WHY NINFA 50-N
The ideal profile for walls
ADVANTAGES:
1. Profile only, no casing
2. Fast assembly in 3 moves
3. Passes the static load tests required by regulations
INTENDED USE
RESIDENTIAL
- private home
- indoor/outdoor
HOSPITALITY
- hotels - restaurants - chalets
CONDOMINIUMS
- balconies - terraces
TYPES OF ASSEMBLY
NINFA 50-N
The NINFA 50-N glass balustrade is the new technology from Faraone, ideal for residential and wall installations. It passes all static load tests required by regulations.
TECHNICAL SPECIFICATIONS:
- Glass thickness: single pane thickness 8.8.
- Glass height: max. 600 mm from wall
For uncrowded environments: category C2 -> 200 kg/m (tested at 300 kg/m)
SINGLE PROFILE, WITHOUT CASING
TECHNICAL DETAILS
This datasheet has the complete list of main components.
Unlike the other profiles in the Ninfa 6 series, the Ninfa 50-N profile does not use the RS system for to adjust the glass, but rather a register with a polycarbonate presser.
N50: (Ninfa 50-N profile)
N6-REG10: L-shaped glass-holding plastic (4/metre pieces)
M13-AR/G-2: Rubber washer, 2 per fastening (10 pieces per metre)
N6-REG11: Presser (4 pieces per metre)
N6-G1: External threaded gasket (TPV black)
BF-05: Internal pressure gasket (TPV black)
M13-AC-11: Galvanised rod M8x130 including nut and flat washer (5 pieces per metre)
SYSTEMS TESTED EXTENSIVELY FOR YOUR SAFETY
We carry out rigorous strength tests for all balustrade models. Static load and impact tests required by regulations to ensure maximum safety.
Testing at the Faraone laboratory 1 2 Test at the Politecnico di Milano
Every product begins passing through laboratory tests.
During the development process, Ninfa 50-N also underwent several tests in the Faraone LAB.
Having passed the tests at Faraone, certificates were also obtained at the Politecnico di Milano.
INDICATED HARDENED-INDURITE GLASS: cat C2 static load resistance of 200 kg/m + 50% (safety factor)
h 600 mm / 8+8+1,52 PVB/EVA
OUR STRENGTH: QUICK ASSEMBLY
3 simple steps, and you're done!
STEP01
PREPARATION
A) Position the pre-drilled bar to be used as a template
B) Mark the holes and then drill the wall
C) Clean the holes thoroughly
D) Apply resin
E) Insert the rods
START OF ASSEMBLY
Once the resin has dried, position the profile and start to secure it.
Insert in order:
1) Rubber washer;
2) Ninfa 50-N profile;
3) Second rubber washer;
4) Flat washer;
5) M8 nut.
STEP02
Housing the glass
A) Insert the plastic for glass housing inside the profile
B) Insert the glass in an inward tilted position
STEP03
POSITIONING THE GLASS
A) Insert the glass-pressing wedges in the glass-holding plastic.
B) Insert the inner pressure gasket.
C) An aluminium handrail can be fitted as an option
OUR PUBLICATIONS
MANUALS:
– Glass balustrade manual
GUIDES
– Guide for designing glass balustrades
– Sports facilities manual
BOOKS:
– Transparent Architectures book
FARAONE TRAINING AND ACTIVITIES
The first in Italy to carry out actual tests and promote compliance with regulations on balustrades and railings.
Since 2005, Faraone has been engaged in this ambitious project related to training, with the Faraone tour, seminars and meetings, increasingly expanding its range of topics and expert collaborators.
We believe in collaborating with designers and all industry professionals to provide all the necessary tools and updates on the world of transparent architectures.
This is also why Faraone Campus was founded in 2020.
A training container made up of both live and online appointments.
The new online platform was created with the aim of opening up a new channel and offering more content divided into specific training courses including: Design, BIM, Case histories, Safety and regulations, Marketing and business strategy and much more.
What you will find in Faraone Campus
20.000
WE TAKE CARE OF YOUR PROJECTS
Our experience at your service. We guide you in choosing the best solution for your needs.
EXPERT GUIDE
Following a project through every stage is sometimes not easy. That is why we provide you with full support from technical advice through to after-sales.
INSTALLATION
We select the experts who carry out the installation of our products to ensure the quality standard. During this phase, site tests are carried out to ensure that the installation has been carried out properly and that everything is safe.
How you can contact us:
email: faraone@faraone.it
Tel: +39 0861 784200
web: faraone.it
Request information via our website