Assembly instructions Ninfa Stadio

Page 1

Assembly Instructions NINFA stadio BALUSTRADE

ents nd adjustm Fixings a e! the insid only from

INterior side

WATCH THE VIDEO OF THE ASSEMBLY (Faraone YouTube channel)

Lato esterno


ARCHITETTURE TRASPARENTI

ARCHITETTURE TRASPARENTI

How to mount the NINFA STADIO system NINFABar STADIO: ISTRUZIONI DI MONTAGGIO (LEGGERE PRIM positioning

1

A DI INIZIARE LA POSA)

FASCIA MOUNTING ONLY

NINFANINFA STADIO: STADIO: ISTRUZIONI ISTRUZIONI DI MONTAGGIO DI MONTAGGIO (LEGGERE (LEGGERE PRIM PRIM exterior side

A DI INIZIARE A DI INIZIARE LA POSA) LA POSA) Posizionare la barra, fare il primo e

NINFA STADIO: ISTRUZIONI DI MONTAGGIO (LEGGERE PRIM

A DI INIZIARE LAperni POSA) Inserire due (astine filettate in

l’ultimo foro.

Attenzione: dotazione) per mantenere il profilo in posizione

Attenzione: - Non fissare il profilo sopra le guaine; - Assicurarsi che il fissaggio avvenga su Attenzione: Attenzione: muratura solida.

2

Attenzione:

Floor drilling

2

exterior side

(Utilizzare punta da 14mm) Use the drill to mark the position of the N.B. holes on the low wall using the already drilled profile as a template. Then move the profile and drill the low wall according to the previously made signs. da exterior side (Utilizzare (Utilizzare punta punta 14mm) da 14mm) (Use a 14 mm bit). N.B.

3

N.B. (Utilizzare punta da 14mm) Note. The profiles are already drilled according to the class of resistance N.B. (300 kg/m - 500 kg/m) required when ordering.

Cleaning

Ø14 mm holes

Carefully clean the holes with a suitable pump, or with compressed air, before applying the chemical resin.

4

Application of resin

Screed min. 70

www.faraone.it / Assembly Instructions

Concrete Apply certified chemical resin (Fischer V-BOND or similar). Fill the hole about half of its height.


How to mount the NINFA STADIO system

5

Inserting the rods Insert the M12 threaded rods in the holes, leaving the necessary protrusion (24 mm for the internal fastening line, 28 mm for the external) for the profile thickness and the M12 nuts. Importante: Importante: Important: once the rod has been Importante: Importante: inserted into the hole, the resin can overflow. Therefore, carefully clean the excess resin before positioning the aluminium profile.

24 28

24 28

6

min.70

Fissaggio profilo a Rubber washer Anti-infiltration protection

Corner coupling: solutions on page 7 5

Once the resin has dried, move the profile closer and start fixing. Insert as follows: 1) Rubber washer; 2) Ninfa Stadio profile; 3) Second rubber washer; 4) Galvanized flat washer; 5) M12 nut.

4 3 2 1

SECTIONAL PROFILE VIEW

7

Fissaggio profilo b SECTIONAL PROFILE VIEW

5

Glass-holding dowels Important: Solutions for LEDs on page 7

Tighten the nuts very well and then place the transparent polycarbonate glass-holding spacers (3 pieces/meter). Importante:

Solutions against water infiltration on page 6- gasket between glass and glass

8

Glass positioning

Tilt the glass Tempered glass sheet

1.000

Hardened glass sheet Already assembled gaskets

Glass

Profile Move the upper adjusters on one side, beyond the size of the glass sheet, to insert the glass avoiding to twist the already assembled external gasket and to have more space for the glass assembly.

Polycarbonate spacer

Important: Importante: The hardened-tempered glass must be positioned with the hardened sheet towards the external side. Insert the glass in an inclined position towards the inside, taking care not to touch (twist) the external Importante: Importante: gasket. Important: place the glass slowly on the glass-holding spacers (a sudden drop of the glass risks breaking the polycarbonate spacers).

Assembly Instructions / www.faraone.it

3


ARCHITETTURE TRASPARENTI

ARCHITETTURE TRASPARENTI

How to mount the NINFA STADIO system Importan

9

Positioning of the adjusters 50

Messa in piombo:

300

300

300

A2 più a) Serrare i registri superiori Tempered Hardened glass sheetdella lastra (in rosso); glass sheet esterni

50

b) ORIENTANDO LA LASTRA

, raggiungere il A1MANUALMENTE Adjuster

piombo e di conseguenza serrare i

inferiori A1 più esterni della A2 registri Adjuster

Glass

Glass

Glass

A2 Adjuster Profile

A1 Adjuster

100

200

9.a

200

200

200

100

9.b

4

a) Screw the two upper A2 adjusters of the glass sheet (in red), until they come into contact with the glass, ORIENTING THE GLASS SHEET MANUALLY, until the plumb is reached;

b) Screw the lower A1 adjusters of the glass sheet (in blue), constantly checking the level of the bubble;

Important: To tighten the lower A1 adjusters, it is advisable to use a torque wrench with a tightening torque set at 6.5 Nm. For a correct functioning of the system, do not tighten THE A1 AND A2 ADJUSTERS excessively. www.faraone.it / Assembly Instructions

lastra (in blu), verificando costantemente il livello della bolla; c) Completati i primi due passaggi, procedere al serraggio dei registri A1 ed A2 intermedi (in verde); d) Nell'eventualità che (durante la fase c) il vetro perdesse il piombo, seguire le istruzioni di montaggio al punto 8 per ripristinare il corretto posizionamento della lastra.

N.B. Per il serraggio dei registri inferiori A1, si consiglia l'uso della chiave dinamometrica con una coppia di serraggio impostata a 6.5Nm. L'ECCESSIVO SERRAGGIO DEI REGISTRI A1 E A2 PUÒ PORTARE ALL'APERTURA DEL PROFILO E, DI CONSEGUENZA, AL MALFUNZIONAMENTO DEI REGISTRI STESSI.

9.c

c) Once the first two steps have been completed, proceed to tighten the intermediate A1 and A2 adjusters (in green); d) In the event that (during phase c) the glass isn’t plumb anymore, follow the operating instructions of the adjusters in points 10 and 11 to restore the correct positioning of the glass sheet.

4


How to mount the NINFA STADIO system

10

Glass alignment with adjusters It’s EASY TO ALIGN the glass with millimeter precision 2°

2° towards the outside

13 mm wrench for A2 adjuster

Ratchet (or Screwdriver) for A1 Adjuster

towards the outside

A2 Adjuster

A1 Adjuster

11

Glass alignment with adjusters It’s EASY TO ALIGN the glass with millimeter precision 2° 13 mm wrench for A2 adjuster

towards the inside

Ratchet (or Screwdriver) for A1 Adjuster

towards the inside

A2 Adjuster

A1 Adjuster

12

Alignment of the glass towards the outside. Check with a bubble level if the glass is plumb and then adjust the slope degree of the glass, using the two rows of upper and lower adjusters. To move the glass sheet outwards, loosen the lower A1 adjusters and tighten the upper A2 adjusters. Until the glass is plumb.

Glass alignment towards the inside. Conversely, to shift the slope of the glass inwards, loosen the upper A2 adjusters and tighten the lower A1 adjusters. Once the ideal slope degree has been found, tighten the adjusters (we recommend the use of a torque wrench, set the tightening torque to 6.5 Nm).

Plumbing and cladding insertion Glass

Glass When tightening the lower adjuster, the tab of the plastic block may break; it is all normal, the glass blocking system remains well functioning.

Cladding to be inserted by snap shut

Cladding inserted

Cladding to be inserted by snap shut Once the glass is plumb and the adjusters are properly tightened, insert the upper and lower snap-fit cladding.

13

Inserting caps

Side cap

Screw the side-covering caps with the supplied screws. Evaluate, depending on the case, whether to carry out this operation after point 5. Finished. Check again if you properly followed the instructions. “Bravo!”

5


ARCHITETTURE TRASPARENTI

ARCHITETTURE TRASPARENTI

How to mount the NINFA STADIO system

APPENDIX A

(valid for all Ninfa models)

GASKET ASSEMBLY DIAGRAM TO PREVENT WATER INFILTRATION BETWEEN GLASS AND GLASS (Valid for all Ninfa profiles)

1st GLASS Reference line

2nd GLASS

6

Push it!

Note: Attach the adhesive gasket to the upper edge of the cladding

1st GLASS

Gaskets included in the supply.

Important: Align the gasket with the reference line. The adhesive gasket that you find in the package is supplied with the suitable height and glass thickness for that type of Ninfa model. Place the adhesive gasket on the glass after having inserted it in the profile, then follow the assembly instructions starting from point 8.

1st GLASS

Ninfa profile

After placing the 1st glass, repeat the same assembly sequences with the next glass, taking care to push the 2nd glass against the gasket until it is compressed by about 1mm.

20 3rd GLASS Seal

20 2nd GLASS

Seal

Seal

Cladding to be inserted by snap shut

www.faraone.it / Assembly Instructions

1st GLASS

Seal at the beginning and at end after Sealing: use only neutral black inserting the silicone. cap Once all the glass has been positioned, seal well between Ninfa profile glass and glass and on the gasket cap before inserting the internal snap-fit cladding.


How to mount the NINFA STADIO system

B

BRACKETS FOR COUPLING CORNERS Assembly without drilling the profile. (Valid for all Ninfa models).

Accessory to be ordered separately.

PROFILE ANGULAR JOINT art. M18-AC-05

2

3

ACCESSORY FOR LINEAR JOINTS BETWEEN THE BARS Assembly without drilling the profile. (Valid for all Ninfa models). 1

2

Accessory to be ordered separately. 3

7 PROFILE LINEAR JOINT art. M18-AC-06

C

LED SYSTEM ASSEMBLY INSTRUCTIONS

Accessory to be ordered separately.

4 3 2 1

LED-holding profiles

Tighten the nuts very well and then place as follows: 1) Aluminium LED-holding profiles in pieces (3 pieces/meter); 2) LED-holding profile in continuous aluminium; 3) LED strip; 4) Snap-fit polycarbonate profile.

5

5 been Once the LED system have installed, follow the assembly instructions continuing from point 5 5.

The glass will lay on the polycarbonate profile of the LED system. Assembly Instructions / www.faraone.it


ARCHITETTURE TRASPARENTI

ARCHITETTURE TRASPARENTI

How to mount the NINFA STADIO system

MANY ADVANTAGES WITH Ninfa stadio Illustrations: example of glass assembly.

ADJUSTMENT AND PLUMBING

3

• No scaffolding or external platforms required. • Glass mounting only from the inside.

4

• Adjustable to plumb the glass by acting only from the inside.

GLASS ASSEMBLY

2

INTERNAL CLADDING ASSEMBLY

• Work in safety.

MAXIMUM ATTENTION TO SAFETY

FALL PROTECTION SYSTEM WITH FASTENING ON A SOLID ANCHORAGE POINT

Note:

Follow the Safety Manager’s instructions on site.

ARCHITETTURE TRASPARENTI

FARAONE SRL ARCHITETTURE TRASPARENTI SEDE via Po 12 - 64018 Tortoreto Lido (TE) T 0861 784200 F 0861 781035 @ faraone@araone.it WEB www.faraone.it

already installed external cladding

FLOOR DRILLING AND FIXING OF THE ALUMINIUM PROFILE

1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.