PORTFOLIO Farid Sulthan Ilhami
S.ars., Ar.2023
Selected Works 2022-2023
FARID SULTHAN ILHAMI
Architectural Portfolio Selected Works 2022-2023
RESUME Curriculum Vitae Farid Sulthan Ilhami 083113494818 | ilhamifarid@gmail.com | Brebes, Jawa Tengah, Indonesia www.linkedin.com/faridilhami Experienced as an Architectural Designer and Supervise project at house-scale-project, experienced to get involved with 3D BIM modelling project, have a good time-management, able to work as a team, interest to learn and developing skills
WORK EXPERIENCES 2021-2023
Tujuh Bhawana Group | Yogyakarta, Indonesia Planner Contribute as Architectural Planner, Meet with Clients, Supervise Project, Communicate with handyman/vendors
Universitas Islam Indonesia | Yogyakarta, Indonesia
2022-2023
Planner Team at PPAR UII Interior Project Planner Team at Mahannani Project Terban (in collab with Pemkot Yogyakarta) Planner Team at Kulon Progo Edutourism Project (in collab with Dinas Pariwisata DIY) Research Assistant “Rekonstruksi Candi Kimpulan Perpustakaan UII” 2021-2023
PT Navara Cipta Desain | Yogyakarta, Indonesia Internship Contribute as Assistant Planner, Drafts editing, 3d Modelling and visualize
Smol Studio
| WFH, Indonesia
2021-2023
Freelance Contribute to Designing from Brief-Schematic-Final Product, 3D Modelling and Visualize
EDUCATION Universitas Islam Indonesia | Yogyakarta, Indonesia PPAr Profession Degree
|
GPA 3.91/4.00
Sept 2022-Dec 2023
|
GPA 3.71/4.00
Aug 2018-July 2022
Universitas Islam Indonesia Bachelor Degree
ORGANIZATION EXPERIENCES Temu Karya Ilmiah Mahasiswa Arsitektur Indonesia 2019 Consume Team Contribute to Management Consumption, Communication with vendors, food scheduling, and provide food to attendances
Supersemarch Arsitektur UII 2019 Event Organize Team Contribute to manage and controlling Talkshow event, Sayembara Competition (Impossible architecture) and Architectural Exhibition (at Taman Budaya Yogyakarta)
HARDSKILLS & ACHIEVEMENT BIM Archicad 4 yrs exp | Use for Architectural Works, Drafting BIM Revit
3 yrs exp | Use for Architectural Works, Drafting
Sketchup
3 yrs exp | Simple Modelling, Interior Works, Finishing Modelling from Archicad for Render
Illustrator
4 yrs exp | Use for 2D Presentation, making APREB, Graphical Layout and produce book
Enscape
3 yrs exp | Use for Architectural Render
ACHIEVEMENT 8th Place at Texture National Competition 2023 Category Co Working Space Sayembara
CONTENT Architectural Portfolio
KANOMAN TRADITIONAL MARKET REDESIGN PROJECT Academic Project
RUMAH SAKIT ALMA ATA | YOGYAKARTA Academic Project
KIDSLOOP COWORKING SPACE | YOGYAKARTA Sayembara Entry
KOES MIX-USED BUILDING Professional Project
KOES MIX-USED BUILDING Professional Project
STUDIO PPAR UII REDESIGN Professional Project
REDESAIN PASAR KANOMAN | CIREBON Kanoman Market is the main market in Cirebon which accommo-
The issue that occurs is the lack of lighting and ventilation which
dates at least 1800 trading units. This redesign changes
makes the kanoman market less comfortable for its users. The
Kanoman Market, which has been established and active since
idea proposed as a solution in the redesign of the Kanoman
1890, into a building that is sustainable and relevant for today.
market is to adapt biophilic studies into a healthy market in the context of ventilation and lighting.
Site location at Jl. Kanoman Lemahwungkuk Kota Cirebon, Jawa Barat
17300sqm Area Site
Keraton Kanoman neighborhood at
Main Acess to Keraton kanoman
Commercial Zone surrounding
southern site
is between Kanoman Market area
the site
Existing building contains 2 mass that divided by main acess to Keraton Kanoman
Mass modified by cut their front side for green area and parking zone
Mass transformed into curved to embrace the dialogue between main acess and building
Relocate new commercial trading zone by designing 3 level building mass
Main Acess sterilized from traditional trader that crowd around
Final Mass form of Pasar Kanoman
3
3
4
3
3 3
3 3
3
3
3
4
3
4
3
3 3 3
3
3
4
3
3
1. Parking Area 2. Lemprakan Trading Zone 3. Los Trading Zone 4. Kios Trading Zone 5. Service Zone 6. Landscape
4
3
3 3
3
3
4
4
3
4 3 3 3
3
3
3 4
3
5
4
3
6 2
2
5
3 3
3
4
4
4
2
4 6 3
2 3
1
5
Axonometric Diagram
3
5
3
Lemprakan is the smallest rental unit in Kanoman Market
Los is a unit that has a 150x200 module, this unit is facilitated
because it only measures 150x150, this unit is maintained because
with a table as a medium for placing merchandise
it is one of the traditional elements and the rental costs are affordable for small-scale traders
The kiosk is the largest unit in the Kanoman Market, in terms of modules it uses variations of 200x300 and 300x300. This module is facilitated by a solid space but is still ventilated so that light and ventilation can penetrate the room
Kanoman Market uses concrete construction elements combined with architectural elements made from exposed brick to give an authentic and traditional impression
The Kanoman Market design has a circulation configuration so that users are not crowded together
The Kanoman Market design is configured so that users can "dialogue" with nature, feel light and ventilation, which is represented by vegetation and voids.
Sirkulasi Menuju Keraton
RUMAH SAKIT ALMA ATA | YOGYAKARTA Alma Ata Hospital is a type C hospital with a capacity of 117 inpatients and 18 outpatient polyclinics. Planning for Alma Ata Hospital is located in Kasihan, Yogyakarta
The planning for Alma Ata Hospital is an answer to public demand regarding health services for modern society. Health service-based buildings have now been greatly helped by technology. Good infrastructure, services and building maintenance. Some buildings are starting to be seen as prioritizing symbols of 'Quality Assurance', can be adapted from time to time, are flexible in use, easy to care for and maintain, are accessible in location, and speak for meeting ecological demands. They also offer customers an accessible and eco-friendly environment.
Jl. Tamantirto, Kecamatan Kasihan, Kabupaten Bantul, with +/- 11.100 sqm area
The concept being proposed is Healing architecture, which is a
The implementation carried out is the use of natural light, views for
concept that involves architecture in the user's healing process.
users, and vegetation elements as natural natural elements that
Architecture plays a supporting role in the healing process of the
allow users to touch, feel and visit them.
patient's psychological and physical aspects.
Eksisting Condition with nothing above
Massing configuration to comply with existing regulations
The mass responds to the shape of the site which extends perpendicular to the orientation of the sun
darurat reguler
The slim mass shape extends in response to the climate and maximizes daylight and incorporates cross ventilation.
Circulation is divided into 2, emergency and regular circulation, making it easier when a patient needs first aid
Final form of building that accommodates user needs and meets regulations
24
Office Zone
20 21
Surgery Inpatient
24
22 23
21 22
23
19
18
16 17 18 19
ICU Perinatology
9 11
Polyclinic
12 13 14 15
15 9 11
12 14 13
10
5 9
4
VIP Inpatient
20
17
16
Isolation Inpatient Internal Disease Inpatient
11
6
Birthing Room Mother and Child Inpatient
Commercial Zone Meeting Room Medic Rehabilitation Central Surgery Unit CSSD
4
Emergency Departments
5 6 7 8 9 10 11
Radiology Lobby Pharmacys Laboratorium Polyclinic Laundry dan Nutrition Departement Commercial
1 2 3
Parking Area Interment of the Body Service
8 7
1 2
3
1
Emergency Track
2
General Track
3
Emergency Unit Drop Off
7
4 5
3
6
1
4
Patient Drop Off (non-emergency)
5
Ambulance Park Zone
6
Doctors Park Zone
7
Patient/Visitor Park Zone
2
Visitor Accessibility is divided into emergency and non-emergency. This is to make it easier if there is a patient who immediately needs first aid from the emergency room unit
Zona 1
Zona 4
Zona 2
Zona 3
To provide a fresh taste for patients and visitors. This design has several green areas that are used as landscapes. for this reason, the landscape area is divided into 4 zones
Zona 1 Landscape Zones 1 and 2 are landscapes that have the essence of hosting guests, the differences between them are zone 1 has a function just for walking around, not as a seating zone that can be seat for a long time because it is flanked by 2 vehicle lanes.
Zona 2 Zone 2 is specifically for areas that can accommodate visitors to spend a long time because it has a seating area and is more audio comfortable. The pavement used uses a combination of solid paving materials and paving which has holes for rainwater absorption
Zona 3
Zona 4
Zone 3 is the parking zone, the vegetation planted is shady vegetation to help block direct rays for users who want to access the parking zone
Zone 4 is the connecting zone between the main parking lot and the parking space, this zone is a focal point for visitors and inpatients, so it can calm users psychologically because of the natural elements
West Elevation ( facade)
East Elevation
South Elevation
North Elevation
Section A
Tampak Belakang | Timur
Section B
The West Facade uses Aluminium Composite Panel as an envelope that blocks heat to the building
The South and North facades use precast shading material as building accents and also as functional elements to block direct sunlight
Shading is integrated with practical beams which will later be connected to the main structure
Tampak Depan | Barat
Tampak Belakang | Timur
Tampak Selatan | Utara
KIDSLOOP COWORKING SPACE YOGYAKARTA Starting from the Working from Anywhere phenomenon which
Kidult takes the words from KID and ADULT. The concept of this
backfired on workers due to the emergence of uncertain working
design combines these two elements into a rhythm and working
hours and professional demands, many people then felt stressed
concept. Coworking spaces still provide the needs for working
(burnout). This is exacerbated by monotonous workplace
comfortably with a playground to warm up the atmosphere.
conditions.
Games/games become camouflage in the work process.
Kidsloop's coworking space design uses the work-life-play theme as a solution to workers' problems today. The kidult concept was adopted to reduce work pressure. This design tries to prove that work and productivity do not have to exist in conventional balloons. Adults can continue to work and be productive and play like children
MUJA MUJU AREA, UMBULHARJO YOGYAKARTA CITY, DIY
Yogyakarta City Mayor Office
Kenari Street Ipda Tut Harsono Street
Site
The Muja-Muju area, Umbulharjo is a strategic area. This is proven by the many contexts of commercial areas around Site. Site located at "hook" around the Yogyakarta Mayor's Office which has potential commercial areas
1
The design tries to respond to the context of the site which is the
The main facade is located in a hook area in the form of a circular
meeting point of four axes. The mass extends north-south in response to the climate and circulation around the site. The mass is divided into two areas with different themes (work and play).
design to accommodate flexible activities from the play theme raised in the concept and to become an acoustic barrier from surrounding street noise. The second mass is a functional mass to maximize open space and thicken the circular mass.
Addition of a void area to maximize passive ventilation and maintain clean air circulation around the workplace. This area is also intended to incorporate the outdoor into an indoor area with various functions that can be accommodated. In the square mass area there is a barrier which is transformed into stairs to form a space between the landscape and the parking area.
Adaptation of roofs and facades to the surrounding area. The roof adapts the Jogja regionalism concept with a circular roof and continues with a straight roof. The facade uses arch elements and curves in harmony with the shape of the building.
Broadly speaking, zoning is divided into Kidult and Formal areas. The formal area is in the mass of the building itself with more conventional/formal functions, namely meeting rooms and multi-purpose rooms. These rooms are intended for large to small scale group/community activities. The kidult area is in a concentric building with freer and more colorful functions
The building is filled with games camouflaged into the building, circulation and furniture. This game is available in physical form as well as a brain game which is expected to refresh the mind. The service area is placed in the north of the building close to the parking area for ease of mobility and zoning.
11
11
11 10
1 2 3 4 5 6 7 8 9 10 11
5
10
9
1 8
5
8
4
6 5 3
7 2
7
Parking Drop Off Cashier Pantry Toilet Musala Co-Cafe Productive Space Working Capsule Coworking Space Meeting Area
Solar Tuff
Galvalum Pasir Pipa Hollow Kayu Ulin Dak Beton
Kolom Beton
Ceramic Tile Finishing
Kidsloop provides an entertainment experience by facilitating a play zone for visitors when they are stressed by the work they are going through
Polikarbonat Transparan
Struktur Baja Hollow
Balok Beton
Pasangan Bata
KOES MIXUSED BUILDING | YOGYAKARTA Located among the shophouses on Jalan Bantul, Koes House has a
Located in Yogyakarta, the owner wants this house to have a
distinctive appearance so that it is easy for visitors to recognize.
modern, catchy accent, but still look minimalist and simple.
This shophouse is expected to become a space that can accommo-
Material selection in the planning process uses materials available
date commercial activities, dental clinics, and also residential
in the surrounding area so that it is not difficult when implement-
space. The owner wants this area to be a halfway house where you
ing it in the construction process
can rest and also be a place to be creative
11
6
5
1 2 3 4 5 6 7 8 9
7 7 9 11
8 6
10
4 4
11
2 1
3
5
Parking Commercial Area Administration Diagnose Room Pantry Toilet Bedroom Living Room Prayer Room
10 Painting Studio 11
Void
The site has an elongated shape and is squeezed by the surround-
The owner has a hobby of painting and wants a special room.
ing existing buildings. The idea of this planning is to present
For this reason, this plan has an integrated studio room with
natural light as a natural element covered by skylights. This zone is
facade windows whose direct light is blocked by a brick facade
placed with an administrative waiting area so that users, especially patients, can wait in dialogue with nature
INTERIOR PPAR UII | YOGYAKARTA This project is a collaborative project between UII (Universitas
The scope of work for this Interior Project is to not change existing
Islam Indonesia) Architecture Lecturer Representatives and UII
walls and permanent openings, so there are challenges in prepar-
PPAR (Architect Profession Program) Student Representatives.
ing the layout and placement of interior elements.
This project is the dream of every room user to make the Interior of the UII PPAR Study Program into a comfortable zone for all user
The interior of the room includes 3 zones, namely 1. Integrated Studio Zone (3 Studios and 1 Administration) 2. Discussion Zone/Room 3. Lecturer Zone/Room
Existing Integrated Studio Zone
5
3 2 1 4 1 2 3 4 5
Admin Session Room PPAR Studio 1 Studio 2 Storage Room
Existing Lecturer’s Room
2 1
1 2
Existing Discussion Room
PPAR’s Secretariat Lecturers Room
Integrated Studio Zone Plan
2
4
3 1
1 2 3 4 5
5
3 2 1 4 The Studio room was transformed with a modular furniture approach so it is very possible that relayouting will be carried out if there are other needs. Apart from that, the admin zone is designed with a warm impression because it is a contact zone and also a welcoming zone
Administration & Secretariat Session Room PPAR Studio 1 Studio 2 Storage Room
2
1
1 2 3
Lecturer’s room Productive Space Guest Seat
3
The configuration of the Lecturer's Room has not been completely changed. The lecturer's room, which is relatively small, uses transparent partitions to maintain a wide appearance and visibility function. The negative space is used as a leisure area and also as furniture that functions as storage
The existing floor plan, which is not symmetrical, is a challenge in planning the layout of the discussion room. The irregular shape of the table is an expression for embedding asymmetrical elements, but the negative area created is used as a storage area and also a leisure area.
1
2
1 2
Discussion Zone Storage & Leisure Area
Session Room
Terima Kasih!