ARCHITECTURAL PORTFOLIO FHSUWAIDI96@GMAIL.COM +971509550509
FATIMA ALSUWAIDI
SELECTED WORKS 2014-2019
SHORT BIO.
INTERNSHIP EXPERIENCE 2019 2019 2018
Solar Decathlon Middle East 2020 - Team Leader
University of Sharjah Architectural Engineer Solar Decathlon Middle East 2018 - Intrumentation Contact
2018
MINISTRY OF INFRASTRUCTURAL DEVELOPMENT
2017
EMIRATES NATURE - WWF YES TO WORK PROGRAM-ACTVET Abu Dhabi
7th Undergraduate Research Award
DIGITAL SKILLS AutoCAD Revit SketchUp
VOLUNTEERING EXPERIENCE 2020
SOLAR DECATHLON 2018
Fiverr (online)
2018
2012 Fatima AlSuwaidi, born in 1996, an art and architecture enthusiast. Graduated in Spring 2019 with Bachelors in Architectural Engineering from University of Sharjah, Currently studying Masters in Conservation Management of Cultural Heritage Management of Heritage Sites.. Her Architectural interests lay mostly in research in architectural history and heritage, smart building energy and sustainable architecture.
AFFILIATIONS
BIDAYA ART EXHIBITION 2, DUBAI
2017
ART DUBAI
2016
BIDAYA ART EXHIBITION 1, DUBAI DUBAI DESIGN WEEK
2014 THINK SCIENCE COMPETITION Takatof, Dubai
Adobe Photoshop
Adobe inDesign
Microsoft Office
Best Middle Eastren Team TEAM KNOWHOWSE MEMBER UNIVERSITY OF SHARJAH
First Prize Winner of the Architecture and Urban Planning Category at GCC level organized by Abu Dhabi University with the patronage of the UAE Ministry of Education
TABLE OF CONTENTS
PEROJECT COURSE YEAR
PAGE
Linear Design Basic Design Fall 2015 4 School Design Design IV Fall 2016 5 Sharjah Sports City Urban Design Design V Spring 2017 8 Rehabilitate Shis: a Program to Revitalize the UAE community
Senior Design
Spring/Fall 2018-2019
10
Villa Design Competition
EngTips
2019
14
LINEAR DESIGN BASIC DESIGN / Fall 2015 The aim of this little project was exprimenting the linear movement within a space, we were requested to design an art museum. It was precieved in such a way to expriment the different shades and shadows within the space, sun rays and light reflections, Different roofing layers allowed more openings to the space to reduce heat but allow light. Working with triangles was an expriment of structural balance and stability.
4
The approach of the design came from the aim of creating a transparent community of students and teachers that are separated but still feel connected. The building is a one mass in an L-shape where one strip is for Art and one strip is for the Sciene sector, In the middle is a triple agent that created the main circulation point of the building, is the main structural element of the building as well as the one the main source of ventilation. Great considerations of methods of sustainbility has been considrered like the use of cross ventilation carrying cold air from the small pond into the outdoor students cafeteria, the use of building materials that reduce the energy efficiency within the building as well as social sustainability through creating spaces that can be used by the communtiy during non working hours.
DESIGN STRATEGIES
Group Members: Walaa Mutasim - Luna Bassam
CONCEPT DEVELOPMENT
SCHOOL DESIGN DESIGN IV / Fall 2016
5
6
7
SHARJAH SPORTS CITY URBAN DESIGN DESIGN V / Spring 2017 Group Members: Walaa Mutasim - Luna Bassam Balsam Munadhil
The main vehicle access to the city passes under a big pedesterian bridge that connects the four quarters of the site, the bridge in which is the main node will be used for daily perdesterian movement as well as crowd management in days of olympics, and as shading to an open market.
MASTER PLAN
A chellenging site of 4 million sqm has been designed from the concept of creating a healthy communtiy and an environment that supports an active lifestyle for it’s residents and visitors. Planning a smart sports city that promotes sports with connectivity and offers people a smart way of living, moving and competing internationally.
LEGEND: 1. Local Mosque 2. Wellness Park and Resort 3. Residential Community 4. Office Buildings 5. Main Headquarters 6. Shopping Mall 7. Media Center 8. Sports Hospital & Rehabitational Center 9. Gym for Public 10. Gym for Professional Training 11. Tennis Stadium 12. Cricket Stadium 13. Baseball Stadium 14. Aquatics Center 15. Rugby Union 16. American Football 17. Basketball & Wheelchair Basketball 18. Martial Arts 19. Ice Rink skating & Hockey 20. Gymnastics and Squash 21. Football Stadium 22. Golf Club 23. Apartment Buildings 24.Transportation Hub 25. Youth Academy & kids play area 26. Hospital 27.Handball, Goalball, Futsal, Volleyball & Boccia
8
URBAN LAYERS
CLSTER VIEW
ACCESSIBILITY LAYERS
9
CLUSTER SECTION
CLUSTER SITE PLAN
PROJECT PROGRAM
HYDROGRAPHY
GREENERY
1st Place Winner of the 7th Undergraduate Research Award at GCC level organized by Abu Dhabi University with the patronage of the UAE Ministry of Education
OROGRAPHY
Group Members: Walaa Mutasim - Luna Bassam
SITE ANALYSIS
LOCATION
REHABILITATE SHIS: A PROGRAM TO REVITALIZE UAE COMMUNITY THROUGH ECO-CULTURAL TOURISM SENIOR DESIGN / 20182019
44 universities, 261 projects, 3 rounds of assessment
This research moves within the workframe of Sharjah tourism vision 2021, and particularly tackles the valorization of the local cultural heritage through the UAE Emiratization initiative. The mountainous area of Khorfakkan (Sharjah) is characterized by several villages among them; Shis emerges as one of the most interesting realities. The local community consists of 15 families that resided up the hill, living of small agriculture. In the past, the urban environment within Shis enabled strong cultural interaction and the placement of the now abandoned houses promoted community gathering.
10
SIGNIFIC
MASS &
CIRCULA
BOUNDA
MASTER PLAN 1:200
The long-term objective of this research is to make Shis a pilot project for the revitalization of the local heritage into a destination that combines eco- and cultural- tourism. By questioning and framing the value of the village, the study deduced that Shis’s intrinsic value resides in the integrity of its community, beyond the mere existence of its buildings or its urban fabric. Shis’s community needs to be preserved and developed as a diffused hotel and developed with new construction: extra accommodations/rooms and service for tourists.
11
SCALE: 1:50
1:50
Village entrance Qomra.
STRUCTURE
Bending Moment Diagram
Deflection Diagram
Shear Diagram
3D Rendering
CONSTRUCTION SECTION 1-1 1:20
The construction process of the add-on cabins fosters sustainable, light-weight and reversible structures that interfere minimally with the built and natural heritage, the design of the urban and architecture will highlight the new from the old creating a harmonic relationship between heritage and innovation which will be promoted by a combination of traditional low-tech and innovative high-tech features and techniques to support heritage customs, engaging visitors and promoting the revitalization of Shis by new generation of Emiratis.
EXPLODED VIEW OF QOMRA
12
within the land boundary using areesh roofing, later on with the introduction of concrete blocks an inner box was introduced with higher roof top,
BAIT SHIS Pilot of the rehabilitation process, works as a welcoming hub to the village and front of the diffused hotel.
now following the trend of construction development, an another thin, light and reversible inner box that mandatory to be introduced to main-
Following the trend of the construction development in the UAE, another thin, light and reversible inner box was mandatory to be introduced into the rehabilitated houses to maintain them and make them efficient, adding extension to the height of the house to provide BAIT SHIS SECTION 1-1 SCALE 1:50 natural light and to naturally ventilate BAIT SHIS SECTION 1-1 SCALE 1:50 the rooms. RESTITUITION PLAN
Job No
Sheet No
BAIT SHIS PLAN
tain the houses and make them efficient, adding extension to the height of the house to provide natural light and naturally ventilate the rooms.
RESTITUITION PLAN
UP
BAIT SHIS PLAN
Job No
Sheet No
Rev
Rev
1
1
Part
Software licensed to
Part
Job Title
Ref
Ref By
File
Date18-Apr-19
Date/Time
BS str.std
By
Chd
Job No
Sheet No
Sheet No
Job Title
Ref
Client
File
Part Job Title
Software licensed to
Job Title
File
Client
COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
Date18-Apr-19
Date/Time
Sheet No Job No
Part
Y X Z
Date18-Apr-19
BS str.std
Date18-Apr-19
BAIT SHIS SECTION 1-1 SCALE 1:50
Chd
Chd
Date/Time
Y
Date/Time
01-May-2019 09:58
01-May-2019 09:58
Load 4 : Shear Z : Shear Y
UP
STRUCTURE
BAIT SHIS SECTION 1-1 SCALE 1:50
BAIT SHIS SECTION 1-1 SCALE 1:50
Software licensed to
Sheet No
Chd
Date/Time
Date/Time
Date18-Apr-19
File
BS str.std
Y
01-May-2019 09:58
BAIT SHIS PLAN
Chd
Chd
Date/Time
01-May-2019 09:58
X Z
Load 4 : Shear Z : Shear Y
01-May-2019 09:58
Whole Structure Fz 150kN:1m Fy 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
Rev
Date18-Apr-19
Chd
Date/Time
BS str.std
Job No
Sheet No
Rev
2
01-May-2019 09:58
Ref By
By Client
File
Date18-Apr-19
BS str.std
Chd
Date/Time
Date18-Apr-19
Y File
XBS str.std Z
01-May-2019 09:58
Y
Date/Time
Load 4 : Shear Z : Shear Y
Y X Z
RESTITUITION PLAN Print Time/Date: 01/05/2019 10:02
Y Load 4 : Shear Z : Shear YX
Z
Shear Diagram
CONSTRUCTION SECTION 1-1 1:20
Deflection Diagram
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Load 4 : Bending Z : Bending Y
Job No
RESTITUITION PLAN 3D Rendering BAIT SHIS SECTION 1-1 SCALE Job 1:50 No Sheet No
Software licensed to
Software licensed to Job Title
Job Title
Sheet No
2
Load 4 : Displacement
Sheet No
BAIT SHIS PLAN
Rev
Print Run 1 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Date18-Apr-19
01-May-2019 09:58
Rev
1
Part
tain the houses and make them efficient, adding extension to the height of the house to provide natural ligh Job Title
Ref
Ref
By
By Client
File
Rev
1
STRUCTURE
1
Date18-Apr-19
Chd
Date/Time
BS str.std
Y
File
Date18-Apr-19
Chd
Date/Time Print Time/Date: 01/05/2019 10:0209:58 01-May-2019 Y X Z
BS str.std
01-May-2019 09:58
X Z
Print Run 2 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Load 4 : Shear Z : Shear Y
Load 4 : Bending Z : Bending Y
Part
Part
3D Rendered View
Ref
Ref
By
By
Client
Whole Structure My 300kip-in:1m Mz 300kip-in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
Client
Date18-Apr-19 File
File
Date18-Apr-19
Chd BS str.std
Date/Time
BS str.std
Print Time/Date: 01/05/2019 10:02
Chd
Date/Time
Job No
Print Run 2 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
R
2
Job Title
Ref
Software licensed to Load 4 : Bending Z : Bending Y
Part
By
Job Title
Client
Job No
Part
Software licensed to
Y X Z
Sheet No
Whole Structure Fz 150kN:1m Fy 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
Whole Structure My 300kip-in:1m Mz 300kip-in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
01-May-2019 09:58
01-May-2019 09:58
File
Date18-Apr-19
BS str.std
3D Rendered View
Chd
Ref 01-May-20
Date/Time
By Print Time/Date: 01/05/2019 10:02 Print Run 1 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Chd
Date/Time
BS str.std
BAIT SHIS PLAN
Software licensed to
Part Job Title
Software licensed to
Print Run 1 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
By
File
3D Rendering
SHIS SECTION 1-1 now following the BAIT trend of construction development, an another thin, light and reversible inner box that m SCALE 1:50 Job No
Load 4 : Displacement
Rev Print Run 2 of 2 Client Job No Sheet No 3D Rendered View Whole Structure Displacements 30in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
Print Time/Date: 01/05/2019 10:02
Print Time/Date: 01/05/2019 10:02
Ref
Load 4 : Displacement
Client
Deflection Diagram
3D Rendered View
Load 4 : Bending Z : Bending Y
3D Rendered View
Shear Diagram
within the land boundary using areesh roofing, later on with the introduction of concrete blocks an inner box CONSTRUCTION SECTION 1-1 1:20
UP
X Z
Job Title
Load 4 : Shear Z : Shear Y
Load 4 : Bending Z : Bending Y
Whole Structure Displacements 30in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) Whole Structure Fz 150kN:1m Fy 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) 150kN:1m 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) Whole Structure My 300kip-in:1m Mz 300kip-in:1m 4 COMBINATION LOAD CASE Whole 4 (InputStructure data wasFzmodified afterFypicture taken)
Y
STATE OF ART Bending Moment Diagram
X Z
Bending Moment Diagram
3D Rendering
X Z
X Z
Y
01-May-2019 09:58
X Z
Part
Software licensed to
Y
Chd
3D Rendered View
Y
Print Time/Date: 01/05/2019 10:02
Date18-Apr-19
BS str.std
Sheet No
By File
Part
Ref
STRUCTURE Deflection Diagram
X Z
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Date18-Apr-19
BS str.std
Rev
1
Rev
2 Client
Whole Structure Displacements 30in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) 150kN:1m 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) Whole Structure My 300kip-in:1m Mz 300kip-in:1m 4 COMBINATION LOAD CASE Whole 4 (InputStructure data wasFzmodified afterFypicture taken)
Print Time/Date: 01/05/2019 10:02
By
By Client
development in shis started with the tent (khaima) and stone fencing wall marking the integrity BAIT SHIS Pilot of the rehabilitation process, worksTheasdesign a welcoming hub to the village and front of the diffused hotel. Job Title
Y
UP
By
Rev
1 Ref
Ref
File
01-May-2019 09:58
Part
Rev
File
Sheet No
Chd
Date/Time
Ref Job No
Sheet No
Software licensed to
Part Job Title
Client Load 4 : Displacement Whole Structure Displacements 30in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) Load 4 : Shear Z : Shear Y
Print Run 1 of 2
Date18-Apr-19
BS str.std
Part
Job Title
Job No
Load 4 : Displacement
Whole Structure Displacements 30in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) 150kN:1m 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) p-in:1m 4 COMBINATION LOAD CASE Whole 4 (InputStructure data wasFzmodified afterFypicture taken)
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
File
1
Y
X Z
Job No
Software licensed to
X Z
Load 4 : Bending Z : Bending Y
Sheet No
2
RESTITUITION PLAN
Job Title
Whole Structure Fz 150kN:1m Fy 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
Y
X Z
Ref
Client
Rev
Ref Job No
Client
Part Whole Structure DisplacementsSoftware 30in:1m licensed4toCOMBINATION LOAD CASE 4 (Input data was modified after picture taken)
X Z
Client
Y
Job Title
2 Software licensed to
Part Job Title
Software licensed to
Job Title
By File
BS str.std
Job No Sheet No
Load 4 : Displacement
Ref
By File
BAIT SHIS SECTION 1-1 SCALE 1:50
Job No
Rev
11
Rev
2
01-May-2019 09:58
Part
Ref
Chd
Preliminary design principles promises full integration to MEP and reconstruction technologies as dealing with Bending Moment the Diagramheritage context Shearhas Diagramhigher level of sensitivity. development of the CONSTRUCTION SECTION 1-1The 1:20 project proposal, is the theme of energy efficiency and environmental protection, as passive energy requalification measures, relating to the insulation of building structures through the use of high performance insulation materials is already issued. Implimenting energy efficiency system to the holistic system of environmental compatibility to facilitate the buildings and contribute to pearl rating system(Estidama).
Sheet No
Part
Chd
Date/Time
Rev
Sheet No
01-May-2019 09:58
STRUCTURE
Job No
01-May-2019 09:58
BAIT SHIS PLAN
Job No
Job Title
BS str.std
Date18-Apr-19
BS str.std
RESTITUITION PLAN Rev
Ref
By Client
Client
Chd
Date/Time
By
Software licensed to
Software licensed to
Date18-Apr-19
BS str.std
Software licensed to
By
2
Load 4 : Displacement
File
Part
Software licensed to
UP
Job No
Rev
Client
2
01-May-2019 09:58
Print Time/Date: 01/05/2019 10:02
Whole Structure My 300kip-in:1m Mz 300kip-in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
Print Run 2 of 2
Print Run 1 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Client
Print Run 2 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
File
BS str
Y X Z
X Z
Print Time/Date: 01/05/2019 10:02 Print Time/Date: 01/05/2019 10:02
X Z
Y
Y
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Load 4 : Displacement Load 4 : Shear Z : Shear Y
Load 4 : Bending Z : Bending Y
Bending Moment Diagram
ShearBAIT Diagram SHIS SECTION 1-1 SCALE 1:50
Print Run 1 of 2
X Z
CONSTRUCTION SECTION 1-1 1:20 BAIT SHIS SECTION 1-1
BAIT SHIS CONSTRUCTION SECTION AB SCALE 1:50
Rev
1
3D Rendered View
BAIT SHIS SECTION 1-1 1 SCALE 1:50 in shis started with 2 The design development the tent (khaima) and stone fencing wall marking the integrity of la EXPLODED VIEW OF BAIT SHIS BAIT SHIS CONSTRUCTION SECTION AB Ref
Ref
By Client
Job No
Client
File
Whole Structure Displacements 30in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
By
Sheet No BS str.std
Date18-Apr-19
Chd
Date/Time
Rev 01-May-2019 09:58
File
Job No BS str.std
Date18-Apr-19
Chd
Sheet No
Y
Date/Time
Rev
01-May-2019 09:58
X Z
Load 4 : Shear Z : Shear Y
SCALE 1:50 BAIT SHIS SECTION 1-1 STRUCTURE 18-Apr-19 BAIT SHIS CONSTRUCTION SECTION AB 18-Apr-19 SCALE 1:50 BS str.std 01-May-2019 09:58blocks an inner box was i within the land boundary using areesh roofing, later on with the introduction of concrete SCALE 1:50 Load 4 : Displacement
Print Time/Date: 01/05/2019 10:02
EXPLODED VIEW OF BAIT SHIS
Sheet No
Part
Software licensed to
Part Job Title
Job Title
SCALE 1:50
Y
EXPLODED VIEW OF BAIT SHIS
3D Rendering Job No
2
Load 4 : Displacement
Software licensed to
X Z
Deflection Diagram
Whole Structure Displacements 30in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) Print Run 2 of 2 Job No Sheet No Rev Y 150kN:1m 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) Whole Structure My 300kip-in:1m Mz 300kip-in:1m 4 COMBINATION LOAD CASE Whole 4 (InputStructure data wasFzmodified afterFypicture taken)
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Print Run 1 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Software licensed to
Part
Software licensed to
Part Job Title
Job Title
Ref
Ref
By
By Client
Client
File
Whole Structure Displacements 30in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
STRUCTURE
Date
Chd
Date/Time
BS str.std
File
01-May-2019 09:58
Date
Chd
Whole Structure Fz 150kN:1m Fy 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) Date/Time Y
X Z
Print Time/Date: 01/05/2019 10:02
Print Run 2 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Y
now following the trend of construction development, an another thin, light and reversible inner box that manda X Z
Load 4 : Bending Z : Bending Y
3D Rendered View
tain the houses and make them efficient, adding extension to the height of the house to provide natural light and X Z
X Z
Whole Structure Fz 150kN:1m Fy 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data wa
Whole StructureYMy 300kip-in:1m Mz 300kip-in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) X
Y
Y
Z
Bending Moment Diagram
Load 4 : Displacement
Load 4 : Shear Z : Shear Y
Load 4 : Bending Z : Bending Y
Shear Diagram
3D Rendering
Deflection Diagram
Whole Structure Displacements 30in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) 150kN:1m 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) Whole Structure My 300kip-in:1m Mz 300kip-in:1m 4 COMBINATION LOAD CASE Whole 4 (InputStructure data wasFzmodified afterFypicture taken)
CONSTRUCTION SECTION 1-1 1:20 Print Time/Date: 01/05/2019 10:02
Print Time/Date: 01/05/2019 10:02
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20 Print Run 2 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Print Run 1 of 2
3D Rendered View
Y X Z
Y
Y
X Z
X Z Print Time/Date: 01/05/2019 10:02
Bending Moment Diagram BAIT SHIS CONSTRUCTION SECTION A SCALE 1:50
BAIT SHIS CONSTRUCTION SECTION A SECTION B SCALE 1:50
Load 4 : Displacement Load 4 : Shear Z : Shear Y
Load 4 : Bending Z : Bending Y Print Run 1 of 2
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Shear Diagram
3D Rendering
Deflection Diagram
Whole Structure Displacements 30in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) Print Time/Date: 01/05/2019 10:02 SHIS CONSTRUCTION SECTION C Fypicture Whole Structure 150kN:1m 150kN:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken) Whole Structure My 300kip-in:1m Mz 300kip-in:1m 4 COMBINATION LOAD BAIT CASE 4 (Input data wasFzmodified after taken)
BAIT SHIS CONSTRUCTION SECTION C SCALE 1:50
SECTION A
BAIT SHIS CONSTRUCTION SECTION A CONSTRUCTION SECTION 1-1 1:20 SCALE 1:50 SCALE 1:50
3D Rendered View EXPLODED VIEW OF BAIT SHIS
Y X Z
SECTION C BAIT SHIS CONSTRUCTION SECTION C 3D Rendered View SCALE 1:50 Load 4 : Bending Z : Bending Y
BAIT SHIS CONSTRUCTION SECTION AB SCALE 1:50
Whole Structure My 300kip-in:1m Mz 300kip-in:1m 4 COMBINATION LOAD CASE 4 (Input data was modified after picture taken)
Print Time/Date: 01/05/2019 10:02
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
Print Run 1 of 2
13
STAAD.Pro V8i (SELECTseries 3) 20.07.08.20
P
Villa Design Competition - 2019 Project Member: Hessa Al Khaja
Separation between public, private/family and services spaces.
Main spaces facing NORTH.
Customized wooden shading device
14
13.15 0.7
1.00
1.70
1.60
2.00
1.30
2.00
2.85
A 1.10
0.40
4.50
1.00
0.45 0.90
2.30
0.50 1.00
1.10
4.70
0.50
0.90
1.00
Living Area 35 m²
+0.45
1.10
WC 6.00 m²
1.80
1.80
1.67
1.35 1.70
2.60
2.60
UP
3.80
Laundry 10 m²
1.70 1.80
0.50
Bathroom 4.20 m²
0.75 19.40
0.30
+0.60
7.45
1.20 0.90
1.55
0.75
2.00 5.25
3.60
2.65
+0.15
3.20
Maid Room 11.50 m²
Majlis 6.10
DN
Electrical Room 3.77 m²
1.00
32 m²
1.45
2.00
+0.45
2.60
0.70
19.25
DN
1.25
1.40 5.80 5.75
4.60
Transitional Space 7.30 m²
2.20
Store 10.00 m² 5.10
3.65
Dining Room 26.70 m²
4.60
2.00
2.00
4.60
WC 7.00 m² 2.30 2.30
Kitchen 26.45 m²
0.90
1.20
2.25 1.40
0.90 0.80
A
1.00
4.00
4.00
4.60
1.10
0.90
2.90
18.50
GROUND FLOOR PLAN
FIRST FLOOR PLAN
15
OUTDOOR VIEW
SECTION A-A
INDOOR VIEW
16
2020 Fatima AlSuwaidi. All Rights Resereved,