 FRONT ELEVATION 2 1 : 50

JF-2/1 BACK ELEVATION 3 1 : 50

14 reception HS 9 400

10

11 8. 500

8

9

HEADSPACE RECEPTION PLAN 1 : 50

10

JF-14/1 ELEVATION 1 1 : 50

11

JF-14/1 ELEVATION 2 1 : 50

JF-14/1 ELEVATION 3 1 : 50

13 waiting HS

950

15 400

13

TB

TB

14 JF-13/1

4150

NO UH-4

PLANTER

3200

UH-4 UH-3

RT

H

UH-3

REV. DESCRIPTION P1 PRELIMINARY ISSUE P2 70% CONSTRUCTION ISSUE P3 90% CONSTRUCTION ISSUE

650

100

100

750

400

1600

DATE 23.10.23 2/11/23 9/11/23

650 750

1900

1040

5100 O/A C.O.S

13

1 : 50

14

JF-13/1 ELEVATION 1 1 : 50

JF-13/1 ELEVATION 2

15

1 : 50

JF-13/1 ELEVATION 3 1 : 50

WOLLONGONG T 02 4226 3600 NOWRA T 02 4421 6822

400

BATEMANS BAY

SS

W www.aej.com.au

CLIENT

Bluestone Building Group

19 MW

18

1200

32 kitchen/dining

400

SITE

-

172 Shellharbour Road, Warilla

17

DW

DRAWING

SPECIAL AREA PLANS & INTERNAL ELEVATIONS

SS SNK-1

325

650

E aej@aej.com.au

PROJECT

JF-32/2

MW 2750

T 02 4472 7388

REFER TO TYPICAL SECTION ON DRAWING 450

GPH WARILLA

ISLAND BENCH

900

3000 20 ISLAND BENCH

T-1

REF-1

JF-32/1

JOB NO

23-0057 2900

18 3926

16

STAFF KITCHEN PLAN 1 : 50

Autodesk Docs://23-0057 BBG Warilla Ver.22/23-0057 BBG Warilla CD.rvt

HEADSPACE WAIT AREA PLAN

864 1440

127

17

JF-32/1 ELEVATION 1 1 : 50

18

JF-32/2 ELEVATION 2 1 : 50

19

JF-32/3_ELEVATION 3 1 : 50

20

JF-32/4_ELEVATION 4 1 : 50

SCALES

1 : 50 @ A1

DATE

9/11/23

DRAWN

RL/LF/NT

CHECKED RL

SHEET NO

400 No. IN SET 5 OF 7

REV.

P3

13/11/2023 3:45:41 PM

12

RCP


MASTER THESIS & OTHER ACADEMIC WORKS


04 Thesis: A manual for retrofitting the 'enacted space' 2020, Semester 2, MSD Master Thesis Project Individual Academic Work Supervisor:Yvonne Meng

J O B W A R E H O U S E

Location: Job warehouse, Bourke street, Austrilia Type: heritage renovation Software: Rhino / Revit /AutoCAD / Photoshop / Illustrator / Indisign

Thesis proposal

MANUAL

Job warehouse, once a successful and iconic immigrant business model, as it stands today is bare and underutilised.Using street life scenarios and immigrant cultural value as an opportunity, my thesis aims to transform the site into a multicultural business platform. Inspired by ‘enacted environment’ (James Rojas, 1991), the project translated enacted space around Job Warehouse into architectural language to examine multicultural migrants as users and creators of space through their behavior patterns. While gaining new job and interaction opportunities, migrants can express their identity at the same time. Cultural boundaries are lost, while migrants will win diverse identities.

Instructions and advice for retrofitting the 'enacted space'

Lexie Fan Bo urke street

Urba n texture

Bo urke street

Ena cted sa pce i n urba n co ntext


1

Original Job warehouse

2

Keep original fabric

3

New flexible fabric

4

Frame system


Adaptable space Ground floor day&night Edge and t hreshold can help t o create adapt abl e s p ace . mov able architect ural components are used to b l u r t h e boundary and create dynamic circu l ati on

8

10 Of

fic

Crossley St

9

Brewery

8

10

e

Market

7

To

9

Livepool St

Soft boundary

Livepool St

Adaptable threshold

Crossley St

Create dynamic circulation

Backyard

Market

7

1F Truck

11

To

11

5

3 2

Annotation

6

1

3

Market

A nnotation

5

2

1 . Pa p e r b a c k b o ok sh o p 2 . Re a d i n g a re a 3 . Fl e a m a r k e t 4.Job gallery 5 . Ex h i b i t i o n a re a 6 . M i c ro b a r 7.Loading space 8 . M i c ro b re w e r y 9 . Ba c k y a rd 10.Office lobby 11 . O r i g i n a l s t a i rc a se 12.Information

4

12

1F

1 . P a p e rb a c k b o o k sh o p ( c l o s e d ) 2 . L e isu re a re a 3.Food market 4.Job gallery(closed) 5 . D in in g a re a 6 . M ic ro b a r ( o p e n ) 7 . L o a d in g s p a c e 8 . Visitin g 9 . B a c k y a rd 1 0 . D in in g a re a 11 . O rig in a l s t a i rc a s e 1 2 . I n fo rm a t i o n

6

1 4 12

Market

o ld f a b r i c n ew f a b r i c

old fabric new fabric

B ou r k e S t

N

0

10

Ground floor: Day 9am-5pm

B our ke S t

N

0

10

Ground floor: Night 6pm-10pm


1

C ommu n ity k itc hen & He rb g arde n

Micro t h e a te r

2

1

2 6

3

5

Li

ve

po

ol S

t

4

Cr

os s

4

le

u Bo

y

r

ke

St

St

A l ley v i ew : Crossl ey St

3

Immigrant museum


Ma nua l B ook f or us er s to us e the 'e na cte d spa ce'

* Definition of 'Enacted space': the space where people are allowed to use the props or retrofit designated area.

A.O r i gi na l b ui l di ng

B.New bu ildin g

In the newly built area, users can use props, change the color or material of specific architectural elements (doors, windows and balustrade panels) as well as create on the specific areas of walls.

A.1 Original paperback bookshop

B.1 Props Adaptable threshold

Before

In the newly built area, users can use props, change the color or material of specific architectural elements (doors, windows and balustrade panels) as well as create on the specific areas of walls.

Props are designed for users to display their crafts work and brands of small business

B.1.1 Swing boards

Food pushcart

B.2 Architectural elements B.2.1 Private Door

A.3 Front shops

B.1.2 Display boards

specific architectural elements include doors, windows and balustrade panels can be changed color and pattern

B.2.2 Bay window

B.2.3 Louver

B.2.4 Balustrade panel

After

Adaptable threshold

B.3 The specific areas B.3.1 Micro theater

Rotating billboard Posters

Before

B.1.3 Shop signs

After

A.2 Main entry

Before

* who can use: local artists, small business owners, traditional craftsman, visitors, residents...

After

B.3.2 Craft workshop

Replaceable module panels

B.3.3 Graffiti boards

Graffiti create


C . M a n u a l B ook fo r use rs to e x pre ss id e n tif y b y th e re trofitting pa ne ls

1

pi ck u p m odu l e fr a m e s

2

c hoo se to ol s f r om sha r e d to ol k i ts

D.Mu lticu ltu ral User Samp les Polish folk c rafts

A lic ja 23 P o land T raditio nal F a bric textures

C hine se C arp e ntry

Z hi Li 37 C hina

3

se le c t in st a lla t ion mod e s

4

V erti c al

select a preferred l oc a ti o n to e x p r e ss your i d e nti f y

Wo o dw o rk

I ke b ana

A yum i 49 J a pa n J a pa nes e flo w ers a rra ngem ent

Hori z on tal

Vie tnam hand ic raft

P ha m T hi Ngo c 57 V ietna m Ba m bo o w eaving


1

Annotation

2

1.ext ernal w al l : 20mm pl ast er ext ernal f i ni sh, 103mm f ace bri ck, 60mm ai r gap, 90mm i nsul at i on, 140mm dense concret e bl ock 13mm pl ast er i nt ernal f i ni sh. 2.B al ust rade: 150mm w i de sof t w ood C N C pat t ern

4 3

3.B al cony st ruct ure: 1200mm w i de 152*89mm UB 50*50mm t i mber j oi st s 150mm w i de t i mber board decki ng 4.F i rst f l oor 150*50mm sof t w ood j oi st s (400mm cent er)

R etrof itted Balc ony

5

4

3

2

Annotation

1

1.replaceable exhibition panel 2.uni versal st eel beam 3.repl aceabl e hangi ng panel 4.repl aceabl e w al l panel 5.doubl e gl azi ng f l oor 6

5

6

R etrof itted A trium

6.second f l oor: f l oor f i ni sh proct orw rap DOW st yrof oam R TM-X w at erproof i ng membrane concret e roof sl ab DOW Tuf f -R


Small business owner was preparing before opening

A visitor was taking pictures of the weaving workshop exhibition

7:00

12:00

During the lunch break, people of different nationalities gathered on the roof to share their recipes through the herb garden and community kitchen. 14:00

The exhibition hall will hold regular exhibitions about immigration culture 16:00


A C A D E M I C W O R K S


05 Zero Carbon Data Loop 2020, Semester 1, MSD Studio 21 Individual Academic Work Studio Leader:Toby Reed Location: Port Melbourne, Austrilia Site Area: 57000 ㎡ Software: Rhino / Revit /AutoCAD / Photoshop / Illustrator / Indisign / Lumion The site location is inner-city suburb, Port Melbourne. Undoubtedly,completing a giant data center between modern city and nature will be an aggression against the nature. This project explores the possibility of let green invade building reversely and achieve the zerocarbon goal. Green pop up in and between buildings, absorbing the exhaust from mechanical plants. The building is seem as a huge container where architecture and engineering mix happening, letting human, mechanical plants and nature coexist harmoniously. A surreal atmosphere is created for citizens who come for leisure and exercise to have possibility of dialogue with the future.Data center is not a daunting and closed military base any more. It becomes a free civic space, like a land art park. It participates in urban carbon cycle and play a role in building a sustainable future. Here, Some weightless, some symbolic. Some imagination has opened.




View B

View C

View A

Ground Floor 0

VIEW A Data lobby

VIEW B

5

10

20m

Mezzanine

Generators/Switch room/ fuel storage/ Loading dock / Civic space

Generator delivery space

0

VIEW C Community space

5

10

20m

Generators / Switch room / Control center


View

D

View F

View E

First Floor 0

VIEW D

Promenade

5

10

20m

Second Floor

Datahalls / Interconnect room / Chill out / Staff administration VIEW E

Greenhouse

0

VIEW F Client Lobby

5

10

20m

Datahalls / Interconnect room / Greenhouse / Public library


Energy master plan With 66 units generators ,this datacenter can generate 60MW to 80MW of electricity. At the same time, a huge amount of exhaust will be a big challenge for the community and natural environment. Instead of emitted directly to external environment, waste heat is designed to be re-consumed by fast-growing greenhouse and winter swimming pool first. This datacenter will participate in urban carbon cycle and play a role in building a sustainable future.

Zero Carbon Concept Diagram


Rainwater harvesting Various roof level Skylight

Commercial plants growing

Giant roof structure

Waterfall landscape

Green space Public - unsecurity Office - security

Warm swimming pool

Roof public square

Public library

Cafe

Staff administration

Meeting room

0

5

10

20m


06 Abstract Revolution 2019, Semester 2, MSD Studio 36 Individual Academic Work Studio Leader:Anna Nervegna Location: 180 St Kilda Rd, Melbourne VIC 3006, Austrilia Software: Rhino /AutoCAD / Vray Photoshop / Illustrator / Indisign / Lumion Inspired by Carmen Herrera's abstract art, NGV_ C reinterpretates architecture into the form of fragmented space, resemblancing between abstract art and physical space. The design takes triangle as a clue in creating a piece of artwork for modern melbourne city. The form of building and interior architectural elements can remind people of a famous artwork, or this NGV itself is an artwork, like yellow peril, becoming an urban critical symbolic.


Perspective Section


B

3 9 10 1

17

A

16 6

A

5

4

2

8

11

7

12

B

1 Open Air Amphitheatre 2 Sculpture Park 3 Promenade 4 Kids Learning Space 5 Cloak 6 Info Desk 7 Ticket Office 8 Gift Shop 9 Staff Entry 10 Loading Dock 11 Staff & Administration 12 Multimedia Theatre 13 Digital Exhibition

11

First Floor

Ground Floor

14 Archive 15 Permanent Exhibition 16 Member's Lounge 17 Storage 18 Temporary Exhibition 19 Aboriginal Exhibition 20 Movable-wall Exhibition 21 Sky Restaurant 22 Sculpture Exhibition

12 14 19 1

21 18

20 22 20

13 18

15 Basement

Second Floor

Third Floor 0

5

10

20m


F4 Art Coffee&Sky Restaurant Rotated walls / Outdoor sculpture exhibition

F3 Art Coffee&Sky Restaurant

F2 Art Coffee&Sky Restaurant

Mezzanine Art Coffee&Sky Restaurant

F1 Art Coffee&Sky Restaurant

GF Art Coffee&Sky Restaurant

CO

RE

GE EL

NE

EM

EN

TS

RA

LE

LE

M

EN

TS BF Co-creation space, Digital exhibition Lecture hall, Movie cinema,Steps exhibition


05 Index: the partial figures and residual events always already home 2019, Semester 1, MSD Studio 26 Individual Academic Work Studio Leader:Colby and Pricilla

Inspired by Derrida, the HOUSE can be seen as a machine that works uninterruptedly, always already an ‘INDEX’ system. Information including human and materials are input in from all direction. Content enters the home along with the human. Human distribute and use objects by their consciousness but disposed in a natural but unconscious way. After that, these information can be identified and redefined because of human efforts. The home, is totally human-oriented, flowing and plastic, wrapped by serve routes. While Objects in home are just the agent of human. Water coming in home but waste coming out, the changing situation and form of materials happened in domesticity daily life. Instead of just composed by basic architecture elements to provide a shelter for human, users actions make effects on home all the time.in this house,these effects be enlarged in architecture scale, the result of index become building elements such as floor,wall and table. Home is a human oriented home and layout is natural result of events, which make it difference from other building forms.The basic steps of ‘INDEX’ is Collect - Display - Disposal, and the only thing this home claims to do is to retrace and display this indexing process.


FE

Edge Moment At the edge moment, domesticity enters the site with information. When outside information can be indexed by home, they come in through the openings. Light, dust, water, food, they all go through the edge and come in home. At the same time, some information, like social rules, strong wind, junk mail, are refused at the edge of site. The edges sometimes are invisible, like what the images show. Water come in home from pipes everyday but people seldom notice these under kitchen sinks. Only when people need to fix some problems, they will squat and zoom in this tiny edge.

Center Moment

EDGE MOMENT _ SECTION

0m

At the center moment, domesticity enters the site with trace. ‘to live is to live trace’. In the center of home, user imprint the traces on objects of everyday uses. The traces can be,for example, coffee stains, used plates, leftover or rust stains on the legs of chairs. Traces are always left along with time and events. In center image, the still warm food imply that people would not be away for long . In additionally, the movements of chairs in section image, may record a wonderful family dinner. Center is the ‘heart’ of the home and here comfort is an important psychological dimension. People will have a sense of security when they live in a space filled with their traces. As the result, in a home, where has the most trace, where is the center of home.

1m

2m

3m


Entry Moment - Entrance door and Shower

The entry of home is considered a prominade between front door, plaster boardwalls and staircase to the back left. The plasterboard wall at the rear conceals a bathroom with shower, which is too considered part of the entry. These programs and elements reflect Human oriented needs or pragmatics. Elements used by the conscious body that constructs the notion of domesticity, the desire for an ideal home and the a particular lifestyle. However, the conscious body becomes an object too. While the human’s consciousness control home in the form of desire, acts and ritual conducted in parts of the home designated as specific programs - like having a shower in the bathroom. During this conscious act, an unconscious detachment occurs where a part of the human’s body , such as hair and skin are stripped from the conscious body and flow away through the drain channel embedded into underfloor. In the entry guests or other residents walk above or see the residual trace and flow of such detachment via the glazing exposing the drain channel, through the entry and out the front door. At this moment, the unconscious fragments of the human body leave from the point where the conscious whole entered.


Edge Moment - Kitchen

For a home, edges can be blurred, like windows and doors; can be fixed, like walls and floors ; be invisible ,like water pipes.Different types of edges identity the home edge together but human often overlook these invisible edge. Kitchen water come into home daily controlled by human’s consciousness when they turn on the tap. Instead of simply flowing away, the water can be indexed into objects still staying in home, like soil in bent pipes or withered leaves stuck in the sink drain. On the roof level, the glass rooftop drain shows how rain is collected clearly and display rain in a long glass square pipe embedded in the wall. Above the sink, a glass rain gauge with large scale numbers deeply engraved is embedded in another wall. How water in and out this home is how information exchanged on the edge of home. Users in kitchen can see this process clearly with these enlarged containers and feel about the edge of home strongly.


pull chairs to have dinner

[disposal]

[collect] [brush - food residue]

push chairs to collect

[display]

CENTER MOMENT _ PLAN 1:30

Center Moment - Dining area

In contemporary culture, the frequency of mass gatherings are less frequently conducted in the home, and the use of a formal dining room decreased. The preparation of food is also reduced, due to convience culture like premade meals and delivery services. Here the kitchen is folded into the wall and excess chairs used for the dining table be stored underneath. In the rare occasional of a dinner part or formal event, the chairs are pulled out, the connecting rod drives the brush to the edge of the table, and then top surface of the brush becomes edge to prevent food falling. When people have finished eating, they take the dishes into the sink push the chair to put away. Brush is moved to the center of table and collect small food residue into several bacteria degradation tank below table. People can obverse the process of degradation which can be completed within 24 hours. The index process here is: the traces of eating are indexed as pieces of food and then food waste are collected and be displayed and then a new round indexing start again to convert waste into food ingredient again.

[brush - food residue] [collect]


Thanks for your time.

If you need any details or have any questions feel free contact: Lexie Wei Fan lexiefn94@gmail.com 0450 934 126


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.